CJ - Project master data and structure

The following messages are stored in message class CJ: Project master data and structure.
It is part of development package CN_PSP_OPR in software component PS-ST-OPR. This development package consists of objects that can be grouped under "Operative Work Breakdown Structure".
Message Nr
Message Text
001& & & &
002Network & does not exist
003Enter project
004Enter WBS element
005Enter project definition or WBS element
006Select at least one activity
007Network & contains no activities
008Choose only one WBS element (PR...)
009Start date must be later than "&"
010Project & already exists
011Project & does not exist
012Finish date must be earlier than "&"
013Project & is being created
014Project & is being changed
015Project & is being deleted
016Project & version & already exists
017Project & version & does not exist
018Cannot search in the selected column
019Object does not exist
020WBS element & already exists
021WBS element & does not exist
022There are active simulations for the project
023WBS element & is being created
024WBS element & is being changed
025WBS element & is being deleted
026WBS element & version & already exists
027WBS element & version & does not exist
028Simulations already exist for the WBS element
029Enter project or WBS element
030Navigation not possible
031& &: No changes permitted
032No changes to project definition allowed
033The WBS elements do not exist
034The project definition could not be changed
035The project definition could not be created
036Data cannot be saved
037Project definition & is not active
038Deletion flag for WBS element & not possible
039Deletion flag for project & not possible
040Maintain calendar
041Error & when calling up classification - saving is not possible
042WBS element & cannot be classified - saving is not possible
043Could not set a deletion flag for the activity elements
044Project & version & already exists
045Activating inactive simulation versions can lead to to inconsistencies
046Deletion flags could not be set for milestones
047Deletion flags could not be set for relationships
048Deletion flag not possible, act. &1 for act. elem. &2 &3 not selected
049Activity &1 &2 do not belong to simulation version &3 in project &4
050Active simulation versions exist for WBS element &
051WBS element & is not an account assignment element
052WBS element & is not a billing element
053WBS element has not been assigned a billing plan
054You cannot maintain the settlement rule for WBS element
055WBS element & has an account assignment and cannot be deleted
056&: account assignment indicator cannot be removed
057WBS element & is already budgeted and cannot be deleted
058WBS element & is plan integrated and can not be deleted
059There are already plan values for the WBS element &
060No long text exists
061Text not yet created for & &
062& & already exists
063WBS element & is marked for deletion
064WBS element & is locked for account assignment
065WBS element & does not belong to controlling area &
066WBS element & does not belong to company code &
067WBS element & does not belong to business area &
068WBS element & is not assigned to a business area
069WBS element & is already fully invoiced
070WBS element & is a statistical WBS element
071The top element cannot be cut
072WBS element &1 cannot be deleted due to assignments in network &2
073Project &1 (sub-tree &2) is being changed
074WBS element & could not be created
075Controlling area is different in reference & and project
076Enter just one WBS element to select a subtree
077Cannot delete - simulation versions exist
078WBS element cannot be included in the worklist
079Double-click on an object in the templates section to select a template
080Substitution was not carried out
081Project &1 does not belong to controlling area &2
082Enter a start date. Otherwise today's date will be used
083Enter a finish date. Otherwise today's date will be used
084The activity has not been assigned to the WBS elements
085Create an object by double-clicking or drag and drop
086Milestone &1 is assigned to another WBS element
087Error during scheduling. Save function not possible
088Final date must be later than &
089Start date must be earlier than &
090Standard network & is assigned to the WBS element
091Activity &1 in standard network &2 is asigned to the WBS element
092WBS element &: Assignments of dependent objects
093Project &: Assignments of dependent objects
094Checking whether object can be deleted ...
095WBS element & is not relevant for project summarization
096&1 &2 &3 already exists operative (only deletion flag possible)
097Copying (standard) WBS structure is not possible
098Activity element &1, standard network &2 is assigned to the WBS element
099Scheduling is not supported in the actual set of dates
100========================================================================
101Status &1 of WBS element &2 does not allow changes to the data
102Enter the start date. Otherwise the finish date is set here
103Enter the finish date. Otherwise the start date is set here
104User status & is not active
105Variance in obj. currency despite availability control in object currency
106You cannot delete the milestone
107Standard WBS element is assigned to material &1 (ord.type: &2) (see CN08)
108Project stock: invalid value or action
109Errors occurred in the BAdI &
110Function cannot be carried out in display mode
111You can only derive the structure, if you select the whole project
112WBS elements and the project definition have different/no editing masks
113No errors were found
114Function cannot be executed, please check
115Could not find a superior WBS element for WBS element &
116Superior WBS element released or technically completed
117WBS element & is assigned to a capital investment measure
118No editing mask exists for project &
119"SD/PS Assignment" indicator cannot be set
120Project Definition '&1' : No changes possible because of status &2
121No WBS element exists for project &
122& is the WBS element for project &
123& & not selected
124Existing relationships are shown
125&1 is WBS element in project &2 version &3
126Activity element cannot be moved to the new network
127Number of the WBS element or activity cannot be changed
128Enter a WBS number or an activity number
129&1: Indicator &2 cannot become &3
130**************Project planning board***************************
131The object cannot be shifted vertically
132Select a project object
133You selected too many project objects
134Select at least one set of dates
135Select either earliest or latest dates
136Date for the time line must be on the time axis
137Date for the left frame of the graphic must be on the time axis
138No dates available. Today's date is used as start date.
139Select WBS element and/or activity.
140No dates available. Project start is used as start date.
141No dates available. Project finish is used as finish date.
142No dates available. Today's date is used as finish date.
143You have not entered a WBS or an activity number. Data is not transfered.
144You do not have authorization to edit all activities for WBS element &
145You have not entered a profile. Access not possible.
146No report selected. You cannot call up the info system
147Not all activities can be costed for WBS element &
148No costs were calculated for any WBS element
149Planned values calculated -> See reports
150No dates set. Scheduling could not be carried out
151No confirmations for WBS element "&" exist
152Reconcile the milestone date with that of the WBS element
153Select a valid line
154There are still activities in the buffer
155There are still WBS elements in the buffer
156No activities exist
157WBS element & cannot be costed
158Constraint & not valid
159Project object "&" cannot be changed due to status
160Only the first 32 periods are displayed
161Activity cannot be scheduled. Control key does not allow scheduling
162Status was set
163Purchase requisitions/reservations were activated
164Finish date &1 of reporting period must be after the start date &2
165Dates from & WBS element(s) were adjusted
166No network is assigned to WBS element "&"
167Activity dates are not within WBS dates
168Activities in network "&" are assigned to several WBS elements
169WBS element is displayed by number
170Not all of the fields in the field selection are displayed
171Your relationship's predecessor or successor is not an activity
172You cannot cancel. Superior WBS is confirmed
173Select a valid line
174WBS element & has no activities
175The dates for WBS element & cannot be changed
176Automatic cost calculation for networks was activated
177Capacity calculation was activated and takes place from next scheduling
178Not all activities are displayed
179Status set, apart from the project definition
180Field selection not possible for &.
181The selected project object dates cannot be deleted
182Selected project objects cannot be deleted
183Constraints for actual dates are not possible
184No forecast dates exist
185No dependent objects exist
186Field selection profile & cannot be changed
187Planning board profile cannot be changed
188Control error & has occured in the graphic
189No capacities have been assigned to the selected WBS elements
190Activity elements are not copied separately
191Activity & Network &: Release not allowed
192WBS element & has no activities
193Selct one or more project objects of the same type
194You cannot copy an activity milestone to a WBS element
195"Open project" starts project &1 in the planning board
196&1 cannot be moved to &2
197Milestone &1 was created for WBS element &2
198Milestone belongs to a billing plan - cannot change assignments
199Found no requirements for material &1 in plant &2
200========================================================================
201Entry & missing for screen sequence control
202Processing only possible in the Project System
203Cannot set finish date
204No maintenance orders available
205Bottom-up scheduling is only useful for the entire hierarchy
206&1 '&2': Generic object services are possibly only after saving
207WBS element not yet saved; function not possible
208Work center / work cannot be changed for general costs activity &
209Not all project types are assigned to project profile &1
210Project type &1 not assigned to Project Profile &2.
211You need to use the Plan Customer Project app to edit the project
212You need to use Project Services apps to edit the project
213Project &1 can only be edited using the Project Services apps.
214Changes to project &1 cannot be saved.
215WBS element &1 can only be edited using the Project Services apps.
216Changes to WBS element &1 cannot be saved.
217
218You cannot modify the root level WBS Element. Make another selection.
219You cannot open this project as the profile assigned is not supported.
220You can copy only projects with Enterprise Project - Internal profile.
221Data not changed
222Data saved
223Data cannot be saved because required entries have not been made.
224You cannot delete the WBS element at the root level.
225You cannot change &1. Verify the status of root level WBS Element.
226You can select only projects with Enterprise Project - Internal profile.
227You can include only WBS with Enterprise Project - Internal profile.
228You cannot move the root level WBS element.
229Enter a project definition to be copied.
230No detailed information found
231Error during migration of project &1.
232No period values available
233Error during migration of project &1.
234Start and end dates are set based on the duration of the source project.
235Data cannot be saved. Enter all project element details.
236Scheduling scenario set: Change (substitution) is not possible
237Profit center of WBS & is not same as the profit center of its order &
238Profit center of WBS & is not same as the profit center of activity & &
239Change your setting.The billing element can be set only at the root level
240You cannot copy the project due to inconsistencies in the source project.
241You cannot create the project with this ID.
242You cannot delete this project element.
243Include project elements having same project profile as source project.
244You cannot create a settlement rule.
245You can create a settlement rule only at the project root level.
246Project currency cannot be changed. Actual or planned costs exist.
247No authorization to copy Controlling Areas.
248Planned Start was determined automatically
249Planned Finish was determined automatically
250----------------------Versions-------------------------------------------
251Enter an unique version number without special characters
253No version & exists for project &
254You do not have authority to create simulation versions.
255The version &1 &2 is no longer active
256Simulation version &1 for project &2 exists already
257First save the simulation
258This version key is not permissible for simulation versions
259Mask & is inactive.
260Enter a version number
261Creating project &1 version &2
262Project &1 version &2 is not a simulation version
263Creating sub-trees is not allowed
264Project &1 version &2 is being changed
265Project &1 version &2 is being changed (sub-tree &3)
266WBS element & is inactive. Function not possible
267Enter a version name
268Enter a user status
269Enter a version key
270Display of objects from simulation versions is not supported
271Version & is controlled by status. You cannot delete
272Heriarchy cannot become &1, because &2 is forbidden
273Simulation &1 &2 consists of partial trees. No transfer possible
274Cannot create asset under construction for a simulation WBS
275Hierarchy for &1 &2 cannot be &3 and &4 is not allowed
276
277Field Key &1 is not valid for the project definition
278Field Key &1 is not valid for the WBS element
279Unmigrated PS Texts exist.Please run the Migration Report &1.
280Termination: Too many errors (more than &1% of methods)
281The New Model of PS Text was already activated. This cannot be reverted.
300========================================================================
301Select a line
302Select only one entry
303List has only & entries
304Select an entry
305You have not selected another object
306No multiple selection (choose only one option)
307List has no entries
308Please select with "X", * set by the system
309Too many lines to insert. Enlarge your window.
310Position cursor as desired and press Enter
311To select or mark, position cursor on selection field
312Short ID has only & character(s)
313First selected WBS element reached
314Last selected WBS element reached
315Last WBS milestone reached
316First WBS milestone reached
317First selected object already displayed
318Last selected object already displayed
319Select a column
320It is not possible to search in this column
321No entries were found for the criteria entered
322Alphanumeric search string for this column is not possible
330&1 records of PRPS were not updated
351Project profile & does not exist.
352A status does not allow you to extend the structure.
353Graphic profile could not be created
360Status profile is different: Cannot set user status
400=================== Hierarchy ==========================================
401You cannot shift WBS element & into its own sub-hierarchy
402Select WBS element first
404Choose top item
406Choose reference element and layout
410You cannot insert/position an element next to the initial element
411& WBS elements could not be moved to lower levels
412& WBS elements could not be moved to higher levels
413You cannot shift elements before the initial element
414You can only cut if the entire project is selected
415Initial element cannot be deleted
416& WBS elements deleted
417You cannot shift the initial element
418WBS element & can no longer be shifted
419No hierarchical changes possible to WBS element &1
420No hierarchical changes possible since the project has budget postings
426Highest element of selected hierarchy reached
427Left limit of hierarchy level reached
428Right limit of hierarchy level reached
429Element not further subdivided
430Navigation not possible
435Enter new WBS elements only under the initial element
436Do not enter a level smaller than &
437Do not enter a level greater than &
440Subproject assignment & not allowed - You cannot save
441Process the subproject assignment completely
444Not all required networks read/locked. Date cannot be moved
449No template has been entered
450WBS elements could not be included. Check your entry
451Key and hierarchy were checked: No errors
452& key was not processed
453A WBS element with key "&" already exists
454Key "&" has been assigned several times (& WBS elements)
455& does not exist. You cannot replace
456& key(s) were changed
457Enter only one WBS element
458WBS elements were not included
459& WBS elements were included
460Enter project profile or project definition to be copied
461Level missing in hierarchy: WBS element & cannot be included
462Project definition to be copied not entered
463Select required WBS elements
464Incomplete assignment: Required WBS elements are missing
465Hierarchy could not be included; root element does not exist
466WBS element & does not exist in subhierarchy
467Subhierarchy is not consistent
468Hierarchy can no longer be changed
469You cannot move the root element of the hierarchy
470====================== Project planning board ===========================
471Activities for WBS element & could not be read
472Enter profile for project planning board in project profile "&"
473Scheduled dates cannot be changed
474Select an activity
475Select an activity with a subnetwork
476No subnetworks displayed in the graphic
477Select a milestone
478Select a(n) &
479You have not selected an activity or a(n) &
480Select a relationship
481Select a milestone for an activity
482Date not entered correctly
483Time not entered correctly
484Unit & is not valid
485You did not select "description" in field selection
486You did not select dates in field selection
487You did not select costs in field selection
488No activities for selected & found
489No activities are displayed for the selected WBS elements
490Enter only dates or duration and one date
491Incorrect entry for time scale. Try again
492Activity is already dispatched. You cannot change dates.
493You cannot insert dates in this mode
494WBS element & has no start date. Scheduling not possible.
495WBS element & has no finish date. Scheduling not possible.
496You cannot insert lines in the table area
497Several sets of dates selected: You cannot insert a time bar
498There are no relationships which can be displayed.
499No graphic profile with index & exists
500=================== Scheduling =========================================
501Select a WBS element
502You can only insert one time bar per element
503Dates in WBS element & not current
504WBS element & is not an account assignment element
505WBS element & is locked for time scheduling
506Finish date for WBS element & no longer fits
507Start date for WBS element & no longer fits
508WBS element & has no activities
509Enter a standard network or network
510Network & locked. You cannot shift dates
511Network & locked. Time scheduling not possible
512Actual finish date for WBS element & cannot be maintained
513No dates exist for WBS element &
514No overlapping dates found
515You cannot delete the start date
516You cannot delete the finish date
517No schedule conflicts found
518No activities copied
519Enter a WBS element
520No schedule conflicts found for basic dates
521No schedule conflicts found for forecast dates
522Network profile does not exist. Change project definition
523You cannot assign the activity number
524Start date earlier than start date & in superior WBS element
525Start date earlier than start date & of the project
526Finish date later than finish date & of the project
527Finish date later than finish date & of superior WBS element
528Start date in the future
529Finish date in the future
530Schedule conflicts found. Correct dates
531No dates in WBS element &. Reconciliation not possible
532Schedule conflicts exist. See log
533Either select only one WBS element or no WBS element
534No WBS elements exist
535Missing data for time scheduling in project profile &
536No new networks exist
537Schedule conflicts found for basic dates. Please correct
538Schedule conflicts found for forecast dates. Please correct
539No activity elements could be found for the selected activities
540No network assignment entered for WBS element &
541WBS element & must be an account assignment element
542New start date is later than the old one
543No date changes exist
544Network type "&" does not exist
545Date &1 is not a working day. Continue using &2?
546Start date is in the past
547Finish date is in the past
548Select a network first
549Activity dates exist for WBS element &. You cannot delete
550Define network profile first
551Enter dates in the project definition first
552No activities exist for the selected WBS elements
553No basic dates exist. Forecast dates for & not possible
554Dates conflict with the dates of the subordinate WBS elements.
555Dates for activity elements could not be maintained
556Field length exceeded when calculating WBS element & duration
557No activities exist for WBS element &
558Field length exceeded when calculating project & duration
559Activity start earlier than WBS element & start date
560Activity finish later than WBS element & finish date
561WBS element & has activities. Delete activities first
562Level dates for all activities first
563Finish date is earlier than start date
564Enter start and finish date
565MRP controller &2 does not exist in plant &1
566Plant cannot be determined. Please check profile
567There are no activities for the selected WBS elements
568WBS element &1: Activity &2 in network &3 is not in time frame
569Project structure contains several calendars
570No activities. Scheduling was not carried out.
571No actual dates could be determined for WBS element &
572Subnetwork cannot be shown
573Date conflicts exist. Check dates
574Activities for WBS element & cannot be read
575Profile & for project planning board does not exist
576WBS dates were updated from activities. (See Extras -> Act-WBS)
577Date entered is not a workday. Continue with &?
578You cannot delete in current set of dates
579Activity elements can only be created for activities.
580No activities can be assigned to project definition
581No graphic profile with group & exists
582Not all activities assigned to WBS element & have been finally confirmed
583The subordinate WBS elements of WBS elem. & are not all finally confirmed
584No valid scheduling type has been entered. Edit settings
585No graphic profile with group &, name & and index &
586Time profile & does not exist
587WBS elements have earlier start date than project definition
588WBS elements have later finish date than project definition
589No dates for WBS or project definition exist
590Scale & for time axis does not exist
591Enter start date
592Enter finish date
593No parameters for WBS scheduling. Maintain settings
594You selected some activities which are in header-assigned networks
595Profile for time scale & does not exist
596No valid activity was selected
597Network & could not be copied
598WBS element start cannot be later than & activity start
599WBS element finish cannot be earlier than activity finish &
600=== editing and miscellaneous =====================
601Mask must begin with letter &
602No special indicator was maintained for coding
603Character &1 is not valid. Valid characters are & and &
604Key is too long. Key cannot exceed & places
605Key for coding mask must be exactly & places long
606Entry & already exists
607Only numerical or alphanumerical characters may be used in each section
608In one section of Project or WBS Element, there is no number. "&"
609Key does not correspond to mask: &
610Entry length is incorrect. "&"
611Cannot make this change to the editing mask (see long text)
612Project "&" already exists. You cannot delete it.
613Screen for coding can only be extended, not changed.
614Project & already exists. (You cannot use this key)
615Select the end of the block
616Line cannot be selected
617No previous element exists
618No subsequent element exists
619No. of project sections does not agree with project mask "&"
620Project number or WBS number may not be used
621Structure indicator & ... is locked
622Costs calculated for WBS element &
623Costs not completely calculated for WBS element & -> see log
624Log contains no entries
625Key is too long. Enter a key no longer than 24 characters.
626You can only change from numeric to alphanumeric sections
627Edit screen is "&" too long
628Enter an edit mask
629Special characters were changed. Check project editing masks and change
630Select a &
631You cannot create an activity element in a new network
632No entry in table TBALK for key &
633No material was found for the selected objects
634No costs could be found for the selected objects
635WBS elements with inconsistent WBS dates are highlighted
636Cannot display values with different categories
637Select an object in the costs overview
638The column could not be moved
639Special character & is not allowed
640You can only change the unit, if dates exist
641Click on the object to display assignments
642Cannot undo at the moment
643No log exists
644Select at least two activities
645The zoom factor you entered is smaller than &
646The zoom factor you entered is larger than &
647Objects not highlighted. Cannot position
648Milestone for WBS element cannot be copied to an operation
649Top-down planning: The function "project dates" is not possible
650=================== Status management ==================================
651Element: & & -- Person responsible: &
652You cannot reset the deletion flag &
653Definition: & & -- Person responsible: &
654Status "&" "&" is set - no action
655Project definition & is not released
656WBS element & is not released
657Status "&" "&" is not active - no action
658Check user status of new WBS elements
659Status cannot be set for WBS element &
660Status profile &: You cannot set or delete the user status
661Project stock exists in the WBS element structure
662The status of the WBS element does allow changes
663You cannot add an actual date horizontal bar
664Physical inventory for material not completed or locked for movements
665Definition: & &
666Element: & &
667You cannot set the status "Closed" for WBS element &
668You cannot set the status �Deletion flag� for WBS element &
671Master data in project definition & is locked
672Master data in WBS element & is locked
673Basic data lock set on WBS element &
674Basic data lock set on project &
675Basic data lock removed from WBS element &
676Basic data lock removed from project &
677Assignment of internal order to WBS element & is not allowed
678Assignment of order to WBS element & is not allowed
679You are not allowed to assign a network to WBS element &
680Grayed-out special indicators are already being used
681At least one coding mask is already being used
682WBS element & has an open CA-TS assignment
683Network activity & & has an open CA-TS assignment
690==========================Billing plan =================================
691Enter a plan profile
692&1 is not a revenue element
693Assign a revenue element to the planning profile &1
694Assign a valid plan profile to project &1
695Revenue element &1 in COAr &2 does not exist on &3
696Billing plan for WBS element &1 is being processed by &2
700=== Validation of master data fields ===
701Company code & does not exist. (Check entry)
702Business area & does not exist. (Check entry)
703Controlling area & does not exist. (Check entry)
704Project definition not automatically created with profile &
705Factory calendar copied from plant
706Currency copied from company code
707Factory calendar in project differs from plant factory calendar
708Profit center was not created for entire period
709You have not entered a project definition or a project profile
710Automatic transfer to project definition is deactivated
711You cannot create another WBS element for project definition &
712Project currency must be same as company code currency
713Costs for WBS could not be displayed
714Statistical WBS element: No surcharges, settlement etc. &
715Enter level
716Asset under construction for & not allowed
717Subproject & is not valid (check your entry)
718Currency in requesting company code must be company code currency
719Several WBS elements on level 1 not allowed
720Joint Venture Accounting is not active in company code &
721The profile entered is in the SAP name range
722Parts of & exist already
723Project definition exists already
724Costs have already been posted to WBS element &
725Postings have been made for WBS element &1 - Deletion not allowed
726No field attributes flagged for field &1 -> CJCK_PR*_FIELD_ATTR_INIT
727Field &1: Changing the contents of the field is not permitted
728WBS el. & has act. costs, act. reveue. You cannot change the bus. area
729Requesting cost center initialized for WBS &1
751Please fill in controlling area for cost center &
752Enter controlling area and cost center
753Requested company code &1 was copied from requested cost center &2
754WBS elem. "&" not acct. assignm. elem. Assets under constr. not allowed.
755Assignment to capital investment program can not be changed
756Character is already used as first character in an edit screen
757First character is already used in 'automatic number assignment'
771Default value & copied for &
772You cannot change the investment profile
773You cannot change the statistical indicator for WBS element &1
800=================== Basis functions (locking, graphic, ...)=============
801Your graphic profile & contains errors
802Internal error & & during number assignment
803Number assignment for & in critical area
804Number assignment: Interval for & exhausted
806&1 &4 &2 is currently being processed by &3
807Change document: &
808Mouse pointer is not on a column heading
809No milestones for selected objects can be displayed
810Modifications are not possible in the capacity utilization graphic
811Please choose a valid relationship type
812Method & is not supported
813Object type & is not supported
814Incorrect number of update structures for table &
815The transfered hierarchy is inconsistent
816The method table is not consistent with the data tables
817Change mode has been switched on
818Change mode has been switched off
819This function is not permissible for all project elements
820The external key is not compatible with the internal key
821There are no project objects that can be shown
822There are no project objects that can be hidden
823WBS element & is not locked - no changes possible
824Error when processing asset under construction (AuC) for WBS element &1
825Initializing of graphics for & is not supported in the SAP GUI
826Select at least one entry in the update structure
827Inconsistent hierarchy in project &
828The Field Key & is still being used in existing project definitions
829The Field Key & is still being used in existing WBS elements
830The Field Key & is still being used in existing networks
841Program &1 table &2: Repeat program run
842Program &1 table &2: Changes executed successfully
843Program &1 table &2: No changes made
844Program & can only be started when upgrading the system
845Program & is only required in Releases 30D to 45B
850Partner determination procedure & does not exist for 'Work Breakdown Str"
851You can create only one project within one transaction
870No user-defined characteristic could be found for field &
871Value of user-defined characteristic & written to field &
872No additional field found for characteristic &
873&1 &2 are being processed
875
876
877
895System error in program & (&) -> F1
896Function not supported here
897Error when calling up function module &: & & &
898Error when accessing file: & & & &
899System error: Program &, module &, error: & &
Privacy Policy