6P - Messages for planned independent requirements (Appl.area 60)

The following messages are stored in message class 6P: Messages for planned independent requirements (Appl.area 60).
It is part of development package MDPB in software component PP-MP-DEM. This development package consists of objects that can be grouped under "Application development R/3 purchasing".
Message Nr
Message Text
001Transaction code & does not exist
002Argument & does not exist in Table &
003Plant & not defined
004Desired qty not equal to split qty, after enter, planned qty valid
005Please enter date, quantity and material number
006System error: index & not found when reading XPBET
007Argument & does not exist in Table &
008Requirements type in Tables 450B and 459B must be the same
009No requirements were found which correspond to the selection criteria
010Please enter either a material number or a reqmts number, or both
011Requirement already exists, maintain via change transaction first
012Requirement blocked
013System locking error
014Requirement already exists and can be changed after pressing enter
015Please enter requirements date or copy reference data
016Requirements type & not allowed with reqmts category & (Table 459K)
017No new requirements can be created during a change transaction. & / &
018Requirement already exists for the entered reqmts type or version
019Argument & & is not intended for table &
020System error: index & does not exist in internal Table &
021Enter a date
022You have not entered a period
023Please check your entries
024When entering a product group, quantity or percent is not allowed
025When entering a product group, displacement is not allowed
026Sales plan can only be transferred on list entry screen
027Production plan can only be transferred on list entry screen
028Field selection & does not exist (T450F)
029Enter a material number
030Requirements type & does not exist
031Strategy group has not been maintained
032Requirement has been deleted, after ENTER you can recreate it
033Reference was directly copied
034Specify a plant
035Requirements type cannot be changed
036Version cannot be changed
037Requirement was already available
038No reqmts were found, after confirming entries, they will be created
039Please enter requirements number
040Selected entry combination excludes allocation display
041No data was changed
042Please enter either a material number or an MRP controller
043Please enter an MRP controller
044Please enter an operator
045Date is not within the planning horizon ( & - & )
046Select a valid period
047Only inactive requirements exist
048The raster & you selected in invalid
049Incorrect combination of interface parameters
050Not possible to switch views due to a different calendar.
051Reference data outside the planning horizon was not copied.
052Not possible to display table because calendar is different.
053Errors occurred while reading data, see the message log
054Incorrect interface parameters
055No data is available for the sales/production plan for material &.
056No consumption records exist for material & &.
057Error occurred during determination of the consumption records.
058Date ( & ) lies outside the planning horizon
059Material is locked for modeling
060Configuration and period splitting exist
061All materials relating to the planning scenario are selected
062Entry not possible due to different calendars
063No data found for & & & &
064Entry not possible due to missing/incorrect calendar
065Not possible to display planning table due to different calendars
066Not possible to display planning table due to missing calendar
067Only & materials are copied per step
068Please choose a processing type
069Error building XPBPT
070Entry not possible due to missing/incorrect fiscal year variant
071Data with periods or planning calendar not postponed
072The materials have different posting periods
073No schedule lines exist for the reference
074No reference could be determined
075No further items exist for display
076First item reached
077Material & is marked for deletion
078Not possible to maintain individual quantities when total quantity = 0
079For the change number, schedule lines need to be maintained for & & & &
080Please enter a change number
081Changes on & only allowed with change number &
082MRP area & is not defined
083No plant is assigned to MRP area &
084Please enter plant or MRP area
085Fiscal year variant and period indicator could not be determined
086No suitable requirement for time period & - & selected
087There are no work days in the specified planning period
088Termination: VBFA entry from previous year exists; repeat operation
100System error in the module pool & module &
104Transfer of data not permitted in display mode.
105No data can be transferred after a change of period
106Active indicator & is invalid.
107Strategy group & requires an exact lot size
108Strategy group & does not allow a rounding value
116The forecast period could not be determined
118Please maintain periods & & in Table T009
119Please maintain factory calendar in Table T001W
123Error determining planning periods for calendar &
124Maintain the planning periods for calendar &
130Requirements with suppressed configuration cannot be activated
140*****COMMENT: Messate for XXL/EXCEL interface
141Schedule lines in the past were ignored
142The period of examination contains more than 100 schedule line dates
143Planning with several BOM expl.numbers indicated with BOM expl.number "*"
144Planning with several production versions indicated with prod.version "*"
145File for list object could not be opened !
146List object could not be recorded in the file !
147XXL has not been installed correctly !
148Presentation server does not run under MS Windows!
149Unexpected error &
150The export of the list object was terminated by another user!
151Error calculating the period of adjustment for planning
301Number range for object &: interval not found
302No internal number assignment for object & number range allowed
303Number range is not defined for object &
304Number of requested numbers must be greater than 1
305Number range is full for object &
311Requirement saved
322Incorrect index structure in Table &
323Select one or more items
325System error: index not found when reading (&)
331Item & does not exist
336Schedule line already exists, after "enter" current quantity valid
337Schedule line already exists, quantity will be added after confirmation
338Item & already exists, entry will be ignored
341Please select desired schedule line
342Please select a schedule line
343Select at least one line
344Please select an item
345Choose one schedule line only
357System: item & is in the workarea for schedule line &
360Configuration for material & not possible
362No items exist
363The date & is not convertible (please correct)
364& date lies before start of factory calendar. (Please correct)
365& date comes after end of valid factory calendar. (Please correct)
366Invalid factory calendar or error in the factory calendar &
367& is not a workday
368Period indicator & cannot be converted
369The fiscal year variant is not maintained in the material master record
370Requirements number & is reserved for individual project planning
371Requirements number & reserved for single-item planning
372Enter info structure and key figure.
373Requirements number & is reserved for internal number assignment
374Requirement already exists with material no. & version & MRP area &
375Planned independent requirement can only be maintained via the network
376Requirement tracking number & already exists
377Requirement number & not within external number range
380Only stock requirements are allowed when planning at MRP area level
426Reference copied for material &, version &
427Item is not suitable for the schedule line (program error)
428From requirements date is greater than to requirements date
429Requirements date indicator smaller than splitting indicator
430Material & & does not exist
431Reqmts with material number &, version &, plant & already exists
432Requirements date indicator equals splitting indicator
433Planning period should lie in the future
434Date will be displaced to the next earlier workday &
435Quantity entered already in the specified period will be deleted
436Splitting period requires the entry of a requirements date to
437Splitting period requires the entry of a splitting indicator
438You must enter a requirements date
439Displacement only possible with monthly/weekly split
440Select the end of the block
441No forecast values exist for material &
442Please enter valid version
443At least one active version already exists in the data base
444No forecast parameters maintained for material &
445Copying the forecast is not allowed with this MRP type
446Requirements date indicator equals splitting indicator
447Please enter different planned quantity or different percentage
448Requirements type exists already
449No authorization for creating in plant &
450No authorization for changing in plant &
451No authorization for displaying in plant &
452No further requirements selected
453No periods exist in calendar &
454Please select a process
455When using the reference, please enter material and select
456Please select the corresponding line
457User parameters were saved
458User parameters were deleted
459No product group members exist for product group &
460Reference type & does not exist here
461Product group & & does not exist
462Error occurred when copying the reference --> error log
463Material status does not allow a planned independent requirement
464Error occurred when reading reference -- error log
465No error log exists
466Please enter a product group
467Please enter a material number, a reqmts number, or a product group
468No sales plan exists for product group &
469No production plan exists for product group &
470Please enter a material number or a product group
471Please enter a requirements number or a product group
472Material not provided for gross requirements planning
473Fiscal year variant not maintained for material &
474Date & is not valid with period &
475Function not allowed --> exit
476Planning is only possible with material & &
477Splitting indicator & is not allowed
478Please enter valid requirements type
479Original date lies in the planning time fence
480New date lies in the planning time fence
481Date lies in the planning time fence ( & - & )
482BOM explosion number & is not active
483BOM explosion number & is only valid in plant &
484BOM explosion number & is only valid for material & in plant &
485BOM explosion number & does not exist
486BOM explosion number & is flagged for deletion
487Entered week has no workdays
488When using the reference, enter material
489Quantity already split will be deleted
490Display only possible for items with material
491No items exist for deletion
492No requirement type exists for material &1 in plant &2
493Changes made in the planning time fence will be ignored (& - &)
494Material is blocked
495You cannot make any deletions in the planning time fence (& - &)
496Date in the planning time fence (& - &) deleted
497Material & has no valuation price
498Consumption indicator & is not possible with this requirements class
499Planning is not allowed with the matetial type &
500To confirm the transfer, press ENTER
501No history is recorded
502Planned independent requirements not included in MRP
503Function not allowed as not all materials were copied
504Forecast has changed since the last transfer
505The production plan has changed for the PG
506The production plan has changed
507Several references have changed -> error log
508Period & already exists with another period indicator
509No period split exists
510Unit conversion not possible
511PG for material & plant & not found
512Posting period does not exist
513Requirement existed in deleted state, and was chenged
514& plant & is a product group, not a material - enter a material
515Entry cannot be interpreted as number
516Too many decimal places
517Period & already exists as period split
518MRP controller & does not exist for plant &
519Please enter either a material number or an MRP controller
520No further materials selected
521Spool order created
522No deviations exist
523Selected function cannot be used for the element
524No sales plan available for the members of PG &
525No production plan for the members of PG &
526Material & & is not provided for demand management
527No long-term dependent requirements exist for material & &
528For use with reference, confim with ENTER
529Version & was selected
530Warning! Function not supported until a later release
531Production version & does not exist
532Strategy & does not exist
533Warning! Function not possible with period totals
534Date type of the schedule line is incorrect - only day, week, month
535Configure the first schedule line &
536The supporting points are selected
537Material & & cannot be configured
538Select either a sales key figure or a production key figure
539No materials exist for selection
540No scenario exists
541Assembly planning not allowed
542Selection lies outside the permitted area.
543Splitting is not permitted.
544The planning calendar is not maintained for material &
545Planning profile saved
546Class type is not possible for the configuration profile
547SOP key figures do not agree.
548SOP versions do not agree.
549Info structures do not agree.
550*Function module usage probability
551The usage probability cannot be negative
552Please select the valid statistics column
553Please only select characteristic values
554Usage probability for a combination key is greater than 100%
555Usage probability total is less than 100% for mandatory combination key
556Usage probab. total is greater than 100 for single-value characteristic
557Invalid object dependency
558Invalid configuration
559No characteristic values exist that are relevant to planning
560Internal error: configuration is not initialized
561Different per. splits in indep. reqmts and in info structure
562Object dependency not valid for indep. reqmts
563Object & & contains no instance in characteristics value planning
564Inconsistent object in instance &
565Variant table/row does not exist
566Please enter a profile text
567No object characteristic exists
568Material &1 is not defined for MRP area &2
569No charact. values combinations relevant for planning exist
570Planning profile created
571No characteristic values exist
572Only one characteristic per characteristic combination can be changed.
573No new usage probabilities can be calculated.
574MRP area & for material & is marked for deletion
575Select the corresponding header row
576Select the relevant customer requirement
577Select the corresponding row with text indicator
578The planned independent requirement item is flagged for deletion
600Not possible to open sequential file &
601Error writing to sequential file &
602Processing terminated
603No records in sequential file &
604First record in sequential file & not a session record (type 0)
605First transaction does not start with an ANFOSATZ
606List entry screen data has already been transferred
607Schedule line data has already been transferred
609Session & was created
610Session &: session record contains no session name
611Session &: session record contains no client
612Session &: transferred client & differs from system client &
613Session &: session record contains no user name
614Schedule line & has already been transferred
615ODC processing carried out
616Data transfer carried out
617Date type transferred incorrectly
650Allocation indicator must exist
651Consumption of configuration should not be changed
700Version & is a default value and cannot be deleted
701Delete not possible as entry & contains default values
702Plant &: delete not possible. Default values are set
703No versions were deleted
704Version & is a default value for requirements class &
705Version & is a default value for reference type &
706No requirements types were deleted
707Please specify only one default value for reqmts class & at the most
708Delete not possible as sales documents exist with reqmts type &
709Requirements class should only be changed in exceptional cases
710When making changes while system in prod.-pay attention to documentation
711Requirements classes from MD64, MD65 and MD66 must be the same
712Nothing was saved
713No consumption is carried out with this type of requirements types
714Period totals not possible
715Please enter a main strategy
716Configuration corresponds to strategy group & &
717You can only enter a maximum of 7 strategies
718Strategy group & already exists
719Stratega group & does not exist
720Strategy group will be changed
721Data was not changed
722Please enter a strategy group
723Place the cursor on a valid line
724No strategy group found (too many sub-strategies specified?)
750****COMMENT: Messages for reorg. demand management (RM60R...)
751Reorganization period has not been maintained for any plant
752Key date for deleting old requirements records is missing
753Error writing a history record
754You do not have the necessary authorization for this activity
755Distribution key & does not exist
756Distribution key & in period split & is not provided for plant &
799***COMMENT: Messages for long-term planning function group M60C
800Scenario & does not exist
850Please maintain the class type first
851Class & does not exist in table KLAH for characteristic &
852Characteristic & not found
853The table entered has characteristics in common in the profile
854No planning profile maintained for material &.
855No characteristic value for characteristic & exists in table &
856Variant table could not be created for characteristic &
857Entries & & in variant table & could not be created.
858Material & for Profile & already exists in table &.
859Material &: no profile could be created in table &
860Only one profil can be updated
861Profile for material & cannot be deleted because it is in use
862Combination does not exist
863Comination key too wide to be displayed
864Table lines used
865Several variant tables created automatically exist for characteristic &
866At least one planning profile already exists
867Runtime object successfully deleted
868No runtime object available
869Exception log successfully deleted
870No exception messages available
871Sales order cancelled
872Week & has no workday
873Enter external requirements plan ID
874Requirements plan is generated internally for material with segmentation
875Requirement segment not valid for material without segmentation
876Use external requirements plan number for material with segmentation
877Define internal number assignment for requirement class
878Enter mat. no. or reqmts plan or extern. reqmts plan no. or combine them
880
885Enter an absolute date or a relative date (number of days)
Privacy Policy