C7 - Scheduling
The following messages are stored in message class C7: Scheduling.
It is part of development package CX in software component PP-CRP-SCH. This development package consists of objects that can be grouped under "R/3 Application development: R/3 Scheduling".
It is part of development package CX in software component PP-CRP-SCH. This development package consists of objects that can be grouped under "R/3 Application development: R/3 Scheduling".
Message Nr ▲ | Message Text |
|---|---|
| 000 | **** Messages,which are written into the protocol |
| 001 | Scheduling terminated: Check date and scheduling type |
| 002 | Scheduling terminated: Check lot size unit of measure |
| 003 | Scheduling terminated: Check lot size unit of measure |
| 004 | No work center in the op./act. (working/operat.time via cal.in op./act.) |
| 005 | All standard values not maintained in the operation |
| 006 | No dates found for restrictions |
| 007 | Date for restriction could not be converted |
| 008 | Date is not defined in factory calendar |
| 009 | PRT: Finish date is before start date, finish date = start date |
| 010 | Sub-op.: Finish date is before start date, finish date = start date |
| 011 | Order: Finish dat is before start date, finish date = start date |
| 012 | Scheduling terminated: No time unit defined for day |
| 013 | Time units are not fully defined |
| 014 | No working/operating time maintained in work center for scheduling |
| 015 | No capacity category maintained in work center for scheduling |
| 016 | Calender not found |
| 017 | No calendar specified |
| 018 | Work center not found |
| 019 | Entry not found in move time matrix |
| 020 | Field overflow when calculating PRT quantities |
| 021 | Field overflow when calculating PRT usage values |
| 022 | Date cannot be converted into the internal format |
| 023 | Error when converting into other quantity units |
| 024 | Field overflow when calculating duration |
| 025 | Scheduled start is after scheduled finish |
| 026 | Scheduling type not defined, scheduling type = "only capacity reqmts" |
| 027 | Quantity unit of the operation/activity is invalid |
| 028 | No work center or calender in operation/activity |
| 029 | No release period key defined for scheduling |
| 030 | Start date is in the past: today scheduling |
| 031 | Control key & not found |
| 032 | Scheduling terminated: Scheduling parameters are missing |
| 033 | Constraint is before basic start date |
| 034 | Constraint is after basic finish date |
| 035 | Scheduled start is before basic start date |
| 036 | Scheduled finish is after basic finish date |
| 037 | Schedule conflict: Constraint is too early |
| 038 | Schedule conflict: Constraint is too late |
| 039 | Cannot keep within time constraint |
| 040 | Schedule conflict: Contradicting time constraints |
| 041 | No work center in the relationship (Operating time via calender from rel) |
| 042 | Relationship: No operating time maintained in work center for scheduling |
| 043 | Rel: No capacity category maintained in work center for scheduling |
| 044 | Relationship: Calendar does not exist |
| 045 | Relationship: No calendar specified |
| 046 | Rel: Work center does not exist |
| 047 | Rel: Field overflow when calculating the time interval |
| 048 | Rel: Date is not defined in factory calendar |
| 049 | Rel: Date cannot be converted into the internal format |
| 050 | Rel: Error when converting into different quantity unit |
| 051 | Operating time not maintained for move in the move time matrix |
| 052 | Milestone &2: Date is not within the dates for activity &1 |
| 053 | Field overflow when calculating quantity |
| 054 | WBS date could not be converted |
| 055 | Division by 0 when calculating operation quantity |
| 056 | Capacity & not available |
| 057 | No valid capacity for finite scheduling |
| 058 | Relationships to other standard networks exist |
| 059 | Detailed scheduling level - Order & |
| 060 | Rate-based scheduling level - Order & |
| 061 | Rough-cut scheduling level - Order & |
| 062 | ========================================================================= |
| 063 | Overlapping could not be maintained |
| 064 | Minimum overlap time could not be maintained |
| 065 | Order & is completely confirmed. Order basic dates unchanged |
| 066 | Error during scheduling of splits |
| 067 | Not all standard values maintained |
| 068 | Can delivery date for material & be kept? Realistic date: & |
| 069 | PRT: no master record found |
| 070 | Relationship: Maximum duration could not be kept |
| 071 | Operation has been scheduled |
| 072 | After scheduling: Order starts in the past |
| 073 | Milestone &2: Date is not within the dates for WBS element &1 |
| 074 | Dates are set by external system |
| 075 | Overall network scheduling: Basic finish date before scheduled finish |
| 076 | Overall network scheduling: Basic start is after scheduled start |
| 077 | Overall netw. sched.: No conflicts between basic and scheduled dates |
| 078 | WBS element &: Forwards scheduling is not possible without a start date |
| 079 | WBS element &: Backwards scheduling is not possible without a finish date |
| 080 | Program CX_TCX00 executed successfully |
| 081 | Program CX_TCX00 executed with a warning |
| 082 | Time units exist that are smaller and larger/equal to the day |
| 083 | WBS element &1: Scheduled start comes before the basic start date |
| 084 | WBS element &1: Scheduled finish comes after the basic finish date |
| 085 | Repetitive maufacturing: Midpoint sched. around work center &1 not poss. |
| 086 | In-house production time determined is greater than 999 days |
| 090 | Scheduling: Multiple commitment due to constraint dates |
| 091 | Lack of capacity in order &1 |
| 100 | **** Messages which are not written into the log |
| 101 | Forward scheduling (enter start date) |
| 102 | Backward scheduling (enter finish date) |
| 103 | Capacity requirements calc. (enter start and finish date) |
| 104 | Start date must not be later than finish date |
| 105 | Start date is in the past |
| 106 | Finish date is in the past |
| 107 | Enter a valid scheduling type |
| 108 | Lot size is not within selected lot size range |
| 109 | Basic finish date is after requirements date & |
| 110 | Outline finish date is after requirements date & |
| 111 | Check if rate-based scheduling is appropriate -> see long text |
| 112 | Dependency is too complicated; routing & , sequence & , operation & |
| 118 | Scheduling has not yet been carried out |
| 119 | Scheduling log does not contain any entries |
| 120 | Outline finish date could not be kept |
| 121 | Outline start date could not be kept |
| 130 | ********* Texts for X messsages ***************************************** |
| 131 | Status object &1 in operation &2 order &3 is invalid |
| 132 | Error while creating internal table operation for order number & |
| 133 | Scheduling termination: Invalid scheduling time |
| 134 | Error while creating internal table Order for order number &1 |
| 135 | Error while reading internal table Operation |
| 136 | Error whiel reading internal table Order |
| 137 | Selection criteria not allowed for capacities |
| 138 | Incorrect access to the capacity document table during availability check |
| 139 | Key field for operation in capacity requirements record KBED incorrect |
| 141 | Error while reading capacities with version numbers |
| 142 | error while reading capacities with splits |
| 144 | WBS element/project scheduling: No date has been entered |
| 145 | Dates do not exist in the forecast dates |
| 146 | There is no operation for scheduling |