RYBED - Time-phased planning with requirements (MRP)
SAP data element RYBED has the title "Time-phased planning with requirements (MRP)".
It is part of development package MD03 in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Application Devt ERP MPS/Deterministic Requirements Planning".
It is part of development package MD03 in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Application Devt ERP MPS/Deterministic Requirements Planning".
Properties of data element RYBED
Property | |
|---|---|
| Domain | XFELD |
| Data Type | CHAR |
| Length | 1 |
| Decimals | 0 |
| Output Length | 1 |
| Supports lower case | No |
| Conversion Routine | |
| Short Description | TPl.w.reqs |
| Medium Description | Tm-phased w.reqs |
| Long Description | Time-phased w. reqs |
Tables with fields of type RYBED
The data element RYBED is used by fields in the following tables.
Table | Development Package | ||
|---|---|---|---|
| T438A | MRP Type | MD | Application Development R/3 Material Requirements Planning |