C7 - Scheduling
 The following messages are stored in message class C7: Scheduling.
It is part of development package CX in software component PP-CRP-SCH. This development package consists of objects that can be grouped under "R/3 Application development: R/3 Scheduling".
 It is part of development package CX in software component PP-CRP-SCH. This development package consists of objects that can be grouped under "R/3 Application development: R/3 Scheduling".
| Message Nr ▲ | Message Text | 
|---|---|
| 000 | **** Messages,which are written into the protocol | 
| 001 | Scheduling terminated: Check date and scheduling type | 
| 002 | Scheduling terminated: Check lot size unit of measure | 
| 003 | Scheduling terminated: Check lot size unit of measure | 
| 004 | No work center in the op./act. (working/operat.time via cal.in op./act.) | 
| 005 | All standard values not maintained in the operation | 
| 006 | No dates found for restrictions | 
| 007 | Date for restriction could not be converted | 
| 008 | Date is not defined in factory calendar | 
| 009 | PRT: Finish date is before start date, finish date = start date | 
| 010 | Sub-op.: Finish date is before start date, finish date = start date | 
| 011 | Order: Finish dat is before start date, finish date = start date | 
| 012 | Scheduling terminated: No time unit defined for day | 
| 013 | Time units are not fully defined | 
| 014 | No working/operating time maintained in work center for scheduling | 
| 015 | No capacity category maintained in work center for scheduling | 
| 016 | Calender not found | 
| 017 | No calendar specified | 
| 018 | Work center not found | 
| 019 | Entry not found in move time matrix | 
| 020 | Field overflow when calculating PRT quantities | 
| 021 | Field overflow when calculating PRT usage values | 
| 022 | Date cannot be converted into the internal format | 
| 023 | Error when converting into other quantity units | 
| 024 | Field overflow when calculating duration | 
| 025 | Scheduled start is after scheduled finish | 
| 026 | Scheduling type not defined, scheduling type = "only capacity reqmts" | 
| 027 | Quantity unit of the operation/activity is invalid | 
| 028 | No work center or calender in operation/activity | 
| 029 | No release period key defined for scheduling | 
| 030 | Start date is in the past: today scheduling | 
| 031 | Control key & not found | 
| 032 | Scheduling terminated: Scheduling parameters are missing | 
| 033 | Constraint is before basic start date | 
| 034 | Constraint is after basic finish date | 
| 035 | Scheduled start is before basic start date | 
| 036 | Scheduled finish is after basic finish date | 
| 037 | Schedule conflict: Constraint is too early | 
| 038 | Schedule conflict: Constraint is too late | 
| 039 | Cannot keep within time constraint | 
| 040 | Schedule conflict: Contradicting time constraints | 
| 041 | No work center in the relationship (Operating time via calender from rel) | 
| 042 | Relationship: No operating time maintained in work center for scheduling | 
| 043 | Rel: No capacity category maintained in work center for scheduling | 
| 044 | Relationship: Calendar does not exist | 
| 045 | Relationship: No calendar specified | 
| 046 | Rel: Work center does not exist | 
| 047 | Rel: Field overflow when calculating the time interval | 
| 048 | Rel: Date is not defined in factory calendar | 
| 049 | Rel: Date cannot be converted into the internal format | 
| 050 | Rel: Error when converting into different quantity unit | 
| 051 | Operating time not maintained for move in the move time matrix | 
| 052 | Milestone &2: Date is not within the dates for activity &1 | 
| 053 | Field overflow when calculating quantity | 
| 054 | WBS date could not be converted | 
| 055 | Division by 0 when calculating operation quantity | 
| 056 | Capacity & not available | 
| 057 | No valid capacity for finite scheduling | 
| 058 | Relationships to other standard networks exist | 
| 059 | Detailed scheduling level - Order & | 
| 060 | Rate-based scheduling level - Order & | 
| 061 | Rough-cut scheduling level - Order & | 
| 062 | ========================================================================= | 
| 063 | Overlapping could not be maintained | 
| 064 | Minimum overlap time could not be maintained | 
| 065 | Order & is completely confirmed. Order basic dates unchanged | 
| 066 | Error during scheduling of splits | 
| 067 | Not all standard values maintained | 
| 068 | Can delivery date for material & be kept? Realistic date: & | 
| 069 | PRT: no master record found | 
| 070 | Relationship: Maximum duration could not be kept | 
| 071 | Operation has been scheduled | 
| 072 | After scheduling: Order starts in the past | 
| 073 | Milestone &2: Date is not within the dates for WBS element &1 | 
| 074 | Dates are set by external system | 
| 075 | Overall network scheduling: Basic finish date before scheduled finish | 
| 076 | Overall network scheduling: Basic start is after scheduled start | 
| 077 | Overall netw. sched.: No conflicts between basic and scheduled dates | 
| 078 | WBS element &: Forwards scheduling is not possible without a start date | 
| 079 | WBS element &: Backwards scheduling is not possible without a finish date | 
| 080 | Program CX_TCX00 executed successfully | 
| 081 | Program CX_TCX00 executed with a warning | 
| 082 | Time units exist that are smaller and larger/equal to the day | 
| 083 | WBS element &1: Scheduled start comes before the basic start date | 
| 084 | WBS element &1: Scheduled finish comes after the basic finish date | 
| 085 | Repetitive maufacturing: Midpoint sched. around work center &1 not poss. | 
| 086 | In-house production time determined is greater than 999 days | 
| 090 | Scheduling: Multiple commitment due to constraint dates | 
| 091 | Lack of capacity in order &1 | 
| 100 | **** Messages which are not written into the log | 
| 101 | Forward scheduling (enter start date) | 
| 102 | Backward scheduling (enter finish date) | 
| 103 | Capacity requirements calc. (enter start and finish date) | 
| 104 | Start date must not be later than finish date | 
| 105 | Start date is in the past | 
| 106 | Finish date is in the past | 
| 107 | Enter a valid scheduling type | 
| 108 | Lot size is not within selected lot size range | 
| 109 | Basic finish date is after requirements date & | 
| 110 | Outline finish date is after requirements date & | 
| 111 | Check if rate-based scheduling is appropriate -> see long text | 
| 112 | Dependency is too complicated; routing & , sequence & , operation & | 
| 118 | Scheduling has not yet been carried out | 
| 119 | Scheduling log does not contain any entries | 
| 120 | Outline finish date could not be kept | 
| 121 | Outline start date could not be kept | 
| 130 | ********* Texts for X messsages ***************************************** | 
| 131 | Status object &1 in operation &2 order &3 is invalid | 
| 132 | Error while creating internal table operation for order number & | 
| 133 | Scheduling termination: Invalid scheduling time | 
| 134 | Error while creating internal table Order for order number &1 | 
| 135 | Error while reading internal table Operation | 
| 136 | Error whiel reading internal table Order | 
| 137 | Selection criteria not allowed for capacities | 
| 138 | Incorrect access to the capacity document table during availability check | 
| 139 | Key field for operation in capacity requirements record KBED incorrect | 
| 141 | Error while reading capacities with version numbers | 
| 142 | error while reading capacities with splits | 
| 144 | WBS element/project scheduling: No date has been entered | 
| 145 | Dates do not exist in the forecast dates | 
| 146 | There is no operation for scheduling |