CK - Nachrichten Erzeugniskalkulation

The following messages are stored in message class CK: Nachrichten Erzeugniskalkulation.
It is part of development package CKSA in software component CO-PC-PCP. This development package consists of objects that can be grouped under "R/3 Application Development COPC-PCP Quantity Structure Tool".
Message Nr
Message Text
000**** General Messages ****
001Transaction & is not in screen sequence control CIM
002Costing variant & does not exist (please check your entry)
003Costing type & does not exist (please check your entry)
004Enter a strategy sequence that does not have gaps
005Reference object & does not exist (please check your entry)
006Plant &1 for material &2 is not assigned to a controlling area
007Plant & is not assigned to a controlling area
008Error in formula for work center &2, plant &1
009Table & has no entry for costing variant &
010Entry missing in costing type or costing variant for &
011An asterisk (*) is not an allowed strategy
012System error. Notify your system administrator
013Valuation variant & does not exist (please check your entry)
014Error when converting the costing date --> posting period
015No valid strategy for &1 &2 &4 with valuation variant &3
016Incorrect call for activity valuation in file RKIN
017No activity price exists for cost ctr & CO area & act. type &
018Internal error: & &
019No cost center planning exists for CCtr & CO area &
020Field overflow with int. activity: CCtr & CO area & act. type &
021Costing variants & and & would overwrite each other
022No longer used
023No cost estimate found (please check your entry)
024Costing variant & not assigned to a number range group
025Number range group & not found in number assignment
026Number range object & not found in number assignment
027Tolerance limit exceeded when number & was assigned
028Number & was the last number that can be assigned for this interval
029Date from is later than Date to (please check your entry)
030No additive cost estimate found for the area of validity entered
031Please select an area of validity
032Position the cursor on a field you can select
033Additive cost estimate already exists
034Plant & does not exist (please check your entry)
035Plant & is not assigned to a valuation area
036Parameters do not exist for plant & order type &
037Lot size & & taken from costing view
038Lot size in material master is & &
039The cost estimate is being saved
040Material & in plant & has no valuation data
041Field overflow with material & plant &
042Costing data are inconsistent
043Please correct your entry for the date
044"Costing date to" set to &
045Customizing for costing variant & incomplete
046& errors ocurred during costing. See log
047Select at least one costing level
048No cost element segment exists for & on &
049No successful strategy with valuation variant &2
050No longer used
051Select at least one material
052Costing variant does not exist (please check your entry)
053Deletion indicator set in material & plant &
054Deletion indicator set in material & valuation area &
055Plant & is not assigned exclusively to valuation area &
056Valuation segment locked for material & valuation area &
057Special procurement type & plant & does not exist
058System error when locking
059Inconsistency in cost element category with material &
060Object was not costed
061Additive cost estimate will be deleted
062Additive cost estimate locked by another user
063Activity type &2 not assigned to cost center &3
064Assignment of activity type & / cost center & is not valid
065Activity type & in CO area & cannot be charged
066Error when translating dimensions (&): different dimensions
067No cost component structure is assigned to costing variant & and plant &
068Valuation variant & does not exist
069Costing run already exists
070Costing run does not exist
071Costing run locked by another user
072The log can only be saved in connection with a cost estimate
073Specify a costing variant for the costing run
074Existing selection will be overwritten
075Planning date is in the past -> cost estimate cannot be saved
076Costing run & & is being saved
077No longer used
078No materials were selected for the costing run
079Date control & does not exist
080Material & plant &: BOM not active
081Material & plant &: alternative BOM & not found
082Material & plant &: no suitable BOM found
083No longer used
084No longer used
085System error during second attempt to lock
086No suitable costing run found (please check your entry)
087Specify only one sort criterion
088Specify at least one sort criterion
089Plants & and & do not belong to the same company code
090Log not found (error during udpate)
091Internal error when saving itemization
092Material & in plant & could not be costed (see log)
093& costing level(s) selected
094Internal error when reading the purchasing info record
095Purchasing info record & not found
096Update of cost estimate terminated
097Error when selecting costing levels (please check your entry)
098No number could be assigned for material & in plant &
099No cost component split can be determined for material & / plant &
100Overhead group & has no overhead key
101You must save the cost component split
102Cost estimate will be saved without itemization
103Cost estimate will be saved without cost element itemization
104Cost est. will be saved w/o itemization or cost element itemization
105Set the update indicator
106Costing run only possible for cost estimates belonging to company code
107Check costing dates
108Cost estimate will be saved without costing variants or costing dates
109Internal error: No KEKO key can be determined with costing variant &
110Internal error: No KEKO key can be determined with costing variant &
111No BOM found for material & plant & lot size &
112No longer used
113Material &1 cannot be costed
114Costing run & & is being deleted
115Company code & does not exist (please check your entry)
116No materials with marking were found
117&1 materials successfully reset
118Allowance for marking for company code &1 not removed
119Marking not authorized for company code & period & year &
120Parameter error: T_KOMK1 is empty
121Material control record does not exist in company code &
122Invalid posting period (please check your entry)
123Plant & does not exist (please check your entry)
124Valuation class for material & & changed
125Valuation area & does not exist (please check your entry)
126Company code & does not exist (please check your entry)
127No date control is assigned to costing variant &
128Material & in plant & has no accounting data
129No plant specified for material &, item &, operation &
130Work center & in plant & has no cost center
131No plant specified for operation & sub-operation &
132The log is empty
133No longer used
134Marking and release not possible
135Period is in the past
136Release is only possible within this period
137Plant &1 does not exist
138Marking for posting period & & not allowed
139Cost estimate for marked period does not exist
140Cost estimate has status & (marking not possible)
141Costing not allowed across controlling areas
142Valuation area & material &: Cost estimate locked by another user
143Valuation area &1 does not exist
144Material master locked by another user
145System error when locking material
146No costing variant for std cost estimate found
147No cost component structure for standard cost estimate
148Material &v1& plant &v3&: Field overflow in future standard price
149Last selected material reached
150First selected material reached
151Internal error: Material & & has no lot size
152Cost estimate marked but material has no accounting data
153Cost estimate marked
154Material valuation strategy not suitable for costing variant &
155Material has no standard cost estimate
156Company code &1: Release too late
157Company code &1: Release too early
158There is no assignment for valuation area & valuation category &
159Routing & & does not exist
160No itemization found for cost estimate
161No costing type found for standard cost estimate
162Current cost estimate not found (inconsistent data)
163Future cost estimate not found (inconsistent data)
164Future cost estimate has unsuitable error status
165Check the entry for the costing run
166System error when blocking cost estimate &
167Cost estimate for material & could not be locked
168Cost estimate for material & / plant & is incorrect
169Material & in plant & was not costed
170Material & in plant & contains marked cost estimate
171Material & in plant & has a released cost estimate
172Material & in plant &: No cost est. exists -> raw mat. cost estimate
173Material & in plant &: Costing status not allowed for material type
174Selected variants have different quantity structure control
175Internal error: Operation number cannot be determined from KALKTAB item
176Error when translating dimensions: Field overflow
177Error when translating dimensions: Dimension not defined
178Error when translating dimensions: Unit of measurement not defined
179Material &4: Material type &1 does not exist
180No posting string can be determined in table &
181Entry missing for account determination
182Constant for account modification cannot be determined in table T156X
183Usage account cannot be determined due to read error in table &
184No authorization for costing variant &1, controlling area &2
185&3: Marking has already been allowed for posting period &1 &2
186Marking file is currently locked
187System error when locking
188Allowance for marking for posting period & & issued
189Specify either company code or chart of accounts
190&2: no authorization for controlling area &1
191Valuation area &1 is not assigned to a company code
192Material & in plant & has no suitable cost component split
193Material & in plant & w/o cost comp split: price acc to val strategy
194Operation & / & has no work center
195Exception & occurred with material & plant &
196No authorization for creating a material master record
197G/L account & & does not exist
198Chart of accounts for company code & not found
199G/L account & & has deletion indicator
200Error during transaction call from func. module CK_F_PC_MATERIAL_CHECK
201G/L account & & locked for posting
202G/L account & & is a reconciliation account
203Controlling area for company code & not found
204Cost element & does not exist
205Cost element & is not a primary cost element
206Update type & does not exist
207Error in DELETE KEKO
208Error in UPDATE KEKO
209Error in DELETE KEPH
210Error in UPDATE KEPH
211Cost estimate terminated
212Field overflow during valuation of an external operation
213Cost component structure & is not active
214No active standard cost estimates exist
215& costing level(s) selected for the cost estimate
216& costing level(s) selected for marking for release
217& costing level(s) selected for release
218No cost component split exists for material & in plant &
219No itemization exists for material & in plant &
220Material/plant &/& can only be costed with unit costing
221Material & in plant & has no accounting view
222External operation & / & has no price
223Internal error in program &: Price unit = 0
224Costing version & was determined through internal number assignment
225Costing version & is not valid (please check your entry)
226Exception & occurred in CK_F_TCK_TABLES_READ_21
227Plant segment missing for material & in plant &
228Group segment missing for material & in plant &
229No routing could be determined for material &
230Costing item has no material or price
231Valuation area & missing for goods received valuation
232Valuation variant & does not exist
233No costing variant found during number assignment
234No costing type found during number assignment
235No valuation variant found during number assignment
236No date control found during number assignment
237No reference object found during number assignment
238Plant & is not the only plant assigned to valuation area &
239Cost element & is not assigned to a cost component
240Cost component split costed with value of zero
241Value of cost component split is less than zero
242Error in update of KEKO in CK_F_KEKO_RELEASE_POSTING
243There is no data for material & in plant &
244Material & does not exist (internal error)
245Costing view could not be created
246Costing variant for marking/release missing from costing run
247Incorrect number of financial accounting documents in costing run
248Material & in plant & is currently locked
249Cost component split for material & in plant & not saved
250There is no cost element itemization for material & in plant &
251Costing variant missing
252No costing number could be assigned
253Cost estimate cannot be saved
254Costing view created for material &1 in plant &2
255No costing dates available
256No cost field for fixed costs has been defined
257Cost element missing from BOM item with purchase price
258Material & in plant & has no alternative BOM &
259Material & in plant & has no alternative BOM & and usage &
260Additive costs cannot be updated
261Errors occurred when costs were calculated (see log)
262Messages were issued when costs were calculated (see log)
263There is no costing type for the standard cost estimate
264There is no costing view for material & in plant &
265Cost transaction &1: Error converting from &2 -> &3
266Costing variant & does not allow cost estimates to be saved
267No log exists
268There is no log for &
269Usage & for finding alternative BOMs is not available
270Error with DELETE
271Costing run & & was canceled
272Lot size & & was transferred from the MRP segment
273Error when selecting costing levels (please check your entry)
274Error when selecting costing levels (please check your entry)
275Select at least one selection criterion
276Lot size in material master cannot be determined
277No materials selected
278Price unit is greater than the costing lot size entered
279BOM already exploded for costing run & &
280No purchasing info record operation &
281Inconsistency in customizing with costing variant &
282Work center & / & has no cost center
283The marked standard price will be overwritten
284Cost estimate has status &. It has already been released.
285Cost estimate for material & in plant & cannot be released
286Cost estimate for material & in plant & could not be released
287Log for selection printed or written to the spool
288Error in order type for product costing
289No costs will be calculated: costing variant missing
290Cstg vrnt missing for determ. of purch. req. price for non-stock item
291Cstg vrnt missing for determ. of purch. req. price for external proc.
292Error while determining the controlling area
293Marking authorization for costing variant &1 not granted
294Allowance for release not made for costing variant &1 in company code &3
295Valuation strategy & rejected by activity valuation
296Enter BOM usage for alternative BOM &
297No selection ID & for task list selection
298Internal error: incorrect call during routing selection
299No alternative to multi-level BOM found for material & in plant &
300Control key & is not defined in Customizing
301Costing variant & not costed in costing run
302Unit cost est. found for material & in plant & for cstg variant &
303Previously released cost est. was used for material & in plant &
304Costing variants &1 and &2 have the same val. variant and costing type
305BOM for material & in plant & is flagged for deletion
306No routing could be determined for material & plant & sel. ID &
307Spool request & created
308List & printed on printer &
309Plant & does not belong to company code &
310Material & is marked for deletion
311No operation could be created for material & plant &
312Internal error during material selection
313No cost estimate found
314Material & in plant & has no BOM
315Material & in plant & is configurable and will not be costed
316No entry found for material & and/or plant &
317Internal error during sel./qty struct. determ. of config. materials
318Cost estimate for material & contains errors -> Planned price
319Material & in plant & has no costing status
320Material & is not a configured material (please check your entry)
321Overhead key & is not suitable for costing sheet &
322Consumption account cannot be determined
323There is no exchange rate for exchange rate type & on &: &
324Material & in plant & will not be costed because the BOM is recursive
325No name exists for view & in language &
326Qty & not allowed. Check your entry
327View & does not exist (check user settings)
328View & does not exist (check user settings)
329Requirements date not supported in Release &
330Settings for the costing dates are inconsistent
331"Costing date to" changed by system to end of period &
332Internal error: no view selection
333Cost component view & does not exist. Check your entry
334Costing item & is not assigned to a cost component
335Settings for the cost display for costing variant & were saved
336Settings for the cost display were saved
337Company code &1: Cancellation not allowed
338Company code &1: Cancellation not allowed
339Item category & for item & ( & / & ) not allowed
340Costing lot size changed from & & to & &
341Releasing has not yet been allowed for posting period &2 &3
342Cost estimate has not yet been marked
343Selection criterion & for date interval is invalid
344Material & plant &: BOM not found
345Recursivity with special procurement of material & in plant &
346Cost comp. structures for costng variant & in plant & differ from plant &
347Cost comp. split not transferred due to different cost comp. structure
348Costing lot size is smaller than price unit &
349Carry out costing in the background
350Mat. & in plant & should be costed in cost est. w/o qty structure
351Material master data not consistent with costing data
352External service operation & / & has no price
353Field overflow when valuating an external service
354Material & in plant & has material status & : &
355Material PPS status & for material & in plant & does not exist
356Costing variants & and & have different transfer control IDs
357Transfer costing with status & exists for material & in plant &
358Multiple costing variants only possible w/o transfer control ID
359There was no activity price planning for &/& in fiscal year &
360No actual activity prices available for cost ctr & acty type &
361Value of costing item & in itemization is 0
362No plant with a one-to-one assignment to its valuation area exists
363Plant & does not have a one-to-one assignment to its valuation area
364Costing variant & does not allow this update
365Costing variant & does not allow price update
366Select at least one price to be updated
367Make either all entries or no entries for the planned price
368Validity dates for planned price must be in ascending order
369Starting date of fiscal period cannot be determined
370No price update for mat. & in plant & for valuation type &
371No cost component structure found for costing variant & plant &
372Spool request & created for user exit
373List & for user exit sent to printer
374Internal error when posting itemization
375No cost estimate found for material item & in itemization
376No longer used
377No longer used
378Material master in plant & could not be locked
379Marking already carried out
380No valid source of supply could be found
381Costing canceled due to locked cost estimate in company code &
382Material & does not exist in withdrawal plant &
383BOM & /alt. & /usage & has no items relevant to costing
384Costing variant & is not assigned to costing run
385Enter a routing group for routing type &
386A routing of type & cannot be costed
387No G/L account for & on &
388Process cannot be costed with the cost estimate
389Only the planned prices can be updated
390Only the commercial prices can be updated
391Only the tax prices can be updated
392Cost estimate(s) found for another costing variant
393Special procurement type & ignored for configurable materials
394No cost estimate has been created for costing run & &
395A suitable future standard cost estimate could not be transferred
396Cost component split does not exist although costing header data present
397Invalid data combination occurred
398Valuation strategy & ignored in costing
399Costing is not allowed for material/PPS status
400Material &1: No plant maintained for special procurement type
401Material &1: Plant &2 not found for special procurement type
402Material &1 plant &2 could not be found
403Material price costing carried out for co-product & in plant &
404No. of co-products differs from no. of items in apportionment structure
405Cost collector counter does not exist
406Index table on KALKTAB incorrect
407There is no plant &2 in company code &1. Check your entry
408Controlling areas in source and target systems differ
409Function not supported. Costing run has multiple costing variants
410Marking not allowed with this combination
411Transfer control according to costing variant &1 accepted
412You have not checked the updating and printing parameters
413& cost estimates can be deleted
414Costing variant & does not allow marking or releasing
415&2 cost estimates can be deleted out of the &1 selected
416Material &1 in plant &2 has costing number &3
417Material &1 in plant &2: key date for currency conversion not set
418No cost components defined in cost component structure &
419System messages were generated. See log
420Enter a costing run, a plant or a company code
421Select at least one option for automatic/additive costing
422Select at least one option for costing with/without qty structure
423Cost estimates to be archived must be in the past
424Material & in plant & has no BOM
425Cost component &1 does not exist in cost component structure &2
426Valuation type not set for material &
427Costs of co-product & & subtracted from costing result
428Overflow while evaluating operation & in routing &
429Material &: Overflow during conversion into &
430Missing formula in work center &
431Parallel mode: Cost estimates are always updated
432Not all materials in costing level & costed
433Enter the destinations for the parallel costing run
434No authorization for costing variant & in company code &
435No authorization for costing variant & in company code &
436No authorization for release in company code &
437No authorization for marking in company code &
438No authorization for allowing release/marking in company code &
439No cost estimates can be selected with this indicator setting ->
440No authorization in comp. code & to delete cost ests with cstg vrnt &
441No account found for co-product & &
442Errors occurred when costing co-product & &
443Conversion error in company code currency for general costs activity &
444Costing run & & was canceled
445No longer used
446Deletion program cannot be started ->
447Cost est. for mat. & cannot be loaded back into production system ->
448No longer used
449& cost estimates were written to the archive ->
450& cost estimates were deleted ->
451& cost estimates can be deleted
452& cost estimates were in the archive
453& cost estimates remain in the archive
454& cost estimates were reloaded into the system
455Of the cost estimates selected, & cannot be reloaded
456&2 cost estimates were selected of the &1 in the archive
457No planned credit could be determined for the order (mat. &)
458Costing for costing run & & has already been carried out
459No entries exist
460Internal error: Wrong application parameter
461Routing & either does not exist or contains no operations
462Selected routing & does not match selection ID &
463"Pass on lot size" function not supported in costing runs
464Lot size for material & in plant & taken from costing view
465No price could be determined for material/batch &1 plant &2
466No price could be determined for internal activity &1 &2
467No price could be determined for external processing
468No price could be determined for subcontracting
469&2 data record(s) could not be updated in plant &1
470The selected materials will not be updated
471Material & in plant & is not relevant for costing with qty structure
472Material & in plant & is not relevant for costing with qty structure
473Cost estimate stored in buffer
474The costing lot size is smaller than the price unit
475No cost component view for cost of goods sold exists
476Material &: Routing does not match selection ID &
477No routing could be found with the specified selection criteria
478No routing could be found with the specified selection criteria
479Material & in plant & with individual requirements has no costing view
480Position the cursor on a cost component view
481The costing lot size of the order item must be passed on
482The write program for archiving cannot be started
483The reload program for archiving cannot be started
484The display program for archiving cannot be started
485Material &1 in plant &2: Future standard price is zero
486You are not authorized to delete company code &1, costing variant &2
487Enter an existing costing variant
488Allowance for marking for posting period & & issued
489Organizational measure locked in period &2 by user &4
490No company code could be determined for plant &1
491Material master locked by user &
492Standard cost estimate locked by user &
493Material master has no costing view
494The system lacks a costing type for the std cost estimate
495&1: Currency type &2 is not assigned in the material ledger
496There is no standard cost estimate in posting period &3
497Standard cost estimate for future period &3 already released
498Standard cost estimate for future period &3 already marked
499Standard cost estimate for future period &3 cannot be marked
500Standard cost estimate for period &3 already released with errors
501Material master has no costing view. Marking not possible
502Material &1 in plant &2 locked by user &3
503Std cost estimate at future material master anchor locked by user &4
504Multiple valuation method (&1) is not active
505Operation &1/suboperation (or cost comp) &2: Activity type not entered
506Material &1 could not be valuated
507Error in currency translation
508Valuation area &1 is not assigned to a controlling area
509Company code &1 does not exist
510No valuation area could be determined for plant &1
511No controlling area could be determined for plant &1
512Plant &1 does not exist in the system
513Error in the organizational structure for plant &1
514System error while locking organizational measure
515Material &1 in valuation area &2 with valuation type &3 is locked
516Allowance for marking for period &2 &3 is being reversed
517Release of cost est. for mat. & plant & thru mat. ledger settlement
518Marking/release through costing run only in company code &
519Release of cost est. in plant & through material ledger settlement
520Costing run &1 locked by user &2. No selection possible
521Division by zero in formula &4
522Separate valuation for internal production not mandatory
523Standard cost estimate in posting period &4 is inconsistent
524Standardd cost estimate at material master anchor inconsistent
525Marked or released standard cost estimate is inconsistent
526Cost estimate for material &1, valuation area &2 is locked
527Standard cost estimate for future period &2 locked by user &4
528Company code &1 does not exist
529Posting period &1 in fiscal year &2 is invalid
530Posting period &1 &2 is in the past
531Period &1 &2 in the marking database is locked by user &3
532System error while locking the marking database for period &1 &2
533Select one entry only
534Marking database locked by user &3
535System errors occurred while locking the marking database
536Company code & does not exist
537Posting period & & is invalid
538Posting period & & is in the past
539Marking database: Period &1 &2 locked by user &3
540Error while locking: Release not allowed
541Number of cost estimates to be marked exceeds &
542Release with valuation type & required for separate valuation
543No future standard cost estimate has been marked for material &1
544Your system has no costing type for the standard cost estimate
545No current standard cost estimate found in posting period &3 &4
546Future standard cost estimate for posting period &3 &4 is not marked
547No future standard cost estimate exists for posting period &3 &4
548Error at destination &1
549Prod. version & for material & in plant & does not exist
550Material &1 in plant &2 has no costing view
551Valuation segment for material &1 does not exist
552Material &1 in valuation area &2 locked by user &4
553System errors while locking material &1 in valuation area &2
554Material &1 in valuation area &2 could not be found
555Plant &3 could not be found
556Release for posting period &1 &2 too late
557Release for posting period &1 &2 too early
558Destination &1 not available
559Co-product & not relevant to costing
560Parallel processing: Costing results will be released immediately
561Internal error. Notify your system administrator
562Cost reports cannot be printed in parallel processing
563No configuration valuation passed on for material & in plant &
564Costing segments could not be created
565Costing view for material & in plant & could not be created
566No destination is currently free for parallel processing
567Internal error in server table
568Error at destination &1
569Server & is not responding
570All servers have errors or are inactive
571Server & is not responding
572No valid cost estimate found.
573Inconsistent BOM structure with material & in plant &
574Cost component view &1 does not exist. Check your entry
575Internal error during parallel processing
576A processing block was completed at &
577Server & is not responding
578Costs of cost element & cannot be assigned to any cost component
579Parallel processing: Costing results will be marked immediately
580Material &1 in plant &2 was costed with production version &3
581Missing authorization for BOM
582Mat. & plant & has no suitable cost comp. split (cost est w/o qty struc.)
583Costing views for & materials will be created
584A block of costing views was created
585Server group & does not exist
586Batch input started on & at &
587Batch input ended on & at &
588Sales document & & & was costed with errors
589Number of sales documents selected &
590Number of cost estimates with errors &
591Sales document & & & selected
592Error in batch input processing of sales document &
593Number of sales documents with faulty batch input &
594Sales document & & & was costed without errors
595Number of cost estimates to be executed &
596Number of cost estimates executed &
597Costing items for material &1 in plant &2 without cost element.
598Plant & does not exist
599View is not suitable for report call
600Specify valuation class for material &1, plant &2, valuation type &3
601Cost estimate is not in archive ->
602No authorization to display cost estimates in company code &1
603Organizational units for plant &1 are inconsistent
604Material &1 in valuation area &2 does not exist
605Costing variant &1 does not exist
606Enter a costing version from 01 to 99
607Index successfully generated
608&1 index entries were deleted
609No archiving session matches the selection criteria
610The archiving files selected do not have an index
611Plant &1 for material &2 is not assigned to a controlling area
612Material &1, PRT &2: Zero fxd/var. values in table TOOL_COST
613Material &1, PRT &2: No cost element found in TOOL_COST
614Material &1, PRT &2: no valid entry in TOOL_COST
615In valuation area &1, &2 is not defined as local valuation category
616The indicator 'In-house production mandatory' was not set
617Valuation type for in-house production is blank
618Valuation area & does not exist
619Authorization for marking was not given
620Int. error: No cost comp split exists for output material & in process &
621Int. error with BOM explosion: Matl & in plant & exists more than once
622Data used from material master of process material &3
623No cost estimate found
624& cost estimates can be deleted
625& cost estimates were deleted
626& cost estimates were deleted
627& cost estimates displayed from archive
628Plant & is not assigned to a company code
629Marked cost estimates generated for material valuation
630No costing view exists for material & with material type &
631Costing lot size calculated for co-product & is lower than price unit
632Costing lot size of co-product & calculated using process lot size
633No cost apportionment schema maintained for process mat. & in plant &
634No cost apportionment schema maintained for process mat. & in plant &
635Saving new cost estimate overwrites marked cost estimate
636Please enter either production version or BOM data/planning data
637Profit center from process material master data used for co-product &
638Prod. version & for material & in plant & does not exist
639In a reference cost estimate, entries are deleted from the intital screen
640Marked cost estimate cannot be changed
641Material &2: Profit center cannot be determined.
642Material &2: Dummy profit center used for partner determination
643Mat. no. &2: Business area could not be determined.
644Material &1 in plant &2: apportionment structure &3 will be used
645Error when reading CO object &1.
646Material & in plant & has incorrect cost component split.
647Material & plant & is not costed due to recursive structure
648Reference cost estimate requires cost estimates from 4.0 or later
649Marking has already been allowed
650Maximum 1 costing type for the standard cost estimate allowed
651No order type-dependent parameters found
652&2 not active for controlling area &1
653User &1 is locking material &2 valuation area &3 valuation type &4
654Marking has not yet been allowed
655User &1 is locking future std. cost estimate for material &2 &3
656Marking has already been allowed
657Max. 1 costing type for the std cost estimate for group valuation
658Max. 1 costing type for the std cost estimate for profit center valuation
659No reference cost estimate found for material & in plant &
660Enter company code
661Enter controlling area
662&1 cost estimates selected for marking
663Costing not authorized in profit center &
664Costing not authorized in company code &
665Standard cost estimate is incorrect. Marking not possible
666Material &1/plant &2: Transfer price could not be found.
667Costing variant missing
668Entry for company code & canceled
669Deleting current standard cost estimates can cause inconsistencies
670Company code &1: marking too late
671Controlling area & does not exist (check entry)
672company code &1 is not assigned to a controlling area
673Select at least one valuation view
674Quantity structure not found for co-product & in plant &
675No cost apportionment when costing material & in plant &
676No plants able to be selected
677Inconsistency in apportionment structure & for material & in plant &
678No itemization found for material &1
679No itemization found for material &1
680Controlling area &1 does not exist
681Enter receiving logical system
682The organizational measure was not carried out
683Costing variant/version combination cannot be marked
684Idoc &1 received by system without errors
685No stock segment found
686No stock segment found
687Cost center &1, activity type &2: Actvty price differs fr. cost comp splt
688User &4 is locking allowance for marking: company code &1, period &2 &3
689Enter company code or controlling area
690Error in partner number assignment
691Material &1 in plant &2 could not be costed due to error &3.
692Prod. version & for material & in plant & does not exist
693For process &1, no structure could be determined
694No structure could be determined for internal activity &1 (&2)
695Operation/sub-operation &2: No quantity -> No costs
696Apportionmt structure & for mat. & in plant & without valid assignments
697Standard cost estimate already released
698Reference cost est. for mat. & in plant & has no itemization
699Reference cost est. for mat. & in plant & has no itemization
700Enter period and fiscal year
701Marking not authorized for period &1 / &2 in company code &3
702Number of materials in FI document must be between 1 and 400
703Release not authorized for period &1 / &2 in company code &3
704No cost estimate found for price update
705Of &2 materials, &1 cost estimates were updated successfully
706&1 cost estimate(s) was/were read acc. to selection criteria
707&1 cost estimate(s) was/were already marked (status VO)
708&1 cost estimate(s) marked
709&1 cost estimate(s) released
710&1 cost estimate(s) already released
711&1 cost estimate(s) could not be marked due to an error
712&1 cost estimate(s) could not be released due to an error
713Enter a server group
714Messages have been collected --> see log
715Select only one valuation view
716The costing run entered does not exist
717Unit of measure & could not be converted to unit of measure &
718Release material &1 plant &2 through material ledger
719Process without co-product & in plant &
720Co-product & has no equivalence no. assignment in apportionment struct. &
721Internal error & when costing cycles iteratively
722More than & materials should be locked
723Costing of cycle & does not converge
724Standard value w/o activity type exists in operation &1/suboperation &2
725Quantity structure type was changed between selection and explosion
726Qty structure type was changed between selection/explosion and costing
727Lot size cannot be passed on in combination with mixed costing
728Lot size entered ignored by mixed cost estimate
729Costing view could not be created
730Cycle & not iterated due to cost estimate with errors
731Material &1 valuation area &2 is blocked by user &4
732Mixed cost estimate for material &1 in plant &2 has errors
733Costing is only possible after saving
734Inconsistency found for mixed cost estimate for material & in plant &
735No cost estimate found for procurement alternative
736No cost estimate found for procurement alternative
737Co-product & in plant & is not generated by process material &
738Quantity structure entries are ignored in a mixed cost estimate
739Costing for cycle & has no solution
740Material &1 in plant &2 belongs to cycle &3 costed with errors
741Production campaign &1 does not exist.
742Business process group is not maintained for production campaign &1
743Business process group &1 does not exist.
744Complete the costing run entries
745Campaign &1 has no item.
746Campaign &1 has no header data.
747The order for camapign &1, item &2 could not be found.
748Profit center and group costing for sales order/project inventory only
749Mixing ratio ignored for fixed-price co-product &
750Fixed price co-product indicator cannot be set
751Procurement alternative & does not exist for material &, plant &
752Material &1 in plant &2 cannot be released
753Multiple valuation active - choose another release function
754Choose a number between 01 and 99
755Qty struct. entries ignored in cost estimate for procurement alternative
756Paralell processing: System error at start of task
757Parallel processing: System error when receiving task results
758Valuation in costing variant is not the same as operational valuation
759Of &2 materials, &1 cost estimates were updated successfully
760Of &2 materials, &1 cost estimates were updated successfully
761Fxd price co-product &V1& cannot be costed using another header material
762Controlling area entered is ignored
763Company code &1: period closing has not yet taken place
764Costing status &1 is incorrect or unsuitable
765Cost component view &1 has no COGM/inventory valuation costs
766Cost comp &1 &2 is not assigned to cost comp struct &3 with addive costs
767Customizing for Product Costing
768Costing across controlling areas with group valuation only
769Material & in plant & must not be costed
770No entry exists for cost element &1 &2 in cost component structure &3
771Future standard cost estimate is locked
772Current standard cost estimate is locked
773Process & does not exist for material & in plant &
774Price of material &1 in plant &2 cannot be calculated
775Archive cannot be displayed. Cost estimate displayed from database
776No valid source of supply found for material &1 plant &2
777Number of additive cost component splits &
778No cost estimates have been selected from company code &1
779Choose valuation views
780No valid production version has been found for material & in plant &
781Special procurement key & from material master ignored
782Procurement type F ignored
783Either no or no suitable costing variant found
784Configuration of raw material still not included in price determination
785Price not calculated from purch. info record for mat. & in plant &
786&1 materials updated with errors
787&1 standard cost estimates selected for release
788&1 materials released successfully
789&1 materials released incorrectly
790*************** Summary &1: *********************
791Arithmetic problems when calculating future planned price
792&1 / &2: No transfer price maintained for company code change.
793Costing variant &1 does not exist or is incomplete
794A released cost estimate already exists.
795Choose only costing variants that are allowed
796Allowance for marking was issued
797Company code &1: Release already carried out, cancellation not possible.
798Mark at least one row
799******* Messages for BAPIs in Product Costing 800 - 899 ***************
800No error occurred when selecting cost estimates
801No cost estimate could be selected
802No cost estimate found with these selection criteria
803No authorization for displaying cost estimates
804Cost estimate was successfully read
805Cost component view &1 does not exist
806Cost component group &1 does not exist
807The cost estimate does not exist
808The organizational units for plant &1 are inconsistent
809No authorization for displaying this cost estimate
810Missing formula for business process &1 in work center &2
811Cost estimate for material &1 in plant &2 could not be selected
812No cost estimate could be selected
813Costing structure was exploded successfully
814Highest cost estimate was not found -> explosion not possible
815Cost estimate was not found -> explosion not possible
816Itemization was read successfully
817Itemization does not exist in the database
818No authorization to display this cost estimate
819No authorization for displaying this cost estimate
820Cost component split was not found in controlling area currency
821Transfer control &1 indicates cost est with different valuation view
822Overflow in a value or price field
823Field overflow: lot size & for material &/plant & too large
824Costing not possible with lot size &
825Recursion recognized: Lot size cannot be passed on
826Message cannot be maintained by user
827User-defined message was changed
828Double click on the message to be maintained
829The default was recreated. Start transaction again
830Messages are being displayed again. Start transaction again
831No changes were carried out
832Default was recreated
833Default already exists
834Recording carried out for transport request &1
835You are not authorized to display these explanation facilities
836Material & in plant & w/o cost comp split: price acc to val strategy
837Material selection completed
838& costing levels were determined
839Planning date &1 (in the past) is not allowed for standard cost estimate
840Material &1 plant &2 valuated with valuation type &3 instead of &4
841Only costing types from the legal valuation view are permitted
842No cost estimates could be deleted
843Deletion successful
844Deletion successful
845Cost estimate does not exist
846Marking for posting period &1 / &2 successfully authorized
847Org. measure for posting period &1 / &2 successfully executed
848Organizational measure successfully determined
849No org. measures could be found based on selection criteria
850Company code &1: No authorization to remove allowance for marking
851Costs cannot be allocated to the co-products
852Messages have been issued --> see log
853Production version & contains inconsistencies
854Production version &3 is locked for costing
855A current standard cost estimate already exists in target system
856Plant or company code missing or not allowed. Check your entries.
857Co. code &1 in target system is not the same as cross-system co. code &2
858No suitable or valid production version found
859Partner versions are different in variant &1 in source and target system
860Production version & is still being used in the cost estimate
861Order BOM costing can only be carried out for valuated stock
862Material &1 &2 does not contain any segment for in-house production
863Production version &1 not valid for quantity structure date &2
864Production version &1 does not match costing lot size &2 &3
865Co-product & / & is defined more than once in the BOM
866Valuation type &3 for material &1 in plant &2 is ignored
867Maximum number of 99999 Cycles reached in cost estimate
868Costing of cycle & diverges
869Mat. &1 in plant &2: itemization does not match cost component split
870Iteration of cycle &1 oscillates by &2 &3
871Item &3 with item category &4 was not transferred
872Costing for stock transfer of a configurable material is not possible
873Costing variant cannot contain reference variant (Note 792996)
874Set P1 P2 P3 C1 C2 C3 T1 T2 or T3 as parameter value for PRICE_FIELD
875Enter costing run or costing variant, version, or date
876Use PLANNED_PRICE_ADDITIONS only with planned prices
877Sales order costing not possible for recursive configurable materials
878Fill either COSTESTIM_ID or ORG_MEASURE
879Own costs transferred with direct partner &1
880Cost comp. split does not match partner split at comp. &1
881Own costs less than zero with direct partner &1, component &2
882No CCS assigned to costing variant & and company code &
883Costing variant &1 has no cost component structure for auxiliary CCS
884Organizational units are inconsistent
885Master data missing for material &1 in plant &2
886Partner number could not be determined
887ISO unit &1 invalid
888Field does not contain a valid number &1
889No cost component structure defined for costing variant &1
890Organizational units are inconsistent
891Organizational units are inconsistent
892Wrong indicator "Material with/without BOM"
893Cost estimate already exists
894Transferred tables do not match definition of partner version &1
895Transferred lot size, unit of measure, or currency is blank or 0
896At least one transferred date is blank
897Cost component &1 has no fixed costs
898Redo mode activated
899********** End of messages for BAPIs for Product Costing ****************
900Material &1 in plant &2 already has a marked standard cost estimate
910Specify a costing run and the costing run date
911Arithmetical problems with the calculation of plan price &1
912Arithmetical problems with the calculation of other prices
920Item &1: plant &2 has been assigned to controlling area &3
999& & & &
Privacy Policy