CJ - Project master data and structure
The following messages are stored in message class CJ: Project master data and structure.
It is part of development package CN_PSP_OPR in software component PS-ST-OPR. This development package consists of objects that can be grouped under "Operative Work Breakdown Structure".
It is part of development package CN_PSP_OPR in software component PS-ST-OPR. This development package consists of objects that can be grouped under "Operative Work Breakdown Structure".
Message Nr ▲ | Message Text |
---|---|
001 | & & & & |
002 | Network & does not exist |
003 | Enter project |
004 | Enter WBS element |
005 | Enter project definition or WBS element |
006 | Select at least one activity |
007 | Network & contains no activities |
008 | Choose only one WBS element (PR...) |
009 | Start date must be later than "&" |
010 | Project & already exists |
011 | Project & does not exist |
012 | Finish date must be earlier than "&" |
013 | Project & is being created |
014 | Project & is being changed |
015 | Project & is being deleted |
016 | Project & version & already exists |
017 | Project & version & does not exist |
018 | Cannot search in the selected column |
019 | Object does not exist |
020 | WBS element & already exists |
021 | WBS element & does not exist |
022 | There are active simulations for the project |
023 | WBS element & is being created |
024 | WBS element & is being changed |
025 | WBS element & is being deleted |
026 | WBS element & version & already exists |
027 | WBS element & version & does not exist |
028 | Simulations already exist for the WBS element |
029 | Enter project or WBS element |
030 | Navigation not possible |
031 | & &: No changes permitted |
032 | No changes to project definition allowed |
033 | The WBS elements do not exist |
034 | The project definition could not be changed |
035 | The project definition could not be created |
036 | Data cannot be saved |
037 | Project definition & is not active |
038 | Deletion flag for WBS element & not possible |
039 | Deletion flag for project & not possible |
040 | Maintain calendar |
041 | Error & when calling up classification - saving is not possible |
042 | WBS element & cannot be classified - saving is not possible |
043 | Could not set a deletion flag for the activity elements |
044 | Project & version & already exists |
045 | Activating inactive simulation versions can lead to to inconsistencies |
046 | Deletion flags could not be set for milestones |
047 | Deletion flags could not be set for relationships |
048 | Deletion flag not possible, act. &1 for act. elem. &2 &3 not selected |
049 | Activity &1 &2 do not belong to simulation version &3 in project &4 |
050 | Active simulation versions exist for WBS element & |
051 | WBS element & is not an account assignment element |
052 | WBS element & is not a billing element |
053 | WBS element has not been assigned a billing plan |
054 | You cannot maintain the settlement rule for WBS element |
055 | WBS element & has an account assignment and cannot be deleted |
056 | &: account assignment indicator cannot be removed |
057 | WBS element & is already budgeted and cannot be deleted |
058 | WBS element & is plan integrated and can not be deleted |
059 | There are already plan values for the WBS element & |
060 | No long text exists |
061 | Text not yet created for & & |
062 | & & already exists |
063 | WBS element & is marked for deletion |
064 | WBS element & is locked for account assignment |
065 | WBS element & does not belong to controlling area & |
066 | WBS element & does not belong to company code & |
067 | WBS element & does not belong to business area & |
068 | WBS element & is not assigned to a business area |
069 | WBS element & is already fully invoiced |
070 | WBS element & is a statistical WBS element |
071 | The top element cannot be cut |
072 | WBS element &1 cannot be deleted due to assignments in network &2 |
073 | Project &1 (sub-tree &2) is being changed |
074 | WBS element & could not be created |
075 | Controlling area is different in reference & and project |
076 | Enter just one WBS element to select a subtree |
077 | Cannot delete - simulation versions exist |
078 | WBS element cannot be included in the worklist |
079 | Double-click on an object in the templates section to select a template |
080 | Substitution was not carried out |
081 | Project &1 does not belong to controlling area &2 |
082 | Enter a start date. Otherwise today's date will be used |
083 | Enter a finish date. Otherwise today's date will be used |
084 | The activity has not been assigned to the WBS elements |
085 | Create an object by double-clicking or drag and drop |
086 | Milestone &1 is assigned to another WBS element |
087 | Error during scheduling. Save function not possible |
088 | Final date must be later than & |
089 | Start date must be earlier than & |
090 | Standard network & is assigned to the WBS element |
091 | Activity &1 in standard network &2 is asigned to the WBS element |
092 | WBS element &: Assignments of dependent objects |
093 | Project &: Assignments of dependent objects |
094 | Checking whether object can be deleted ... |
095 | WBS element & is not relevant for project summarization |
096 | &1 &2 &3 already exists operative (only deletion flag possible) |
097 | Copying (standard) WBS structure is not possible |
098 | Activity element &1, standard network &2 is assigned to the WBS element |
099 | Scheduling is not supported in the actual set of dates |
100 | ======================================================================== |
101 | Status &1 of WBS element &2 does not allow changes to the data |
102 | Enter the start date. Otherwise the finish date is set here |
103 | Enter the finish date. Otherwise the start date is set here |
104 | User status & is not active |
105 | Variance in obj. currency despite availability control in object currency |
106 | You cannot delete the milestone |
107 | Standard WBS element is assigned to material &1 (ord.type: &2) (see CN08) |
108 | Project stock: invalid value or action |
109 | Errors occurred in the BAdI & |
110 | Function cannot be carried out in display mode |
111 | You can only derive the structure, if you select the whole project |
112 | WBS elements and the project definition have different/no editing masks |
113 | No errors were found |
114 | Function cannot be executed, please check |
115 | Could not find a superior WBS element for WBS element & |
116 | Superior WBS element released or technically completed |
117 | WBS element & is assigned to a capital investment measure |
118 | No editing mask exists for project & |
119 | "SD/PS Assignment" indicator cannot be set |
120 | Project Definition '&1' : No changes possible because of status &2 |
121 | No WBS element exists for project & |
122 | & is the WBS element for project & |
123 | & & not selected |
124 | Existing relationships are shown |
125 | &1 is WBS element in project &2 version &3 |
126 | Activity element cannot be moved to the new network |
127 | Number of the WBS element or activity cannot be changed |
128 | Enter a WBS number or an activity number |
129 | &1: Indicator &2 cannot become &3 |
130 | **************Project planning board*************************** |
131 | The object cannot be shifted vertically |
132 | Select a project object |
133 | You selected too many project objects |
134 | Select at least one set of dates |
135 | Select either earliest or latest dates |
136 | Date for the time line must be on the time axis |
137 | Date for the left frame of the graphic must be on the time axis |
138 | No dates available. Today's date is used as start date. |
139 | Select WBS element and/or activity. |
140 | No dates available. Project start is used as start date. |
141 | No dates available. Project finish is used as finish date. |
142 | No dates available. Today's date is used as finish date. |
143 | You have not entered a WBS or an activity number. Data is not transfered. |
144 | You do not have authorization to edit all activities for WBS element & |
145 | You have not entered a profile. Access not possible. |
146 | No report selected. You cannot call up the info system |
147 | Not all activities can be costed for WBS element & |
148 | No costs were calculated for any WBS element |
149 | Planned values calculated -> See reports |
150 | No dates set. Scheduling could not be carried out |
151 | No confirmations for WBS element "&" exist |
152 | Reconcile the milestone date with that of the WBS element |
153 | Select a valid line |
154 | There are still activities in the buffer |
155 | There are still WBS elements in the buffer |
156 | No activities exist |
157 | WBS element & cannot be costed |
158 | Constraint & not valid |
159 | Project object "&" cannot be changed due to status |
160 | Only the first 32 periods are displayed |
161 | Activity cannot be scheduled. Control key does not allow scheduling |
162 | Status was set |
163 | Purchase requisitions/reservations were activated |
164 | Finish date &1 of reporting period must be after the start date &2 |
165 | Dates from & WBS element(s) were adjusted |
166 | No network is assigned to WBS element "&" |
167 | Activity dates are not within WBS dates |
168 | Activities in network "&" are assigned to several WBS elements |
169 | WBS element is displayed by number |
170 | Not all of the fields in the field selection are displayed |
171 | Your relationship's predecessor or successor is not an activity |
172 | You cannot cancel. Superior WBS is confirmed |
173 | Select a valid line |
174 | WBS element & has no activities |
175 | The dates for WBS element & cannot be changed |
176 | Automatic cost calculation for networks was activated |
177 | Capacity calculation was activated and takes place from next scheduling |
178 | Not all activities are displayed |
179 | Status set, apart from the project definition |
180 | Field selection not possible for &. |
181 | The selected project object dates cannot be deleted |
182 | Selected project objects cannot be deleted |
183 | Constraints for actual dates are not possible |
184 | No forecast dates exist |
185 | No dependent objects exist |
186 | Field selection profile & cannot be changed |
187 | Planning board profile cannot be changed |
188 | Control error & has occured in the graphic |
189 | No capacities have been assigned to the selected WBS elements |
190 | Activity elements are not copied separately |
191 | Activity & Network &: Release not allowed |
192 | WBS element & has no activities |
193 | Selct one or more project objects of the same type |
194 | You cannot copy an activity milestone to a WBS element |
195 | "Open project" starts project &1 in the planning board |
196 | &1 cannot be moved to &2 |
197 | Milestone &1 was created for WBS element &2 |
198 | Milestone belongs to a billing plan - cannot change assignments |
199 | Found no requirements for material &1 in plant &2 |
200 | ======================================================================== |
201 | Entry & missing for screen sequence control |
202 | Processing only possible in the Project System |
203 | Cannot set finish date |
204 | No maintenance orders available |
205 | Bottom-up scheduling is only useful for the entire hierarchy |
206 | &1 '&2': Generic object services are possibly only after saving |
207 | WBS element not yet saved; function not possible |
208 | Work center / work cannot be changed for general costs activity & |
209 | Not all project types are assigned to project profile &1 |
210 | Project type &1 not assigned to Project Profile &2. |
211 | You need to use the Plan Customer Project app to edit the project |
212 | You need to use Project Services apps to edit the project |
213 | Project &1 can only be edited using the Project Services apps. |
214 | Changes to project &1 cannot be saved. |
215 | WBS element &1 can only be edited using the Project Services apps. |
216 | Changes to WBS element &1 cannot be saved. |
217 | |
218 | You cannot modify the root level WBS Element. Make another selection. |
219 | You cannot open this project as the profile assigned is not supported. |
220 | You can copy only projects with Enterprise Project - Internal profile. |
221 | Data not changed |
222 | Data saved |
223 | Data cannot be saved because required entries have not been made. |
224 | You cannot delete the WBS element at the root level. |
225 | You cannot change &1. Verify the status of root level WBS Element. |
226 | You can select only projects with Enterprise Project - Internal profile. |
227 | You can include only WBS with Enterprise Project - Internal profile. |
228 | You cannot move the root level WBS element. |
229 | Enter a project definition to be copied. |
230 | No detailed information found |
231 | Error during migration of project &1. |
232 | No period values available |
233 | Error during migration of project &1. |
234 | Start and end dates are set based on the duration of the source project. |
235 | Data cannot be saved. Enter all project element details. |
236 | Scheduling scenario set: Change (substitution) is not possible |
237 | Profit center of WBS & is not same as the profit center of its order & |
238 | Profit center of WBS & is not same as the profit center of activity & & |
239 | Change your setting.The billing element can be set only at the root level |
240 | You cannot copy the project due to inconsistencies in the source project. |
241 | You cannot create the project with this ID. |
242 | You cannot delete this project element. |
243 | Include project elements having same project profile as source project. |
244 | You cannot create a settlement rule. |
245 | You can create a settlement rule only at the project root level. |
246 | Project currency cannot be changed. Actual or planned costs exist. |
247 | No authorization to copy Controlling Areas. |
248 | Planned Start was determined automatically |
249 | Planned Finish was determined automatically |
250 | ----------------------Versions------------------------------------------- |
251 | Enter an unique version number without special characters |
253 | No version & exists for project & |
254 | You do not have authority to create simulation versions. |
255 | The version &1 &2 is no longer active |
256 | Simulation version &1 for project &2 exists already |
257 | First save the simulation |
258 | This version key is not permissible for simulation versions |
259 | Mask & is inactive. |
260 | Enter a version number |
261 | Creating project &1 version &2 |
262 | Project &1 version &2 is not a simulation version |
263 | Creating sub-trees is not allowed |
264 | Project &1 version &2 is being changed |
265 | Project &1 version &2 is being changed (sub-tree &3) |
266 | WBS element & is inactive. Function not possible |
267 | Enter a version name |
268 | Enter a user status |
269 | Enter a version key |
270 | Display of objects from simulation versions is not supported |
271 | Version & is controlled by status. You cannot delete |
272 | Heriarchy cannot become &1, because &2 is forbidden |
273 | Simulation &1 &2 consists of partial trees. No transfer possible |
274 | Cannot create asset under construction for a simulation WBS |
275 | Hierarchy for &1 &2 cannot be &3 and &4 is not allowed |
276 | |
277 | Field Key &1 is not valid for the project definition |
278 | Field Key &1 is not valid for the WBS element |
279 | Unmigrated PS Texts exist.Please run the Migration Report &1. |
280 | Termination: Too many errors (more than &1% of methods) |
281 | The New Model of PS Text was already activated. This cannot be reverted. |
300 | ======================================================================== |
301 | Select a line |
302 | Select only one entry |
303 | List has only & entries |
304 | Select an entry |
305 | You have not selected another object |
306 | No multiple selection (choose only one option) |
307 | List has no entries |
308 | Please select with "X", * set by the system |
309 | Too many lines to insert. Enlarge your window. |
310 | Position cursor as desired and press Enter |
311 | To select or mark, position cursor on selection field |
312 | Short ID has only & character(s) |
313 | First selected WBS element reached |
314 | Last selected WBS element reached |
315 | Last WBS milestone reached |
316 | First WBS milestone reached |
317 | First selected object already displayed |
318 | Last selected object already displayed |
319 | Select a column |
320 | It is not possible to search in this column |
321 | No entries were found for the criteria entered |
322 | Alphanumeric search string for this column is not possible |
330 | &1 records of PRPS were not updated |
351 | Project profile & does not exist. |
352 | A status does not allow you to extend the structure. |
353 | Graphic profile could not be created |
360 | Status profile is different: Cannot set user status |
400 | =================== Hierarchy ========================================== |
401 | You cannot shift WBS element & into its own sub-hierarchy |
402 | Select WBS element first |
404 | Choose top item |
406 | Choose reference element and layout |
410 | You cannot insert/position an element next to the initial element |
411 | & WBS elements could not be moved to lower levels |
412 | & WBS elements could not be moved to higher levels |
413 | You cannot shift elements before the initial element |
414 | You can only cut if the entire project is selected |
415 | Initial element cannot be deleted |
416 | & WBS elements deleted |
417 | You cannot shift the initial element |
418 | WBS element & can no longer be shifted |
419 | No hierarchical changes possible to WBS element &1 |
420 | No hierarchical changes possible since the project has budget postings |
426 | Highest element of selected hierarchy reached |
427 | Left limit of hierarchy level reached |
428 | Right limit of hierarchy level reached |
429 | Element not further subdivided |
430 | Navigation not possible |
435 | Enter new WBS elements only under the initial element |
436 | Do not enter a level smaller than & |
437 | Do not enter a level greater than & |
440 | Subproject assignment & not allowed - You cannot save |
441 | Process the subproject assignment completely |
444 | Not all required networks read/locked. Date cannot be moved |
449 | No template has been entered |
450 | WBS elements could not be included. Check your entry |
451 | Key and hierarchy were checked: No errors |
452 | & key was not processed |
453 | A WBS element with key "&" already exists |
454 | Key "&" has been assigned several times (& WBS elements) |
455 | & does not exist. You cannot replace |
456 | & key(s) were changed |
457 | Enter only one WBS element |
458 | WBS elements were not included |
459 | & WBS elements were included |
460 | Enter project profile or project definition to be copied |
461 | Level missing in hierarchy: WBS element & cannot be included |
462 | Project definition to be copied not entered |
463 | Select required WBS elements |
464 | Incomplete assignment: Required WBS elements are missing |
465 | Hierarchy could not be included; root element does not exist |
466 | WBS element & does not exist in subhierarchy |
467 | Subhierarchy is not consistent |
468 | Hierarchy can no longer be changed |
469 | You cannot move the root element of the hierarchy |
470 | ====================== Project planning board =========================== |
471 | Activities for WBS element & could not be read |
472 | Enter profile for project planning board in project profile "&" |
473 | Scheduled dates cannot be changed |
474 | Select an activity |
475 | Select an activity with a subnetwork |
476 | No subnetworks displayed in the graphic |
477 | Select a milestone |
478 | Select a(n) & |
479 | You have not selected an activity or a(n) & |
480 | Select a relationship |
481 | Select a milestone for an activity |
482 | Date not entered correctly |
483 | Time not entered correctly |
484 | Unit & is not valid |
485 | You did not select "description" in field selection |
486 | You did not select dates in field selection |
487 | You did not select costs in field selection |
488 | No activities for selected & found |
489 | No activities are displayed for the selected WBS elements |
490 | Enter only dates or duration and one date |
491 | Incorrect entry for time scale. Try again |
492 | Activity is already dispatched. You cannot change dates. |
493 | You cannot insert dates in this mode |
494 | WBS element & has no start date. Scheduling not possible. |
495 | WBS element & has no finish date. Scheduling not possible. |
496 | You cannot insert lines in the table area |
497 | Several sets of dates selected: You cannot insert a time bar |
498 | There are no relationships which can be displayed. |
499 | No graphic profile with index & exists |
500 | =================== Scheduling ========================================= |
501 | Select a WBS element |
502 | You can only insert one time bar per element |
503 | Dates in WBS element & not current |
504 | WBS element & is not an account assignment element |
505 | WBS element & is locked for time scheduling |
506 | Finish date for WBS element & no longer fits |
507 | Start date for WBS element & no longer fits |
508 | WBS element & has no activities |
509 | Enter a standard network or network |
510 | Network & locked. You cannot shift dates |
511 | Network & locked. Time scheduling not possible |
512 | Actual finish date for WBS element & cannot be maintained |
513 | No dates exist for WBS element & |
514 | No overlapping dates found |
515 | You cannot delete the start date |
516 | You cannot delete the finish date |
517 | No schedule conflicts found |
518 | No activities copied |
519 | Enter a WBS element |
520 | No schedule conflicts found for basic dates |
521 | No schedule conflicts found for forecast dates |
522 | Network profile does not exist. Change project definition |
523 | You cannot assign the activity number |
524 | Start date earlier than start date & in superior WBS element |
525 | Start date earlier than start date & of the project |
526 | Finish date later than finish date & of the project |
527 | Finish date later than finish date & of superior WBS element |
528 | Start date in the future |
529 | Finish date in the future |
530 | Schedule conflicts found. Correct dates |
531 | No dates in WBS element &. Reconciliation not possible |
532 | Schedule conflicts exist. See log |
533 | Either select only one WBS element or no WBS element |
534 | No WBS elements exist |
535 | Missing data for time scheduling in project profile & |
536 | No new networks exist |
537 | Schedule conflicts found for basic dates. Please correct |
538 | Schedule conflicts found for forecast dates. Please correct |
539 | No activity elements could be found for the selected activities |
540 | No network assignment entered for WBS element & |
541 | WBS element & must be an account assignment element |
542 | New start date is later than the old one |
543 | No date changes exist |
544 | Network type "&" does not exist |
545 | Date &1 is not a working day. Continue using &2? |
546 | Start date is in the past |
547 | Finish date is in the past |
548 | Select a network first |
549 | Activity dates exist for WBS element &. You cannot delete |
550 | Define network profile first |
551 | Enter dates in the project definition first |
552 | No activities exist for the selected WBS elements |
553 | No basic dates exist. Forecast dates for & not possible |
554 | Dates conflict with the dates of the subordinate WBS elements. |
555 | Dates for activity elements could not be maintained |
556 | Field length exceeded when calculating WBS element & duration |
557 | No activities exist for WBS element & |
558 | Field length exceeded when calculating project & duration |
559 | Activity start earlier than WBS element & start date |
560 | Activity finish later than WBS element & finish date |
561 | WBS element & has activities. Delete activities first |
562 | Level dates for all activities first |
563 | Finish date is earlier than start date |
564 | Enter start and finish date |
565 | MRP controller &2 does not exist in plant &1 |
566 | Plant cannot be determined. Please check profile |
567 | There are no activities for the selected WBS elements |
568 | WBS element &1: Activity &2 in network &3 is not in time frame |
569 | Project structure contains several calendars |
570 | No activities. Scheduling was not carried out. |
571 | No actual dates could be determined for WBS element & |
572 | Subnetwork cannot be shown |
573 | Date conflicts exist. Check dates |
574 | Activities for WBS element & cannot be read |
575 | Profile & for project planning board does not exist |
576 | WBS dates were updated from activities. (See Extras -> Act-WBS) |
577 | Date entered is not a workday. Continue with &? |
578 | You cannot delete in current set of dates |
579 | Activity elements can only be created for activities. |
580 | No activities can be assigned to project definition |
581 | No graphic profile with group & exists |
582 | Not all activities assigned to WBS element & have been finally confirmed |
583 | The subordinate WBS elements of WBS elem. & are not all finally confirmed |
584 | No valid scheduling type has been entered. Edit settings |
585 | No graphic profile with group &, name & and index & |
586 | Time profile & does not exist |
587 | WBS elements have earlier start date than project definition |
588 | WBS elements have later finish date than project definition |
589 | No dates for WBS or project definition exist |
590 | Scale & for time axis does not exist |
591 | Enter start date |
592 | Enter finish date |
593 | No parameters for WBS scheduling. Maintain settings |
594 | You selected some activities which are in header-assigned networks |
595 | Profile for time scale & does not exist |
596 | No valid activity was selected |
597 | Network & could not be copied |
598 | WBS element start cannot be later than & activity start |
599 | WBS element finish cannot be earlier than activity finish & |
600 | === editing and miscellaneous ===================== |
601 | Mask must begin with letter & |
602 | No special indicator was maintained for coding |
603 | Character &1 is not valid. Valid characters are & and & |
604 | Key is too long. Key cannot exceed & places |
605 | Key for coding mask must be exactly & places long |
606 | Entry & already exists |
607 | Only numerical or alphanumerical characters may be used in each section |
608 | In one section of Project or WBS Element, there is no number. "&" |
609 | Key does not correspond to mask: & |
610 | Entry length is incorrect. "&" |
611 | Cannot make this change to the editing mask (see long text) |
612 | Project "&" already exists. You cannot delete it. |
613 | Screen for coding can only be extended, not changed. |
614 | Project & already exists. (You cannot use this key) |
615 | Select the end of the block |
616 | Line cannot be selected |
617 | No previous element exists |
618 | No subsequent element exists |
619 | No. of project sections does not agree with project mask "&" |
620 | Project number or WBS number may not be used |
621 | Structure indicator & ... is locked |
622 | Costs calculated for WBS element & |
623 | Costs not completely calculated for WBS element & -> see log |
624 | Log contains no entries |
625 | Key is too long. Enter a key no longer than 24 characters. |
626 | You can only change from numeric to alphanumeric sections |
627 | Edit screen is "&" too long |
628 | Enter an edit mask |
629 | Special characters were changed. Check project editing masks and change |
630 | Select a & |
631 | You cannot create an activity element in a new network |
632 | No entry in table TBALK for key & |
633 | No material was found for the selected objects |
634 | No costs could be found for the selected objects |
635 | WBS elements with inconsistent WBS dates are highlighted |
636 | Cannot display values with different categories |
637 | Select an object in the costs overview |
638 | The column could not be moved |
639 | Special character & is not allowed |
640 | You can only change the unit, if dates exist |
641 | Click on the object to display assignments |
642 | Cannot undo at the moment |
643 | No log exists |
644 | Select at least two activities |
645 | The zoom factor you entered is smaller than & |
646 | The zoom factor you entered is larger than & |
647 | Objects not highlighted. Cannot position |
648 | Milestone for WBS element cannot be copied to an operation |
649 | Top-down planning: The function "project dates" is not possible |
650 | =================== Status management ================================== |
651 | Element: & & -- Person responsible: & |
652 | You cannot reset the deletion flag & |
653 | Definition: & & -- Person responsible: & |
654 | Status "&" "&" is set - no action |
655 | Project definition & is not released |
656 | WBS element & is not released |
657 | Status "&" "&" is not active - no action |
658 | Check user status of new WBS elements |
659 | Status cannot be set for WBS element & |
660 | Status profile &: You cannot set or delete the user status |
661 | Project stock exists in the WBS element structure |
662 | The status of the WBS element does allow changes |
663 | You cannot add an actual date horizontal bar |
664 | Physical inventory for material not completed or locked for movements |
665 | Definition: & & |
666 | Element: & & |
667 | You cannot set the status "Closed" for WBS element & |
668 | You cannot set the status �Deletion flag� for WBS element & |
671 | Master data in project definition & is locked |
672 | Master data in WBS element & is locked |
673 | Basic data lock set on WBS element & |
674 | Basic data lock set on project & |
675 | Basic data lock removed from WBS element & |
676 | Basic data lock removed from project & |
677 | Assignment of internal order to WBS element & is not allowed |
678 | Assignment of order to WBS element & is not allowed |
679 | You are not allowed to assign a network to WBS element & |
680 | Grayed-out special indicators are already being used |
681 | At least one coding mask is already being used |
682 | WBS element & has an open CA-TS assignment |
683 | Network activity & & has an open CA-TS assignment |
690 | ==========================Billing plan ================================= |
691 | Enter a plan profile |
692 | &1 is not a revenue element |
693 | Assign a revenue element to the planning profile &1 |
694 | Assign a valid plan profile to project &1 |
695 | Revenue element &1 in COAr &2 does not exist on &3 |
696 | Billing plan for WBS element &1 is being processed by &2 |
700 | === Validation of master data fields === |
701 | Company code & does not exist. (Check entry) |
702 | Business area & does not exist. (Check entry) |
703 | Controlling area & does not exist. (Check entry) |
704 | Project definition not automatically created with profile & |
705 | Factory calendar copied from plant |
706 | Currency copied from company code |
707 | Factory calendar in project differs from plant factory calendar |
708 | Profit center was not created for entire period |
709 | You have not entered a project definition or a project profile |
710 | Automatic transfer to project definition is deactivated |
711 | You cannot create another WBS element for project definition & |
712 | Project currency must be same as company code currency |
713 | Costs for WBS could not be displayed |
714 | Statistical WBS element: No surcharges, settlement etc. & |
715 | Enter level |
716 | Asset under construction for & not allowed |
717 | Subproject & is not valid (check your entry) |
718 | Currency in requesting company code must be company code currency |
719 | Several WBS elements on level 1 not allowed |
720 | Joint Venture Accounting is not active in company code & |
721 | The profile entered is in the SAP name range |
722 | Parts of & exist already |
723 | Project definition exists already |
724 | Costs have already been posted to WBS element & |
725 | Postings have been made for WBS element &1 - Deletion not allowed |
726 | No field attributes flagged for field &1 -> CJCK_PR*_FIELD_ATTR_INIT |
727 | Field &1: Changing the contents of the field is not permitted |
728 | WBS el. & has act. costs, act. reveue. You cannot change the bus. area |
729 | Requesting cost center initialized for WBS &1 |
751 | Please fill in controlling area for cost center & |
752 | Enter controlling area and cost center |
753 | Requested company code &1 was copied from requested cost center &2 |
754 | WBS elem. "&" not acct. assignm. elem. Assets under constr. not allowed. |
755 | Assignment to capital investment program can not be changed |
756 | Character is already used as first character in an edit screen |
757 | First character is already used in 'automatic number assignment' |
771 | Default value & copied for & |
772 | You cannot change the investment profile |
773 | You cannot change the statistical indicator for WBS element &1 |
800 | =================== Basis functions (locking, graphic, ...)============= |
801 | Your graphic profile & contains errors |
802 | Internal error & & during number assignment |
803 | Number assignment for & in critical area |
804 | Number assignment: Interval for & exhausted |
806 | &1 &4 &2 is currently being processed by &3 |
807 | Change document: & |
808 | Mouse pointer is not on a column heading |
809 | No milestones for selected objects can be displayed |
810 | Modifications are not possible in the capacity utilization graphic |
811 | Please choose a valid relationship type |
812 | Method & is not supported |
813 | Object type & is not supported |
814 | Incorrect number of update structures for table & |
815 | The transfered hierarchy is inconsistent |
816 | The method table is not consistent with the data tables |
817 | Change mode has been switched on |
818 | Change mode has been switched off |
819 | This function is not permissible for all project elements |
820 | The external key is not compatible with the internal key |
821 | There are no project objects that can be shown |
822 | There are no project objects that can be hidden |
823 | WBS element & is not locked - no changes possible |
824 | Error when processing asset under construction (AuC) for WBS element &1 |
825 | Initializing of graphics for & is not supported in the SAP GUI |
826 | Select at least one entry in the update structure |
827 | Inconsistent hierarchy in project & |
828 | The Field Key & is still being used in existing project definitions |
829 | The Field Key & is still being used in existing WBS elements |
830 | The Field Key & is still being used in existing networks |
841 | Program &1 table &2: Repeat program run |
842 | Program &1 table &2: Changes executed successfully |
843 | Program &1 table &2: No changes made |
844 | Program & can only be started when upgrading the system |
845 | Program & is only required in Releases 30D to 45B |
850 | Partner determination procedure & does not exist for 'Work Breakdown Str" |
851 | You can create only one project within one transaction |
870 | No user-defined characteristic could be found for field & |
871 | Value of user-defined characteristic & written to field & |
872 | No additional field found for characteristic & |
873 | &1 &2 are being processed |
875 | |
876 | |
877 | |
895 | System error in program & (&) -> F1 |
896 | Function not supported here |
897 | Error when calling up function module &: & & & |
898 | Error when accessing file: & & & & |
899 | System error: Program &, module &, error: & & |