C7 - Scheduling

The following messages are stored in message class C7: Scheduling.
It is part of development package CX in software component PP-CRP-SCH. This development package consists of objects that can be grouped under "R/3 Application development: R/3 Scheduling".
Message Nr
Message Text
000**** Messages,which are written into the protocol
001Scheduling terminated: Check date and scheduling type
002Scheduling terminated: Check lot size unit of measure
003Scheduling terminated: Check lot size unit of measure
004No work center in the op./act. (working/operat.time via cal.in op./act.)
005All standard values not maintained in the operation
006No dates found for restrictions
007Date for restriction could not be converted
008Date is not defined in factory calendar
009PRT: Finish date is before start date, finish date = start date
010Sub-op.: Finish date is before start date, finish date = start date
011Order: Finish dat is before start date, finish date = start date
012Scheduling terminated: No time unit defined for day
013Time units are not fully defined
014No working/operating time maintained in work center for scheduling
015No capacity category maintained in work center for scheduling
016Calender not found
017No calendar specified
018Work center not found
019Entry not found in move time matrix
020Field overflow when calculating PRT quantities
021Field overflow when calculating PRT usage values
022Date cannot be converted into the internal format
023Error when converting into other quantity units
024Field overflow when calculating duration
025Scheduled start is after scheduled finish
026Scheduling type not defined, scheduling type = "only capacity reqmts"
027Quantity unit of the operation/activity is invalid
028No work center or calender in operation/activity
029No release period key defined for scheduling
030Start date is in the past: today scheduling
031Control key & not found
032Scheduling terminated: Scheduling parameters are missing
033Constraint is before basic start date
034Constraint is after basic finish date
035Scheduled start is before basic start date
036Scheduled finish is after basic finish date
037Schedule conflict: Constraint is too early
038Schedule conflict: Constraint is too late
039Cannot keep within time constraint
040Schedule conflict: Contradicting time constraints
041No work center in the relationship (Operating time via calender from rel)
042Relationship: No operating time maintained in work center for scheduling
043Rel: No capacity category maintained in work center for scheduling
044Relationship: Calendar does not exist
045Relationship: No calendar specified
046Rel: Work center does not exist
047Rel: Field overflow when calculating the time interval
048Rel: Date is not defined in factory calendar
049Rel: Date cannot be converted into the internal format
050Rel: Error when converting into different quantity unit
051Operating time not maintained for move in the move time matrix
052Milestone &2: Date is not within the dates for activity &1
053Field overflow when calculating quantity
054WBS date could not be converted
055Division by 0 when calculating operation quantity
056Capacity & not available
057No valid capacity for finite scheduling
058Relationships to other standard networks exist
059Detailed scheduling level - Order &
060Rate-based scheduling level - Order &
061Rough-cut scheduling level - Order &
062=========================================================================
063Overlapping could not be maintained
064Minimum overlap time could not be maintained
065Order & is completely confirmed. Order basic dates unchanged
066Error during scheduling of splits
067Not all standard values maintained
068Can delivery date for material & be kept? Realistic date: &
069PRT: no master record found
070Relationship: Maximum duration could not be kept
071Operation has been scheduled
072After scheduling: Order starts in the past
073Milestone &2: Date is not within the dates for WBS element &1
074Dates are set by external system
075Overall network scheduling: Basic finish date before scheduled finish
076Overall network scheduling: Basic start is after scheduled start
077Overall netw. sched.: No conflicts between basic and scheduled dates
078WBS element &: Forwards scheduling is not possible without a start date
079WBS element &: Backwards scheduling is not possible without a finish date
080Program CX_TCX00 executed successfully
081Program CX_TCX00 executed with a warning
082Time units exist that are smaller and larger/equal to the day
083WBS element &1: Scheduled start comes before the basic start date
084WBS element &1: Scheduled finish comes after the basic finish date
085Repetitive maufacturing: Midpoint sched. around work center &1 not poss.
086In-house production time determined is greater than 999 days
090Scheduling: Multiple commitment due to constraint dates
091Lack of capacity in order &1
100**** Messages which are not written into the log
101Forward scheduling (enter start date)
102Backward scheduling (enter finish date)
103Capacity requirements calc. (enter start and finish date)
104Start date must not be later than finish date
105Start date is in the past
106Finish date is in the past
107Enter a valid scheduling type
108Lot size is not within selected lot size range
109Basic finish date is after requirements date &
110Outline finish date is after requirements date &
111Check if rate-based scheduling is appropriate -> see long text
112Dependency is too complicated; routing & , sequence & , operation &
118Scheduling has not yet been carried out
119Scheduling log does not contain any entries
120Outline finish date could not be kept
121Outline start date could not be kept
130********* Texts for X messsages *****************************************
131Status object &1 in operation &2 order &3 is invalid
132Error while creating internal table operation for order number &
133Scheduling termination: Invalid scheduling time
134Error while creating internal table Order for order number &1
135Error while reading internal table Operation
136Error whiel reading internal table Order
137Selection criteria not allowed for capacities
138Incorrect access to the capacity document table during availability check
139Key field for operation in capacity requirements record KBED incorrect
141Error while reading capacities with version numbers
142error while reading capacities with splits
144WBS element/project scheduling: No date has been entered
145Dates do not exist in the forecast dates
146There is no operation for scheduling
Privacy Policy