C7 - Scheduling
The following messages are stored in message class C7: Scheduling.
It is part of development package CX in software component PP-CRP-SCH. This development package consists of objects that can be grouped under "R/3 Application development: R/3 Scheduling".
It is part of development package CX in software component PP-CRP-SCH. This development package consists of objects that can be grouped under "R/3 Application development: R/3 Scheduling".
Message Nr ▲ | Message Text |
---|---|
000 | **** Messages,which are written into the protocol |
001 | Scheduling terminated: Check date and scheduling type |
002 | Scheduling terminated: Check lot size unit of measure |
003 | Scheduling terminated: Check lot size unit of measure |
004 | No work center in the op./act. (working/operat.time via cal.in op./act.) |
005 | All standard values not maintained in the operation |
006 | No dates found for restrictions |
007 | Date for restriction could not be converted |
008 | Date is not defined in factory calendar |
009 | PRT: Finish date is before start date, finish date = start date |
010 | Sub-op.: Finish date is before start date, finish date = start date |
011 | Order: Finish dat is before start date, finish date = start date |
012 | Scheduling terminated: No time unit defined for day |
013 | Time units are not fully defined |
014 | No working/operating time maintained in work center for scheduling |
015 | No capacity category maintained in work center for scheduling |
016 | Calender not found |
017 | No calendar specified |
018 | Work center not found |
019 | Entry not found in move time matrix |
020 | Field overflow when calculating PRT quantities |
021 | Field overflow when calculating PRT usage values |
022 | Date cannot be converted into the internal format |
023 | Error when converting into other quantity units |
024 | Field overflow when calculating duration |
025 | Scheduled start is after scheduled finish |
026 | Scheduling type not defined, scheduling type = "only capacity reqmts" |
027 | Quantity unit of the operation/activity is invalid |
028 | No work center or calender in operation/activity |
029 | No release period key defined for scheduling |
030 | Start date is in the past: today scheduling |
031 | Control key & not found |
032 | Scheduling terminated: Scheduling parameters are missing |
033 | Constraint is before basic start date |
034 | Constraint is after basic finish date |
035 | Scheduled start is before basic start date |
036 | Scheduled finish is after basic finish date |
037 | Schedule conflict: Constraint is too early |
038 | Schedule conflict: Constraint is too late |
039 | Cannot keep within time constraint |
040 | Schedule conflict: Contradicting time constraints |
041 | No work center in the relationship (Operating time via calender from rel) |
042 | Relationship: No operating time maintained in work center for scheduling |
043 | Rel: No capacity category maintained in work center for scheduling |
044 | Relationship: Calendar does not exist |
045 | Relationship: No calendar specified |
046 | Rel: Work center does not exist |
047 | Rel: Field overflow when calculating the time interval |
048 | Rel: Date is not defined in factory calendar |
049 | Rel: Date cannot be converted into the internal format |
050 | Rel: Error when converting into different quantity unit |
051 | Operating time not maintained for move in the move time matrix |
052 | Milestone &2: Date is not within the dates for activity &1 |
053 | Field overflow when calculating quantity |
054 | WBS date could not be converted |
055 | Division by 0 when calculating operation quantity |
056 | Capacity & not available |
057 | No valid capacity for finite scheduling |
058 | Relationships to other standard networks exist |
059 | Detailed scheduling level - Order & |
060 | Rate-based scheduling level - Order & |
061 | Rough-cut scheduling level - Order & |
062 | ========================================================================= |
063 | Overlapping could not be maintained |
064 | Minimum overlap time could not be maintained |
065 | Order & is completely confirmed. Order basic dates unchanged |
066 | Error during scheduling of splits |
067 | Not all standard values maintained |
068 | Can delivery date for material & be kept? Realistic date: & |
069 | PRT: no master record found |
070 | Relationship: Maximum duration could not be kept |
071 | Operation has been scheduled |
072 | After scheduling: Order starts in the past |
073 | Milestone &2: Date is not within the dates for WBS element &1 |
074 | Dates are set by external system |
075 | Overall network scheduling: Basic finish date before scheduled finish |
076 | Overall network scheduling: Basic start is after scheduled start |
077 | Overall netw. sched.: No conflicts between basic and scheduled dates |
078 | WBS element &: Forwards scheduling is not possible without a start date |
079 | WBS element &: Backwards scheduling is not possible without a finish date |
080 | Program CX_TCX00 executed successfully |
081 | Program CX_TCX00 executed with a warning |
082 | Time units exist that are smaller and larger/equal to the day |
083 | WBS element &1: Scheduled start comes before the basic start date |
084 | WBS element &1: Scheduled finish comes after the basic finish date |
085 | Repetitive maufacturing: Midpoint sched. around work center &1 not poss. |
086 | In-house production time determined is greater than 999 days |
090 | Scheduling: Multiple commitment due to constraint dates |
091 | Lack of capacity in order &1 |
100 | **** Messages which are not written into the log |
101 | Forward scheduling (enter start date) |
102 | Backward scheduling (enter finish date) |
103 | Capacity requirements calc. (enter start and finish date) |
104 | Start date must not be later than finish date |
105 | Start date is in the past |
106 | Finish date is in the past |
107 | Enter a valid scheduling type |
108 | Lot size is not within selected lot size range |
109 | Basic finish date is after requirements date & |
110 | Outline finish date is after requirements date & |
111 | Check if rate-based scheduling is appropriate -> see long text |
112 | Dependency is too complicated; routing & , sequence & , operation & |
118 | Scheduling has not yet been carried out |
119 | Scheduling log does not contain any entries |
120 | Outline finish date could not be kept |
121 | Outline start date could not be kept |
130 | ********* Texts for X messsages ***************************************** |
131 | Status object &1 in operation &2 order &3 is invalid |
132 | Error while creating internal table operation for order number & |
133 | Scheduling termination: Invalid scheduling time |
134 | Error while creating internal table Order for order number &1 |
135 | Error while reading internal table Operation |
136 | Error whiel reading internal table Order |
137 | Selection criteria not allowed for capacities |
138 | Incorrect access to the capacity document table during availability check |
139 | Key field for operation in capacity requirements record KBED incorrect |
141 | Error while reading capacities with version numbers |
142 | error while reading capacities with splits |
144 | WBS element/project scheduling: No date has been entered |
145 | Dates do not exist in the forecast dates |
146 | There is no operation for scheduling |