AG - Nachrichten ATP-Server
The following messages are stored in message class AG: Nachrichten ATP-Server.
It is part of development package ATPG in software component CA-ATP. This development package consists of objects that can be grouped under "Application development ATP server".
It is part of development package ATPG in software component CA-ATP. This development package consists of objects that can be grouped under "Application development ATP server".
Message Nr ▲ | Message Text |
|---|---|
| 001 | Check the settings for checking group &1 and checking rule &2 |
| 002 | Error in RFC call-up: &1, &2 |
| 003 | Replenishment lead time for material &1 (plant &2) is 0 days |
| 004 | Sales order item number not specified in requirement |
| 005 | Project item number not specified in a requirement |
| 006 | Error occurred during availability check |
| 007 | No data exists for plant &1 and special procurement key &2 |
| 008 | Unit of measure &1 does not exist |
| 009 | No master data could be found for material &1 and plant &2 |
| 010 | In-house production time &1 for material &2, plant &3 is too long |
| 011 | Date &1 cannot be converted (please correct) |
| 012 | Date &1 lies before start of the valid factory calendar (please correct) |
| 013 | Date &1 lies after the end of the valid factory calendar (please correct) |
| 014 | Factory calendar missing or error in factory calendar &1 |
| 015 | Customer number not specified in one requirement |
| 016 | A requirement needs to be checked against the forecast and ATP logic |
| 017 | Error occurred during assembly processing |
| 018 | No plant data exists for plant &1 |
| 019 | No MRP control data exists for plant &1 |
| 020 | No control data maintained for checking group &1 |
| 021 | No control data maintained for checking group &1 and checking rule &2 |
| 022 | Error calling ATP Server: &1, &2 |
| 023 | Error in calling up function '&1' in APO server '&2': &3 |
| 024 | No checking group is maintained for product &1, plant &2 in matl master |
| 025 | There is no ATP group for DELKZ '&1', ATPIF '&2' and SORT1 '&3' |
| 026 | Advanced ATP materials cannot be processed, see note 2642047. |
| 027 | Adv. ATP material &1 in plant &2 cannot be processed, see note 2642047. |
| 028 | Product availability check is switched off for material &1 in plant &2 |
| 029 | Material Master settings for RPM component &1 &2 are unsuitable for ATP. |
| 031 | Past receipts were taken into account |
| 032 | Receipts in the past were not included |
| 033 | SCM version is too low for RBA control at item level |
| 034 | Item &1, &2: MISL group cannot be deleted; SCM version too low |
| 035 | Plant substitution in the item is not possible for MRP areas |
| 050 | Full conf. of ICON item &1, &2 sch. line &3 unchecked despite APO int. |
| 051 | 0 conf. of ICON item &1, &2 sch. line &3 unchecked despite APO int. |
| 091 | Selected function cannot be used for the element |
| 101 | Choose a changeable single record |
| 102 | Choose one record only |
| 103 | Please choose an individual record |
| 111 | Select a line |
| 112 | Please select a valid line |
| 115 | Material &1 in plant &2 is APO-relevant |
| 116 | APO-relevant materials exist. These were not processed |
| 120 | No MRP element found (are single records expanded?) |
| 121 | No other MRP element with this number exists |
| 122 | Please enter the number of the MRP element first |
| 123 | Call up search function first |
| 130 | Enter plant or MRP area |
| 131 | MRP area &1 does not exist |
| 132 | MRP area &1 is not defined in plant &2 |
| 150 | Requested quantity is not available. |
| 151 | Requested quantity must not be negative. |
| 152 | There is no availability information for the requested date. |
| 153 | Requested date is in the past. |
| 190 | The line item & not found in internal Table & |
| 201 | The ATP server cannot be updated (table &1) (area &2) |
| 202 | Unknown error in call &1 |
| 203 | RFC error in call &1: &2&3 |
| 204 | Distribution function &1 in plant &2 is incorrect |
| 205 | Distribution function &1 in plant &2 is incorrect |
| 206 | Error calling function for reading the batch stocks |
| 207 | ATP Server not set up |
| 208 | The grouping element could not be determined for &1, &2, &3 |
| 209 | Projects belonging to &1, &2, &3 could not be determined |
| 210 | Error occurred when determining MRP area for &1, &2, &3, &4 |
| 211 | MRP area for &1, &2 not determined - continue with plant MRP aea &3 |
| 212 | The grouping element could not be determined for &1, &2, &3 |
| 221 | Programming error: unknown table ID &1 |
| 222 | Programming error: unknown processing status &1 |
| 223 | Programming error: data already aggregated |
| 224 | Programming error: status sequence &1 after &2 not permitted |
| 257 | Up to &, only & can be confirmed. Requested & |
| 290 | Text for MRP element &1 not maintained in language &2 |
| 310 | Only the ATP quantity can be confirmed |
| 320 | The order was already checked according to ATP logic |
| 410 | Please check the material staging for order & |
| 501 | Program error: incorrect call of function &1 using parameter &2 |
| 510 | Lock user not specified |
| 511 | Lock argument incomplete: & |
| 588 | Check the settings for checking group & and checking rule & |
| 600 | *********** Messages: Lock Management |
| 601 | System error while locking |
| 602 | Material & is locked (availability check not possible) |
| 603 | Planning material & is locked (assignment check not possible) |
| 604 | Overflow of the block table during transfer of results |
| 605 | Material & is blocked (Blocking table has not been updated) |
| 606 | Planning material & is blocked (Blocking table has not been updated) |
| 607 | Communication or system problem when locking (see system log) |
| 608 | Availability check is not possible |
| 609 | The item & in document & cannot be changed at this point |
| 751 | The committment is only possible for the amount of the ATP qty & |
| 752 | Changes were copied |
| 753 | No changes were made |
| 754 | The total committed quantity is greater than the order quantity |
| 755 | Please select a line that can be changed |
| 756 | Data on updating backorders was saved |
| 757 | Please check the controlling of updating backorders |
| 758 | You have no authorization for updating backorders in plant & |
| 759 | You have no authorization for making changes in plant & |
| 760 | Material & is already being processed in plant & |
| 761 | Order & item & is already being processed |
| 762 | The change leads to an overconfirmation in the amount of &1 |
| 764 | Order date lies after the confirmation date |
| 765 | Enter a date before the end of the replenishment lead time &1 |
| 770 | Material with active ingredient management! No changes possible! |
| 771 | Material with steel management! No changes possible! |
| 772 | No display: Material not relevant to check, therefore always available |
| 773 | Document with credit limit block! |
| 774 | Document with reqmt-specific delivery block! No changes possible |
| 775 | Document with reqmt-specific credit limit block! No changes possible |
| 776 | Not all changes could be saved (see follow-up messages) |
| 800 | Incorrect setup of table & |
| 801 | The confirmed quantity - & & - can only be reduced |
| 802 | On the &, only & & available |
| 803 | Please enter date, or delete quantity |
| 804 | Please note that the customer wants complete delivery |
| 805 | Delivery is only possible on & or later |
| 806 | No goods accepted on &1. The next possible date is: &2 |
| 807 | Select plants to be checked |
| 808 | The specifications are valid for the entire item |
| 809 | Please note that the customer wants complete delivery |
| 810 | Only && are available, && have been assigned so far |
| 811 | No APO materials available in delivery group &1 |
| 812 | Correlation in APO only possible for delivery groups (shipping) |
| 813 | Rounding: &1 &4 was rounded down by &2 &4 to &3 &4 |
| 814 | Rounding: &1 was rounded to &2 (base unit of measure). Reference: &3 &4 |
| 815 | Rounding: &1 &4 was rounded up by &2 &4 to &3 &4 |
| 816 | Rounding: Previous schedule lines were rounded down by &1 &2 |
| 817 | Product allocation data cannot be displayed for original requirement. |
| 818 | Some availability check results could not be displayed. |
| 819 | Availability check results cannot currently be displayed. |
| 820 | Error: Duplicate key for ProductAvailabilityRequirement &1 |
| 821 | Incorrect parameters when calling FUNCTION PAR_DB_READ |
| 822 | Object with ID &1 &2 does not exist |
| 823 | Object with ID &1 does not exist |
| 824 | Item &1 &2 exists already in ProductAvailabilityRequirement &3 |
| 825 | ProductAvailabilityRequirement with ID &1 &2 has the status "Canceled" |
| 850 | Error while calling function &1 in TM server &2: &3&4 |
| 851 | TM scheduling: no MBDAT determined; ATP confirm. not possible &1 &2 &3 |
| 852 | TM scheduling: no result; ATP confirmation not possible &1 &2 &3 |
| 853 | TM scheduling: no quantity; ATP confirmation not possible &1 &2 &3 |
| 854 | TM scheduling: incorrect quantity; ATP confirm. not possible &1 &2 &3 &4 |
| 855 | TM scheduling: incorrect date; ATP confirm. not possible &1 &2 &3 &4 |
| 856 | TM scheduling: error in TM; ATP confirmation not possible &1 &2 &3 &4 |
| 857 | TM system could not be determined |
| 858 | TM scheduling: APO release &3 not connected; &1 &2: no date/time consist. |
| 859 | TM scheduling: APO release &4 not connected; &1 &2 &3: no substitution |
| 860 | TM scheduling: Unit of measure conversion from &1 to ext. UoM failed |
| 861 | TM scheduling: document UoM missing; ATP confirmtn not possible &1 &2 &3 |
| 862 | TM scheduling: system error while filling service structures |
| 863 | TM scheduling: error while calling service: &1&2&3&4 |
| 864 | TM scheduling: conversion error for pick/pack duration &1 &2 &3 |
| 870 | &1&2&3&4 |
| 898 | System error while locking |