The following messages are stored in message class CN: Meldungen f�r Netzpl�ne.
It is part of development package CN_NET_OPR in software component PS-ST-OPR-NET. This development package consists of objects that can be grouped under "Operative Network".
Message Nr
Message Text
001Cost element & & does not exist (check entry)
002Position cursor on a valid entry
003Company code & does not exist (check entry)
004Enter a numeric value
005You cannot maintain the settlement rule for the network header
006You cannot maintain the settlement rule for the activity
007No authorization in plant & for network type &
008No authorization in plant & for MRP controller &
009Network & does not exist
010Network & does not exist (check entry)
011Network & is already being processed by &
012Network profile & does not exist (check entry)
013Network & released
014WBS element & for network/order & not (partially) released
015Activity & released
016WBS element & for activity & not (partially) released
017Project definition & not (partially) released
018Activity assignment: Display costs by activity
019No entry in table & found
020No parameters for network type & exist (check entry)
021You cannot create a subnetwork for activity element "&"
022Subnetwork number is identical to network number
023You cannot delete. Activity "&" has been replaced by a subnetwork
024No control parameters for scheduling exist
025Network does not contain activities
026No elements for activity & exist
027Enter an activity number
028Activities are not within time frame of WBS elements
029Log contains no entries
030You cannot assign to activity "&"
031Production versions with standard networks are not possible
032Enter a business area
033WBS element & does not belong to project definition &
034& is not a network
035No activity with an assignment to a standard WBS exists
036Network created with plant & of copied network
037Network type & is not same as & in copied network
038You can only choose selected objects together with activities
039Activity "&" has status "&"
040Enter a standard network or network
041Network & is currently being processed
042Enter a network number
043Network is not assigned to a profit center
044An assignment to a standard WBS element already exists
045No possible entries for network number
046Control key "&" from network profile "&" is copied
047Control key of superior activity is not changed
048The status of the network '&' does not permit changes
049------ Error messages for organization elements -------------------------
050Control key not available for external processing
051Control key not available for costs
052Control key does not exist
053Network does not have activity account assignment
054Controlling area could not be determined
055Network does not exist (check entry)
056Activity account assignment not allowed for this network
057Network has activity account assignment
058Activity & does not exist
059Network has no costs
060Cost display could not be generated due to missing parameters
061Project definitions have different header and activity
062& Finish date is in the past
063You cannot create a subnetwork
064Enter a cost element
065Plant & is not assigned to controlling area & of network
066Plant & is not assigned to company code & of network
067Purch. org. & is not assigned to company code & of activity
068WBS elem. cntrl. area & is not same as network cntrl. area &
069WBS elem. cntrl. area & is not same as activity cntrl. area &
070WBS elem. cntrl. area & is not same as act. elem. cntr. area &
071Activity can only differ between internal and external processing
072Plant & is not assigned to company code & of activity
073PS text cannot be copied since it does not have SAPScript format
074Control key is not valid for services
075External processing required as purchase order exists
076Project definitions of WBS elements must agree
077Company codes of WBS elements must agree
078Business areas of WBS elements must agree
079Profit centers of WBS elements must agree
080Status of WBS element & does not permit assignments
081WBS element & is not an account assignment element (check)
082Activity & is not assigned to a WBS element
083You cannot change the company code (see long text)
084The order or network could not be saved
085You can only perform the method 'Save' once
086The method 'Save' cannot be executed
087No valuated stock is planned for WBS element &
088Controlling areas of the WBS elements must agree
089The unit & for the component & only permits & decimal places
090The unit & for the external activity & only permits & decimal places
091The unit & for the external activity & only permits & decimal places
092Please enter info record and purchasing organization
093Unit costing is only possible for primary cost activities
094The network for activity & could not be found
095No costs were calculated for the activity
096*************** PS Texts **********************************************
097WBS element & is marked for deletion
098Network & is marked for deletion
099Standard network & & is marked for deletion
100Enter text identification, language, and text type
101You have not marked an assignment
102No PS texts exist for activity &
103Select either standard network, network, or project
104No entry for selection
105Invalid text key
106There are no assignments from selected PS text to a &1
107No assignments from selected PS text to a network exist
108No assignments from selected PS text to a standard network exists
109Text & & does not exist
110Text & & already exists
111Text is used in standard network &
112Text is used in network &
113Text is used in project &
114PS text is currently being processed, you can only display
115Select network first
116Select relationship first
117Selection not possible, position cursor on overview line
118No PS text could be selected (check entry)
119No data was changed
120Data entered was saved
121Text type & does not exist
122Specified assignment to network already exists
123Specified assignment to network does not exist
124Text used in WBS element &
125PS text & deleted
126PS text & is already being processed
127New text entered by copying
128Text does not exist in document table
129No text in language "&" exists
130No bill of material matching selection criteria exists
131Bill of material is not valid for networks
132Function is not allowed since component already deleted
133PS text & & is already assigned to activity &
134Enter activity only together with network
135Specified assignment to standard network already exists
136Specified assignment to WBS element already exists
137Specified assignment to standard network does not exist
138Specified assignment to WBS element does not exist
139Enter either a project definition or a WBS element
140Enter activity only together with standard network
141Unit & invalid - Only unit & valid for work center
142Unit & invalid - Only dimension & valid for work center
143Text type & is only permissible for simulation versions
144The data have been deleted.
145Unit calculation for activity & was not created/changed
146Activity & in network & could not be found
147Network activity with internal number & & could not be found
148No unit costing exists for activity &
149No bill of material item available for processing
150No bill of material could be found meeting the selection criteria
151No current evaluations exist
152All assignments are already current
153No activity could be found meeting the selection criteria
154Enter various priorities
155Network &1 does not belong to controlling area &2
156Data field & & is not defined in DDIC
157Lengths defined for data fields are not identical
158Reference fields of selected activities are not unique
159Enter material number
160Enter sales order and item
161Enter a project, a WBS element, a sales order/ item, or a network
162Activity & network & was already deleted (see long text)
163You have already reached the first assembly
164You have already reached the last assembly
165Problem when reading the change number, date remains unchanged
166Select an activity
167Material & not found in plant &
168Plant & has not been assigned to a company code (please check)
169System error while assigning subscreen to the processing loc. in TC32: &
170You are not authorized to create a version in this category
171Invalid version number
172Method &1 is not intended for object type &2
173Method & cannot be used without an object type
174Status 'Account assignment locked' has been set
175Status 'Account assignment locked' has been removed
176Order & cannot be copied into operative structures
177There is no sales order BOM for the material, plant and usage
178WBS element is already marked for requirements grouping
179No reference number has been entered for method &1 for object type &2
180Activity & has not been released: Data for fund management is missing
181Release not possible, since data for funds management is missing
182Activity & cannot be released: Purchasing data is missing
183Trace & has been created successfully
184Trace & could not be created
185Sales document is not assigned to the WBS element you entered
186Sales document is not assigned to the project definition you entered
187An incorrect object key was entered for object type &
188A reference object cannot be entered for the method 'Save'
189A reference object cannot be entered for the method 'Update'
190No network profile has been entered for network & during creation
191BAPI method &1 is not intended for object type &2
192Network type &1 does not exist
193No project BOM exists for the material, plant and usage
194The statuses could not be created while creating network &
195Plant &2 could not be found while creating network &1
196General business data not found for network &
197Successor or predecesor in relationships cannot be changed
198Network &1 / &2: &3
199The relationship type cannot be changed
200------Printing in Networks---------
201Print job created for shop papers of network &
202Print job created after saving shop papers of network &
203You cannot print: Network & has status "deleted"
204You cannot print: Network & has status "technically closed"
205Original printed: Copy created from network &
206Print job for network shop papers already created
207After saving shop papers are printed for network
208The relationship type has not been entered
209Enter a WBS element or a sales order item
210The network could not be released
211Enter a standard network
212Standard network & does not exist (check entry)
213Automatic number assignment not possible. Enter activity number
214Select an alternative
215List does not contain alternatives
216Last selected alternative already reached
217First selected alternative already reached
218Standard network & alternative & does not exist
219The network activity could not be released
220Factory calendar & does not exist
221Plant & does not exist (please check your entry)
222A time unit is required for the duration of the relationship
223& is not a valid time unit for the duartion of the relationship
224Enter the offset for rel. either as a fixed time or a percentage
225Key & for calculating the relationship offset is invalid
226Relationship type & could not be converted to the external format
227Relationship type & could not be converted to the internal format
228The network has already been released (please check)
229Release not possible for element &, purchasing data missing
230No unit costing exists for component &
231Enter control key for the network activity
232Capapcity assignments for activity & could be deleted
233Network & has been deleted logically
234Maintain at least one activity data field
235Different controlling area for the reference and the new network
236Activity/element &1: Unit of measure is being updated from info record
237Only one project version can be created during processing
238The network profile cannot be changed
239The network type cannot be changed
240The plant cannot be changed
241Network &1: Increment &2 is not possible after activity number &3
242For network &1 all 9999 operation numbers have already been assigned
243Enter a project
244No entry could be found for the specified filter conditions
245The organizational units do not match in network and standard network
246The project definitions of the subnetwork and the superior network differ
247Created milestone &1 for network &2 activity &3
248Object type: &1, external ID; &2, new ID: &3
249Confirmation not possible - Save network first
250************* PS Billing Plan ******************************************
251Invoicing plan only for externally procured components
252Billing plan for item & does not exist
253Invoicing plan for activity & does not exist
254Billing plan not available for internally processed activities
255Billing plan is only available for components relevant to costing
256Billing plan is not for negative values or quantities
257Teh invoicing plan for material component & could not be deleted
258Could not find source to copy for the invoicing plan for comp. &
259Purchasing data missing for activity &
260Purchasing data missing for activity element &
261BOM for material & is locked at the moment
262Item numer interval is almost exhausted (see long text)
263Maximum item number reached (see long text)
264Enter a network type
265Activity element &1 does not exist in network &2
266Network & is locked
267Network & has been unlocked
268Planned independent requirements not found for &1 on &2
269WBS element & does not have valuated stock
270The component has not been allocated to valuated individual stock
271Component allocations to individual stock still exist
272Controlling area &1 of the plant is different to that of the network (&2)
273Controlling area &1 of the plant differs from that of the proj./SO (&2)
274Item category &1 is not intended for &2
275There are no effectivity parameters for material &1 in plant &2
276BOM for material & has already been exploded (check you entries)
277Could not lock network &
278Could nou unlock network &
279You are not authorized to create an activity or activity element
280No material components or PRTs exist
281Missing material for network &
282No material is missing for network &
283Cannot create a milestone for network &
284Activity does not exist for element &
285No component could be determined with the selection criteria
286Enter a project, WBS element, or network
287Component & is not intended for monitoring dates
288Network type &1 plant &2: No checking rule maintained for activity
289All inspected material components available for network &
290You cannot transfer a bill of material with sub-items
291Check procurement parameters of the copied items
292Lacking material availability for network &
293Bill of material without a material number cannot be exploded
294Network type &: Maintain material avail. control for status "created"
295Function not allowed due to activity & status
296No changes allowed due to activity status
297Enter a change number
298Take care when processing sets with multi-level config. (see long text)
299Freely defined reference point overrules a fixed reference point
300No possible entries exist
301& entries were changed
302Value for priority is not valid (check entry)
303Enter the amount and currency
304Unit & is not allowed as a business unit
305Material components can only be moved within a network
306Cannot change actual date; activity/element & not (finally) confirmed
307You are not authorized to change activity or element &1 &2
308Specify a work center for the activity type
309Validation has not been defined in Customizing
310A residence time has been entered for network type &1 - cannot delete
311Posting exists for activity/element &1 - cannot delete
312Posting hve been made for network &1 - cannot delete
313Material component & has been deleted; goods issue not possible
314Activity &1 is assigned to WBS element &2, which is marked for deletion
315Enter a scheduling type without the "Time of day" indicator
316Activity/element &1 &2 could not be created
317There is not a WBS BOM for the material and plant
318External network number & cannot be used more than once
319Activity &1 has been assigned material components - Deletion not allowed
320Enter a positive value
321Entry of a functional area is not possible
322Functional area & does not exist
323Monitoring dates saved
324Monitoring dates discontinued due to data inconsistency
325Value assignment for parameter effectivity copied
326There are still componnents for the group. Cannot delete
327Missing assignment of components to group. Check your entries
328A milestone has already been assigned to event &
329Milestone is already assigned
330There is no reference to a milestone for event &
331Could not find any entries for the filter criteria entered
332Enter a group
333The program was terminated intentionally, note the termination point
334Select an event
335Select a group
336Event is referenced completely. Manual maintenance not possible
337Select a component
338Cannot delete, reference fields are still assigned to event &
339No role has been defined for user &1 in project &2
340Select at least one date type
341Sorting according to the selected column is not possible
342Network has already been partially released
343Network & is not locked; no changes possible
344The position in this group has already been assigned; please check
345A negative planned independent requirement is not permitted. Check entry
346The event is not assigned a position in any group
347Plant &1 is not assigned to the project controlling area &2
348Function is only possible for external activities/activity elements
349Supply source determination carried out for &1 / &2
350You cannot change the activity type
351Status does not permit the settlement rule to be changed
352Material type and item type for material & do not match
353Substitution has not been defined in Customizing
354No authorization for processing: &1 &2 &3 &4
355Text control cannot be generated
356Scheduling for network & is reset
357Customer number proposed from SD document
358The component will lose its route character
359Network was already released and cannot be deleted
360Material status &1 for &2 &3 does not permit planned indep. requirements
361No items exist for the standard BOM
362Plant change; BOM assignment will be deleted
363Configuration for material & is not permitted. You cannot save
364Format & does not exist
365There are CATS records for the object to be deleted
366You can not execute milestone functions in the background (&1)
367No data exists for the order report
368Changes to network not allowed due to purch. req. & & rel. status
369Changes to network & critical due to purch. req. release status
370Network is released. Purchase requisition can no longer be changed
371Activity & not yet finally confirmed
372Element & not yet finally confirmed
373Act. or element & must be confirmed but is only partially confirmed
374Subnetwork & for activity & not marked for deletion
375Activity & has already been released and can no longer be deleted
376Element & has already been released and can no longer be deleted
377Activity &1 in network &2 has already been released. Cannot delete
378Element &1 in network &2 has already been released. Cannot delete
379Purchase requisition(s) for external act./element already archived in MM
380Purchase requisition(s) for component already archived in MM
381Specify an outline agreement and an item
382Plant in purchase requisition cannot be changed at a later date
383Select network components only
384There is no data for the selected entries
385Material &1 is replaced by material &2, according to the materal master
386A network connected by relationships does not yet exist
387Deblock acc. assignment in operation &1 rejected, as network &2 blocked
388Status of WBS element & does not permit creation of purchase requisition
389Actual costs and/or actual revenues exist: Object class cannot be changed
390The validity of the change number is not the same as the valuation
391The minimum purchase order quantity according to the info record is &1 &2
392PS text & is deleted when you save
393Total value of invoicing plan &1 is not equal to total val. of service &2
394Activity/elem. &1 &2 &3 carries act. values; you cannot change bus. area
395You can enter data in the summariz. fields only after releasing the data
396Purchase order already exists for configuration of component &
397Address different from address in customer master is proposed from SD doc
398External BOM data is not allowed (see long text)
399Assemblies with remaining quantities exist
400*********** Milestones *******************
401Maintain fixed date only or reference to activity
402Status profile changed - all maintained user statuses deleted
403Enter unit
404Enter date and time
405Enter either absolute or percentual interval
406You cannot delete: Milestone is assigned to billing schedule
407Invalid status. Check entry
408Enter status for triggering function
409Enter status change for triggering function
410Enter standard network and network type
411Enter standard network and activity
412Standard milestone & does not exist. Check entry
413Standard milestone & saved
414Standard milestone & already exists
415Saving not necessary - no data was changed
416Standard milestone & is currently being processed
417Standard trigger point & saved
418Standard milestone & deleted
419Error when determining CUA status
420Enter milestone group
421Position cursor on a function
422Enter a valid standard network
423Enter only positive values between 0-100 for start of interval
424Enter only negative values between 100-0 for finish of interval
425Milestone group & contains no standard milestones
426Status and status change are ignored in manual activation
427Enter a valid workflow task
428You must at least enter a usage or description
429User statuses were deleted when milestone was copied
430Enter the description of the trigger point
431Standard trigger point & deleted
432Enter date key
433No trigger points can be created for elements
434Standard trigger point & does not exist. Check entry
435Enter trigger point group
436Maintained user statuses were deleted when trigger point was copied
437Trigger point group & contains no standard trigger points
438Actual dates in milestones were not set - no authorization
439Standard trigger point & already exists
440Serious error occurred during number assignment
441Milestone function indicator is not set
442Activity & does not exist. Subnetwork cannnot be created
443Status of activity & does not permit subnetwork to be created
444Activities "predecessor" and "succesor" cannot be the same
445First selected entry already reached
446Last selected entry already reached
447No entry selected - please choose
448Select only one entry
449Billing block not automatically set in billing plan dates
450Milestone & does not exist
451Long text could not be processed
452Milestone & has not been created
453Meilestone number &1 can no longer be changed in &2
454You must assign milestone & to an activity
455Milestone belongs to a billing plan - cannot change assignments
456Enter a currency for the services
457Scheduling with subnetworks not allowed
458Scheduling with more than two levels is not supported
459Network '&1': No changes possible because of status &2
460Activity '&1': No changes possible because of status &2
461Activity element '&1': No changes possible because of status &2
462Netwk type &: Maintain material avail. control for status "released"
463Release not possible
464You cannot process the PS text with format &1 in the Web GUI
465Save the confirmations you created for &1
466Activity &1/&2 has already been replaced by subnetwork &3
467Network &1 is already being used in the subnetwork hierarchy
468Subnetwork & for activity & not deleted
469Order & will be undispatched
470All PM/CO/PP orders are not closed.
471Activity/activity element & has status released
472Field Key &1 is not valid for network activity
473Field Key &1 is not valid for activity element
474Field Key &1 is relevant for usage in Networks.
480Work data changed, calculation key set to manual
481Work center & & not allowed (check)
482Enter a plant for the work center
483Confirmed output could not be converted
484Calculation key & not valid
486BAdI NETW_USER_FIELDS_F4 inactive: There is no user-defined F4 help
487The exection factor in the network has been reduced from & to 1
488Costs of activity & element & are becoming too large - please check
489Activity & element & is taking too much time - please check
490Work for activity & is too large - check
491Duration for activity & is too large - check
492Work for activity & element & is too large - check
493Quantity of component & is too large - check
494Quantity in activity & is too large - check
495Quantity in activity & element & is too large - check
496Execution factor for activity & network & becoming too large - check
497Execution factor must be an integer multiple of the header factor (&)
498Change not accepted (execution factor in network too large)
499Costs of activity & becoming too large - please check
500Network & is being created
501Network & was changed
502You do not have authorization to change milestone &1
503Network was created from the sales document. You cannot delete it
504Activity &1 &2: Value too big because of unit used
505Service lines for service activity & & cannot be empty
507Enter alternative only with a standard network
510Standard network alternative "&" "&" not yet released
511Enter either standard network or network to copy
514There are no standard networks that meet the selection criteria
520External Network Activity cannot be selected for network scheduling
522Enter element number
523Element number already exists (check entry)
530Select one line only
531There is no confirmation for the selected purchase orders
532There is no purchase order history for the selected purchase orders
533Select an entry in the tree using its icon
534Select objects of the same type
535There are no entries in the availability log for material components
536Transfer from various sales orders or project stock not intended
537Select a WBS element or a sales order item
539Network &1 is allowed for only one purchase requistition
540Purchase order &1 was generated
541The configuration data for &1/&2 no longer exist
550*** PS-SD Integration/Configuration ***
551Network created from sales order - Display configuration only
552Network status does not allow you to change the configuration
553Master data for network & was reconfigured.
554Assignment to subnetwork & was deleted
555Configuration log-Contains no entries for reconfiguration of master data
556Components already withdrawn for network &
557Characteristic values were copied - you can only display
558Sales order & for network & is being processed by &
559Settlement rule is automatically created
560WBS elements do not belong to same project definition
561Network from sales document - Changes effect sales document
562Errors occured when calculating costs for the network
563Configuration is incomplete or was cancelled
564Standard WBS element & is not a billing element
565You cannot configure component & (reason: &)
566Enter a WBS element
567Error in configuration: Network cannot be created
568Std ntwk & alt. & act. &: error when configuring w/ ref. characteristics
569Assigned WBS element must be released or partially released
570Messages for configuration:
571Configuration cannot be copied (different classes)
572Configuration cannot be copied (status conflict)
573&1/&2: Release invalid: Inconsistent or blocked configuration
578Material &1, item number &2 is already in delivery &3/&4
579Delivery quantity is larger than open quantity
580MAterial &: Delivery quantity of & & reduced according to availability
581Delivery quantity is larger than required quantity
582Please enter a project - or a general selection criterion
583A project could not be selected for criteria entered
584There are no deliveries for the chosen project
585Please enter a project definition
586No items exist with delivery quantities - cannot save
587You can only use an activity as a filter together with a network
588Delivery inforamtion has not been assigned to the component
589Delivery date (material &1, quantity &2 &3) in the past
590The delivery could not be saved (see error log)
591User &2 is creating a delivery for reservation &1
592Missing required entry field: you cannot create the network
593Switch &1 not active.
595Purchase order was not generated. See log
600Program error in program & routine &
601No loop in the network
602Network contains more than the nine loops found
603Network contains & loop(s)
606Relationships printed
607Not printed - no loops or deleted activities exist
608Network contains no relationships
610& relationships deleted
611Network contains loops and cannot be scheduled
617Factory calendar not assinged for activity "&" in network "&"
618Cost control key not allowed for activity
619Control key not available for costs
620Maintain control key in network profile
621Standard network contains no loops
622Standard network contains more than the nine loops found
623Standard network contains & loop(s)
624Standard network contains loops and cannot be scheduled
625You do not have authorization for plant &1, usage &2 and planner group &3
628Standard network contains no relationships
629Service package for the service activity cannot be empty
630You cannot configure standard network &1 (Reason: &2)
631WBS element &1 does not belong to project &2 (assigned to delivery info)
632Delivery info & was deleted
633&1 &2 &3 has a deletion flag, assignment not possible
634Not possible to change the project definition -> see long text
635Delivery inforamtion &1 being created with source &2
636Only the items with delivery info assigned are displayed
637There is no delivery info assigned
638Assignments to invalid objects are deleted when you save
639Delivery information & has been changed
640The assignment exists already
641Delivery information & does not exist
642NOt possible to create, delivery information & already exists
643Enter organizational data completely
644Deletion not possible, there are still valid assignments
645The assignment exists already
646Delivery info &2 is being processed by &1. (Display only)
647The assignments to &2 &3 &4 are being processed by &1. (Display only)
648Delivery info & is being created
649Delivery infos can only be maintained for header-assigned networks here.
650*************** Selecting/Navigating **********************************
651Select relationship first
652Select PS text first
653List shows no relationships
654List shows no PS texts
655Last selected element already reached
656Last selected relationship already reached
657Last selected PS text already reached
658First selected element already reached
659First selected relationship already reached
660First selected PS text already reached
661Select element first
662Access to work detail screen not allowed
663No valid activity selected
664No valid element selected
665List shows no components
666Select a material component first
667Last selected component already reached
668First selected material component already reached
669Positioning not possible
670First selected activity already reached
671Last selected activity already reached
672List shows no milestones
673Select a milestone
674Last selected milestone already reached
675First selected milestone already reached
676Select a network first
677List shows no activities
678Activity & is not valid for service
679You can only align with the start or finish date in a network
680You should enter a requirements date
681Requirements date of item & is in the past
682Release date item &1 activity &2 is &3 days in the past
683Purchasing data for component &1, activity &2 is incomplete
684Activity & was not released -> see log
685Network & was not released -> see log
686Delivery date for a purchase requisition is unrealistic -> see log
687Delivery date: Previous working day is the &
688The purchasing data is incomplete
689The data for variable-size parts is incomplete
690No delivery address has been entered
691Maintain the item text
692Enter material and plant
693Purchase requisition &1 item &2 cannot be updated
694Address copied from the goods recipient in the sales document
695The purchasing view for material &1 has not been edited
696Purchase requisition &1 item &2 cannot be deleted
697Enter a G/L account
698Select a line in the overview
699One or more than one activity was not released. See log
700*************** NETWORK (order type 20) *******************************
701MRP controller & does not exist in plant & (check entry)
702Calculation executed
703Basic work is copied into forecast work because activity is confirmed
704You can only create one document for each transaction
705Purchase req. for activity/element & cannot be generated
706Purchase requisition for material & cannot be generated
707A purchase order already exists for purchase requisition &1 &2
708No relationships to superior activity & must be created
709Material & is marked for deletion (check)
710Maintain both indicator and date for constraint
711No material components allocated to network
712No detailed data available for text item
713No reservation data for item category &
714No purchasing data for item category &
715No variable-size item data for item category &
716No text item data for item category &
717No material components assigned to activity
718You cannot maintain key & for the constraint
719Address maintenance only for third-party orders
720PS text & text type & for item & copied
721You cannot delete: A relationship is currently locked
722You cannot create a purch. req. because scheduling was not carried out
723WBS element is not valid for project stock
724An MRP-relevant reservation exists for & &
725Enter account assignment category for purc. req/reservation
726Component & & is already released
727Material & only for individual requirements (check entry)
728Enter movement types for project management/networks
729Material & is incompatible with item category & (check entry)
730Enter start date
731Dates copied from project definition &
732Dates copied from WBS element &
733Enter a project definition
734Time interval is greater than duration of activity &
735& is not a workday
736Costs were calculated: See menu Edit -> Costs -> Planned - Actual
737Enter a WBS element
738Error when copying a service package
739Schedule network for cost calculation
740Changed profile data not saved
741Schedule WBS element & for current cost calculation
742Order "&" is not a network. You cannot display
743No valid item selected
744No costing variant; planned costs may have been deleted
745Changes to sales order item can influence requirements planning
746Sales order item & not permitted for ind. customer stock
747Maximum of & days copied as duration of activity &
748No authorization to maintain planned independent requirements
749Error when generating planned independent requirements
750Component & item & was already withdrawn
751Material & is not for planned independent requirements
752Material &: Requirement quantity & smaller than quantity withdrawn &
753There are components that have already been (partially) withdrawn
754Offset not taken into account for manually set requirements date
755An alternative account assignment/stock assignment is not possible
756Item & material &: Reqmnt qty & smaller than GR qty &
757No material components exist for activity &
758No more item numbers available (please check)
759Invalid account assignment category -> check your settings
760Activity & has not been assigned capacity requirements
761Enter currency. Cannot execute unit costing
762Long text for activity & could not be copied
763Long text for alternative & could not be copied
764Purchase requisition for service activity / element cannot be generated
765Long text for element & activity & could not be copied
766Info record &1 flagged for deletion
767Distribution is not taken into account for manual requirement dates
768Procurement indicator and material master settings for & are inconsistent
769WBS element &1 has different inventory valuation
770Errors occurred during processing (see error log)
771Network &1 and project &2 have been summarized in different ways
772&2 was already withdrawn for planned independent requirement &1
773Restriction: finish date occurs before start date
774Network could not be classified
775No profile for project planning board (maintain network profile)
776Alternatives exist for the standard network
777Object (network, activity, item) is invalid
778Enter network, activity and item
779Planned independent requirement &1 for material &2/&3 no longer exists
780-------Versions----------------------------------------------
781Version & already exists
782Select version to be processed
783Version was not created
784Select version to be displayed
785Version & is displayed
786Version & is created after saving network
787Project version & is created after saving
788Profile for project version & does not exist
789A project version with key & already exists
790No project versions allowed for network (see profile &)
791No project versions allowed for project (see profile &)
792Project version & does not exist
793Version & deleted
794Project version & deleted
795You do not have authorization to delete all objects of version &
796This version ID is reserved for simulation
797Simulations exist for the network(s)
798Simualtion versions are being processed --> see long text!
799Versions already exist for network &; deletion not possible
800------ Relationships ---------------------------------------
801Activity "&" does not exist in network "&"
802Network & does not exist
803Invalid relationship type (check entry)
804Relationship is already being processed
805System error when locking
806A network linked by relationships is being processed
807Relationship cannot be deleted, it is currently being processed
808You must also maintain a time unit when entering a time interval
809Enter a time unit, since you have entered either work or actual work
810You must also maintain a unit when entering work
811Profile & does not exist
812Activity & does not exist in network &
813Enter activity number
814Activity & cannot have a relationship to itself
815Standard network has several alternatives. Choose one
816Standard network & & being processed. Rel. cannot be maintained
817Standard network & is locked by user &
818Relationships cannot be maintained
819No work center assigned to successor
820No work center assigned to predecessor
821This relationship already exists
822Error in determining work center for relationship
823Relationship does not exist
824Relationship from & & to & & already exists
825You must also maintain a time unit when entering duration
826Relationship does not exist in document table
827You cannot enter a new external network in change mode
828Start of time interval must not be negative
829Finish of time interval must not be positive
830Enter either a fixed or percentage time interval
831This relationship already exists in the reversed order
832Text does not exist in document table
833Activity not found in database
834No graphic profile maintained in network profile &
835Work cannot be converted into desired unit
836Duration cannot be converted into desired unit
837Relationships betw. activities in different alternatives are not allowed
838Several start/target activities exist
839Start and target activities cannot be identical
840Relationship is being processed with change number &
841Relationship cannot be created without using a change number
842Company code & requires a business area
843Business areas activity & and WBS element & are not identical
844Company code activity & and WBS element & are not identical
845Relationships were created
846You cannot create because network & is not locked
847Dates for network & activity & cannot be locked
848Relationship cannot be created . & is an activity element
849The duration cannot be larger than the maximum duration
850======== Standard network/network-specific messages =====================
851Minimum duration must not exceed standard duration
852Activity loses its internal processing character
853Activity loses its external processing character
854You can only enter a cost control key
855Cost control keys are not allowed
856Invalid controlling area & for company code &
857Invalid cost center
858Maintain a work center to calculate duration
859Control key & not valid for services
860Maintain duration and work to calculate number of capacities
861Maintain work to calculate duration
862Maintain duration to calculate work
863Enter units when calculating work or duration
864Problems during conversion work and duration
865Maintain a work center to calculate work
866Control key & is only for service
867Price fixing is only possible in connection with a purchasing info record
868Selected alternative will be deleted when you press Enter
869Standard network already deleted
870Choose another key for alternative; this one already exists
871Standard network & for this key date does not exist
872External processing data missing
873Activity & does not exist in standard network & &
874Standard network & & does not exist
875Standard network & not valid for external number assignment
876Activity/activity element & already exists
877No operating time entered for the work center
878Enter activity quantity and base unit of measure
879Order unit does not correspond with unit from info record
880Data copied from info record
881Number of capacities in activity exceeds capacities in work center
882Long text for alternative & could not be copied
883Maintain pricing unit and currency
884Activity & does not exist
885Activity & is an activity element
886Activity & in network & has no capacity requirements
887Material component & & does not exist
888Problem in forming ITAB with relationships (LNWBTU27)
889Material component & & could not be changed
890Material component & & could not be deleted
891Due to existing assignments milestone & & cannot be deleted
892Milestone & & does not exist and therefore cannot be deleted
893Thze function was called up with incorrect parameters
894The invoicing plan for activity & could not be copied
895The invoicing plan for activity & could not be deleted
896The source for the invoicing plan for activity & could not be found
897The invoicing plan for material component & could not be copied
898&
899Convert matchcode: &
900Service lines for service activity & & cannot be empty