CK2 - Nachrichten Erzeugniskalkulation Teil 2

The following messages are stored in message class CK2: Nachrichten Erzeugniskalkulation Teil 2.
It is part of development package CKSA in software component CO-PC-PCP. This development package consists of objects that can be grouped under "R/3 Application Development COPC-PCP Quantity Structure Tool".
Message Nr
Message Text
001Reference cost estimate master data differs for material &1 plant &2
002Costing terminated, as costing in plant & is locked
003&1 material(s) in company code &2 excluded via selection list
004Component &1, plant &2 can only be calculated by order BOM cost estimate
005Closure date is after 2047
006&2 is not active for controlling area &1
007&2 is not active for company code &1
008Max. 1 costing type for standard cost est. allowed for &1 for ledger &2
009Costing variant &1 is assigned to ledger &2
010There is already a released cost estimate with costing variant &1
011Marking allowance for company code &1 is not possible
012There is already a flagged cost estimate with costing variant &1
013Multiple selection contains various valuation views
014Specification of ledger missing
015Specification of subtype of valuation view is missing
016Ledger &1 differs from ledger &2 of costing variant &3
017Ledger &1 of cost. var. &2 is not active for company code &3
018Ledger &1 of cost. var. &2 is not active for controlling area &3
019Posting period &3 does not contain a standard cost estimate w/ ledger &4
020Ledger specification &1 is ignored
021Ledger &1 is not active for valuation view
022Error during data migration
023Shifting of current standard cost estimate for ledger &1
024For internal activity &1 &2, the price is equal to 0
Privacy Policy