BANK_JC - Nachrichten zur Jobsteuerung
The following messages are stored in message class BANK_JC: Nachrichten zur Jobsteuerung.
It is part of development package BANK_PP_JOBCTRL in software component CA-GTF-TS-PPM. This development package consists of objects that can be grouped under "Parallel Processing and Job Control".
It is part of development package BANK_PP_JOBCTRL in software component CA-GTF-TS-PPM. This development package consists of objects that can be grouped under "Parallel Processing and Job Control".
Message Nr ▲ | Message Text |
---|---|
000 | Process flow &1 has been started |
001 | There is already a process with this key (&1, &2) |
002 | No predecessor <-> successor relationships for process flow template &1 |
003 | No internal process flow number can be assigned |
004 | Process &1 being started |
005 | Start of process (&1, &2) has been prepared |
006 | Status of process &1 corrected to "terminated" |
007 | It is not possible to end process &1 with job (&2,&3) |
008 | Process flow &1 (mass run ID &2, &3, &4) has been deleted |
009 | Process &1 already has status &2 (&3) - start not possible |
010 | It is not possible to restart execution of process flow &1 |
011 | Job (&1, &2) is terminated |
012 | Job (&1, &2) does not exist |
013 | Report &1 started with variant &2 |
014 | Flow template &1 does not contain any reports |
015 | Variant &1 for report &2 does not exist |
016 | Current processing of process flow &1 is completed |
017 | At least one process from process flow &1 terminated |
100 | A process being started externally needs and external ID |
101 | The external key of the process flow is not set |
102 | Specify the list of reports for scheduling in table &1 |
103 | There is more than one report without predecessor in the process flow |
104 | Report number &1 is not contained in the report list for the process flow |
105 | Specify a report name for report number &1 |