CN - Meldungen f�r Netzpl�ne
The following messages are stored in message class CN: Meldungen f�r Netzpl�ne.
It is part of development package CN_NET_OPR in software component PS-ST-OPR-NET. This development package consists of objects that can be grouped under "Operative Network".
It is part of development package CN_NET_OPR in software component PS-ST-OPR-NET. This development package consists of objects that can be grouped under "Operative Network".
Message Nr ▲ | Message Text |
---|---|
001 | Cost element & & does not exist (check entry) |
002 | Position cursor on a valid entry |
003 | Company code & does not exist (check entry) |
004 | Enter a numeric value |
005 | You cannot maintain the settlement rule for the network header |
006 | You cannot maintain the settlement rule for the activity |
007 | No authorization in plant & for network type & |
008 | No authorization in plant & for MRP controller & |
009 | Network & does not exist |
010 | Network & does not exist (check entry) |
011 | Network & is already being processed by & |
012 | Network profile & does not exist (check entry) |
013 | Network & released |
014 | WBS element & for network/order & not (partially) released |
015 | Activity & released |
016 | WBS element & for activity & not (partially) released |
017 | Project definition & not (partially) released |
018 | Activity assignment: Display costs by activity |
019 | No entry in table & found |
020 | No parameters for network type & exist (check entry) |
021 | You cannot create a subnetwork for activity element "&" |
022 | Subnetwork number is identical to network number |
023 | You cannot delete. Activity "&" has been replaced by a subnetwork |
024 | No control parameters for scheduling exist |
025 | Network does not contain activities |
026 | No elements for activity & exist |
027 | Enter an activity number |
028 | Activities are not within time frame of WBS elements |
029 | Log contains no entries |
030 | You cannot assign to activity "&" |
031 | Production versions with standard networks are not possible |
032 | Enter a business area |
033 | WBS element & does not belong to project definition & |
034 | & is not a network |
035 | No activity with an assignment to a standard WBS exists |
036 | Network created with plant & of copied network |
037 | Network type & is not same as & in copied network |
038 | You can only choose selected objects together with activities |
039 | Activity "&" has status "&" |
040 | Enter a standard network or network |
041 | Network & is currently being processed |
042 | Enter a network number |
043 | Network is not assigned to a profit center |
044 | An assignment to a standard WBS element already exists |
045 | No possible entries for network number |
046 | Control key "&" from network profile "&" is copied |
047 | Control key of superior activity is not changed |
048 | The status of the network '&' does not permit changes |
049 | ------ Error messages for organization elements ------------------------- |
050 | Control key not available for external processing |
051 | Control key not available for costs |
052 | Control key does not exist |
053 | Network does not have activity account assignment |
054 | Controlling area could not be determined |
055 | Network does not exist (check entry) |
056 | Activity account assignment not allowed for this network |
057 | Network has activity account assignment |
058 | Activity & does not exist |
059 | Network has no costs |
060 | Cost display could not be generated due to missing parameters |
061 | Project definitions have different header and activity |
062 | & Finish date is in the past |
063 | You cannot create a subnetwork |
064 | Enter a cost element |
065 | Plant & is not assigned to controlling area & of network |
066 | Plant & is not assigned to company code & of network |
067 | Purch. org. & is not assigned to company code & of activity |
068 | WBS elem. cntrl. area & is not same as network cntrl. area & |
069 | WBS elem. cntrl. area & is not same as activity cntrl. area & |
070 | WBS elem. cntrl. area & is not same as act. elem. cntr. area & |
071 | Activity can only differ between internal and external processing |
072 | Plant & is not assigned to company code & of activity |
073 | PS text cannot be copied since it does not have SAPScript format |
074 | Control key is not valid for services |
075 | External processing required as purchase order exists |
076 | Project definitions of WBS elements must agree |
077 | Company codes of WBS elements must agree |
078 | Business areas of WBS elements must agree |
079 | Profit centers of WBS elements must agree |
080 | Status of WBS element & does not permit assignments |
081 | WBS element & is not an account assignment element (check) |
082 | Activity & is not assigned to a WBS element |
083 | You cannot change the company code (see long text) |
084 | The order or network could not be saved |
085 | You can only perform the method 'Save' once |
086 | The method 'Save' cannot be executed |
087 | No valuated stock is planned for WBS element & |
088 | Controlling areas of the WBS elements must agree |
089 | The unit & for the component & only permits & decimal places |
090 | The unit & for the external activity & only permits & decimal places |
091 | The unit & for the external activity & only permits & decimal places |
092 | Please enter info record and purchasing organization |
093 | Unit costing is only possible for primary cost activities |
094 | The network for activity & could not be found |
095 | No costs were calculated for the activity |
096 | *************** PS Texts ********************************************** |
097 | WBS element & is marked for deletion |
098 | Network & is marked for deletion |
099 | Standard network & & is marked for deletion |
100 | Enter text identification, language, and text type |
101 | You have not marked an assignment |
102 | No PS texts exist for activity & |
103 | Select either standard network, network, or project |
104 | No entry for selection |
105 | Invalid text key |
106 | There are no assignments from selected PS text to a &1 |
107 | No assignments from selected PS text to a network exist |
108 | No assignments from selected PS text to a standard network exists |
109 | Text & & does not exist |
110 | Text & & already exists |
111 | Text is used in standard network & |
112 | Text is used in network & |
113 | Text is used in project & |
114 | PS text is currently being processed, you can only display |
115 | Select network first |
116 | Select relationship first |
117 | Selection not possible, position cursor on overview line |
118 | No PS text could be selected (check entry) |
119 | No data was changed |
120 | Data entered was saved |
121 | Text type & does not exist |
122 | Specified assignment to network already exists |
123 | Specified assignment to network does not exist |
124 | Text used in WBS element & |
125 | PS text & deleted |
126 | PS text & is already being processed |
127 | New text entered by copying |
128 | Text does not exist in document table |
129 | No text in language "&" exists |
130 | No bill of material matching selection criteria exists |
131 | Bill of material is not valid for networks |
132 | Function is not allowed since component already deleted |
133 | PS text & & is already assigned to activity & |
134 | Enter activity only together with network |
135 | Specified assignment to standard network already exists |
136 | Specified assignment to WBS element already exists |
137 | Specified assignment to standard network does not exist |
138 | Specified assignment to WBS element does not exist |
139 | Enter either a project definition or a WBS element |
140 | Enter activity only together with standard network |
141 | Unit & invalid - Only unit & valid for work center |
142 | Unit & invalid - Only dimension & valid for work center |
143 | Text type & is only permissible for simulation versions |
144 | The data have been deleted. |
145 | Unit calculation for activity & was not created/changed |
146 | Activity & in network & could not be found |
147 | Network activity with internal number & & could not be found |
148 | No unit costing exists for activity & |
149 | No bill of material item available for processing |
150 | No bill of material could be found meeting the selection criteria |
151 | No current evaluations exist |
152 | All assignments are already current |
153 | No activity could be found meeting the selection criteria |
154 | Enter various priorities |
155 | Network &1 does not belong to controlling area &2 |
156 | Data field & & is not defined in DDIC |
157 | Lengths defined for data fields are not identical |
158 | Reference fields of selected activities are not unique |
159 | Enter material number |
160 | Enter sales order and item |
161 | Enter a project, a WBS element, a sales order/ item, or a network |
162 | Activity & network & was already deleted (see long text) |
163 | You have already reached the first assembly |
164 | You have already reached the last assembly |
165 | Problem when reading the change number, date remains unchanged |
166 | Select an activity |
167 | Material & not found in plant & |
168 | Plant & has not been assigned to a company code (please check) |
169 | System error while assigning subscreen to the processing loc. in TC32: & |
170 | You are not authorized to create a version in this category |
171 | Invalid version number |
172 | Method &1 is not intended for object type &2 |
173 | Method & cannot be used without an object type |
174 | Status 'Account assignment locked' has been set |
175 | Status 'Account assignment locked' has been removed |
176 | Order & cannot be copied into operative structures |
177 | There is no sales order BOM for the material, plant and usage |
178 | WBS element is already marked for requirements grouping |
179 | No reference number has been entered for method &1 for object type &2 |
180 | Activity & has not been released: Data for fund management is missing |
181 | Release not possible, since data for funds management is missing |
182 | Activity & cannot be released: Purchasing data is missing |
183 | Trace & has been created successfully |
184 | Trace & could not be created |
185 | Sales document is not assigned to the WBS element you entered |
186 | Sales document is not assigned to the project definition you entered |
187 | An incorrect object key was entered for object type & |
188 | A reference object cannot be entered for the method 'Save' |
189 | A reference object cannot be entered for the method 'Update' |
190 | No network profile has been entered for network & during creation |
191 | BAPI method &1 is not intended for object type &2 |
192 | Network type &1 does not exist |
193 | No project BOM exists for the material, plant and usage |
194 | The statuses could not be created while creating network & |
195 | Plant &2 could not be found while creating network &1 |
196 | General business data not found for network & |
197 | Successor or predecesor in relationships cannot be changed |
198 | Network &1 / &2: &3 |
199 | The relationship type cannot be changed |
200 | ------Printing in Networks--------- |
201 | Print job created for shop papers of network & |
202 | Print job created after saving shop papers of network & |
203 | You cannot print: Network & has status "deleted" |
204 | You cannot print: Network & has status "technically closed" |
205 | Original printed: Copy created from network & |
206 | Print job for network shop papers already created |
207 | After saving shop papers are printed for network |
208 | The relationship type has not been entered |
209 | Enter a WBS element or a sales order item |
210 | The network could not be released |
211 | Enter a standard network |
212 | Standard network & does not exist (check entry) |
213 | Automatic number assignment not possible. Enter activity number |
214 | Select an alternative |
215 | List does not contain alternatives |
216 | Last selected alternative already reached |
217 | First selected alternative already reached |
218 | Standard network & alternative & does not exist |
219 | The network activity could not be released |
220 | Factory calendar & does not exist |
221 | Plant & does not exist (please check your entry) |
222 | A time unit is required for the duration of the relationship |
223 | & is not a valid time unit for the duartion of the relationship |
224 | Enter the offset for rel. either as a fixed time or a percentage |
225 | Key & for calculating the relationship offset is invalid |
226 | Relationship type & could not be converted to the external format |
227 | Relationship type & could not be converted to the internal format |
228 | The network has already been released (please check) |
229 | Release not possible for element &, purchasing data missing |
230 | No unit costing exists for component & |
231 | Enter control key for the network activity |
232 | Capapcity assignments for activity & could be deleted |
233 | Network & has been deleted logically |
234 | Maintain at least one activity data field |
235 | Different controlling area for the reference and the new network |
236 | Activity/element &1: Unit of measure is being updated from info record |
237 | Only one project version can be created during processing |
238 | The network profile cannot be changed |
239 | The network type cannot be changed |
240 | The plant cannot be changed |
241 | Network &1: Increment &2 is not possible after activity number &3 |
242 | For network &1 all 9999 operation numbers have already been assigned |
243 | Enter a project |
244 | No entry could be found for the specified filter conditions |
245 | The organizational units do not match in network and standard network |
246 | The project definitions of the subnetwork and the superior network differ |
247 | Created milestone &1 for network &2 activity &3 |
248 | Object type: &1, external ID; &2, new ID: &3 |
249 | Confirmation not possible - Save network first |
250 | ************* PS Billing Plan ****************************************** |
251 | Invoicing plan only for externally procured components |
252 | Billing plan for item & does not exist |
253 | Invoicing plan for activity & does not exist |
254 | Billing plan not available for internally processed activities |
255 | Billing plan is only available for components relevant to costing |
256 | Billing plan is not for negative values or quantities |
257 | Teh invoicing plan for material component & could not be deleted |
258 | Could not find source to copy for the invoicing plan for comp. & |
259 | Purchasing data missing for activity & |
260 | Purchasing data missing for activity element & |
261 | BOM for material & is locked at the moment |
262 | Item numer interval is almost exhausted (see long text) |
263 | Maximum item number reached (see long text) |
264 | Enter a network type |
265 | Activity element &1 does not exist in network &2 |
266 | Network & is locked |
267 | Network & has been unlocked |
268 | Planned independent requirements not found for &1 on &2 |
269 | WBS element & does not have valuated stock |
270 | The component has not been allocated to valuated individual stock |
271 | Component allocations to individual stock still exist |
272 | Controlling area &1 of the plant is different to that of the network (&2) |
273 | Controlling area &1 of the plant differs from that of the proj./SO (&2) |
274 | Item category &1 is not intended for &2 |
275 | There are no effectivity parameters for material &1 in plant &2 |
276 | BOM for material & has already been exploded (check you entries) |
277 | Could not lock network & |
278 | Could nou unlock network & |
279 | You are not authorized to create an activity or activity element |
280 | No material components or PRTs exist |
281 | Missing material for network & |
282 | No material is missing for network & |
283 | Cannot create a milestone for network & |
284 | Activity does not exist for element & |
285 | No component could be determined with the selection criteria |
286 | Enter a project, WBS element, or network |
287 | Component & is not intended for monitoring dates |
288 | Network type &1 plant &2: No checking rule maintained for activity |
289 | All inspected material components available for network & |
290 | You cannot transfer a bill of material with sub-items |
291 | Check procurement parameters of the copied items |
292 | Lacking material availability for network & |
293 | Bill of material without a material number cannot be exploded |
294 | Network type &: Maintain material avail. control for status "created" |
295 | Function not allowed due to activity & status |
296 | No changes allowed due to activity status |
297 | Enter a change number |
298 | Take care when processing sets with multi-level config. (see long text) |
299 | Freely defined reference point overrules a fixed reference point |
300 | No possible entries exist |
301 | & entries were changed |
302 | Value for priority is not valid (check entry) |
303 | Enter the amount and currency |
304 | Unit & is not allowed as a business unit |
305 | Material components can only be moved within a network |
306 | Cannot change actual date; activity/element & not (finally) confirmed |
307 | You are not authorized to change activity or element &1 &2 |
308 | Specify a work center for the activity type |
309 | Validation has not been defined in Customizing |
310 | A residence time has been entered for network type &1 - cannot delete |
311 | Posting exists for activity/element &1 - cannot delete |
312 | Posting hve been made for network &1 - cannot delete |
313 | Material component & has been deleted; goods issue not possible |
314 | Activity &1 is assigned to WBS element &2, which is marked for deletion |
315 | Enter a scheduling type without the "Time of day" indicator |
316 | Activity/element &1 &2 could not be created |
317 | There is not a WBS BOM for the material and plant |
318 | External network number & cannot be used more than once |
319 | Activity &1 has been assigned material components - Deletion not allowed |
320 | Enter a positive value |
321 | Entry of a functional area is not possible |
322 | Functional area & does not exist |
323 | Monitoring dates saved |
324 | Monitoring dates discontinued due to data inconsistency |
325 | Value assignment for parameter effectivity copied |
326 | There are still componnents for the group. Cannot delete |
327 | Missing assignment of components to group. Check your entries |
328 | A milestone has already been assigned to event & |
329 | Milestone is already assigned |
330 | There is no reference to a milestone for event & |
331 | Could not find any entries for the filter criteria entered |
332 | Enter a group |
333 | The program was terminated intentionally, note the termination point |
334 | Select an event |
335 | Select a group |
336 | Event is referenced completely. Manual maintenance not possible |
337 | Select a component |
338 | Cannot delete, reference fields are still assigned to event & |
339 | No role has been defined for user &1 in project &2 |
340 | Select at least one date type |
341 | Sorting according to the selected column is not possible |
342 | Network has already been partially released |
343 | Network & is not locked; no changes possible |
344 | The position in this group has already been assigned; please check |
345 | A negative planned independent requirement is not permitted. Check entry |
346 | The event is not assigned a position in any group |
347 | Plant &1 is not assigned to the project controlling area &2 |
348 | Function is only possible for external activities/activity elements |
349 | Supply source determination carried out for &1 / &2 |
350 | You cannot change the activity type |
351 | Status does not permit the settlement rule to be changed |
352 | Material type and item type for material & do not match |
353 | Substitution has not been defined in Customizing |
354 | No authorization for processing: &1 &2 &3 &4 |
355 | Text control cannot be generated |
356 | Scheduling for network & is reset |
357 | Customer number proposed from SD document |
358 | The component will lose its route character |
359 | Network was already released and cannot be deleted |
360 | Material status &1 for &2 &3 does not permit planned indep. requirements |
361 | No items exist for the standard BOM |
362 | Plant change; BOM assignment will be deleted |
363 | Configuration for material & is not permitted. You cannot save |
364 | Format & does not exist |
365 | There are CATS records for the object to be deleted |
366 | You can not execute milestone functions in the background (&1) |
367 | No data exists for the order report |
368 | Changes to network not allowed due to purch. req. & & rel. status |
369 | Changes to network & critical due to purch. req. release status |
370 | Network is released. Purchase requisition can no longer be changed |
371 | Activity & not yet finally confirmed |
372 | Element & not yet finally confirmed |
373 | Act. or element & must be confirmed but is only partially confirmed |
374 | Subnetwork & for activity & not marked for deletion |
375 | Activity & has already been released and can no longer be deleted |
376 | Element & has already been released and can no longer be deleted |
377 | Activity &1 in network &2 has already been released. Cannot delete |
378 | Element &1 in network &2 has already been released. Cannot delete |
379 | Purchase requisition(s) for external act./element already archived in MM |
380 | Purchase requisition(s) for component already archived in MM |
381 | Specify an outline agreement and an item |
382 | Plant in purchase requisition cannot be changed at a later date |
383 | Select network components only |
384 | There is no data for the selected entries |
385 | Material &1 is replaced by material &2, according to the materal master |
386 | A network connected by relationships does not yet exist |
387 | Deblock acc. assignment in operation &1 rejected, as network &2 blocked |
388 | Status of WBS element & does not permit creation of purchase requisition |
389 | Actual costs and/or actual revenues exist: Object class cannot be changed |
390 | The validity of the change number is not the same as the valuation |
391 | The minimum purchase order quantity according to the info record is &1 &2 |
392 | PS text & is deleted when you save |
393 | Total value of invoicing plan &1 is not equal to total val. of service &2 |
394 | Activity/elem. &1 &2 &3 carries act. values; you cannot change bus. area |
395 | You can enter data in the summariz. fields only after releasing the data |
396 | Purchase order already exists for configuration of component & |
397 | Address different from address in customer master is proposed from SD doc |
398 | External BOM data is not allowed (see long text) |
399 | Assemblies with remaining quantities exist |
400 | *********** Milestones ******************* |
401 | Maintain fixed date only or reference to activity |
402 | Status profile changed - all maintained user statuses deleted |
403 | Enter unit |
404 | Enter date and time |
405 | Enter either absolute or percentual interval |
406 | You cannot delete: Milestone is assigned to billing schedule |
407 | Invalid status. Check entry |
408 | Enter status for triggering function |
409 | Enter status change for triggering function |
410 | Enter standard network and network type |
411 | Enter standard network and activity |
412 | Standard milestone & does not exist. Check entry |
413 | Standard milestone & saved |
414 | Standard milestone & already exists |
415 | Saving not necessary - no data was changed |
416 | Standard milestone & is currently being processed |
417 | Standard trigger point & saved |
418 | Standard milestone & deleted |
419 | Error when determining CUA status |
420 | Enter milestone group |
421 | Position cursor on a function |
422 | Enter a valid standard network |
423 | Enter only positive values between 0-100 for start of interval |
424 | Enter only negative values between 100-0 for finish of interval |
425 | Milestone group & contains no standard milestones |
426 | Status and status change are ignored in manual activation |
427 | Enter a valid workflow task |
428 | You must at least enter a usage or description |
429 | User statuses were deleted when milestone was copied |
430 | Enter the description of the trigger point |
431 | Standard trigger point & deleted |
432 | Enter date key |
433 | No trigger points can be created for elements |
434 | Standard trigger point & does not exist. Check entry |
435 | Enter trigger point group |
436 | Maintained user statuses were deleted when trigger point was copied |
437 | Trigger point group & contains no standard trigger points |
438 | Actual dates in milestones were not set - no authorization |
439 | Standard trigger point & already exists |
440 | Serious error occurred during number assignment |
441 | Milestone function indicator is not set |
442 | Activity & does not exist. Subnetwork cannnot be created |
443 | Status of activity & does not permit subnetwork to be created |
444 | Activities "predecessor" and "succesor" cannot be the same |
445 | First selected entry already reached |
446 | Last selected entry already reached |
447 | No entry selected - please choose |
448 | Select only one entry |
449 | Billing block not automatically set in billing plan dates |
450 | Milestone & does not exist |
451 | Long text could not be processed |
452 | Milestone & has not been created |
453 | Meilestone number &1 can no longer be changed in &2 |
454 | You must assign milestone & to an activity |
455 | Milestone belongs to a billing plan - cannot change assignments |
456 | Enter a currency for the services |
457 | Scheduling with subnetworks not allowed |
458 | Scheduling with more than two levels is not supported |
459 | Network '&1': No changes possible because of status &2 |
460 | Activity '&1': No changes possible because of status &2 |
461 | Activity element '&1': No changes possible because of status &2 |
462 | Netwk type &: Maintain material avail. control for status "released" |
463 | Release not possible |
464 | You cannot process the PS text with format &1 in the Web GUI |
465 | Save the confirmations you created for &1 |
466 | Activity &1/&2 has already been replaced by subnetwork &3 |
467 | Network &1 is already being used in the subnetwork hierarchy |
468 | Subnetwork & for activity & not deleted |
469 | Order & will be undispatched |
470 | All PM/CO/PP orders are not closed. |
471 | Activity/activity element & has status released |
472 | Field Key &1 is not valid for network activity |
473 | Field Key &1 is not valid for activity element |
474 | Field Key &1 is relevant for usage in Networks. |
480 | Work data changed, calculation key set to manual |
481 | Work center & & not allowed (check) |
482 | Enter a plant for the work center |
483 | Confirmed output could not be converted |
484 | Calculation key & not valid |
486 | BAdI NETW_USER_FIELDS_F4 inactive: There is no user-defined F4 help |
487 | The exection factor in the network has been reduced from & to 1 |
488 | Costs of activity & element & are becoming too large - please check |
489 | Activity & element & is taking too much time - please check |
490 | Work for activity & is too large - check |
491 | Duration for activity & is too large - check |
492 | Work for activity & element & is too large - check |
493 | Quantity of component & is too large - check |
494 | Quantity in activity & is too large - check |
495 | Quantity in activity & element & is too large - check |
496 | Execution factor for activity & network & becoming too large - check |
497 | Execution factor must be an integer multiple of the header factor (&) |
498 | Change not accepted (execution factor in network too large) |
499 | Costs of activity & becoming too large - please check |
500 | Network & is being created |
501 | Network & was changed |
502 | You do not have authorization to change milestone &1 |
503 | Network was created from the sales document. You cannot delete it |
504 | Activity &1 &2: Value too big because of unit used |
505 | Service lines for service activity & & cannot be empty |
507 | Enter alternative only with a standard network |
510 | Standard network alternative "&" "&" not yet released |
511 | Enter either standard network or network to copy |
514 | There are no standard networks that meet the selection criteria |
520 | External Network Activity cannot be selected for network scheduling |
522 | Enter element number |
523 | Element number already exists (check entry) |
530 | Select one line only |
531 | There is no confirmation for the selected purchase orders |
532 | There is no purchase order history for the selected purchase orders |
533 | Select an entry in the tree using its icon |
534 | Select objects of the same type |
535 | There are no entries in the availability log for material components |
536 | Transfer from various sales orders or project stock not intended |
537 | Select a WBS element or a sales order item |
539 | Network &1 is allowed for only one purchase requistition |
540 | Purchase order &1 was generated |
541 | The configuration data for &1/&2 no longer exist |
550 | *** PS-SD Integration/Configuration *** |
551 | Network created from sales order - Display configuration only |
552 | Network status does not allow you to change the configuration |
553 | Master data for network & was reconfigured. |
554 | Assignment to subnetwork & was deleted |
555 | Configuration log-Contains no entries for reconfiguration of master data |
556 | Components already withdrawn for network & |
557 | Characteristic values were copied - you can only display |
558 | Sales order & for network & is being processed by & |
559 | Settlement rule is automatically created |
560 | WBS elements do not belong to same project definition |
561 | Network from sales document - Changes effect sales document |
562 | Errors occured when calculating costs for the network |
563 | Configuration is incomplete or was cancelled |
564 | Standard WBS element & is not a billing element |
565 | You cannot configure component & (reason: &) |
566 | Enter a WBS element |
567 | Error in configuration: Network cannot be created |
568 | Std ntwk & alt. & act. &: error when configuring w/ ref. characteristics |
569 | Assigned WBS element must be released or partially released |
570 | Messages for configuration: |
571 | Configuration cannot be copied (different classes) |
572 | Configuration cannot be copied (status conflict) |
573 | &1/&2: Release invalid: Inconsistent or blocked configuration |
578 | Material &1, item number &2 is already in delivery &3/&4 |
579 | Delivery quantity is larger than open quantity |
580 | MAterial &: Delivery quantity of & & reduced according to availability |
581 | Delivery quantity is larger than required quantity |
582 | Please enter a project - or a general selection criterion |
583 | A project could not be selected for criteria entered |
584 | There are no deliveries for the chosen project |
585 | Please enter a project definition |
586 | No items exist with delivery quantities - cannot save |
587 | You can only use an activity as a filter together with a network |
588 | Delivery inforamtion has not been assigned to the component |
589 | Delivery date (material &1, quantity &2 &3) in the past |
590 | The delivery could not be saved (see error log) |
591 | User &2 is creating a delivery for reservation &1 |
592 | Missing required entry field: you cannot create the network |
593 | Switch &1 not active. |
595 | Purchase order was not generated. See log |
600 | Program error in program & routine & |
601 | No loop in the network |
602 | Network contains more than the nine loops found |
603 | Network contains & loop(s) |
606 | Relationships printed |
607 | Not printed - no loops or deleted activities exist |
608 | Network contains no relationships |
610 | & relationships deleted |
611 | Network contains loops and cannot be scheduled |
617 | Factory calendar not assinged for activity "&" in network "&" |
618 | Cost control key not allowed for activity |
619 | Control key not available for costs |
620 | Maintain control key in network profile |
621 | Standard network contains no loops |
622 | Standard network contains more than the nine loops found |
623 | Standard network contains & loop(s) |
624 | Standard network contains loops and cannot be scheduled |
625 | You do not have authorization for plant &1, usage &2 and planner group &3 |
628 | Standard network contains no relationships |
629 | Service package for the service activity cannot be empty |
630 | You cannot configure standard network &1 (Reason: &2) |
631 | WBS element &1 does not belong to project &2 (assigned to delivery info) |
632 | Delivery info & was deleted |
633 | &1 &2 &3 has a deletion flag, assignment not possible |
634 | Not possible to change the project definition -> see long text |
635 | Delivery inforamtion &1 being created with source &2 |
636 | Only the items with delivery info assigned are displayed |
637 | There is no delivery info assigned |
638 | Assignments to invalid objects are deleted when you save |
639 | Delivery information & has been changed |
640 | The assignment exists already |
641 | Delivery information & does not exist |
642 | NOt possible to create, delivery information & already exists |
643 | Enter organizational data completely |
644 | Deletion not possible, there are still valid assignments |
645 | The assignment exists already |
646 | Delivery info &2 is being processed by &1. (Display only) |
647 | The assignments to &2 &3 &4 are being processed by &1. (Display only) |
648 | Delivery info & is being created |
649 | Delivery infos can only be maintained for header-assigned networks here. |
650 | *************** Selecting/Navigating ********************************** |
651 | Select relationship first |
652 | Select PS text first |
653 | List shows no relationships |
654 | List shows no PS texts |
655 | Last selected element already reached |
656 | Last selected relationship already reached |
657 | Last selected PS text already reached |
658 | First selected element already reached |
659 | First selected relationship already reached |
660 | First selected PS text already reached |
661 | Select element first |
662 | Access to work detail screen not allowed |
663 | No valid activity selected |
664 | No valid element selected |
665 | List shows no components |
666 | Select a material component first |
667 | Last selected component already reached |
668 | First selected material component already reached |
669 | Positioning not possible |
670 | First selected activity already reached |
671 | Last selected activity already reached |
672 | List shows no milestones |
673 | Select a milestone |
674 | Last selected milestone already reached |
675 | First selected milestone already reached |
676 | Select a network first |
677 | List shows no activities |
678 | Activity & is not valid for service |
679 | You can only align with the start or finish date in a network |
680 | You should enter a requirements date |
681 | Requirements date of item & is in the past |
682 | Release date item &1 activity &2 is &3 days in the past |
683 | Purchasing data for component &1, activity &2 is incomplete |
684 | Activity & was not released -> see log |
685 | Network & was not released -> see log |
686 | Delivery date for a purchase requisition is unrealistic -> see log |
687 | Delivery date: Previous working day is the & |
688 | The purchasing data is incomplete |
689 | The data for variable-size parts is incomplete |
690 | No delivery address has been entered |
691 | Maintain the item text |
692 | Enter material and plant |
693 | Purchase requisition &1 item &2 cannot be updated |
694 | Address copied from the goods recipient in the sales document |
695 | The purchasing view for material &1 has not been edited |
696 | Purchase requisition &1 item &2 cannot be deleted |
697 | Enter a G/L account |
698 | Select a line in the overview |
699 | One or more than one activity was not released. See log |
700 | *************** NETWORK (order type 20) ******************************* |
701 | MRP controller & does not exist in plant & (check entry) |
702 | Calculation executed |
703 | Basic work is copied into forecast work because activity is confirmed |
704 | You can only create one document for each transaction |
705 | Purchase req. for activity/element & cannot be generated |
706 | Purchase requisition for material & cannot be generated |
707 | A purchase order already exists for purchase requisition &1 &2 |
708 | No relationships to superior activity & must be created |
709 | Material & is marked for deletion (check) |
710 | Maintain both indicator and date for constraint |
711 | No material components allocated to network |
712 | No detailed data available for text item |
713 | No reservation data for item category & |
714 | No purchasing data for item category & |
715 | No variable-size item data for item category & |
716 | No text item data for item category & |
717 | No material components assigned to activity |
718 | You cannot maintain key & for the constraint |
719 | Address maintenance only for third-party orders |
720 | PS text & text type & for item & copied |
721 | You cannot delete: A relationship is currently locked |
722 | You cannot create a purch. req. because scheduling was not carried out |
723 | WBS element is not valid for project stock |
724 | An MRP-relevant reservation exists for & & |
725 | Enter account assignment category for purc. req/reservation |
726 | Component & & is already released |
727 | Material & only for individual requirements (check entry) |
728 | Enter movement types for project management/networks |
729 | Material & is incompatible with item category & (check entry) |
730 | Enter start date |
731 | Dates copied from project definition & |
732 | Dates copied from WBS element & |
733 | Enter a project definition |
734 | Time interval is greater than duration of activity & |
735 | & is not a workday |
736 | Costs were calculated: See menu Edit -> Costs -> Planned - Actual |
737 | Enter a WBS element |
738 | Error when copying a service package |
739 | Schedule network for cost calculation |
740 | Changed profile data not saved |
741 | Schedule WBS element & for current cost calculation |
742 | Order "&" is not a network. You cannot display |
743 | No valid item selected |
744 | No costing variant; planned costs may have been deleted |
745 | Changes to sales order item can influence requirements planning |
746 | Sales order item & not permitted for ind. customer stock |
747 | Maximum of & days copied as duration of activity & |
748 | No authorization to maintain planned independent requirements |
749 | Error when generating planned independent requirements |
750 | Component & item & was already withdrawn |
751 | Material & is not for planned independent requirements |
752 | Material &: Requirement quantity & smaller than quantity withdrawn & |
753 | There are components that have already been (partially) withdrawn |
754 | Offset not taken into account for manually set requirements date |
755 | An alternative account assignment/stock assignment is not possible |
756 | Item & material &: Reqmnt qty & smaller than GR qty & |
757 | No material components exist for activity & |
758 | No more item numbers available (please check) |
759 | Invalid account assignment category -> check your settings |
760 | Activity & has not been assigned capacity requirements |
761 | Enter currency. Cannot execute unit costing |
762 | Long text for activity & could not be copied |
763 | Long text for alternative & could not be copied |
764 | Purchase requisition for service activity / element cannot be generated |
765 | Long text for element & activity & could not be copied |
766 | Info record &1 flagged for deletion |
767 | Distribution is not taken into account for manual requirement dates |
768 | Procurement indicator and material master settings for & are inconsistent |
769 | WBS element &1 has different inventory valuation |
770 | Errors occurred during processing (see error log) |
771 | Network &1 and project &2 have been summarized in different ways |
772 | &2 was already withdrawn for planned independent requirement &1 |
773 | Restriction: finish date occurs before start date |
774 | Network could not be classified |
775 | No profile for project planning board (maintain network profile) |
776 | Alternatives exist for the standard network |
777 | Object (network, activity, item) is invalid |
778 | Enter network, activity and item |
779 | Planned independent requirement &1 for material &2/&3 no longer exists |
780 | -------Versions---------------------------------------------- |
781 | Version & already exists |
782 | Select version to be processed |
783 | Version was not created |
784 | Select version to be displayed |
785 | Version & is displayed |
786 | Version & is created after saving network |
787 | Project version & is created after saving |
788 | Profile for project version & does not exist |
789 | A project version with key & already exists |
790 | No project versions allowed for network (see profile &) |
791 | No project versions allowed for project (see profile &) |
792 | Project version & does not exist |
793 | Version & deleted |
794 | Project version & deleted |
795 | You do not have authorization to delete all objects of version & |
796 | This version ID is reserved for simulation |
797 | Simulations exist for the network(s) |
798 | Simualtion versions are being processed --> see long text! |
799 | Versions already exist for network &; deletion not possible |
800 | ------ Relationships --------------------------------------- |
801 | Activity "&" does not exist in network "&" |
802 | Network & does not exist |
803 | Invalid relationship type (check entry) |
804 | Relationship is already being processed |
805 | System error when locking |
806 | A network linked by relationships is being processed |
807 | Relationship cannot be deleted, it is currently being processed |
808 | You must also maintain a time unit when entering a time interval |
809 | Enter a time unit, since you have entered either work or actual work |
810 | You must also maintain a unit when entering work |
811 | Profile & does not exist |
812 | Activity & does not exist in network & |
813 | Enter activity number |
814 | Activity & cannot have a relationship to itself |
815 | Standard network has several alternatives. Choose one |
816 | Standard network & & being processed. Rel. cannot be maintained |
817 | Standard network & is locked by user & |
818 | Relationships cannot be maintained |
819 | No work center assigned to successor |
820 | No work center assigned to predecessor |
821 | This relationship already exists |
822 | Error in determining work center for relationship |
823 | Relationship does not exist |
824 | Relationship from & & to & & already exists |
825 | You must also maintain a time unit when entering duration |
826 | Relationship does not exist in document table |
827 | You cannot enter a new external network in change mode |
828 | Start of time interval must not be negative |
829 | Finish of time interval must not be positive |
830 | Enter either a fixed or percentage time interval |
831 | This relationship already exists in the reversed order |
832 | Text does not exist in document table |
833 | Activity not found in database |
834 | No graphic profile maintained in network profile & |
835 | Work cannot be converted into desired unit |
836 | Duration cannot be converted into desired unit |
837 | Relationships betw. activities in different alternatives are not allowed |
838 | Several start/target activities exist |
839 | Start and target activities cannot be identical |
840 | Relationship is being processed with change number & |
841 | Relationship cannot be created without using a change number |
842 | Company code & requires a business area |
843 | Business areas activity & and WBS element & are not identical |
844 | Company code activity & and WBS element & are not identical |
845 | Relationships were created |
846 | You cannot create because network & is not locked |
847 | Dates for network & activity & cannot be locked |
848 | Relationship cannot be created . & is an activity element |
849 | The duration cannot be larger than the maximum duration |
850 | ======== Standard network/network-specific messages ===================== |
851 | Minimum duration must not exceed standard duration |
852 | Activity loses its internal processing character |
853 | Activity loses its external processing character |
854 | You can only enter a cost control key |
855 | Cost control keys are not allowed |
856 | Invalid controlling area & for company code & |
857 | Invalid cost center |
858 | Maintain a work center to calculate duration |
859 | Control key & not valid for services |
860 | Maintain duration and work to calculate number of capacities |
861 | Maintain work to calculate duration |
862 | Maintain duration to calculate work |
863 | Enter units when calculating work or duration |
864 | Problems during conversion work and duration |
865 | Maintain a work center to calculate work |
866 | Control key & is only for service |
867 | Price fixing is only possible in connection with a purchasing info record |
868 | Selected alternative will be deleted when you press Enter |
869 | Standard network already deleted |
870 | Choose another key for alternative; this one already exists |
871 | Standard network & for this key date does not exist |
872 | External processing data missing |
873 | Activity & does not exist in standard network & & |
874 | Standard network & & does not exist |
875 | Standard network & not valid for external number assignment |
876 | Activity/activity element & already exists |
877 | No operating time entered for the work center |
878 | Enter activity quantity and base unit of measure |
879 | Order unit does not correspond with unit from info record |
880 | Data copied from info record |
881 | Number of capacities in activity exceeds capacities in work center |
882 | Long text for alternative & could not be copied |
883 | Maintain pricing unit and currency |
884 | Activity & does not exist |
885 | Activity & is an activity element |
886 | Activity & in network & has no capacity requirements |
887 | Material component & & does not exist |
888 | Problem in forming ITAB with relationships (LNWBTU27) |
889 | Material component & & could not be changed |
890 | Material component & & could not be deleted |
891 | Due to existing assignments milestone & & cannot be deleted |
892 | Milestone & & does not exist and therefore cannot be deleted |
893 | Thze function was called up with incorrect parameters |
894 | The invoicing plan for activity & could not be copied |
895 | The invoicing plan for activity & could not be deleted |
896 | The source for the invoicing plan for activity & could not be found |
897 | The invoicing plan for material component & could not be copied |
898 | & |
899 | Convert matchcode: & |
900 | Service lines for service activity & & cannot be empty |