AG - Nachrichten ATP-Server

The following messages are stored in message class AG: Nachrichten ATP-Server.
It is part of development package ATPG in software component CA-ATP. This development package consists of objects that can be grouped under "Application development ATP server".
Message Nr
Message Text
001Check the settings for checking group &1 and checking rule &2
002Error in RFC call-up: &1, &2
003Replenishment lead time for material &1 (plant &2) is 0 days
004Sales order item number not specified in requirement
005Project item number not specified in a requirement
006Error occurred during availability check
007No data exists for plant &1 and special procurement key &2
008Unit of measure &1 does not exist
009No master data could be found for material &1 and plant &2
010In-house production time &1 for material &2, plant &3 is too long
011Date &1 cannot be converted (please correct)
012Date &1 lies before start of the valid factory calendar (please correct)
013Date &1 lies after the end of the valid factory calendar (please correct)
014Factory calendar missing or error in factory calendar &1
015Customer number not specified in one requirement
016A requirement needs to be checked against the forecast and ATP logic
017Error occurred during assembly processing
018No plant data exists for plant &1
019No MRP control data exists for plant &1
020No control data maintained for checking group &1
021No control data maintained for checking group &1 and checking rule &2
022Error calling ATP Server: &1, &2
023Error in calling up function '&1' in APO server '&2': &3
024No checking group is maintained for product &1, plant &2 in matl master
025There is no ATP group for DELKZ '&1', ATPIF '&2' and SORT1 '&3'
026Advanced ATP materials cannot be processed, see note 2642047.
027Adv. ATP material &1 in plant &2 cannot be processed, see note 2642047.
028Product availability check is switched off for material &1 in plant &2
029Material Master settings for RPM component &1 &2 are unsuitable for ATP.
031Past receipts were taken into account
032Receipts in the past were not included
033SCM version is too low for RBA control at item level
034Item &1, &2: MISL group cannot be deleted; SCM version too low
035Plant substitution in the item is not possible for MRP areas
050Full conf. of ICON item &1, &2 sch. line &3 unchecked despite APO int.
0510 conf. of ICON item &1, &2 sch. line &3 unchecked despite APO int.
091Selected function cannot be used for the element
101Choose a changeable single record
102Choose one record only
103Please choose an individual record
111Select a line
112Please select a valid line
115Material &1 in plant &2 is APO-relevant
116APO-relevant materials exist. These were not processed
120No MRP element found (are single records expanded?)
121No other MRP element with this number exists
122Please enter the number of the MRP element first
123Call up search function first
130Enter plant or MRP area
131MRP area &1 does not exist
132MRP area &1 is not defined in plant &2
150Requested quantity is not available.
151Requested quantity must not be negative.
152There is no availability information for the requested date.
153Requested date is in the past.
190The line item & not found in internal Table &
201The ATP server cannot be updated (table &1) (area &2)
202Unknown error in call &1
203RFC error in call &1: &2&3
204Distribution function &1 in plant &2 is incorrect
205Distribution function &1 in plant &2 is incorrect
206Error calling function for reading the batch stocks
207ATP Server not set up
208The grouping element could not be determined for &1, &2, &3
209Projects belonging to &1, &2, &3 could not be determined
210Error occurred when determining MRP area for &1, &2, &3, &4
211MRP area for &1, &2 not determined - continue with plant MRP aea &3
212The grouping element could not be determined for &1, &2, &3
221Programming error: unknown table ID &1
222Programming error: unknown processing status &1
223Programming error: data already aggregated
224Programming error: status sequence &1 after &2 not permitted
257Up to &, only & can be confirmed. Requested &
290Text for MRP element &1 not maintained in language &2
310Only the ATP quantity can be confirmed
320The order was already checked according to ATP logic
410Please check the material staging for order &
501Program error: incorrect call of function &1 using parameter &2
510Lock user not specified
511Lock argument incomplete: &
588Check the settings for checking group & and checking rule &
600*********** Messages: Lock Management
601System error while locking
602Material & is locked (availability check not possible)
603Planning material & is locked (assignment check not possible)
604Overflow of the block table during transfer of results
605Material & is blocked (Blocking table has not been updated)
606Planning material & is blocked (Blocking table has not been updated)
607Communication or system problem when locking (see system log)
608Availability check is not possible
609The item & in document & cannot be changed at this point
751The committment is only possible for the amount of the ATP qty &
752Changes were copied
753No changes were made
754The total committed quantity is greater than the order quantity
755Please select a line that can be changed
756Data on updating backorders was saved
757Please check the controlling of updating backorders
758You have no authorization for updating backorders in plant &
759You have no authorization for making changes in plant &
760Material & is already being processed in plant &
761Order & item & is already being processed
762The change leads to an overconfirmation in the amount of &1
764Order date lies after the confirmation date
765Enter a date before the end of the replenishment lead time &1
770Material with active ingredient management! No changes possible!
771Material with steel management! No changes possible!
772No display: Material not relevant to check, therefore always available
773Document with credit limit block!
774Document with reqmt-specific delivery block! No changes possible
775Document with reqmt-specific credit limit block! No changes possible
776Not all changes could be saved (see follow-up messages)
800Incorrect setup of table &
801The confirmed quantity - & & - can only be reduced
802On the &, only & & available
803Please enter date, or delete quantity
804Please note that the customer wants complete delivery
805Delivery is only possible on & or later
806No goods accepted on &1. The next possible date is: &2
807Select plants to be checked
808The specifications are valid for the entire item
809Please note that the customer wants complete delivery
810Only && are available, && have been assigned so far
811No APO materials available in delivery group &1
812Correlation in APO only possible for delivery groups (shipping)
813Rounding: &1 &4 was rounded down by &2 &4 to &3 &4
814Rounding: &1 was rounded to &2 (base unit of measure). Reference: &3 &4
815Rounding: &1 &4 was rounded up by &2 &4 to &3 &4
816Rounding: Previous schedule lines were rounded down by &1 &2
817Product allocation data cannot be displayed for original requirement.
818Some availability check results could not be displayed.
819Availability check results cannot currently be displayed.
820Error: Duplicate key for ProductAvailabilityRequirement &1
821Incorrect parameters when calling FUNCTION PAR_DB_READ
822Object with ID &1 &2 does not exist
823Object with ID &1 does not exist
824Item &1 &2 exists already in ProductAvailabilityRequirement &3
825ProductAvailabilityRequirement with ID &1 &2 has the status "Canceled"
850Error while calling function &1 in TM server &2: &3&4
851TM scheduling: no MBDAT determined; ATP confirm. not possible &1 &2 &3
852TM scheduling: no result; ATP confirmation not possible &1 &2 &3
853TM scheduling: no quantity; ATP confirmation not possible &1 &2 &3
854TM scheduling: incorrect quantity; ATP confirm. not possible &1 &2 &3 &4
855TM scheduling: incorrect date; ATP confirm. not possible &1 &2 &3 &4
856TM scheduling: error in TM; ATP confirmation not possible &1 &2 &3 &4
857TM system could not be determined
858TM scheduling: APO release &3 not connected; &1 &2: no date/time consist.
859TM scheduling: APO release &4 not connected; &1 &2 &3: no substitution
860TM scheduling: Unit of measure conversion from &1 to ext. UoM failed
861TM scheduling: document UoM missing; ATP confirmtn not possible &1 &2 &3
862TM scheduling: system error while filling service structures
863TM scheduling: error while calling service: &1&2&3&4
864TM scheduling: conversion error for pick/pack duration &1 &2 &3
870&1&2&3&4
898System error while locking
Privacy Policy