CK - Nachrichten Erzeugniskalkulation
The following messages are stored in message class CK: Nachrichten Erzeugniskalkulation.
It is part of development package CKSA in software component CO-PC-PCP. This development package consists of objects that can be grouped under "R/3 Application Development COPC-PCP Quantity Structure Tool".
It is part of development package CKSA in software component CO-PC-PCP. This development package consists of objects that can be grouped under "R/3 Application Development COPC-PCP Quantity Structure Tool".
Message Nr ▲ | Message Text |
---|---|
000 | **** General Messages **** |
001 | Transaction & is not in screen sequence control CIM |
002 | Costing variant & does not exist (please check your entry) |
003 | Costing type & does not exist (please check your entry) |
004 | Enter a strategy sequence that does not have gaps |
005 | Reference object & does not exist (please check your entry) |
006 | Plant &1 for material &2 is not assigned to a controlling area |
007 | Plant & is not assigned to a controlling area |
008 | Error in formula for work center &2, plant &1 |
009 | Table & has no entry for costing variant & |
010 | Entry missing in costing type or costing variant for & |
011 | An asterisk (*) is not an allowed strategy |
012 | System error. Notify your system administrator |
013 | Valuation variant & does not exist (please check your entry) |
014 | Error when converting the costing date --> posting period |
015 | No valid strategy for &1 &2 &4 with valuation variant &3 |
016 | Incorrect call for activity valuation in file RKIN |
017 | No activity price exists for cost ctr & CO area & act. type & |
018 | Internal error: & & |
019 | No cost center planning exists for CCtr & CO area & |
020 | Field overflow with int. activity: CCtr & CO area & act. type & |
021 | Costing variants & and & would overwrite each other |
022 | No longer used |
023 | No cost estimate found (please check your entry) |
024 | Costing variant & not assigned to a number range group |
025 | Number range group & not found in number assignment |
026 | Number range object & not found in number assignment |
027 | Tolerance limit exceeded when number & was assigned |
028 | Number & was the last number that can be assigned for this interval |
029 | Date from is later than Date to (please check your entry) |
030 | No additive cost estimate found for the area of validity entered |
031 | Please select an area of validity |
032 | Position the cursor on a field you can select |
033 | Additive cost estimate already exists |
034 | Plant & does not exist (please check your entry) |
035 | Plant & is not assigned to a valuation area |
036 | Parameters do not exist for plant & order type & |
037 | Lot size & & taken from costing view |
038 | Lot size in material master is & & |
039 | The cost estimate is being saved |
040 | Material & in plant & has no valuation data |
041 | Field overflow with material & plant & |
042 | Costing data are inconsistent |
043 | Please correct your entry for the date |
044 | "Costing date to" set to & |
045 | Customizing for costing variant & incomplete |
046 | & errors ocurred during costing. See log |
047 | Select at least one costing level |
048 | No cost element segment exists for & on & |
049 | No successful strategy with valuation variant &2 |
050 | No longer used |
051 | Select at least one material |
052 | Costing variant does not exist (please check your entry) |
053 | Deletion indicator set in material & plant & |
054 | Deletion indicator set in material & valuation area & |
055 | Plant & is not assigned exclusively to valuation area & |
056 | Valuation segment locked for material & valuation area & |
057 | Special procurement type & plant & does not exist |
058 | System error when locking |
059 | Inconsistency in cost element category with material & |
060 | Object was not costed |
061 | Additive cost estimate will be deleted |
062 | Additive cost estimate locked by another user |
063 | Activity type &2 not assigned to cost center &3 |
064 | Assignment of activity type & / cost center & is not valid |
065 | Activity type & in CO area & cannot be charged |
066 | Error when translating dimensions (&): different dimensions |
067 | No cost component structure is assigned to costing variant & and plant & |
068 | Valuation variant & does not exist |
069 | Costing run already exists |
070 | Costing run does not exist |
071 | Costing run locked by another user |
072 | The log can only be saved in connection with a cost estimate |
073 | Specify a costing variant for the costing run |
074 | Existing selection will be overwritten |
075 | Planning date is in the past -> cost estimate cannot be saved |
076 | Costing run & & is being saved |
077 | No longer used |
078 | No materials were selected for the costing run |
079 | Date control & does not exist |
080 | Material & plant &: BOM not active |
081 | Material & plant &: alternative BOM & not found |
082 | Material & plant &: no suitable BOM found |
083 | No longer used |
084 | No longer used |
085 | System error during second attempt to lock |
086 | No suitable costing run found (please check your entry) |
087 | Specify only one sort criterion |
088 | Specify at least one sort criterion |
089 | Plants & and & do not belong to the same company code |
090 | Log not found (error during udpate) |
091 | Internal error when saving itemization |
092 | Material & in plant & could not be costed (see log) |
093 | & costing level(s) selected |
094 | Internal error when reading the purchasing info record |
095 | Purchasing info record & not found |
096 | Update of cost estimate terminated |
097 | Error when selecting costing levels (please check your entry) |
098 | No number could be assigned for material & in plant & |
099 | No cost component split can be determined for material & / plant & |
100 | Overhead group & has no overhead key |
101 | You must save the cost component split |
102 | Cost estimate will be saved without itemization |
103 | Cost estimate will be saved without cost element itemization |
104 | Cost est. will be saved w/o itemization or cost element itemization |
105 | Set the update indicator |
106 | Costing run only possible for cost estimates belonging to company code |
107 | Check costing dates |
108 | Cost estimate will be saved without costing variants or costing dates |
109 | Internal error: No KEKO key can be determined with costing variant & |
110 | Internal error: No KEKO key can be determined with costing variant & |
111 | No BOM found for material & plant & lot size & |
112 | No longer used |
113 | Material &1 cannot be costed |
114 | Costing run & & is being deleted |
115 | Company code & does not exist (please check your entry) |
116 | No materials with marking were found |
117 | &1 materials successfully reset |
118 | Allowance for marking for company code &1 not removed |
119 | Marking not authorized for company code & period & year & |
120 | Parameter error: T_KOMK1 is empty |
121 | Material control record does not exist in company code & |
122 | Invalid posting period (please check your entry) |
123 | Plant & does not exist (please check your entry) |
124 | Valuation class for material & & changed |
125 | Valuation area & does not exist (please check your entry) |
126 | Company code & does not exist (please check your entry) |
127 | No date control is assigned to costing variant & |
128 | Material & in plant & has no accounting data |
129 | No plant specified for material &, item &, operation & |
130 | Work center & in plant & has no cost center |
131 | No plant specified for operation & sub-operation & |
132 | The log is empty |
133 | No longer used |
134 | Marking and release not possible |
135 | Period is in the past |
136 | Release is only possible within this period |
137 | Plant &1 does not exist |
138 | Marking for posting period & & not allowed |
139 | Cost estimate for marked period does not exist |
140 | Cost estimate has status & (marking not possible) |
141 | Costing not allowed across controlling areas |
142 | Valuation area & material &: Cost estimate locked by another user |
143 | Valuation area &1 does not exist |
144 | Material master locked by another user |
145 | System error when locking material |
146 | No costing variant for std cost estimate found |
147 | No cost component structure for standard cost estimate |
148 | Material &v1& plant &v3&: Field overflow in future standard price |
149 | Last selected material reached |
150 | First selected material reached |
151 | Internal error: Material & & has no lot size |
152 | Cost estimate marked but material has no accounting data |
153 | Cost estimate marked |
154 | Material valuation strategy not suitable for costing variant & |
155 | Material has no standard cost estimate |
156 | Company code &1: Release too late |
157 | Company code &1: Release too early |
158 | There is no assignment for valuation area & valuation category & |
159 | Routing & & does not exist |
160 | No itemization found for cost estimate |
161 | No costing type found for standard cost estimate |
162 | Current cost estimate not found (inconsistent data) |
163 | Future cost estimate not found (inconsistent data) |
164 | Future cost estimate has unsuitable error status |
165 | Check the entry for the costing run |
166 | System error when blocking cost estimate & |
167 | Cost estimate for material & could not be locked |
168 | Cost estimate for material & / plant & is incorrect |
169 | Material & in plant & was not costed |
170 | Material & in plant & contains marked cost estimate |
171 | Material & in plant & has a released cost estimate |
172 | Material & in plant &: No cost est. exists -> raw mat. cost estimate |
173 | Material & in plant &: Costing status not allowed for material type |
174 | Selected variants have different quantity structure control |
175 | Internal error: Operation number cannot be determined from KALKTAB item |
176 | Error when translating dimensions: Field overflow |
177 | Error when translating dimensions: Dimension not defined |
178 | Error when translating dimensions: Unit of measurement not defined |
179 | Material &4: Material type &1 does not exist |
180 | No posting string can be determined in table & |
181 | Entry missing for account determination |
182 | Constant for account modification cannot be determined in table T156X |
183 | Usage account cannot be determined due to read error in table & |
184 | No authorization for costing variant &1, controlling area &2 |
185 | &3: Marking has already been allowed for posting period &1 &2 |
186 | Marking file is currently locked |
187 | System error when locking |
188 | Allowance for marking for posting period & & issued |
189 | Specify either company code or chart of accounts |
190 | &2: no authorization for controlling area &1 |
191 | Valuation area &1 is not assigned to a company code |
192 | Material & in plant & has no suitable cost component split |
193 | Material & in plant & w/o cost comp split: price acc to val strategy |
194 | Operation & / & has no work center |
195 | Exception & occurred with material & plant & |
196 | No authorization for creating a material master record |
197 | G/L account & & does not exist |
198 | Chart of accounts for company code & not found |
199 | G/L account & & has deletion indicator |
200 | Error during transaction call from func. module CK_F_PC_MATERIAL_CHECK |
201 | G/L account & & locked for posting |
202 | G/L account & & is a reconciliation account |
203 | Controlling area for company code & not found |
204 | Cost element & does not exist |
205 | Cost element & is not a primary cost element |
206 | Update type & does not exist |
207 | Error in DELETE KEKO |
208 | Error in UPDATE KEKO |
209 | Error in DELETE KEPH |
210 | Error in UPDATE KEPH |
211 | Cost estimate terminated |
212 | Field overflow during valuation of an external operation |
213 | Cost component structure & is not active |
214 | No active standard cost estimates exist |
215 | & costing level(s) selected for the cost estimate |
216 | & costing level(s) selected for marking for release |
217 | & costing level(s) selected for release |
218 | No cost component split exists for material & in plant & |
219 | No itemization exists for material & in plant & |
220 | Material/plant &/& can only be costed with unit costing |
221 | Material & in plant & has no accounting view |
222 | External operation & / & has no price |
223 | Internal error in program &: Price unit = 0 |
224 | Costing version & was determined through internal number assignment |
225 | Costing version & is not valid (please check your entry) |
226 | Exception & occurred in CK_F_TCK_TABLES_READ_21 |
227 | Plant segment missing for material & in plant & |
228 | Group segment missing for material & in plant & |
229 | No routing could be determined for material & |
230 | Costing item has no material or price |
231 | Valuation area & missing for goods received valuation |
232 | Valuation variant & does not exist |
233 | No costing variant found during number assignment |
234 | No costing type found during number assignment |
235 | No valuation variant found during number assignment |
236 | No date control found during number assignment |
237 | No reference object found during number assignment |
238 | Plant & is not the only plant assigned to valuation area & |
239 | Cost element & is not assigned to a cost component |
240 | Cost component split costed with value of zero |
241 | Value of cost component split is less than zero |
242 | Error in update of KEKO in CK_F_KEKO_RELEASE_POSTING |
243 | There is no data for material & in plant & |
244 | Material & does not exist (internal error) |
245 | Costing view could not be created |
246 | Costing variant for marking/release missing from costing run |
247 | Incorrect number of financial accounting documents in costing run |
248 | Material & in plant & is currently locked |
249 | Cost component split for material & in plant & not saved |
250 | There is no cost element itemization for material & in plant & |
251 | Costing variant missing |
252 | No costing number could be assigned |
253 | Cost estimate cannot be saved |
254 | Costing view created for material &1 in plant &2 |
255 | No costing dates available |
256 | No cost field for fixed costs has been defined |
257 | Cost element missing from BOM item with purchase price |
258 | Material & in plant & has no alternative BOM & |
259 | Material & in plant & has no alternative BOM & and usage & |
260 | Additive costs cannot be updated |
261 | Errors occurred when costs were calculated (see log) |
262 | Messages were issued when costs were calculated (see log) |
263 | There is no costing type for the standard cost estimate |
264 | There is no costing view for material & in plant & |
265 | Cost transaction &1: Error converting from &2 -> &3 |
266 | Costing variant & does not allow cost estimates to be saved |
267 | No log exists |
268 | There is no log for & |
269 | Usage & for finding alternative BOMs is not available |
270 | Error with DELETE |
271 | Costing run & & was canceled |
272 | Lot size & & was transferred from the MRP segment |
273 | Error when selecting costing levels (please check your entry) |
274 | Error when selecting costing levels (please check your entry) |
275 | Select at least one selection criterion |
276 | Lot size in material master cannot be determined |
277 | No materials selected |
278 | Price unit is greater than the costing lot size entered |
279 | BOM already exploded for costing run & & |
280 | No purchasing info record operation & |
281 | Inconsistency in customizing with costing variant & |
282 | Work center & / & has no cost center |
283 | The marked standard price will be overwritten |
284 | Cost estimate has status &. It has already been released. |
285 | Cost estimate for material & in plant & cannot be released |
286 | Cost estimate for material & in plant & could not be released |
287 | Log for selection printed or written to the spool |
288 | Error in order type for product costing |
289 | No costs will be calculated: costing variant missing |
290 | Cstg vrnt missing for determ. of purch. req. price for non-stock item |
291 | Cstg vrnt missing for determ. of purch. req. price for external proc. |
292 | Error while determining the controlling area |
293 | Marking authorization for costing variant &1 not granted |
294 | Allowance for release not made for costing variant &1 in company code &3 |
295 | Valuation strategy & rejected by activity valuation |
296 | Enter BOM usage for alternative BOM & |
297 | No selection ID & for task list selection |
298 | Internal error: incorrect call during routing selection |
299 | No alternative to multi-level BOM found for material & in plant & |
300 | Control key & is not defined in Customizing |
301 | Costing variant & not costed in costing run |
302 | Unit cost est. found for material & in plant & for cstg variant & |
303 | Previously released cost est. was used for material & in plant & |
304 | Costing variants &1 and &2 have the same val. variant and costing type |
305 | BOM for material & in plant & is flagged for deletion |
306 | No routing could be determined for material & plant & sel. ID & |
307 | Spool request & created |
308 | List & printed on printer & |
309 | Plant & does not belong to company code & |
310 | Material & is marked for deletion |
311 | No operation could be created for material & plant & |
312 | Internal error during material selection |
313 | No cost estimate found |
314 | Material & in plant & has no BOM |
315 | Material & in plant & is configurable and will not be costed |
316 | No entry found for material & and/or plant & |
317 | Internal error during sel./qty struct. determ. of config. materials |
318 | Cost estimate for material & contains errors -> Planned price |
319 | Material & in plant & has no costing status |
320 | Material & is not a configured material (please check your entry) |
321 | Overhead key & is not suitable for costing sheet & |
322 | Consumption account cannot be determined |
323 | There is no exchange rate for exchange rate type & on &: & |
324 | Material & in plant & will not be costed because the BOM is recursive |
325 | No name exists for view & in language & |
326 | Qty & not allowed. Check your entry |
327 | View & does not exist (check user settings) |
328 | View & does not exist (check user settings) |
329 | Requirements date not supported in Release & |
330 | Settings for the costing dates are inconsistent |
331 | "Costing date to" changed by system to end of period & |
332 | Internal error: no view selection |
333 | Cost component view & does not exist. Check your entry |
334 | Costing item & is not assigned to a cost component |
335 | Settings for the cost display for costing variant & were saved |
336 | Settings for the cost display were saved |
337 | Company code &1: Cancellation not allowed |
338 | Company code &1: Cancellation not allowed |
339 | Item category & for item & ( & / & ) not allowed |
340 | Costing lot size changed from & & to & & |
341 | Releasing has not yet been allowed for posting period &2 &3 |
342 | Cost estimate has not yet been marked |
343 | Selection criterion & for date interval is invalid |
344 | Material & plant &: BOM not found |
345 | Recursivity with special procurement of material & in plant & |
346 | Cost comp. structures for costng variant & in plant & differ from plant & |
347 | Cost comp. split not transferred due to different cost comp. structure |
348 | Costing lot size is smaller than price unit & |
349 | Carry out costing in the background |
350 | Mat. & in plant & should be costed in cost est. w/o qty structure |
351 | Material master data not consistent with costing data |
352 | External service operation & / & has no price |
353 | Field overflow when valuating an external service |
354 | Material & in plant & has material status & : & |
355 | Material PPS status & for material & in plant & does not exist |
356 | Costing variants & and & have different transfer control IDs |
357 | Transfer costing with status & exists for material & in plant & |
358 | Multiple costing variants only possible w/o transfer control ID |
359 | There was no activity price planning for &/& in fiscal year & |
360 | No actual activity prices available for cost ctr & acty type & |
361 | Value of costing item & in itemization is 0 |
362 | No plant with a one-to-one assignment to its valuation area exists |
363 | Plant & does not have a one-to-one assignment to its valuation area |
364 | Costing variant & does not allow this update |
365 | Costing variant & does not allow price update |
366 | Select at least one price to be updated |
367 | Make either all entries or no entries for the planned price |
368 | Validity dates for planned price must be in ascending order |
369 | Starting date of fiscal period cannot be determined |
370 | No price update for mat. & in plant & for valuation type & |
371 | No cost component structure found for costing variant & plant & |
372 | Spool request & created for user exit |
373 | List & for user exit sent to printer |
374 | Internal error when posting itemization |
375 | No cost estimate found for material item & in itemization |
376 | No longer used |
377 | No longer used |
378 | Material master in plant & could not be locked |
379 | Marking already carried out |
380 | No valid source of supply could be found |
381 | Costing canceled due to locked cost estimate in company code & |
382 | Material & does not exist in withdrawal plant & |
383 | BOM & /alt. & /usage & has no items relevant to costing |
384 | Costing variant & is not assigned to costing run |
385 | Enter a routing group for routing type & |
386 | A routing of type & cannot be costed |
387 | No G/L account for & on & |
388 | Process cannot be costed with the cost estimate |
389 | Only the planned prices can be updated |
390 | Only the commercial prices can be updated |
391 | Only the tax prices can be updated |
392 | Cost estimate(s) found for another costing variant |
393 | Special procurement type & ignored for configurable materials |
394 | No cost estimate has been created for costing run & & |
395 | A suitable future standard cost estimate could not be transferred |
396 | Cost component split does not exist although costing header data present |
397 | Invalid data combination occurred |
398 | Valuation strategy & ignored in costing |
399 | Costing is not allowed for material/PPS status |
400 | Material &1: No plant maintained for special procurement type |
401 | Material &1: Plant &2 not found for special procurement type |
402 | Material &1 plant &2 could not be found |
403 | Material price costing carried out for co-product & in plant & |
404 | No. of co-products differs from no. of items in apportionment structure |
405 | Cost collector counter does not exist |
406 | Index table on KALKTAB incorrect |
407 | There is no plant &2 in company code &1. Check your entry |
408 | Controlling areas in source and target systems differ |
409 | Function not supported. Costing run has multiple costing variants |
410 | Marking not allowed with this combination |
411 | Transfer control according to costing variant &1 accepted |
412 | You have not checked the updating and printing parameters |
413 | & cost estimates can be deleted |
414 | Costing variant & does not allow marking or releasing |
415 | &2 cost estimates can be deleted out of the &1 selected |
416 | Material &1 in plant &2 has costing number &3 |
417 | Material &1 in plant &2: key date for currency conversion not set |
418 | No cost components defined in cost component structure & |
419 | System messages were generated. See log |
420 | Enter a costing run, a plant or a company code |
421 | Select at least one option for automatic/additive costing |
422 | Select at least one option for costing with/without qty structure |
423 | Cost estimates to be archived must be in the past |
424 | Material & in plant & has no BOM |
425 | Cost component &1 does not exist in cost component structure &2 |
426 | Valuation type not set for material & |
427 | Costs of co-product & & subtracted from costing result |
428 | Overflow while evaluating operation & in routing & |
429 | Material &: Overflow during conversion into & |
430 | Missing formula in work center & |
431 | Parallel mode: Cost estimates are always updated |
432 | Not all materials in costing level & costed |
433 | Enter the destinations for the parallel costing run |
434 | No authorization for costing variant & in company code & |
435 | No authorization for costing variant & in company code & |
436 | No authorization for release in company code & |
437 | No authorization for marking in company code & |
438 | No authorization for allowing release/marking in company code & |
439 | No cost estimates can be selected with this indicator setting -> |
440 | No authorization in comp. code & to delete cost ests with cstg vrnt & |
441 | No account found for co-product & & |
442 | Errors occurred when costing co-product & & |
443 | Conversion error in company code currency for general costs activity & |
444 | Costing run & & was canceled |
445 | No longer used |
446 | Deletion program cannot be started -> |
447 | Cost est. for mat. & cannot be loaded back into production system -> |
448 | No longer used |
449 | & cost estimates were written to the archive -> |
450 | & cost estimates were deleted -> |
451 | & cost estimates can be deleted |
452 | & cost estimates were in the archive |
453 | & cost estimates remain in the archive |
454 | & cost estimates were reloaded into the system |
455 | Of the cost estimates selected, & cannot be reloaded |
456 | &2 cost estimates were selected of the &1 in the archive |
457 | No planned credit could be determined for the order (mat. &) |
458 | Costing for costing run & & has already been carried out |
459 | No entries exist |
460 | Internal error: Wrong application parameter |
461 | Routing & either does not exist or contains no operations |
462 | Selected routing & does not match selection ID & |
463 | "Pass on lot size" function not supported in costing runs |
464 | Lot size for material & in plant & taken from costing view |
465 | No price could be determined for material/batch &1 plant &2 |
466 | No price could be determined for internal activity &1 &2 |
467 | No price could be determined for external processing |
468 | No price could be determined for subcontracting |
469 | &2 data record(s) could not be updated in plant &1 |
470 | The selected materials will not be updated |
471 | Material & in plant & is not relevant for costing with qty structure |
472 | Material & in plant & is not relevant for costing with qty structure |
473 | Cost estimate stored in buffer |
474 | The costing lot size is smaller than the price unit |
475 | No cost component view for cost of goods sold exists |
476 | Material &: Routing does not match selection ID & |
477 | No routing could be found with the specified selection criteria |
478 | No routing could be found with the specified selection criteria |
479 | Material & in plant & with individual requirements has no costing view |
480 | Position the cursor on a cost component view |
481 | The costing lot size of the order item must be passed on |
482 | The write program for archiving cannot be started |
483 | The reload program for archiving cannot be started |
484 | The display program for archiving cannot be started |
485 | Material &1 in plant &2: Future standard price is zero |
486 | You are not authorized to delete company code &1, costing variant &2 |
487 | Enter an existing costing variant |
488 | Allowance for marking for posting period & & issued |
489 | Organizational measure locked in period &2 by user &4 |
490 | No company code could be determined for plant &1 |
491 | Material master locked by user & |
492 | Standard cost estimate locked by user & |
493 | Material master has no costing view |
494 | The system lacks a costing type for the std cost estimate |
495 | &1: Currency type &2 is not assigned in the material ledger |
496 | There is no standard cost estimate in posting period &3 |
497 | Standard cost estimate for future period &3 already released |
498 | Standard cost estimate for future period &3 already marked |
499 | Standard cost estimate for future period &3 cannot be marked |
500 | Standard cost estimate for period &3 already released with errors |
501 | Material master has no costing view. Marking not possible |
502 | Material &1 in plant &2 locked by user &3 |
503 | Std cost estimate at future material master anchor locked by user &4 |
504 | Multiple valuation method (&1) is not active |
505 | Operation &1/suboperation (or cost comp) &2: Activity type not entered |
506 | Material &1 could not be valuated |
507 | Error in currency translation |
508 | Valuation area &1 is not assigned to a controlling area |
509 | Company code &1 does not exist |
510 | No valuation area could be determined for plant &1 |
511 | No controlling area could be determined for plant &1 |
512 | Plant &1 does not exist in the system |
513 | Error in the organizational structure for plant &1 |
514 | System error while locking organizational measure |
515 | Material &1 in valuation area &2 with valuation type &3 is locked |
516 | Allowance for marking for period &2 &3 is being reversed |
517 | Release of cost est. for mat. & plant & thru mat. ledger settlement |
518 | Marking/release through costing run only in company code & |
519 | Release of cost est. in plant & through material ledger settlement |
520 | Costing run &1 locked by user &2. No selection possible |
521 | Division by zero in formula &4 |
522 | Separate valuation for internal production not mandatory |
523 | Standard cost estimate in posting period &4 is inconsistent |
524 | Standardd cost estimate at material master anchor inconsistent |
525 | Marked or released standard cost estimate is inconsistent |
526 | Cost estimate for material &1, valuation area &2 is locked |
527 | Standard cost estimate for future period &2 locked by user &4 |
528 | Company code &1 does not exist |
529 | Posting period &1 in fiscal year &2 is invalid |
530 | Posting period &1 &2 is in the past |
531 | Period &1 &2 in the marking database is locked by user &3 |
532 | System error while locking the marking database for period &1 &2 |
533 | Select one entry only |
534 | Marking database locked by user &3 |
535 | System errors occurred while locking the marking database |
536 | Company code & does not exist |
537 | Posting period & & is invalid |
538 | Posting period & & is in the past |
539 | Marking database: Period &1 &2 locked by user &3 |
540 | Error while locking: Release not allowed |
541 | Number of cost estimates to be marked exceeds & |
542 | Release with valuation type & required for separate valuation |
543 | No future standard cost estimate has been marked for material &1 |
544 | Your system has no costing type for the standard cost estimate |
545 | No current standard cost estimate found in posting period &3 &4 |
546 | Future standard cost estimate for posting period &3 &4 is not marked |
547 | No future standard cost estimate exists for posting period &3 &4 |
548 | Error at destination &1 |
549 | Prod. version & for material & in plant & does not exist |
550 | Material &1 in plant &2 has no costing view |
551 | Valuation segment for material &1 does not exist |
552 | Material &1 in valuation area &2 locked by user &4 |
553 | System errors while locking material &1 in valuation area &2 |
554 | Material &1 in valuation area &2 could not be found |
555 | Plant &3 could not be found |
556 | Release for posting period &1 &2 too late |
557 | Release for posting period &1 &2 too early |
558 | Destination &1 not available |
559 | Co-product & not relevant to costing |
560 | Parallel processing: Costing results will be released immediately |
561 | Internal error. Notify your system administrator |
562 | Cost reports cannot be printed in parallel processing |
563 | No configuration valuation passed on for material & in plant & |
564 | Costing segments could not be created |
565 | Costing view for material & in plant & could not be created |
566 | No destination is currently free for parallel processing |
567 | Internal error in server table |
568 | Error at destination &1 |
569 | Server & is not responding |
570 | All servers have errors or are inactive |
571 | Server & is not responding |
572 | No valid cost estimate found. |
573 | Inconsistent BOM structure with material & in plant & |
574 | Cost component view &1 does not exist. Check your entry |
575 | Internal error during parallel processing |
576 | A processing block was completed at & |
577 | Server & is not responding |
578 | Costs of cost element & cannot be assigned to any cost component |
579 | Parallel processing: Costing results will be marked immediately |
580 | Material &1 in plant &2 was costed with production version &3 |
581 | Missing authorization for BOM |
582 | Mat. & plant & has no suitable cost comp. split (cost est w/o qty struc.) |
583 | Costing views for & materials will be created |
584 | A block of costing views was created |
585 | Server group & does not exist |
586 | Batch input started on & at & |
587 | Batch input ended on & at & |
588 | Sales document & & & was costed with errors |
589 | Number of sales documents selected & |
590 | Number of cost estimates with errors & |
591 | Sales document & & & selected |
592 | Error in batch input processing of sales document & |
593 | Number of sales documents with faulty batch input & |
594 | Sales document & & & was costed without errors |
595 | Number of cost estimates to be executed & |
596 | Number of cost estimates executed & |
597 | Costing items for material &1 in plant &2 without cost element. |
598 | Plant & does not exist |
599 | View is not suitable for report call |
600 | Specify valuation class for material &1, plant &2, valuation type &3 |
601 | Cost estimate is not in archive -> |
602 | No authorization to display cost estimates in company code &1 |
603 | Organizational units for plant &1 are inconsistent |
604 | Material &1 in valuation area &2 does not exist |
605 | Costing variant &1 does not exist |
606 | Enter a costing version from 01 to 99 |
607 | Index successfully generated |
608 | &1 index entries were deleted |
609 | No archiving session matches the selection criteria |
610 | The archiving files selected do not have an index |
611 | Plant &1 for material &2 is not assigned to a controlling area |
612 | Material &1, PRT &2: Zero fxd/var. values in table TOOL_COST |
613 | Material &1, PRT &2: No cost element found in TOOL_COST |
614 | Material &1, PRT &2: no valid entry in TOOL_COST |
615 | In valuation area &1, &2 is not defined as local valuation category |
616 | The indicator 'In-house production mandatory' was not set |
617 | Valuation type for in-house production is blank |
618 | Valuation area & does not exist |
619 | Authorization for marking was not given |
620 | Int. error: No cost comp split exists for output material & in process & |
621 | Int. error with BOM explosion: Matl & in plant & exists more than once |
622 | Data used from material master of process material &3 |
623 | No cost estimate found |
624 | & cost estimates can be deleted |
625 | & cost estimates were deleted |
626 | & cost estimates were deleted |
627 | & cost estimates displayed from archive |
628 | Plant & is not assigned to a company code |
629 | Marked cost estimates generated for material valuation |
630 | No costing view exists for material & with material type & |
631 | Costing lot size calculated for co-product & is lower than price unit |
632 | Costing lot size of co-product & calculated using process lot size |
633 | No cost apportionment schema maintained for process mat. & in plant & |
634 | No cost apportionment schema maintained for process mat. & in plant & |
635 | Saving new cost estimate overwrites marked cost estimate |
636 | Please enter either production version or BOM data/planning data |
637 | Profit center from process material master data used for co-product & |
638 | Prod. version & for material & in plant & does not exist |
639 | In a reference cost estimate, entries are deleted from the intital screen |
640 | Marked cost estimate cannot be changed |
641 | Material &2: Profit center cannot be determined. |
642 | Material &2: Dummy profit center used for partner determination |
643 | Mat. no. &2: Business area could not be determined. |
644 | Material &1 in plant &2: apportionment structure &3 will be used |
645 | Error when reading CO object &1. |
646 | Material & in plant & has incorrect cost component split. |
647 | Material & plant & is not costed due to recursive structure |
648 | Reference cost estimate requires cost estimates from 4.0 or later |
649 | Marking has already been allowed |
650 | Maximum 1 costing type for the standard cost estimate allowed |
651 | No order type-dependent parameters found |
652 | &2 not active for controlling area &1 |
653 | User &1 is locking material &2 valuation area &3 valuation type &4 |
654 | Marking has not yet been allowed |
655 | User &1 is locking future std. cost estimate for material &2 &3 |
656 | Marking has already been allowed |
657 | Max. 1 costing type for the std cost estimate for group valuation |
658 | Max. 1 costing type for the std cost estimate for profit center valuation |
659 | No reference cost estimate found for material & in plant & |
660 | Enter company code |
661 | Enter controlling area |
662 | &1 cost estimates selected for marking |
663 | Costing not authorized in profit center & |
664 | Costing not authorized in company code & |
665 | Standard cost estimate is incorrect. Marking not possible |
666 | Material &1/plant &2: Transfer price could not be found. |
667 | Costing variant missing |
668 | Entry for company code & canceled |
669 | Deleting current standard cost estimates can cause inconsistencies |
670 | Company code &1: marking too late |
671 | Controlling area & does not exist (check entry) |
672 | company code &1 is not assigned to a controlling area |
673 | Select at least one valuation view |
674 | Quantity structure not found for co-product & in plant & |
675 | No cost apportionment when costing material & in plant & |
676 | No plants able to be selected |
677 | Inconsistency in apportionment structure & for material & in plant & |
678 | No itemization found for material &1 |
679 | No itemization found for material &1 |
680 | Controlling area &1 does not exist |
681 | Enter receiving logical system |
682 | The organizational measure was not carried out |
683 | Costing variant/version combination cannot be marked |
684 | Idoc &1 received by system without errors |
685 | No stock segment found |
686 | No stock segment found |
687 | Cost center &1, activity type &2: Actvty price differs fr. cost comp splt |
688 | User &4 is locking allowance for marking: company code &1, period &2 &3 |
689 | Enter company code or controlling area |
690 | Error in partner number assignment |
691 | Material &1 in plant &2 could not be costed due to error &3. |
692 | Prod. version & for material & in plant & does not exist |
693 | For process &1, no structure could be determined |
694 | No structure could be determined for internal activity &1 (&2) |
695 | Operation/sub-operation &2: No quantity -> No costs |
696 | Apportionmt structure & for mat. & in plant & without valid assignments |
697 | Standard cost estimate already released |
698 | Reference cost est. for mat. & in plant & has no itemization |
699 | Reference cost est. for mat. & in plant & has no itemization |
700 | Enter period and fiscal year |
701 | Marking not authorized for period &1 / &2 in company code &3 |
702 | Number of materials in FI document must be between 1 and 400 |
703 | Release not authorized for period &1 / &2 in company code &3 |
704 | No cost estimate found for price update |
705 | Of &2 materials, &1 cost estimates were updated successfully |
706 | &1 cost estimate(s) was/were read acc. to selection criteria |
707 | &1 cost estimate(s) was/were already marked (status VO) |
708 | &1 cost estimate(s) marked |
709 | &1 cost estimate(s) released |
710 | &1 cost estimate(s) already released |
711 | &1 cost estimate(s) could not be marked due to an error |
712 | &1 cost estimate(s) could not be released due to an error |
713 | Enter a server group |
714 | Messages have been collected --> see log |
715 | Select only one valuation view |
716 | The costing run entered does not exist |
717 | Unit of measure & could not be converted to unit of measure & |
718 | Release material &1 plant &2 through material ledger |
719 | Process without co-product & in plant & |
720 | Co-product & has no equivalence no. assignment in apportionment struct. & |
721 | Internal error & when costing cycles iteratively |
722 | More than & materials should be locked |
723 | Costing of cycle & does not converge |
724 | Standard value w/o activity type exists in operation &1/suboperation &2 |
725 | Quantity structure type was changed between selection and explosion |
726 | Qty structure type was changed between selection/explosion and costing |
727 | Lot size cannot be passed on in combination with mixed costing |
728 | Lot size entered ignored by mixed cost estimate |
729 | Costing view could not be created |
730 | Cycle & not iterated due to cost estimate with errors |
731 | Material &1 valuation area &2 is blocked by user &4 |
732 | Mixed cost estimate for material &1 in plant &2 has errors |
733 | Costing is only possible after saving |
734 | Inconsistency found for mixed cost estimate for material & in plant & |
735 | No cost estimate found for procurement alternative |
736 | No cost estimate found for procurement alternative |
737 | Co-product & in plant & is not generated by process material & |
738 | Quantity structure entries are ignored in a mixed cost estimate |
739 | Costing for cycle & has no solution |
740 | Material &1 in plant &2 belongs to cycle &3 costed with errors |
741 | Production campaign &1 does not exist. |
742 | Business process group is not maintained for production campaign &1 |
743 | Business process group &1 does not exist. |
744 | Complete the costing run entries |
745 | Campaign &1 has no item. |
746 | Campaign &1 has no header data. |
747 | The order for camapign &1, item &2 could not be found. |
748 | Profit center and group costing for sales order/project inventory only |
749 | Mixing ratio ignored for fixed-price co-product & |
750 | Fixed price co-product indicator cannot be set |
751 | Procurement alternative & does not exist for material &, plant & |
752 | Material &1 in plant &2 cannot be released |
753 | Multiple valuation active - choose another release function |
754 | Choose a number between 01 and 99 |
755 | Qty struct. entries ignored in cost estimate for procurement alternative |
756 | Paralell processing: System error at start of task |
757 | Parallel processing: System error when receiving task results |
758 | Valuation in costing variant is not the same as operational valuation |
759 | Of &2 materials, &1 cost estimates were updated successfully |
760 | Of &2 materials, &1 cost estimates were updated successfully |
761 | Fxd price co-product &V1& cannot be costed using another header material |
762 | Controlling area entered is ignored |
763 | Company code &1: period closing has not yet taken place |
764 | Costing status &1 is incorrect or unsuitable |
765 | Cost component view &1 has no COGM/inventory valuation costs |
766 | Cost comp &1 &2 is not assigned to cost comp struct &3 with addive costs |
767 | Customizing for Product Costing |
768 | Costing across controlling areas with group valuation only |
769 | Material & in plant & must not be costed |
770 | No entry exists for cost element &1 &2 in cost component structure &3 |
771 | Future standard cost estimate is locked |
772 | Current standard cost estimate is locked |
773 | Process & does not exist for material & in plant & |
774 | Price of material &1 in plant &2 cannot be calculated |
775 | Archive cannot be displayed. Cost estimate displayed from database |
776 | No valid source of supply found for material &1 plant &2 |
777 | Number of additive cost component splits & |
778 | No cost estimates have been selected from company code &1 |
779 | Choose valuation views |
780 | No valid production version has been found for material & in plant & |
781 | Special procurement key & from material master ignored |
782 | Procurement type F ignored |
783 | Either no or no suitable costing variant found |
784 | Configuration of raw material still not included in price determination |
785 | Price not calculated from purch. info record for mat. & in plant & |
786 | &1 materials updated with errors |
787 | &1 standard cost estimates selected for release |
788 | &1 materials released successfully |
789 | &1 materials released incorrectly |
790 | *************** Summary &1: ********************* |
791 | Arithmetic problems when calculating future planned price |
792 | &1 / &2: No transfer price maintained for company code change. |
793 | Costing variant &1 does not exist or is incomplete |
794 | A released cost estimate already exists. |
795 | Choose only costing variants that are allowed |
796 | Allowance for marking was issued |
797 | Company code &1: Release already carried out, cancellation not possible. |
798 | Mark at least one row |
799 | ******* Messages for BAPIs in Product Costing 800 - 899 *************** |
800 | No error occurred when selecting cost estimates |
801 | No cost estimate could be selected |
802 | No cost estimate found with these selection criteria |
803 | No authorization for displaying cost estimates |
804 | Cost estimate was successfully read |
805 | Cost component view &1 does not exist |
806 | Cost component group &1 does not exist |
807 | The cost estimate does not exist |
808 | The organizational units for plant &1 are inconsistent |
809 | No authorization for displaying this cost estimate |
810 | Missing formula for business process &1 in work center &2 |
811 | Cost estimate for material &1 in plant &2 could not be selected |
812 | No cost estimate could be selected |
813 | Costing structure was exploded successfully |
814 | Highest cost estimate was not found -> explosion not possible |
815 | Cost estimate was not found -> explosion not possible |
816 | Itemization was read successfully |
817 | Itemization does not exist in the database |
818 | No authorization to display this cost estimate |
819 | No authorization for displaying this cost estimate |
820 | Cost component split was not found in controlling area currency |
821 | Transfer control &1 indicates cost est with different valuation view |
822 | Overflow in a value or price field |
823 | Field overflow: lot size & for material &/plant & too large |
824 | Costing not possible with lot size & |
825 | Recursion recognized: Lot size cannot be passed on |
826 | Message cannot be maintained by user |
827 | User-defined message was changed |
828 | Double click on the message to be maintained |
829 | The default was recreated. Start transaction again |
830 | Messages are being displayed again. Start transaction again |
831 | No changes were carried out |
832 | Default was recreated |
833 | Default already exists |
834 | Recording carried out for transport request &1 |
835 | You are not authorized to display these explanation facilities |
836 | Material & in plant & w/o cost comp split: price acc to val strategy |
837 | Material selection completed |
838 | & costing levels were determined |
839 | Planning date &1 (in the past) is not allowed for standard cost estimate |
840 | Material &1 plant &2 valuated with valuation type &3 instead of &4 |
841 | Only costing types from the legal valuation view are permitted |
842 | No cost estimates could be deleted |
843 | Deletion successful |
844 | Deletion successful |
845 | Cost estimate does not exist |
846 | Marking for posting period &1 / &2 successfully authorized |
847 | Org. measure for posting period &1 / &2 successfully executed |
848 | Organizational measure successfully determined |
849 | No org. measures could be found based on selection criteria |
850 | Company code &1: No authorization to remove allowance for marking |
851 | Costs cannot be allocated to the co-products |
852 | Messages have been issued --> see log |
853 | Production version & contains inconsistencies |
854 | Production version &3 is locked for costing |
855 | A current standard cost estimate already exists in target system |
856 | Plant or company code missing or not allowed. Check your entries. |
857 | Co. code &1 in target system is not the same as cross-system co. code &2 |
858 | No suitable or valid production version found |
859 | Partner versions are different in variant &1 in source and target system |
860 | Production version & is still being used in the cost estimate |
861 | Order BOM costing can only be carried out for valuated stock |
862 | Material &1 &2 does not contain any segment for in-house production |
863 | Production version &1 not valid for quantity structure date &2 |
864 | Production version &1 does not match costing lot size &2 &3 |
865 | Co-product & / & is defined more than once in the BOM |
866 | Valuation type &3 for material &1 in plant &2 is ignored |
867 | Maximum number of 99999 Cycles reached in cost estimate |
868 | Costing of cycle & diverges |
869 | Mat. &1 in plant &2: itemization does not match cost component split |
870 | Iteration of cycle &1 oscillates by &2 &3 |
871 | Item &3 with item category &4 was not transferred |
872 | Costing for stock transfer of a configurable material is not possible |
873 | Costing variant cannot contain reference variant (Note 792996) |
874 | Set P1 P2 P3 C1 C2 C3 T1 T2 or T3 as parameter value for PRICE_FIELD |
875 | Enter costing run or costing variant, version, or date |
876 | Use PLANNED_PRICE_ADDITIONS only with planned prices |
877 | Sales order costing not possible for recursive configurable materials |
878 | Fill either COSTESTIM_ID or ORG_MEASURE |
879 | Own costs transferred with direct partner &1 |
880 | Cost comp. split does not match partner split at comp. &1 |
881 | Own costs less than zero with direct partner &1, component &2 |
882 | No CCS assigned to costing variant & and company code & |
883 | Costing variant &1 has no cost component structure for auxiliary CCS |
884 | Organizational units are inconsistent |
885 | Master data missing for material &1 in plant &2 |
886 | Partner number could not be determined |
887 | ISO unit &1 invalid |
888 | Field does not contain a valid number &1 |
889 | No cost component structure defined for costing variant &1 |
890 | Organizational units are inconsistent |
891 | Organizational units are inconsistent |
892 | Wrong indicator "Material with/without BOM" |
893 | Cost estimate already exists |
894 | Transferred tables do not match definition of partner version &1 |
895 | Transferred lot size, unit of measure, or currency is blank or 0 |
896 | At least one transferred date is blank |
897 | Cost component &1 has no fixed costs |
898 | Redo mode activated |
899 | ********** End of messages for BAPIs for Product Costing **************** |
900 | Material &1 in plant &2 already has a marked standard cost estimate |
910 | Specify a costing run and the costing run date |
911 | Arithmetical problems with the calculation of plan price &1 |
912 | Arithmetical problems with the calculation of other prices |
920 | Item &1: plant &2 has been assigned to controlling area &3 |
999 | & & & & |