61 - Fehlermeldungen fuer Bedarfsplanung

The following messages are stored in message class 61: Fehlermeldungen fuer Bedarfsplanung.
It is part of development package MD0C in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Customizing R/3 Material Requirements Planning".
Message Nr
Message Text
000General program error. Please notify SAP development
001Argument & not in Table &
002Planned order & already exists
003Planned order & does not exist
004Material & does not exist in plant &
005The scrap quantity must be smaller than the order quantity
006Please enter completion date and/or start date
007The processing of customer data is not allowed here
008Material &1 &2 &3 is not planned automatically
009Please specify the order deadlines in ascending order
010Planned order & will be created
011Planned order & changed
012Planned order & will be deleted
013Sales order data was cancelled
014Sales order data does not exist
015Dates incorrect (start date > finish date)
016You have made no changes
017Please check the firming indicator
018Invalid procurement type
019Special procurement type & is not allowed with procurement type &
020No scheduling information exists
021A requirement quantity of zero is not allowed
022The requirements date lies after the planned finish date on time axis
023A calculation of the number of partial lots is not possible
024A calculation of the total quantity is not possible
025Please enter partial lot quantity or number of partial lots
026Please create the components
027No material components were determined
028Entry of material components is not allowed for this order type
029Function code & not allowed
030Planned order not defined for external procurement
031Material data of component & & not maintained
032Please enter release date or scheduled delivery date
033Planned order & cannot be converted
034Purchase requisition & & already exists
035Please enter the delivering plant
036The delivering plant is the same as the ordering plant. Please correct
037Supplying plant & does not exist
038Delivering plant was cancelled
039Planned order & converted to purchase requisition & &
040MRP controller &2 does not exist in plant &1
041No planned orders exist for selected criterion
042Planned order already converted
043Please select a planned order
044& Planned orders converted into purchase requisitions
045No planned orders were selected
046Planned orders were converted
047Change to a directly produced planned order - please note long text
048No search help available. Use collective display for planned orders.
049Planned order was converted - no reset is possible
050Invalid planning run type
051Processing key & invalid for single-item planning
052Please check input parameters
053To start the planning run, press enter
054MRP carried out for & & &
055Error in the number assignment (Number range: Module &: &)
056Planned order only partially converted
057Planned order deleted
058Error reading forecast parameters for material & in plant & &
059Please carry out forecast for material & in plant &
060The date & is not convertible (please correct)
061& date lies before start of factory calendar. (Please correct)
062& date comes after end of valid factory calendar. (Please correct)
063Invalid factory calendar or error in the factory calendar &
064& is not a workday and was changed to &
065Exception message text maintained
066%NEM=&: & & &
067& field does not exist
068Specify field names
069Specify table name
070Please enter table names and field names
071Object & not contained in Table T440A
072Generation carried out
073Period split & does not exist
074Language & does not exist
075Table is new. Place cursor on the message and press F1
076No messages exist
077The MRP type & is invalid
078The material & has been marked for the MRP run
079Invalid input combination
080Material &1 &2. Status &3 does not allow long-term planning
081No additional information exists
082Parameter ID not maintained in PARA table
083Please enter the field name as well
084Please maintain table &
085No elements exist for the selection
086The planning run was terminated by the user
087The MRP list for material & & & was deleted
088No MRP list exists
089No more MRP lists were selected
090Select end of block
091No planned orders were selected
092Please specify at least one restriction
093Enter an object
094No changes were carried out
095Enter an object
096The object must be at least 4 characters long
097Invalid item category
098Maximum no. of order proposals per deadline exceeded
099-&- materials processed
100From-date is later than to-date
101Please choose a material
102Please select a material
103List is being printed
104MRP controller & does not exist for plant &
105Please maintain a text in the logon language
106& material(s) was/were selected
107& materials were selected
108Material not maintained by accounting department
109Please select clearly
110Selection is contradictory
111Selected function cannot be used for the element
112Please select a valid line
113The previous workday is the &
114No exception message(s) exists for this element
115Select the end of the block
116The forecast period could not be determined
117The selected element cannot be changed
118Please maintain version in Table T009
119Maintain periods in Table T009B
120Planned order & is blocked by user &2
121Enter either a material or an MRP controller
122Planned order has already been deleted or converted
123Error determining planning periods for calendar &
124In-house production time calculated &1 is too long
125Material & & is to be procured externally
126Material & & cannot be produced in-house
127The material & is defined for in-house production
128Material & & cannot be procured externally
129Please enter a date in the future
130Material &1 &2. Status &3 does not allow the planning run
131Please check the selection parameters
132Material &1 &2 is blocked for single-item planning by user &3
133Purchase requisition & & is blocked
134The planning run for plant & has already been started
135Please select an issue or a receipt field with the cursor
136No blocking entry exists for plant &
137The blocking entry for plant & was deleted
138Plant & has not been maintained
139Requirements planning is not active in plant &
140No planning file entry exists for this selection
141Material cannot be processed with this transaction
142Finish date of a procurement proposal outside the factory calendar
143Account assignment category & invalid
144Purchase requisition has not yet been released
145An account assignment is not allowed
146Quota arrangement has been changed
147Explosion data has changed, please re-explode
148Scheduling error: &
149No requirements type found
150Sales order/item does not exist
151Document is not a sales order
152Sales order was rejected
153Sales order has already been delivered
154Invalid entry
155Sales order does not allow make-to-order production
156Incorrect inventory management in the sales order (&1)
157Incorrect settlement in the sales order (&1)
158Project number was deleted
159Print order was created
160No list found. Please use alternative selection parameters
161Please select only one output type
162Please enter a valid period indicator
163Please enter a fiscal year variant for period indicator &
164Please enter a period split for period indicator &
165Please enter a PP planning calendar for period indicator &
166Fiscal year variant & does not exist
167Period split & does not exist
168Fiscal year variant only makes sence for period totals with period &
169Planning calendar only makes sence for period totals with period &
170Period split only makes sence for period totals with period &
171Graphic profile & & & is not correctly maintained
172Invalid date
173Selection of planned orders was interrupted after & hits
174Period indicator only makes sense for period totals display
175Conversion of unit of measure &1 to unit of measure &2 not possible
176Date lies outwith the period of examination
177No deleted components exist
178Distribution function & does not exist in plant &
179Enter a material
180You have not selected any material components
181Material component is a planned receipt
182The material is only available from & for materials planning
183Material requires configured sales order
184Sales order is different from planned sales order (& &)
185Account assignment type copied from the sales order
186Please enter a date that does not lie in the past
187Rounding profile does not exist
188The purchase requisition has been completely ordered
189Reservation has more than 9999 items
190The line item & not found in internal Table &
191Invalid line in internal Table &
192Material & in plant & is available for the requirement date
193On the &, only & & available
194Material is never available
195Entered value not allowed
196No planned orders exist for the selection criteria
197Error & does not exist
198Special procurement & for plant & is not valid
199Week is invalid
200SQL error: Error in READ (Table: & )
201SQL error: Error in the UPDATE (Table: & )
202SQL error: Error in the DELETE (Table: & )
203SQL error: Error in the SELECT (Table: & )
204SQL error: error during INSERT (table: &)
205MRP calculation only until the end of the short-term horizon
206No. of periods for the end of the short-term horizon set to 1
207The validity of the short-term horizon ws not limited
208Short and long-term lot-size indicator not compatible
209Long-term planning is not active in plant &
210Planning calendar is blocked. Display only
211Sales order &1 &2 is blocked for single-item planning
212An order quantity of 0 is not allowed
213Material &1 &2 is blocked from planning with scenario &3
214Planning run for scenario &1 is plant &2 has already started
215Contract uses storage location &
216Stge loc. does not correspond to the stge loc. of the scheduling agmt
217No documents exist
218Materials to be discont.in parallel and follow-up mat.are deactivated
219Inserting is not possible in the discontinue/follow-up procedure
220The sum of the usage probabilitites is &
221Material's assembly scrap is &
222Time interpr.only poss.when using period lot size with planning calendar
223Do not maintain time interpretation and scheduling together
224Multi-level discontinuation not supported
225Conversion between units of measure &1 / &2 for material &3 not possible
226Quantity overflow for component & in BOM explosion
227Error: non-stock component &1 with in-house production is recursive
228Please specify an account assignment type with consumption posting 'U'
229Material &1 &2. Status &3 allows no purchase order
230Long-term lot size has not yet been completely maintained
231Material &1 in plant &2 is blocked for Purchasing
232Quantity overflow of material & in net requirements calculation
233Error during compression of internal table &
234Error during expanding of internal table &
235Internal table &1 is not in memory
236Transfer end &2 is before transfer start &1.
237Planning run executed: &1 materials, &2 with exceptions
238Order is not part of the BOM you are currently processing
239Purchase requisition can only be deleted by deleting the order.
240Order quantity &1 &3 increased by &2 &3 scrap
241The scrap quantity was adjusted proportionally
242The order quantity may not be less than the GR quantity.
243Partially confirmed planned order &1 cannot be deleted
244Account assignment data is incomplete
245Invalid date &1 for element &2 &3 &4
246Material is locked for purchasing
247No vendor (creditor) found for MRP element
248No customer (debitor) found for MRP element
249Material & does not exist in plant &, MRP area &
250Error calculating the period of adjustment for demand management
251Purchase requisition &1 has not delivery date
252Deletion of & is only allowed in single-level BOM/structure representn
253You change only change & in single-level BOM/structure representation
254Storage location '&' for material '&' in MRP area '&' planned separately
255Error reading the BOM & &
256Invalid unit of measure for components & &
257Up to &, only & can be confirmed. Requested &
258Configured BOM could not be exploded
259Material requires configuration
260Project and/or WBS element not complete
261Project does not allow individual project production
262Project and/or WBS element does not exist
263Missing configuration in planned order &1
264Missing configuration in sales requirement &1
265You can maintain the components by exploding the BOM
266Total requirement & does not exist
267Project &1 is not an account assignment element
268Please check the selection parameters
269Column with rescheduling date shown
270***** COMMENT: Messages for missing table entries
271MRP controller '&1' for material '&2' does not exist
272Plant '&1' does not exist
273MRP parameters for plant '&1' have not been maintained
274No entry exists for plant &, material type & in V134M
275Material & does not exist
276Material status &1 does not exist for material &2
277Release indicator &1 not allowed for purchase requisition &2
278MRP type &1 not allowed for material &2
279Lot-sizing procedure &1 not allowed for material &2
280Range of coverage profile &1 does not exist
281No entries in Table &1 found
282&1 / &2 / &3 is an invalid combination or action code not allowed
283Unknown action code &1
284No entry for &1, &2, &3 in the list profiles
285No action code(s) copied
286No print data exists
287Splitting indicator &1 does not exist
288Exception message &1 or exception message text does not exist
289Special procurement key &1 not defined in plant &2
290Text for MRP element &1 not maintained in language &2
291Action &2 executed for planned order &1
292Please enter action code
293Storage location &2 in plant &1 does not exist
294No entry exists for plant &1 in plant Table
295No entry exists for unit &1 in Table of units
296"Firm" and "Delete firm ind." set at the same time
297Combination "detete" and "print" not allowed
298Action &1 cannot be executed together with another action
299Action &1 requires the update within the module
300Components were deleted
301No components were deleted
302Storage location & does not exist
303& batch does not exist
304Storage location &1 not maintained for material &2 in plant &3
305The withdrawn quantity (partially) exceeds the requirement quantity
306No customer requirements exist for materials selected
307Unit of measure conversion for material &1 of &2 terminated in &3
308Scope of planning '&1' does not exist.
309Planning run for scope of planning is only possible in parallel mode
310The order was already checked according to ATP logic
311No planned independent requirements maintained for material
312Plant / MRP area does not exist in scope of planning
313Capacity has already been planned for the order
314Planning run with scope of planning. Delete scope of plng for plant plng
315Planning file (DBVM) is empty
316Selected scope of planning &1 is empty
317Selected scope of planning &1 is empty. Please fill or delete
318Component &1 cannot be deleted
319Two quantity columns inserted in unit of measure &
320Plg calendar n.maintained far enough into future or per.of entry too smll
321Period profile &1 is not allowed to be used for plant &2
322Planned order &1 may not be changed
323Schedule records are being deleted
324Columns with vendor data shown
325Columns with customer data inserted
326Pegged order & does not exist
327Navigation profile & does not exist
328Please maintain the account assignment data
329Date &1 for element &2 &3 &4 is not within the factory calendar
330Manual firming date &1 set
331Manual firming date &1 deleted
332Action &1 is not possible for simulative planned orders
333Quantity overflow when saving schedule lines for material &
334Quantity overflow when importing MRP elements for material &
335BOM is not valid: &1, &2, &3, &4
336Several main parts in discontinuation group &1
337Sales order planning/project planning not possible for material &1 &2
338Single item planning in simultation mode not possible for material &1 &2
339Time stamp problem: Changes to planned order '&1' terminated
340******* COMMENT: 340- BOM explosion number checks
341BOM explosion number & is not active
342BOM explosion number & is only valid in plant &
343BOM explosion number & is only valid for material & in plant &
347****COMMENT: 348-379 Messages for BOM explosion number maintenance
348You do not have the nec.authorization for maintaining BOM explosion nos.
349You do not have the necessary authorization for displaying BOM expl.nos.
350Please select at least one BOM explosion number
351No BOM explosion numbers exist in the selected area
352BOM explosion number & is blocked by another user
353Error blocking BOM explosion number &
354Error unblocking BOM explosion number &
355Error deleting BOM explosion number &
356BOM explosion number & has been deleted by another user
357BOM explosion number & has been changed by another user
358Error reading BOM explosion number &
359Error saving BOM explosion number &
360BOM explosion number & already exists
361Please enter a BOM explosion number
362& BOM explosion number(s) was(were) saved
363Please enter a fixed key date
364Fixed key date in the past
365No BOM explosion numbers were changed
366Error deleting BOM explosion number &
367BOM explosion number & has been flagged for deletion
368& BOM explosion numbers were retrieved
369BOM explosion number & cannot be recovered
370& BOM explosion number(s) was(were) recovered
371Please select only one item
372Error saving new key assignment & -> &
373& new key assignment(s) was(were) saved
374Error unblocking new key assignment & -> &
375BOM explosion number & is not active
376New key assignment is blocked by another user
377Error blocking new key assignment
378& new key assignment(s) was(were) deleted
379New key assignment for BOM explosion number & blocked. Display only
380****** COMMENT: 380-382 messages for order profile - F4
381Please maintain Table T460B
382Please maintain the order profile
383BOM selection not maintained
390****COMMENT: further messages for BOM explosion number maintenance
391Select a line
392A new key assignment exists for this entry already
400No authorization for & in plant & and MRP controller &
401No authorization for & in plant &
402No authorization for &
403Material & in plant & has been marked for deletion
404The MRP element no longer exists
405No authorization for & and planning scenario & in plant &
406No authorization for &1 and planning scenario &2
410Incomplete transfer of parameters in index maintenance RSDB
411RSDB record already exists
412No RSDB record exists
413Field exceeded in RSDB index counter table
415Run schedule header cannot be calculated
416Error during creation of a run schedule header
417****** COMMENT: 417-433 Allocate projects
418& allocation(s) was/were saved
419& allocation(s) was/were deleted
420An allocation already exists for this entry
421Error saving the new allocation for plant & and material &
422Error unblocking the sales order item & &
423Error reading the WBS element &
424Sales order item & & is blocked
425Error blocking the sales order item & &
426No entries have been selected
427Please enter a WBS element
428No posting to projects is allowed for item & &
429Material & allows no make-to-order stock
430Item & & allows no make-to-order stock
431No items exist for the sales order &
432Specify an item
433Please enter a sales order first
434Daily split carried out
435Production line does not exist
436Please place the cursor on a line with run schedule data
437No planned order was selected for assignment
438Invalid cursor position for executing selected function
439Selected material does not appear in any product group
440Error changing the cost collector
441Error creating cost collector
442Order type not in Table &
443Error creating cost collector
444Run schedule & with cost collector & will be created
445Data may not be up-to-date -> renew
446Reducing the quantity during assignment is not permitted
447Distribution function & is incorrect in plant &
448Planning ID & was not entered
449Enter MRP controller
450Enter either the material or the run schedule number
451Dummy message & for & in plant & and MRP controller &
452Not possible to branch into details
453Enter plant
454Run schedule header & will be created
455Run schedule header & does not exist
456Run schedule header & exists already
457Run schedule header & will be changed
458Run schedule header & will be deleted
459Please select planning object
460Entered line or column greater than maximum value
461No run schedule header exists for material & &
462No run schedule header exists for material & & version &
463Select field
464In period & the total quantity is short of &
465In period & the total quantity is exceeded by &
466Repetitive mfg not allowed for material & &
467Version for material either does not exist or is blocked
468Validity period end is smaller than validity period start
469Validity period end lies after version validity date &
470Validity period start lies brfore version validity date &
471Enter version
472RS header & already exists in the schedule run time
473No run schedule header exists for this selection
474Not possible to convert to production order
475Incorrect run schedule header & in planned/production order &
476Entry & & & missing in T437Z
477No version entered, sel. ind will be deleted
478No valid run schedule header exists in this time
479No assignment possible
480& planned orders cannot be specifically assigned
481Please enter plnning calendar for freely definable plnng period selection
482Please select planning period
483Entry & missing in Table &
484Assignment not possible. No active version exists for the planning date
485No element in column & can be confirmed
486No planned data exists for material &, plant &
487No planning calendar can be selected
488Please select only one period split
489Please select at least one output object
490No valid calendar ID was entered
491No element in column & can be assigned
492Final delivery has already been made for partial order &
493No released production order was selected
494No open reservations exist for production order &
495Production order & has already been finally confirmed
496Conversion factor to unit of measure & for material & not maintained
497Run schedule header & is blocked
498Run sched. hdr &1 cannot be deleted because run sched. qty still exists
499Entered version does not appear in the planning table
500Object & does not exist
501Number range & for object & does not exist
502Entered version already exists
503Enter a version
504Enter a run schedule header with partial orders
505No capactiy planning active
506Assignments were saved
507Changes were made to master plan
508Delete not possible: RH header's cost collector has no deletion indicator
509Please enter a material
510Invalid object type
511Number range & for object & not planned for internal allocation
512Number range not planned for external allocation
513Number range &1 for object &2 nearly exhausted
514Number range & for object &2 exhausted
515Number & does not lie within the defined interval
516No documentation exists
517Please maintain repetitive mfg profile in the material master record
518Entered product group does not exist
519No costing data exists
520Deletion ind. cannot be set; validity per. of RS header extends in future
521Deletion indicator will be set; it cannot be reset
522Please check your entries
523Please enter valid hierarchy
524& RS created, & RS changed, & create version, & change version terminated
525RS header for material &, version & not created. Reason:
526Not possible to go to line set as you did not access via line set
527No pegged requirements exist
528Please enter either RS header or material, version and selection date
529Runtime of RS header cannot be shortened as much
530Procurement type/special procurement type only available as from 2.0
531Please enter either the production or the stock transfer plant
532The production/stock transfer plant corresponds to the ordering plant
533Special procurement type & not defined
534Lot-size indicator for lot-sizing procedure & invalid
535Invalid entry
536Plant entry unnecessary for procurement type "&", special proc. "&"
537Please enter the period length (number of days)
538Period length was cancelled
539Please complete table entry
540Please maintain the range of coverage period
541Backflush not possible as not a milestone operation
542No capacity data can be displayed
543The dates are displayed in ascending order
544Production line not available in the planning table
545Production line and version are not compatible
546Requirements quantity cannot be split
547Please maintain the distribution function
548The latest reqmts date must lie between the reqmts date and the plnnd end
549Distribution does not exist
550Dependent components will be deleted
551Unit of measure & in & cannot be converted
552No long text exists for component &
553No text exists for item &
554Please check the material components
555BOM alternative & is not allowed for application &
556Planning calendar & does not exist
557Please remove error first
558Attention recursiveness. Material & is the same as the order material
559Planning calendar & exists already
560Planning calendar & does not exist. You can create it if you want
561Planning calendar & will be saved
562Please select a phantom assembly
563Withdrawal quantity greater than the requirements quantity
564Availability check only possible for item kept in stock
565Selection parameters were saved
566Selection parameters were deleted
567Version & does not exist for material & in plant &
568Version & invalid for material & in plant &
569No run schedule could be determined for version &
570Select a procurement proposal
571BOM explosion number & does not exist
572BOM explosion number & is not allowed for material & in plant &
573Procurement proposal was copied
574The procurement proposal was not changed
575Components repeat is switched on
576Components repeat is switched off
577Direct procurement has not yet been initiated
578No purchase orders exist as yet
579%N&
580The planned order has not yet been scheduled. Please reschedule
581No scheduling log exists
582Outline agreement & & does not exist
583Outline agreement & & is not allowed
584Outline agreement & & was deleted
585Please enter order/purchase requisition key
586Please select a variable-sized item
587The unit of entry is set equal to the unit of issue
588Check the settings for checking group & and checking rule &
589Planned orders selected were firmed
590No number range has been entered for sim. dep.reqmts for plant &
591Partial order cannot be released
592Lot size area for version: from & to &
593No scheduling allowed
594Capacitites checked. No overload found.
595Assembly orders, changes are transferred to sales order
596Availability check without storage location was activated
597Avail.check w/o storage locations can lead to inconsistencies
598The selected planned orders were changed
599The selected planned orders will be "unfirmed"
600*** COMMENT: Messages for SAPMM61C / Transaction OPPQ
601Plant & does not exist
602No plant parameters are maintained for plant &
603Plant parameters for plant & were deleted
604Parameters from plant & were copied to plant &
605Plant parameters for plant & can now be maintained
606Error reading the parameters for plant &
607Error during modification of Table &
608Error blocking table &
609Plant parameters are blocked by another user
610Parameters already exist for plant &
611Create parameters for plant & first
612You do not have required authorization to maintain parameters in Tab. &
613Parameters for plant & were partially copied to plant &
614Parameters for plant & were partially delete
615Specify a plant
616Parameters for plant & were entered in correction &
617Entry is not allowed
618Calculation rule not maintained correctly
619Please specity valid vendor
620*** COMMENT: Messages for SAPMM61C / Transaction OPPR
621MRP group & & does not exist
622MRP group & & was deleted
623MRP group & & was copied to & &
624MRP group & & can now be maintained
625Error reading MRP group & &
626Error modifying MRP group & &
627Error blocking MRP group (Table T438M)
628MRP groups are blocked by another user
629MRP group & & already exists
630Please create an MRP group first
631You do not have the necessary authorization to maintain MRP groups
632MRP group & & was entered in correction &
633Please enter an MRP group
634MRP group text was not changed
635MRP group text was saved
636Creation of outline agreement requisitions in MRP not allowed
637List for the detailed search does not exist
638No elements exist for search
639No further elements were selected for search
640The order type does not exist
641The ord.type refers to internal or external no.ranges. Check ord.no.entry
642There are still quantities on the line for order &1
643The variance key does not exist
644The controlling area does not exist
645The cost element does not exist
646The order type has not been allocated a number range
647Error in number management (please notify the responsible person)
648Production version &1 for material &2 in plant &3 is locked
649Overhead key could not be determined (check costin variant)
650No data exists
651Only enter proportion unit
652Only enter product unit
653No receiver defined in Customizing for MRP controller
654Splitting quota not allowed
655Processing indicator was set
656Processing indicator reset
657Error in reading consumption values
658& is not a proportion unit
659& is not a product unit
660No order type can be determined automatically
661Purchase requisition no longer exists
662Enter a unit of measure
663Enter plant or MRP area
664Enter a plant
665Enter an MRP area
666At the most, today's date allowed. The & lies in the future.
667Enter today's or a future date
668Settings for user & saved
669The settings for user & have been reset to the default settings
670No exception messages are contained in the list
671The MRP list was already processed on the &
672When searching using exceptions, select at least one exception
673When searching using MRP element, select at least one MRP element
674Please select at least one material
675No message exists for material & in plant &
676Document type not created
677Please enter an MRP controller
678Enter MRP controller, product group, line or planning ID
680& & is a product group
681& & is not a product group
682Enter product group
683Selection by material: enter a material
684Conversion of planning file entries: test (T), processing (X)
685Conversion of planning file entries has already been carried out
686Planning file entries for MRP areas are not converted
687Control parameters for MRP areas do not exist
688MRP areas are active. It is not possible to delete planning file entries
689MRP areas are not defined for SAP Retail systems
690Class & does not exist for class type &
691Class type & not allowed
692Please enter class and class type
693Please enter valid production line
694If necessary, limit the selection further
695Please enter the selection criteria
696No authorization for activation of MRP areas
697Transaction &1 has been replaced by &2. See note &3.
698Report &1 has been replaced by &2. See note &3.
700***** COMMENT: Pegged orders PlOrd: No direct calls -> LTP
701There is no pegged requirement for planned order &1
702Pegged requirement for planned order &1 does not contain an order number
703Pegged requirement for planned order &1 does not contain an order number
704Pegged planned order for requirements &1 / &2 does not exist
707Cannot edit or delete object - TBLP entries exist (relevant to A&D GPD)
710Planned order &1 cannot be deleted. Goods receipt quantity greater than 0
711Order tree for the first procurement element &1 &2 is displayed
712Order report will be displayed
713The order report will be displayed with a maximum of &1 hierarchies
720***** COMMENT: distribution function: messages
721Distribution key - initial
722Distribution key not maintained in Table &
729Issuing storage location only possible for stock transfer
730***** COMMENT: Tree Control: Message
731Error in function module &1
732Grouping without priority is not allowed for &1
733Grouping for &1 reset
734The requested hierarchy levels are already being displayed
735No additional hierarchy levels can be displayed for the element
736Threshold values not maintained correctly
737'Multilevel Delay' indicator not set in profile &1
738Multilevel delay will be calculated for all sales orders in system
739Sales order item &1 &2 is not MRP-relevant
740Firmed components of the planned order are copied
741Multilevel delay calculated for &1 sales orders
742&1 entries deleted from database table &2
750* Comment; messages for availability check
751The committment is only possible for the amount of the ATP qty &
752Changes were copied
753No changes were made
754The total committed quantity is greater than the order quantity
755Please select a line that can be changed
756Data on updating backorders was saved
757Please check the controlling of updating backorders
758You have no authorization for updating backorders in plant &
759You have no authorization for making changes in plant &
760Material & is already being processed in plant &
761Reqmts switched from collective to individual reqmts
762Reqmts switched from individual to collective reqmts
763No coverage by the master plan for this date
764Order date lies after the confirmation date
765Receipts in the past were included
766Receipts in the past were not included
767There are no components for the availability check in order &
768The system could not determine a storage location
769Order & was not deleted. Confirm with ENTER first
770Inconsistencies when creating/modifying the procurement elements
771Receipt quantity greater than requirement quantity
772Configuration change not copied to all production orders
773Document with credit limit block!
774Document with reqmt-specific delivery block! No changes possible
775Document with reqmt-specific credit limit block! No changes possible
776Order &1:Configuration change not completely executed
780*** Messages for printing the component list (SAPLM61L)
781Error determining the material components
790Internal configuration error
791Only &2 decimal places are defined for unit of measure &1
792Object dependency too complicated. BOM: &1-Valid from: &2-Item: &3
800**** COMMENT: Messages from check modules in customizing
801Please enter a period split
802Please enter a planning calendar
803Target range of coverage is smaller than the minimum range of coverage
804Target range of coverage is greater than the maximum range of coverage
805Order type & is not provided for the order group &
806Entry & & does not exist
807Make entries in all required entry fields ('*' allowed)
808Selection ID & does not exist
809For production rate planning, a simplified routing should be used
810The indicator "Create capacity requirements" was set
811Do not set the rounding value smaller than the threshold value
812Please set threshhold value increasing monotonically
813Please set the rounding value increasing monotonically
814Please enter an item number
815Destination &1 not active
816Maintain selection ID in the scheduling parameters
817Enter at least the target or the maximum range of coverage
818Enter withdrawal plant
819Withdrawal plant and production plant must be different
820Plant input only necessary for withdrawal from alternative plant
821Direct production is only possible with in in-house production
822Combination not possible
823Plants &1 and &2 are assigned to different company codes
824Plants &1 and &2 are assigned to different controlling areas
827This item has already been entered
828Counter number is zero or incorrect sequence
829Entry or a plant which belongs to an MRP area already exists
830Navigation from 'New Entries' not possible; go back to 'Change View'
832No total reqs exist for material &1, plant &2, production version &3
833Select at least one material for the comparison
834No additional individual requirements exist for total requirement &1
835No total requirements exist for material &1, plant &2
836"To-date" must not precede the "From-date"
837Overlapping of periods is not permitted: Periods from &1 to &2
838Date-from and date-to must be entered
839No firming type for reorder point or time-phased material planning
840There is no icon called &1
841For demand-driven planning only firming type 1 possible.
842Error occurred in method &1
843Special procurement type &1 not allowed in multilevel subcontracting
844Invalid gap between &3 and &4 in plant &1 calendar &2
845Planning Periods contain errors. Please maintain correctly.
846Cannot save; no planning periods for plant &1 planning calendar &2
847Period &3 to &4 overlap with previous interval in plant &1 calendar &2
848Without Calculation Rule no navigating to Calc. Data and no Calculation.
849Calculation Data empty. No calculation.
850COMMENT*****: Messages for comparison of the MRP lists
851No MRP lists exist
852Calculation Data must be cleared before changing Calculation Rule.
853*** Comment; Messages for repetitive planning table III
854'Adjust scheduling' level incorrect: &1 / &2 / &3
860Data is incomplete; check your entries
861Lead-time scheduling not possible for external procurement
862Lead-time scheduling not possible for preliminary planning
863Lead-time scheduling not possible for Long Term Planning
865Deletion of scheduling margin key &1 plant &2 is not possible
866Scheduling margin key &1 plant &2 is used in &3 master data
867Scheduling margin key &1 plant &2 is created by SAP
870Table RESB contains no fields with 'NOT ZERO' but without default
871Field definitions for table RESB were changed
872Table RESB is inconsistent
873DB definition and SAP DDIC definition are not the same
874No NAMETAB exists for table RESB in the SAP DDIC
880****COMMENT: Messages for calendar - F4 (SAPLDATD, FuBau F4 DATE)
881No capacity requirements exist
882The month &/& lies outwith the factor calendar
883Error reading the factira calendar
884Date lies outwith the factory calendar
885The format of the date in invalid
886Factory calendar & was not found
887Date & lies in the past
888General error. Please inform SAP
890****COMMENT: Messages for BAPI and CIF (planned order)
891Planned order & version & does not exist
892Planned order & version & is not valid on finish date &
895No errors were found
896Error occurred in method &1
898System locking error
899%N& &
900****COMMENT: Messages for Business Object BUS2004 (planned order)
901Reading planned order &1
903Internal error when accessing CY01_PLANNED_ORDERS_INTERFACE
910
911
912
950No errors were found
Privacy Policy