CC - ECM: Nachrichten
The following messages are stored in message class CC: ECM: Nachrichten.
It is part of development package CC in software component CA-GTF-ECM. This development package consists of objects that can be grouped under "Engineering Change Management".
It is part of development package CC in software component CA-GTF-ECM. This development package consists of objects that can be grouped under "Engineering Change Management".
Message Nr ▲ | Message Text |
|---|---|
| 000 | SAP Engineering Change Management |
| 001 | Change number & created |
| 002 | Change number & changed |
| 003 | No change made to change number & |
| 004 | Change number & already exists |
| 005 | Change number & does not exist |
| 006 | Change number & cannot begin with "&" |
| 007 | BOM changes exist for change no. & - it cannot be deleted |
| 008 | Not all objects were deleted |
| 009 | External number assignment not supported for change number & |
| 010 | Object with same key already exists |
| 011 | First selected object |
| 012 | Last selected object |
| 013 | Select object first |
| 014 | Change number & is locked by & |
| 015 | System error locking change number & |
| 016 | Enter the valid-from date |
| 017 | Enter either an alternative date |
| 018 | Enter change number text |
| 019 | Place the cursor on a valid line |
| 020 | Function not supported for task lists |
| 021 | Task list type $ not supported here |
| 022 | No entries found for task lists |
| 023 | Function not supported for material BOMs |
| 024 | No entries found for material BOMs |
| 025 | Function not supported for equipment BOMs |
| 026 | No entries found for equipment BOMs |
| 027 | Function not supported for document structures |
| 028 | No entries for document structures |
| 029 | First select alternative dates |
| 030 | Indicator required, as change objects exist |
| 031 | All indicators deleted |
| 032 | Indicators reset |
| 033 | Indicator deleted |
| 034 | Indicator cannot be changed, as object changes exist |
| 035 | The indicator cannot be reset |
| 036 | Change number & is being assigned |
| 037 | Input parameters are initial |
| 038 | No change to indicators for object type & |
| 039 | No change number for this selection |
| 040 | Object type & is not defined for change number & |
| 041 | Information on trace log |
| 042 | Change object & not supported |
| 043 | Transaction & not supported |
| 044 | Field selection for record type & value & not supported |
| 045 | Error reading document table AENVB |
| 046 | Error reading table DCTAB |
| 047 | Error reading table DTAB |
| 048 | Error reading document table AEOIB |
| 049 | Error reading document table AEDTB |
| 050 | You are not authorized for this authorization group |
| 051 | You are not authorized for this change number and transaction |
| 052 | You are not authorized to create change masters |
| 053 | You are not authorized for this reference |
| 054 | You are not authorized to create a revision level |
| 055 | You are not authorized to change revision levels |
| 056 | You are not authorized to delete change number & |
| 057 | You are not authorized to schedule change number & |
| 058 | You are not authorized to enter change number & |
| 059 | You are not authorized for change number & and activity & |
| 060 | Check the object management records |
| 061 | Processing of this object not supported for change number & |
| 062 | Object locked for processing with change number & |
| 063 | Generation not supported for change object |
| 064 | No changes made to object with change number & |
| 065 | Status & not supported for change master |
| 066 | Change master status & does not allow changes |
| 067 | Choose a display format |
| 068 | Task list changes exist for &. Cannot be deleted |
| 069 | Object management records for materials are not supported in & |
| 070 | No changes made with change number & (note filter) |
| 071 | No changes exist for change number & |
| 072 | No effectivity exists |
| 073 | Date cannot be shifted to & |
| 074 | Date shift changes order |
| 075 | Alternative date & already exists |
| 076 | Status & does not support date shift |
| 077 | First selected alternative date |
| 078 | Last selected alternative date |
| 079 | Not all alternative dates were deleted |
| 080 | Equipment & does not exist |
| 081 | Material & does not exist |
| 082 | Document & & & & does not exist |
| 083 | Functional location & does not exist |
| 084 | No version of document & & & exists |
| 085 | No original found for document & & & & |
| 086 | Document already contains change number & |
| 087 | Versions of & & & already allocated to change number |
| 088 | Management records for documents of change number & deleted |
| 089 | Blank spaces in change number & are not supported |
| 090 | Change number & cannot contain special character & |
| 091 | Missing entries in engineering change management control table |
| 092 | Engineering change mgmt called with data that could not be interpreted |
| 093 | Change number & not allowed for material |
| 094 | Revision level cannot be created for material & |
| 095 | No revision level exists for material & |
| 096 | Material & change number &: no revision levels exist |
| 097 | Revision level & does not exist for material & |
| 098 | No revision level exists for material & on & |
| 099 | Material & change number &: revision level exists |
| 100 | You cannot delete the change number & (documents exist) |
| 101 | Indicator cannot be changed as documents exist for change number |
| 102 | Not all objects were used |
| 103 | Change type & is not defined |
| 104 | No description of change type & exists in language & |
| 105 | Status & is not defined |
| 106 | Status profile & is different to status profile & of change type |
| 107 | Different tasks in change types & and & |
| 108 | Status profile & not defined |
| 109 | Status profile & not allowed here |
| 110 | You must enter material and usages |
| 111 | Equipment and usage are required entries |
| 112 | Type and group are required entries |
| 113 | Enter a material |
| 114 | BOM is locked by & |
| 115 | System error locking a BOM |
| 116 | You must enter document type and document number |
| 117 | You must enter functional location and usage |
| 118 | You must enter standard object and usage |
| 119 | Enter the line in full |
| 120 | Function not supported for material |
| 121 | No entries exist for materials |
| 122 | Function not supported for documents |
| 123 | No entries exist for documents |
| 124 | No objects exist |
| 125 | Function not supported for selected objects |
| 126 | Selection is not supported for this field |
| 127 | Trace log has been activated |
| 128 | Trace log has been deactivated |
| 129 | Revision level & exists already for date & |
| 130 | Revision level & not defined |
| 131 | Revision level & already assigned for material & |
| 132 | No values available for revision level |
| 133 | Revision level & assigned to material & |
| 134 | Revision level & already assigned to change number & |
| 135 | Revision level saved |
| 136 | Revision level changed |
| 137 | No changes made to revision level |
| 138 | Revision level not active in this client |
| 139 | Revision level & is not higher than previous revision level |
| 140 | Update error: table & function & return code & |
| 141 | Change number &: & is inconsistent with existing change status |
| 142 | Change number &: & changes order |
| 143 | & & & & |
| 144 | Change package applies effectivity type from leading change master record |
| 145 | No log exists |
| 146 | Field & requires length &, but field length is & |
| 147 | Change number & is not a leading change master record |
| 148 | Profile & does not exist |
| 149 | An ECR cannot be a leading channge master record |
| 150 | Function not supported for functional location BOMs |
| 151 | No entries for functional location BOMs exist |
| 152 | Function not supported for standard BOMs |
| 153 | No entries for standard BOMs exist |
| 154 | Function not supported for sales order BOMs |
| 155 | No entries for order BOMs exist |
| 156 | This function is not available for work breakdown structure BOM |
| 157 | No entries exist for work breakdown structure BOM |
| 158 | The value '&' is not allowed here |
| 159 | First select a column |
| 160 | Not all objects were allocated |
| 161 | Sales order item & & does not exist |
| 162 | Not all allocations were deleted |
| 163 | Date & is within a protected time period |
| 164 | Date & is in the past |
| 165 | Date shift not possible - data inconsistency in dangerous goods |
| 166 | Date & is greater than &, allowed conversion time running out |
| 167 | Date & is less than &; rule takes effect |
| 168 | Revision level & is not supported (sequence check not possible) |
| 169 | Priority of revision level & is too small |
| 170 | Revision level cannot be created for this document |
| 171 | No revision level exists for this document |
| 172 | No revision level exists for this document and change number & |
| 173 | Revision level & does not exist for this document |
| 174 | No revision level exists for this document on & |
| 175 | No revision level of version & of this document exists |
| 176 | Revision level & has already been assigned for this document |
| 177 | Revision level & for document assigned |
| 178 | Change number & cannot be used for documents |
| 179 | Document version & has revision level & |
| 180 | Change is complete for change number & |
| 181 | Document is not released |
| 182 | Revision levels are not supported for document type & |
| 183 | You can only complete a document in the document management system |
| 184 | Check document data |
| 185 | Enter a revision level |
| 186 | Revision level & is assigned externally |
| 187 | No authorization to create effectivity parameters |
| 188 | No authorization to create effectivity types |
| 189 | System status cannot be set (customer exit) |
| 190 | System status: ECR is not yet approved |
| 191 | System status: the ECR is not yet converted to an ECO |
| 192 | System status: the change is locked |
| 193 | System status: the ECO is already confirmed |
| 194 | System status: the ECO is already completed |
| 195 | System status: Engineering change order & is already released |
| 196 | System status: change is locked by another user |
| 197 | System status: change is locked by the system |
| 198 | System status: order is incomplete |
| 199 | Object Type & is not available |
| 200 | System status: the object cannot be processed yet |
| 201 | System status: the change to this object is already complete |
| 202 | System status: the change to this object is already released |
| 203 | ECR: an object management record is required |
| 204 | ECR contains object management records without a change type |
| 205 | Order & cannot be set to complete (electronic signature is missing) |
| 206 | Order & cannot be released (digital signature required) |
| 207 | Request & cannot be converted (digital signature required) |
| 208 | Task list group & does not exist |
| 209 | Place the cursor on a valid field |
| 210 | Two items are already selected |
| 211 | Two headers are already selected |
| 212 | One header and one item are selected |
| 213 | One header and no items are selected |
| 214 | Only one item is selected |
| 215 | Only one header is selected |
| 216 | No original found for change number & |
| 217 | Choose a valid line |
| 218 | No difference in data records |
| 219 | Nothing was selected |
| 220 | You cannot delete (configuration profile exists) |
| 221 | You cannot delete (characteristics exist) |
| 222 | You cannot delete (classes exist) |
| 223 | You cannot delete (classification exists) |
| 224 | Deletion not possible (object dependencies or assignments thereof exist) |
| 225 | You cannot delete (changes to materials exist) |
| 226 | You cannot delete (material exists) |
| 227 | You cannot delete (phrase exists) |
| 228 | Change number & deleted |
| 229 | You cannot delete (change packages exist) |
| 230 | Alternative date & created for change number & |
| 231 | Alternative date & not found for change number & |
| 232 | Alternative date & deleted for change number & |
| 233 | Alternative date & changed for change number & |
| 234 | Alternative date & has objects allocated for change number & |
| 235 | You cannot delete (dangerous goods exist) |
| 236 | Deletion impossible (variant table exists) |
| 237 | Deletion impossible (planning profile exists) |
| 238 | Deletion not possible |
| 239 | Change number is not assigned (internal number assignment error) |
| 240 | Internal number range 02 not defined |
| 241 | No date shift because characteristics are locked |
| 242 | No date shift because classes are locked |
| 243 | No date shift because classification is locked |
| 244 | No date shift because object dependencies are locked |
| 245 | No date shift because configuration profile is locked |
| 246 | No date shift due to inconsistency in characteristics |
| 247 | No date shift due to inconsistency in classes |
| 248 | No date shift due to inconsistency in classification |
| 249 | No date shift due to inconsistency in object dependencies |
| 250 | No date shift due to inconsistency in configuration profile |
| 251 | ECO & cannot be released for production |
| 252 | Release disallowed (packages do not have released status) |
| 253 | Change number & has already been released for production |
| 254 | Change leader & has already been technically released |
| 255 | Change order & has been released |
| 256 | Reassignment disallowed, inconsistent status |
| 257 | Reassignment disallowed, inconsistent effectivity type |
| 258 | Release key & not supported |
| 259 | Change package & has already been technically released |
| 260 | Object type profile is already in use |
| 261 | Error reading possible entries field for status profile |
| 262 | Effectivity data not copied from source |
| 263 | No date shift (substance is locked) |
| 264 | No date shift (inconsistency in substance) |
| 265 | No date shift (phase is locked) |
| 266 | No date shift (inconsistency in phase) |
| 267 | No date shift (dangerous good locked) |
| 268 | No date shift (inconsistency in dangerous good) |
| 269 | No date shift (& is locked) |
| 270 | Deletion flag is set for leading change master record |
| 271 | Deletion flag is set for this change master |
| 272 | No date shift (inconsistency at &) |
| 273 | Leading change master has deletion flag, and cannot be allocated |
| 274 | Deletion flag removed from change packages |
| 275 | Deletion flag set for change packages |
| 276 | Change leader & is a basic change |
| 277 | Change package & without change leader |
| 278 | You cannot withdraw the "Technical release" indicator |
| 279 | Definition as basic change cannot be withdrawn |
| 280 | Enter the effective date for the statutory rule |
| 281 | End of conversion period & is before effectivity & |
| 282 | Effectivity type & is not fully maintained |
| 283 | Selection is not a change package |
| 284 | Selection must be a leading change master record |
| 285 | Enter & |
| 286 | Value & is greater than & |
| 287 | Enter either & or & |
| 288 | Field & can only have values "X" or " " |
| 289 | Value & in field & is not supported in check table & |
| 290 | No authorization to set digital signature |
| 291 | No electronic signatures available for change number & |
| 292 | Change types & and & have different settings for digital signatures |
| 293 | The value & is not permitted, if & is initial. |
| 294 | Classification could not be copied from the template |
| 295 | Field & is not a fixed value |
| 296 | Value & in field & is not supported |
| 297 | Error occurred in internal buffering |
| 298 | Enter a valid date |
| 299 | Change type & can no longer be changed |
| 300 | Document & & & & does not exist |
| 301 | Revision levels cannot be exploded down |
| 302 | The selected object has no BOM |
| 303 | Select an explosion date within the effectivity period |
| 304 | The selected object is not a document |
| 305 | No original application file exists for the selected document |
| 306 | No object filter defined for user & |
| 307 | No objects were selected for copying |
| 308 | A technical error has occurred. |
| 309 | You need to set the RlProd (released for production) indicator |
| 310 | Combination of global release and individual release not supported |
| 311 | Must be released for planning before you can release for production |
| 312 | Release key value cannot be zero |
| 313 | No allocated package has been technically released |
| 314 | Change number will be unchangeable and taken as effective |
| 315 | Change leader is a basic change. No other packages allowed. |
| 316 | Release key is used in current change numbers |
| 317 | Change number &1 does not exist in object &2 |
| 318 | At least one allocated package is not technically released |
| 319 | Release key cannot be reset |
| 320 | *** TOPIC: DIGITAL SIGNATURE |
| 321 | Inspection request for request & not possible (dig. signature required) |
| 322 | Request check cannot be completed (digital signature is missing) |
| 323 | Request & cannot be approved (digital signature required) |
| 324 | Approval cannot be withdrawn (digital signature required) |
| 325 | Request & cannot be converted (digital signature required) |
| 326 | Request & cannot be copmleted (digital signature required) |
| 327 | Order & cannot be released (digital signature required) |
| 328 | You cannot unlock ECR/ECO & (digital signature required) |
| 329 | You cannot lock ECR/ECO & (digital signature required) |
| 330 | Request & cannot be rejected (digital signature required) |
| 331 | Order & cannot be declared complete (digital signature required) |
| 332 | Order & cannot be declared incomplete (digital signature required) |
| 333 | Change evaluation not possible (digital signature required) |
| 334 | Change number &1 already exists in object &2 |
| 335 | Incorrect processing type (only "A", "C" or "D" allowed) |
| 336 | Change cannot be completed (digital signature required) |
| 337 | Change cannot be released (digital signature required) |
| 338 | Change cannot be declared as having errors (digital signature required) |
| 339 | "Error corrected" status cannot be set (digital signature required) |
| 340 | Release for production without simulation selected |
| 341 | Different signature networks in change types & and & |
| 342 | Object & is still being signed for |
| 343 | ECR/ECO & signed |
| 344 | Object management record & signed |
| 345 | No entries in database for object &1 table &2 |
| 346 | Object & created/changed |
| 347 | Change leader technically released! |
| 348 | Object & has not yet been changed with engineering change order & |
| 349 | ECR/ECO & is still being signed |
| 350 | Material type & not supported for BOM usage & |
| 351 | Signature strategy & does not exist |
| 352 | Change number & duplicated in internal table |
| 353 | User & of document & does not have a user master record |
| 354 | Change number & is restricted |
| 355 | Allocated package & has not been technically released |
| 360 | No changes exist with reference to change packages |
| 361 | Not all packages have been released |
| 362 | No changes exist for current change number |
| 363 | Choose a status where no date shift is allowed |
| 368 | No date shift - validity/material/version locked |
| 369 | No date shift - validity/material/version inconsistent |
| 370 | No date shift, variant table is locked |
| 371 | No date shift, inconsistency in variant table &1, row &2 |
| 372 | No date shift, planning profile is locked |
| 373 | No date shift, inconsistency in planning profile |
| 375 | Leading change master record cannot be changed to &1 |
| 380 | No authorization for this change |
| 381 | Change number cannot be saved |
| 382 | Processing cannot be continued |
| 383 | Object & is not marked in any change number |
| 384 | The combination of object and change number is contained in Baseline |
| 390 | Headings have not been maintained in logon language |
| 392 | Production order does not exist |
| 395 | Object & and ID & do not exist |
| 396 | Long text does not exist |
| 397 | Long text for routing could not be copied |
| 400 | Initial value not expected in interface field "&" |
| 401 | Interface data cannot be interpreted |
| 402 | Value & not supported for interface field & |
| 403 | Error when reading table AENRCNV - return code = & |
| 404 | Template format is & |
| 405 | The length of the change number is greater than the current setting |
| 406 | Entry is too long; format is & |
| 407 | Specify a length or a template |
| 408 | Length & does not match the template |
| 409 | Numeric change numbers already exist in the system |
| 410 | The indicator cannot be canceled (already used) |
| 411 | All dependent indicators are reset |
| 412 | The length of the change number cannot be greater than 12 |
| 420 | Document flow could not be updated |
| 421 | Only enter one import parameter |
| 422 | Change message & does not exist |
| 425 | Data for product and location must not be in R/3 |
| 426 | Data for material and plant must not be in APO |
| 442 | Date & was used from change number |
| 480 | ---***--- ALE for engineering change management |
| 481 | Change number & with incompatible length in field & (& -> &) |
| 482 | You cannot have more than 10 & fields in & |
| 483 | Processing from &1: &2 |
| 484 | No change numbers available for object & |
| 485 | Change number & cannot be distributed |
| 486 | ECR/ECO & cannot be distributed |
| 501 | No master IDoc was created for & |
| 502 | Object & does not have a long text in language & |
| 503 | An error occurred occurred using API to update change number & |
| 504 | ISO language indicator & in object & is not known |
| 505 | Error converting language indicator & in object & |
| 506 | No IDOC generated for change number &1 |
| 507 | Processing of change number: & |
| 508 | Error in IDoc & for change object & |
| 509 | Processing code & unknown |
| 510 | Change number & cannot be sent |
| 511 | Error in date interval |
| 512 | Error in time interval |
| 513 | Error when reading change pointer |
| 514 | Change number & with revision level & updated |
| 515 | Error when updating API for change number & (revision level &) |
| 516 | There are no changes |
| 517 | Error occurred when saving processing flag for change pointer |
| 518 | Error occurred when deleting change number & |
| 519 | Change number & has incompatible name in field & |
| 520 | *** API/IDoc - log entries |
| 521 | Change number function/type is not known |
| 522 | Posting interrupted by customer exit |
| 525 | *** change / maintain |
| 526 | Change master & cannot be converted to an ECR |
| 527 | Function of change number cannot be changed |
| 530 | Function does not support PVS variants |
| 531 | No entries for PVS variants available |
| 532 | PVS nodes and PVS variants have to be entered |
| 533 | iPPE variant with internal key & does not exist |
| 534 | iPPE variant & & & & does not exist |
| 540 | No list with change numbers available |
| 550 | Change number & deleted |
| 551 | Start of change number & processing |
| 552 | Change number & was updated |
| 553 | Obj. mgmt rec. for document structure & could not be posted |
| 554 | Obj. mgmt rec. for FloBOM & could not be posted |
| 555 | Obj. mgmt rec. for standard BOM & could not be posted |
| 556 | Obj. mgmt rec. for sales order BOM & cuold not be posted |
| 557 | Obj. mgmt rec. for material BOM & could not be booked |
| 558 | Obj. mgmt rec. for equipment BOM & could not be booked |
| 559 | Obj. mgmt record for WBS BOM & could not be saved |
| 560 | Obj. mgmt rec. for task list & could not be booked |
| 561 | Object management record for PVS variant & could not be entered |
| 562 | Obj. mgmt rec. for document & could not be posted |
| 564 | Obj. mgmt rec. for material & could not be posted |
| 565 | Change object & has already been used in ECR & |
| 569 | Processing of change number & was canceled |
| 570 | The value 'EFF' must be passed for the effectivity type |
| 571 | Effectivity type & is in use and cannot be changed |
| 572 | Effectivity type & is in use and cannot be deleted |
| 573 | Effectivity type & already exists |
| 574 | Value for function must be '_',1,2, or 3 |
| 575 | & can only be used in combination with a validity type |
| 576 | Enter a numeric value (you entered &) |
| 577 | Interface field '&' must contain initial value |
| 578 | For function '&', interface field '&' must contain initial value |
| 579 | Initial values (0 or blank) are expected in interface table & |
| 581 | Revision level can only be allocated automatically |
| 582 | You can only create one revision level for each object |
| 583 | All interface fields for the document information record passed |
| 600 | *** Change hierarchy |
| 601 | No leading change master records were selected. |
| 602 | Change number & is not a leading change master record or a package |
| 603 | Object type definitions are not supported for change leaders |
| 604 | No leading change master records found in selection area. |
| 605 | The conversion is not allowed for change numbers with effectivity |
| 606 | The valid-from date must be corrected before conversion |
| 651 | Indicator deleted |
| 700 | SYNTAX error when generating RCC00701 |
| 750 | "Valid-to" date less than "valid-from" date |
| 751 | First select an entry |
| 752 | "From serial number" greater than "to serial number" |
| 753 | Overlapping intervals exist |
| 754 | Define an effectivity type in customizing first |
| 755 | According to Customizing, only validities of type & are allowed |
| 756 | Material & has not been created |
| 800 | System messages for ECM |
| 801 | Error occurred on engineering change hierarchy output. |
| 802 | Error occurred when constructing node table |
| 803 | One or more transactions was executed automatically: &1 |
| 804 | One transaction could not be executed automatically: &1 &2 |
| 805 | Changes to &1 &2 have been undone |
| 806 | Changes to &1 &2 cannot be undone |
| 810 | Place the cursor on the change number only |
| 811 | Change only possible for change number. Place cursor appropriately. |
| 819 | Effectivity parameter has not been created |
| 820 | Effectivity: & is not available |
| 821 | Effectivity type & has been created |
| 822 | Error when creating validity type & |
| 823 | Select at least one parameter |
| 824 | Priority & already exists |
| 825 | Domain for parameter & is incorrect (conversion exit) |
| 826 | Data type of parameter & is not allowed |
| 827 | Special character '_' not allowed in parameter names |
| 828 | The number assigned is within the critical area |
| 829 | Last number of number range has been assigned |
| 830 | Last number of number range has been used |
| 831 | The titles are not maintained in the logon language |
| 832 | & is a change leader. Allocated change packages are being retrieved. |
| 833 | Enter the parameter name |
| 834 | & is not a leading change master record |
| 835 | Maintain values for parameter effectivity & |
| 836 | Standard variant & does not exist |
| 837 | Enter a name for the standard variant |
| 838 | Standard value assignment cannot not be a numerical value |
| 839 | Parameter effectivity has been deactivated in Customizing |
| 840 | Structure & is not assigned to a transport request |
| 841 | No transport request has been created for the effectivity types |
| 850 | Date/(maintenance) values are missing for effectivity check |
| 851 | Effectivity type DATE does not exist |
| 852 | Technical status & is not available |
| 853 | You cannot enter a change leader here |
| 854 | Enter a change package |
| 855 | Change package & was transformed |
| 856 | Effectivity type & does not exist |
| 857 | Change number & was transformed |
| 860 | Data has been saved |
| 861 | Data was changed |
| 862 | Data was deleted |
| 863 | Data already saved |
| 864 | Data must be imported first |
| 865 | Enter a change number |
| 866 | Only change numbers can be used with release key |
| 867 | The change number & is already a change packet |
| 868 | Change units are not valid as an entry |
| 870 | This document version has already been released and is for display only |
| 871 | Change type for object management record is initial |
| 872 | Digital signature required - change number is not saved yet |
| 873 | Maximum possible number of alternative dates has already been reached |
| 874 | Change type & cannot be used due to digital signature network & |
| 875 | Authorization group & does not exist; check your entry |
| 876 | Data element & must be in the customer namespace |
| 877 | Domain of data element must be of type NUMC or CHAR |
| 878 | Material number is not permitted |
| 879 | Function is not possible in this context |
| 880 | Data element is not allowed to refer to a reference type |
| 881 | No date shift; material BOM & is in a baseline |
| 882 | Deletion not possible (engineering record(s) exist for &) |
| 883 | More than the maximum of 18 possible validity parameters are assigned. |