CJ - Project master data and structure
The following messages are stored in message class CJ: Project master data and structure.
It is part of development package CN_PSP_OPR in software component PS-ST-OPR. This development package consists of objects that can be grouped under "Operative Work Breakdown Structure".
It is part of development package CN_PSP_OPR in software component PS-ST-OPR. This development package consists of objects that can be grouped under "Operative Work Breakdown Structure".
Message Nr ▲ | Message Text |
|---|---|
| 001 | & & & & |
| 002 | Network & does not exist |
| 003 | Enter project |
| 004 | Enter WBS element |
| 005 | Enter project definition or WBS element |
| 006 | Select at least one activity |
| 007 | Network & contains no activities |
| 008 | Choose only one WBS element (PR...) |
| 009 | Start date must be later than "&" |
| 010 | Project & already exists |
| 011 | Project & does not exist |
| 012 | Finish date must be earlier than "&" |
| 013 | Project & is being created |
| 014 | Project & is being changed |
| 015 | Project & is being deleted |
| 016 | Project & version & already exists |
| 017 | Project & version & does not exist |
| 018 | Cannot search in the selected column |
| 019 | Object does not exist |
| 020 | WBS element & already exists |
| 021 | WBS element & does not exist |
| 022 | There are active simulations for the project |
| 023 | WBS element & is being created |
| 024 | WBS element & is being changed |
| 025 | WBS element & is being deleted |
| 026 | WBS element & version & already exists |
| 027 | WBS element & version & does not exist |
| 028 | Simulations already exist for the WBS element |
| 029 | Enter project or WBS element |
| 030 | Navigation not possible |
| 031 | & &: No changes permitted |
| 032 | No changes to project definition allowed |
| 033 | The WBS elements do not exist |
| 034 | The project definition could not be changed |
| 035 | The project definition could not be created |
| 036 | Data cannot be saved |
| 037 | Project definition & is not active |
| 038 | Deletion flag for WBS element & not possible |
| 039 | Deletion flag for project & not possible |
| 040 | Maintain calendar |
| 041 | Error & when calling up classification - saving is not possible |
| 042 | WBS element & cannot be classified - saving is not possible |
| 043 | Could not set a deletion flag for the activity elements |
| 044 | Project & version & already exists |
| 045 | Activating inactive simulation versions can lead to to inconsistencies |
| 046 | Deletion flags could not be set for milestones |
| 047 | Deletion flags could not be set for relationships |
| 048 | Deletion flag not possible, act. &1 for act. elem. &2 &3 not selected |
| 049 | Activity &1 &2 do not belong to simulation version &3 in project &4 |
| 050 | Active simulation versions exist for WBS element & |
| 051 | WBS element & is not an account assignment element |
| 052 | WBS element & is not a billing element |
| 053 | WBS element has not been assigned a billing plan |
| 054 | You cannot maintain the settlement rule for WBS element |
| 055 | WBS element & has an account assignment and cannot be deleted |
| 056 | &: account assignment indicator cannot be removed |
| 057 | WBS element & is already budgeted and cannot be deleted |
| 058 | WBS element & is plan integrated and can not be deleted |
| 059 | There are already plan values for the WBS element & |
| 060 | No long text exists |
| 061 | Text not yet created for & & |
| 062 | & & already exists |
| 063 | WBS element & is marked for deletion |
| 064 | WBS element & is locked for account assignment |
| 065 | WBS element & does not belong to controlling area & |
| 066 | WBS element & does not belong to company code & |
| 067 | WBS element & does not belong to business area & |
| 068 | WBS element & is not assigned to a business area |
| 069 | WBS element & is already fully invoiced |
| 070 | WBS element & is a statistical WBS element |
| 071 | The top element cannot be cut |
| 072 | WBS element &1 cannot be deleted due to assignments in network &2 |
| 073 | Project &1 (sub-tree &2) is being changed |
| 074 | WBS element & could not be created |
| 075 | Controlling area is different in reference & and project |
| 076 | Enter just one WBS element to select a subtree |
| 077 | Cannot delete - simulation versions exist |
| 078 | WBS element cannot be included in the worklist |
| 079 | Double-click on an object in the templates section to select a template |
| 080 | Substitution was not carried out |
| 081 | Project &1 does not belong to controlling area &2 |
| 082 | Enter a start date. Otherwise today's date will be used |
| 083 | Enter a finish date. Otherwise today's date will be used |
| 084 | The activity has not been assigned to the WBS elements |
| 085 | Create an object by double-clicking or drag and drop |
| 086 | Milestone &1 is assigned to another WBS element |
| 087 | Error during scheduling. Save function not possible |
| 088 | Final date must be later than & |
| 089 | Start date must be earlier than & |
| 090 | Standard network & is assigned to the WBS element |
| 091 | Activity &1 in standard network &2 is asigned to the WBS element |
| 092 | WBS element &: Assignments of dependent objects |
| 093 | Project &: Assignments of dependent objects |
| 094 | Checking whether object can be deleted ... |
| 095 | WBS element & is not relevant for project summarization |
| 096 | &1 &2 &3 already exists operative (only deletion flag possible) |
| 097 | Copying (standard) WBS structure is not possible |
| 098 | Activity element &1, standard network &2 is assigned to the WBS element |
| 099 | Scheduling is not supported in the actual set of dates |
| 100 | ======================================================================== |
| 101 | Status &1 of WBS element &2 does not allow changes to the data |
| 102 | Enter the start date. Otherwise the finish date is set here |
| 103 | Enter the finish date. Otherwise the start date is set here |
| 104 | User status & is not active |
| 105 | Variance in obj. currency despite availability control in object currency |
| 106 | You cannot delete the milestone |
| 107 | Standard WBS element is assigned to material &1 (ord.type: &2) (see CN08) |
| 108 | Project stock: invalid value or action |
| 109 | Errors occurred in the BAdI & |
| 110 | Function cannot be carried out in display mode |
| 111 | You can only derive the structure, if you select the whole project |
| 112 | WBS elements and the project definition have different/no editing masks |
| 113 | No errors were found |
| 114 | Function cannot be executed, please check |
| 115 | Could not find a superior WBS element for WBS element & |
| 116 | Superior WBS element released or technically completed |
| 117 | WBS element & is assigned to a capital investment measure |
| 118 | No editing mask exists for project & |
| 119 | "SD/PS Assignment" indicator cannot be set |
| 120 | Project Definition '&1' : No changes possible because of status &2 |
| 121 | No WBS element exists for project & |
| 122 | & is the WBS element for project & |
| 123 | & & not selected |
| 124 | Existing relationships are shown |
| 125 | &1 is WBS element in project &2 version &3 |
| 126 | Activity element cannot be moved to the new network |
| 127 | Number of the WBS element or activity cannot be changed |
| 128 | Enter a WBS number or an activity number |
| 129 | &1: Indicator &2 cannot become &3 |
| 130 | **************Project planning board*************************** |
| 131 | The object cannot be shifted vertically |
| 132 | Select a project object |
| 133 | You selected too many project objects |
| 134 | Select at least one set of dates |
| 135 | Select either earliest or latest dates |
| 136 | Date for the time line must be on the time axis |
| 137 | Date for the left frame of the graphic must be on the time axis |
| 138 | No dates available. Today's date is used as start date. |
| 139 | Select WBS element and/or activity. |
| 140 | No dates available. Project start is used as start date. |
| 141 | No dates available. Project finish is used as finish date. |
| 142 | No dates available. Today's date is used as finish date. |
| 143 | You have not entered a WBS or an activity number. Data is not transfered. |
| 144 | You do not have authorization to edit all activities for WBS element & |
| 145 | You have not entered a profile. Access not possible. |
| 146 | No report selected. You cannot call up the info system |
| 147 | Not all activities can be costed for WBS element & |
| 148 | No costs were calculated for any WBS element |
| 149 | Planned values calculated -> See reports |
| 150 | No dates set. Scheduling could not be carried out |
| 151 | No confirmations for WBS element "&" exist |
| 152 | Reconcile the milestone date with that of the WBS element |
| 153 | Select a valid line |
| 154 | There are still activities in the buffer |
| 155 | There are still WBS elements in the buffer |
| 156 | No activities exist |
| 157 | WBS element & cannot be costed |
| 158 | Constraint & not valid |
| 159 | Project object "&" cannot be changed due to status |
| 160 | Only the first 32 periods are displayed |
| 161 | Activity cannot be scheduled. Control key does not allow scheduling |
| 162 | Status was set |
| 163 | Purchase requisitions/reservations were activated |
| 164 | Finish date &1 of reporting period must be after the start date &2 |
| 165 | Dates from & WBS element(s) were adjusted |
| 166 | No network is assigned to WBS element "&" |
| 167 | Activity dates are not within WBS dates |
| 168 | Activities in network "&" are assigned to several WBS elements |
| 169 | WBS element is displayed by number |
| 170 | Not all of the fields in the field selection are displayed |
| 171 | Your relationship's predecessor or successor is not an activity |
| 172 | You cannot cancel. Superior WBS is confirmed |
| 173 | Select a valid line |
| 174 | WBS element & has no activities |
| 175 | The dates for WBS element & cannot be changed |
| 176 | Automatic cost calculation for networks was activated |
| 177 | Capacity calculation was activated and takes place from next scheduling |
| 178 | Not all activities are displayed |
| 179 | Status set, apart from the project definition |
| 180 | Field selection not possible for &. |
| 181 | The selected project object dates cannot be deleted |
| 182 | Selected project objects cannot be deleted |
| 183 | Constraints for actual dates are not possible |
| 184 | No forecast dates exist |
| 185 | No dependent objects exist |
| 186 | Field selection profile & cannot be changed |
| 187 | Planning board profile cannot be changed |
| 188 | Control error & has occured in the graphic |
| 189 | No capacities have been assigned to the selected WBS elements |
| 190 | Activity elements are not copied separately |
| 191 | Activity & Network &: Release not allowed |
| 192 | WBS element & has no activities |
| 193 | Selct one or more project objects of the same type |
| 194 | You cannot copy an activity milestone to a WBS element |
| 195 | "Open project" starts project &1 in the planning board |
| 196 | &1 cannot be moved to &2 |
| 197 | Milestone &1 was created for WBS element &2 |
| 198 | Milestone belongs to a billing plan - cannot change assignments |
| 199 | Found no requirements for material &1 in plant &2 |
| 200 | ======================================================================== |
| 201 | Entry & missing for screen sequence control |
| 202 | Processing only possible in the Project System |
| 203 | Cannot set finish date |
| 204 | No maintenance orders available |
| 205 | Bottom-up scheduling is only useful for the entire hierarchy |
| 206 | &1 '&2': Generic object services are possibly only after saving |
| 207 | WBS element not yet saved; function not possible |
| 208 | Work center / work cannot be changed for general costs activity & |
| 209 | Not all project types are assigned to project profile &1 |
| 210 | Project type &1 not assigned to Project Profile &2. |
| 211 | You need to use the Plan Customer Project app to edit the project |
| 212 | You need to use Project Services apps to edit the project |
| 213 | Project &1 can only be edited using the Project Services apps. |
| 214 | Changes to project &1 cannot be saved. |
| 215 | WBS element &1 can only be edited using the Project Services apps. |
| 216 | Changes to WBS element &1 cannot be saved. |
| 217 | |
| 218 | You cannot modify the root level WBS Element. Make another selection. |
| 219 | You cannot open this project as the profile assigned is not supported. |
| 220 | You can copy only projects with Enterprise Project - Internal profile. |
| 221 | Data not changed |
| 222 | Data saved |
| 223 | Data cannot be saved because required entries have not been made. |
| 224 | You cannot delete the WBS element at the root level. |
| 225 | You cannot change &1. Verify the status of root level WBS Element. |
| 226 | You can select only projects with Enterprise Project - Internal profile. |
| 227 | You can include only WBS with Enterprise Project - Internal profile. |
| 228 | You cannot move the root level WBS element. |
| 229 | Enter a project definition to be copied. |
| 230 | No detailed information found |
| 231 | Error during migration of project &1. |
| 232 | No period values available |
| 233 | Error during migration of project &1. |
| 234 | Start and end dates are set based on the duration of the source project. |
| 235 | Data cannot be saved. Enter all project element details. |
| 236 | Scheduling scenario set: Change (substitution) is not possible |
| 237 | Profit center of WBS & is not same as the profit center of its order & |
| 238 | Profit center of WBS & is not same as the profit center of activity & & |
| 239 | Change your setting.The billing element can be set only at the root level |
| 240 | You cannot copy the project due to inconsistencies in the source project. |
| 241 | You cannot create the project with this ID. |
| 242 | You cannot delete this project element. |
| 243 | Include project elements having same project profile as source project. |
| 244 | You cannot create a settlement rule. |
| 245 | You can create a settlement rule only at the project root level. |
| 246 | Project currency cannot be changed. Actual or planned costs exist. |
| 247 | No authorization to copy Controlling Areas. |
| 248 | Planned Start was determined automatically |
| 249 | Planned Finish was determined automatically |
| 250 | ----------------------Versions------------------------------------------- |
| 251 | Enter an unique version number without special characters |
| 253 | No version & exists for project & |
| 254 | You do not have authority to create simulation versions. |
| 255 | The version &1 &2 is no longer active |
| 256 | Simulation version &1 for project &2 exists already |
| 257 | First save the simulation |
| 258 | This version key is not permissible for simulation versions |
| 259 | Mask & is inactive. |
| 260 | Enter a version number |
| 261 | Creating project &1 version &2 |
| 262 | Project &1 version &2 is not a simulation version |
| 263 | Creating sub-trees is not allowed |
| 264 | Project &1 version &2 is being changed |
| 265 | Project &1 version &2 is being changed (sub-tree &3) |
| 266 | WBS element & is inactive. Function not possible |
| 267 | Enter a version name |
| 268 | Enter a user status |
| 269 | Enter a version key |
| 270 | Display of objects from simulation versions is not supported |
| 271 | Version & is controlled by status. You cannot delete |
| 272 | Heriarchy cannot become &1, because &2 is forbidden |
| 273 | Simulation &1 &2 consists of partial trees. No transfer possible |
| 274 | Cannot create asset under construction for a simulation WBS |
| 275 | Hierarchy for &1 &2 cannot be &3 and &4 is not allowed |
| 276 | |
| 277 | Field Key &1 is not valid for the project definition |
| 278 | Field Key &1 is not valid for the WBS element |
| 279 | Unmigrated PS Texts exist.Please run the Migration Report &1. |
| 280 | Termination: Too many errors (more than &1% of methods) |
| 281 | The New Model of PS Text was already activated. This cannot be reverted. |
| 300 | ======================================================================== |
| 301 | Select a line |
| 302 | Select only one entry |
| 303 | List has only & entries |
| 304 | Select an entry |
| 305 | You have not selected another object |
| 306 | No multiple selection (choose only one option) |
| 307 | List has no entries |
| 308 | Please select with "X", * set by the system |
| 309 | Too many lines to insert. Enlarge your window. |
| 310 | Position cursor as desired and press Enter |
| 311 | To select or mark, position cursor on selection field |
| 312 | Short ID has only & character(s) |
| 313 | First selected WBS element reached |
| 314 | Last selected WBS element reached |
| 315 | Last WBS milestone reached |
| 316 | First WBS milestone reached |
| 317 | First selected object already displayed |
| 318 | Last selected object already displayed |
| 319 | Select a column |
| 320 | It is not possible to search in this column |
| 321 | No entries were found for the criteria entered |
| 322 | Alphanumeric search string for this column is not possible |
| 330 | &1 records of PRPS were not updated |
| 351 | Project profile & does not exist. |
| 352 | A status does not allow you to extend the structure. |
| 353 | Graphic profile could not be created |
| 360 | Status profile is different: Cannot set user status |
| 400 | =================== Hierarchy ========================================== |
| 401 | You cannot shift WBS element & into its own sub-hierarchy |
| 402 | Select WBS element first |
| 404 | Choose top item |
| 406 | Choose reference element and layout |
| 410 | You cannot insert/position an element next to the initial element |
| 411 | & WBS elements could not be moved to lower levels |
| 412 | & WBS elements could not be moved to higher levels |
| 413 | You cannot shift elements before the initial element |
| 414 | You can only cut if the entire project is selected |
| 415 | Initial element cannot be deleted |
| 416 | & WBS elements deleted |
| 417 | You cannot shift the initial element |
| 418 | WBS element & can no longer be shifted |
| 419 | No hierarchical changes possible to WBS element &1 |
| 420 | No hierarchical changes possible since the project has budget postings |
| 426 | Highest element of selected hierarchy reached |
| 427 | Left limit of hierarchy level reached |
| 428 | Right limit of hierarchy level reached |
| 429 | Element not further subdivided |
| 430 | Navigation not possible |
| 435 | Enter new WBS elements only under the initial element |
| 436 | Do not enter a level smaller than & |
| 437 | Do not enter a level greater than & |
| 440 | Subproject assignment & not allowed - You cannot save |
| 441 | Process the subproject assignment completely |
| 444 | Not all required networks read/locked. Date cannot be moved |
| 449 | No template has been entered |
| 450 | WBS elements could not be included. Check your entry |
| 451 | Key and hierarchy were checked: No errors |
| 452 | & key was not processed |
| 453 | A WBS element with key "&" already exists |
| 454 | Key "&" has been assigned several times (& WBS elements) |
| 455 | & does not exist. You cannot replace |
| 456 | & key(s) were changed |
| 457 | Enter only one WBS element |
| 458 | WBS elements were not included |
| 459 | & WBS elements were included |
| 460 | Enter project profile or project definition to be copied |
| 461 | Level missing in hierarchy: WBS element & cannot be included |
| 462 | Project definition to be copied not entered |
| 463 | Select required WBS elements |
| 464 | Incomplete assignment: Required WBS elements are missing |
| 465 | Hierarchy could not be included; root element does not exist |
| 466 | WBS element & does not exist in subhierarchy |
| 467 | Subhierarchy is not consistent |
| 468 | Hierarchy can no longer be changed |
| 469 | You cannot move the root element of the hierarchy |
| 470 | ====================== Project planning board =========================== |
| 471 | Activities for WBS element & could not be read |
| 472 | Enter profile for project planning board in project profile "&" |
| 473 | Scheduled dates cannot be changed |
| 474 | Select an activity |
| 475 | Select an activity with a subnetwork |
| 476 | No subnetworks displayed in the graphic |
| 477 | Select a milestone |
| 478 | Select a(n) & |
| 479 | You have not selected an activity or a(n) & |
| 480 | Select a relationship |
| 481 | Select a milestone for an activity |
| 482 | Date not entered correctly |
| 483 | Time not entered correctly |
| 484 | Unit & is not valid |
| 485 | You did not select "description" in field selection |
| 486 | You did not select dates in field selection |
| 487 | You did not select costs in field selection |
| 488 | No activities for selected & found |
| 489 | No activities are displayed for the selected WBS elements |
| 490 | Enter only dates or duration and one date |
| 491 | Incorrect entry for time scale. Try again |
| 492 | Activity is already dispatched. You cannot change dates. |
| 493 | You cannot insert dates in this mode |
| 494 | WBS element & has no start date. Scheduling not possible. |
| 495 | WBS element & has no finish date. Scheduling not possible. |
| 496 | You cannot insert lines in the table area |
| 497 | Several sets of dates selected: You cannot insert a time bar |
| 498 | There are no relationships which can be displayed. |
| 499 | No graphic profile with index & exists |
| 500 | =================== Scheduling ========================================= |
| 501 | Select a WBS element |
| 502 | You can only insert one time bar per element |
| 503 | Dates in WBS element & not current |
| 504 | WBS element & is not an account assignment element |
| 505 | WBS element & is locked for time scheduling |
| 506 | Finish date for WBS element & no longer fits |
| 507 | Start date for WBS element & no longer fits |
| 508 | WBS element & has no activities |
| 509 | Enter a standard network or network |
| 510 | Network & locked. You cannot shift dates |
| 511 | Network & locked. Time scheduling not possible |
| 512 | Actual finish date for WBS element & cannot be maintained |
| 513 | No dates exist for WBS element & |
| 514 | No overlapping dates found |
| 515 | You cannot delete the start date |
| 516 | You cannot delete the finish date |
| 517 | No schedule conflicts found |
| 518 | No activities copied |
| 519 | Enter a WBS element |
| 520 | No schedule conflicts found for basic dates |
| 521 | No schedule conflicts found for forecast dates |
| 522 | Network profile does not exist. Change project definition |
| 523 | You cannot assign the activity number |
| 524 | Start date earlier than start date & in superior WBS element |
| 525 | Start date earlier than start date & of the project |
| 526 | Finish date later than finish date & of the project |
| 527 | Finish date later than finish date & of superior WBS element |
| 528 | Start date in the future |
| 529 | Finish date in the future |
| 530 | Schedule conflicts found. Correct dates |
| 531 | No dates in WBS element &. Reconciliation not possible |
| 532 | Schedule conflicts exist. See log |
| 533 | Either select only one WBS element or no WBS element |
| 534 | No WBS elements exist |
| 535 | Missing data for time scheduling in project profile & |
| 536 | No new networks exist |
| 537 | Schedule conflicts found for basic dates. Please correct |
| 538 | Schedule conflicts found for forecast dates. Please correct |
| 539 | No activity elements could be found for the selected activities |
| 540 | No network assignment entered for WBS element & |
| 541 | WBS element & must be an account assignment element |
| 542 | New start date is later than the old one |
| 543 | No date changes exist |
| 544 | Network type "&" does not exist |
| 545 | Date &1 is not a working day. Continue using &2? |
| 546 | Start date is in the past |
| 547 | Finish date is in the past |
| 548 | Select a network first |
| 549 | Activity dates exist for WBS element &. You cannot delete |
| 550 | Define network profile first |
| 551 | Enter dates in the project definition first |
| 552 | No activities exist for the selected WBS elements |
| 553 | No basic dates exist. Forecast dates for & not possible |
| 554 | Dates conflict with the dates of the subordinate WBS elements. |
| 555 | Dates for activity elements could not be maintained |
| 556 | Field length exceeded when calculating WBS element & duration |
| 557 | No activities exist for WBS element & |
| 558 | Field length exceeded when calculating project & duration |
| 559 | Activity start earlier than WBS element & start date |
| 560 | Activity finish later than WBS element & finish date |
| 561 | WBS element & has activities. Delete activities first |
| 562 | Level dates for all activities first |
| 563 | Finish date is earlier than start date |
| 564 | Enter start and finish date |
| 565 | MRP controller &2 does not exist in plant &1 |
| 566 | Plant cannot be determined. Please check profile |
| 567 | There are no activities for the selected WBS elements |
| 568 | WBS element &1: Activity &2 in network &3 is not in time frame |
| 569 | Project structure contains several calendars |
| 570 | No activities. Scheduling was not carried out. |
| 571 | No actual dates could be determined for WBS element & |
| 572 | Subnetwork cannot be shown |
| 573 | Date conflicts exist. Check dates |
| 574 | Activities for WBS element & cannot be read |
| 575 | Profile & for project planning board does not exist |
| 576 | WBS dates were updated from activities. (See Extras -> Act-WBS) |
| 577 | Date entered is not a workday. Continue with &? |
| 578 | You cannot delete in current set of dates |
| 579 | Activity elements can only be created for activities. |
| 580 | No activities can be assigned to project definition |
| 581 | No graphic profile with group & exists |
| 582 | Not all activities assigned to WBS element & have been finally confirmed |
| 583 | The subordinate WBS elements of WBS elem. & are not all finally confirmed |
| 584 | No valid scheduling type has been entered. Edit settings |
| 585 | No graphic profile with group &, name & and index & |
| 586 | Time profile & does not exist |
| 587 | WBS elements have earlier start date than project definition |
| 588 | WBS elements have later finish date than project definition |
| 589 | No dates for WBS or project definition exist |
| 590 | Scale & for time axis does not exist |
| 591 | Enter start date |
| 592 | Enter finish date |
| 593 | No parameters for WBS scheduling. Maintain settings |
| 594 | You selected some activities which are in header-assigned networks |
| 595 | Profile for time scale & does not exist |
| 596 | No valid activity was selected |
| 597 | Network & could not be copied |
| 598 | WBS element start cannot be later than & activity start |
| 599 | WBS element finish cannot be earlier than activity finish & |
| 600 | === editing and miscellaneous ===================== |
| 601 | Mask must begin with letter & |
| 602 | No special indicator was maintained for coding |
| 603 | Character &1 is not valid. Valid characters are & and & |
| 604 | Key is too long. Key cannot exceed & places |
| 605 | Key for coding mask must be exactly & places long |
| 606 | Entry & already exists |
| 607 | Only numerical or alphanumerical characters may be used in each section |
| 608 | In one section of Project or WBS Element, there is no number. "&" |
| 609 | Key does not correspond to mask: & |
| 610 | Entry length is incorrect. "&" |
| 611 | Cannot make this change to the editing mask (see long text) |
| 612 | Project "&" already exists. You cannot delete it. |
| 613 | Screen for coding can only be extended, not changed. |
| 614 | Project & already exists. (You cannot use this key) |
| 615 | Select the end of the block |
| 616 | Line cannot be selected |
| 617 | No previous element exists |
| 618 | No subsequent element exists |
| 619 | No. of project sections does not agree with project mask "&" |
| 620 | Project number or WBS number may not be used |
| 621 | Structure indicator & ... is locked |
| 622 | Costs calculated for WBS element & |
| 623 | Costs not completely calculated for WBS element & -> see log |
| 624 | Log contains no entries |
| 625 | Key is too long. Enter a key no longer than 24 characters. |
| 626 | You can only change from numeric to alphanumeric sections |
| 627 | Edit screen is "&" too long |
| 628 | Enter an edit mask |
| 629 | Special characters were changed. Check project editing masks and change |
| 630 | Select a & |
| 631 | You cannot create an activity element in a new network |
| 632 | No entry in table TBALK for key & |
| 633 | No material was found for the selected objects |
| 634 | No costs could be found for the selected objects |
| 635 | WBS elements with inconsistent WBS dates are highlighted |
| 636 | Cannot display values with different categories |
| 637 | Select an object in the costs overview |
| 638 | The column could not be moved |
| 639 | Special character & is not allowed |
| 640 | You can only change the unit, if dates exist |
| 641 | Click on the object to display assignments |
| 642 | Cannot undo at the moment |
| 643 | No log exists |
| 644 | Select at least two activities |
| 645 | The zoom factor you entered is smaller than & |
| 646 | The zoom factor you entered is larger than & |
| 647 | Objects not highlighted. Cannot position |
| 648 | Milestone for WBS element cannot be copied to an operation |
| 649 | Top-down planning: The function "project dates" is not possible |
| 650 | =================== Status management ================================== |
| 651 | Element: & & -- Person responsible: & |
| 652 | You cannot reset the deletion flag & |
| 653 | Definition: & & -- Person responsible: & |
| 654 | Status "&" "&" is set - no action |
| 655 | Project definition & is not released |
| 656 | WBS element & is not released |
| 657 | Status "&" "&" is not active - no action |
| 658 | Check user status of new WBS elements |
| 659 | Status cannot be set for WBS element & |
| 660 | Status profile &: You cannot set or delete the user status |
| 661 | Project stock exists in the WBS element structure |
| 662 | The status of the WBS element does allow changes |
| 663 | You cannot add an actual date horizontal bar |
| 664 | Physical inventory for material not completed or locked for movements |
| 665 | Definition: & & |
| 666 | Element: & & |
| 667 | You cannot set the status "Closed" for WBS element & |
| 668 | You cannot set the status �Deletion flag� for WBS element & |
| 671 | Master data in project definition & is locked |
| 672 | Master data in WBS element & is locked |
| 673 | Basic data lock set on WBS element & |
| 674 | Basic data lock set on project & |
| 675 | Basic data lock removed from WBS element & |
| 676 | Basic data lock removed from project & |
| 677 | Assignment of internal order to WBS element & is not allowed |
| 678 | Assignment of order to WBS element & is not allowed |
| 679 | You are not allowed to assign a network to WBS element & |
| 680 | Grayed-out special indicators are already being used |
| 681 | At least one coding mask is already being used |
| 682 | WBS element & has an open CA-TS assignment |
| 683 | Network activity & & has an open CA-TS assignment |
| 690 | ==========================Billing plan ================================= |
| 691 | Enter a plan profile |
| 692 | &1 is not a revenue element |
| 693 | Assign a revenue element to the planning profile &1 |
| 694 | Assign a valid plan profile to project &1 |
| 695 | Revenue element &1 in COAr &2 does not exist on &3 |
| 696 | Billing plan for WBS element &1 is being processed by &2 |
| 700 | === Validation of master data fields === |
| 701 | Company code & does not exist. (Check entry) |
| 702 | Business area & does not exist. (Check entry) |
| 703 | Controlling area & does not exist. (Check entry) |
| 704 | Project definition not automatically created with profile & |
| 705 | Factory calendar copied from plant |
| 706 | Currency copied from company code |
| 707 | Factory calendar in project differs from plant factory calendar |
| 708 | Profit center was not created for entire period |
| 709 | You have not entered a project definition or a project profile |
| 710 | Automatic transfer to project definition is deactivated |
| 711 | You cannot create another WBS element for project definition & |
| 712 | Project currency must be same as company code currency |
| 713 | Costs for WBS could not be displayed |
| 714 | Statistical WBS element: No surcharges, settlement etc. & |
| 715 | Enter level |
| 716 | Asset under construction for & not allowed |
| 717 | Subproject & is not valid (check your entry) |
| 718 | Currency in requesting company code must be company code currency |
| 719 | Several WBS elements on level 1 not allowed |
| 720 | Joint Venture Accounting is not active in company code & |
| 721 | The profile entered is in the SAP name range |
| 722 | Parts of & exist already |
| 723 | Project definition exists already |
| 724 | Costs have already been posted to WBS element & |
| 725 | Postings have been made for WBS element &1 - Deletion not allowed |
| 726 | No field attributes flagged for field &1 -> CJCK_PR*_FIELD_ATTR_INIT |
| 727 | Field &1: Changing the contents of the field is not permitted |
| 728 | WBS el. & has act. costs, act. reveue. You cannot change the bus. area |
| 729 | Requesting cost center initialized for WBS &1 |
| 751 | Please fill in controlling area for cost center & |
| 752 | Enter controlling area and cost center |
| 753 | Requested company code &1 was copied from requested cost center &2 |
| 754 | WBS elem. "&" not acct. assignm. elem. Assets under constr. not allowed. |
| 755 | Assignment to capital investment program can not be changed |
| 756 | Character is already used as first character in an edit screen |
| 757 | First character is already used in 'automatic number assignment' |
| 771 | Default value & copied for & |
| 772 | You cannot change the investment profile |
| 773 | You cannot change the statistical indicator for WBS element &1 |
| 800 | =================== Basis functions (locking, graphic, ...)============= |
| 801 | Your graphic profile & contains errors |
| 802 | Internal error & & during number assignment |
| 803 | Number assignment for & in critical area |
| 804 | Number assignment: Interval for & exhausted |
| 806 | &1 &4 &2 is currently being processed by &3 |
| 807 | Change document: & |
| 808 | Mouse pointer is not on a column heading |
| 809 | No milestones for selected objects can be displayed |
| 810 | Modifications are not possible in the capacity utilization graphic |
| 811 | Please choose a valid relationship type |
| 812 | Method & is not supported |
| 813 | Object type & is not supported |
| 814 | Incorrect number of update structures for table & |
| 815 | The transfered hierarchy is inconsistent |
| 816 | The method table is not consistent with the data tables |
| 817 | Change mode has been switched on |
| 818 | Change mode has been switched off |
| 819 | This function is not permissible for all project elements |
| 820 | The external key is not compatible with the internal key |
| 821 | There are no project objects that can be shown |
| 822 | There are no project objects that can be hidden |
| 823 | WBS element & is not locked - no changes possible |
| 824 | Error when processing asset under construction (AuC) for WBS element &1 |
| 825 | Initializing of graphics for & is not supported in the SAP GUI |
| 826 | Select at least one entry in the update structure |
| 827 | Inconsistent hierarchy in project & |
| 828 | The Field Key & is still being used in existing project definitions |
| 829 | The Field Key & is still being used in existing WBS elements |
| 830 | The Field Key & is still being used in existing networks |
| 841 | Program &1 table &2: Repeat program run |
| 842 | Program &1 table &2: Changes executed successfully |
| 843 | Program &1 table &2: No changes made |
| 844 | Program & can only be started when upgrading the system |
| 845 | Program & is only required in Releases 30D to 45B |
| 850 | Partner determination procedure & does not exist for 'Work Breakdown Str" |
| 851 | You can create only one project within one transaction |
| 870 | No user-defined characteristic could be found for field & |
| 871 | Value of user-defined characteristic & written to field & |
| 872 | No additional field found for characteristic & |
| 873 | &1 &2 are being processed |
| 875 | |
| 876 | |
| 877 | |
| 895 | System error in program & (&) -> F1 |
| 896 | Function not supported here |
| 897 | Error when calling up function module &: & & & |
| 898 | Error when accessing file: & & & & |
| 899 | System error: Program &, module &, error: & & |