CNVMBT - Messages for MBT/API/PCL

The following messages are stored in message class CNVMBT: Messages for MBT/API/PCL.
It is part of development package CNV_MBT_MAIN in software component CA-LT. This development package consists of objects that can be grouped under "Main components of PCL for SLO Products".
Message Nr
Message Text
000&1 &2 &3 &4
001Package &1 is not active
002Logs are from a different application
003No log found
004Customer objects successfully copied to productive data
005No domain rules are maintained for package &1
006Job &1 is scheduled successfully
007More than one sender structure assigned to receiver structure &1
008Receiver structure &1 has no sender structure assigned
009Field &1 is not in sender structure &2
010More fields found for parameter &1 in sender structure &2
011No field found for parameter &1 in sender structure &2
012Include &1 for rule &2 not found in CNVMBTINCL
013No data includes (&1) could be assigned to rules (&2)
014Include &1 does not exist in the central system
015Rule &1 not found in include &2
016Structure of the form &1 in include &2 is not correct
017Table & is a cluster table; no check for table contents is made
018Table &1 is empty, No-Data-Flag set
019Table &1 does not exist in the sender system
020Table &1 has wrong table type &2
021Variant &1 for table analysis created
022&1 records copied to table &2
023No substate information exists
024Mass transfer ID &1 created and assigned to subproject &2
025No access plan ID was specified for package &1
026Program is running in expert mode
027No authorization for expert mode
028Expert mode not allowed, program must succeed once
029Action canceled by user
030Include &1 differs in PCL and central system
031Include &1 was changed in central system since creation of subproject
032Activity is still running in a remote system - log could not be shown
033Search terminated in one system, no table assignment is possible
034Project &1 is already defined in the central system
035Subproject &1 is already defined in the central system
036Package &1 synchronized into system &2
037Problems while synchronizing package &1 into system &2
038Project &1 synchronized into system &2
039Problems while synchronizing project &1 into system &2
040Subproject &1 synchronized into system &2
041Problems while synchronizing subproject &1 into system &2
042&1 tables are set to NO-DATA
043&1 tables are set to NO-EXIST
044Masstransfer-Id &1 is already defined in the DTL system
045ERROR: Unknown error occured. The application will be restarted.
046Definition of semaphores does not work (for details see monitor).
047Data / Existence check terminated in one system
048&1 migration objects are set to TRANSFER
049&1 migration objects are set to NO TRANSFER
050Accesplan ID &1 created and assigned to package &2
051At least one user need the admininstrator status in table cnvmbtusr.
052Table &1 does not exist in the receiver system
053Job has been restarted. See new subactivity to determine the state
054No masstransfer ID specified for subproject &1
055Changes after defining convobject &1 will not be considered
056Field &1-&2 has already a rule assigned and will not be overwritten
057Job information not available for the selected job
058No DMC read authorization (S_DMC_S_R) for user &1 in sender system
059No DMC write authorization (S_DMC_S_R) for user &1 in receiver system
060Saving of settings failed, see log via CNVMBTMON for more details
061Data Load is not running, therefore no hold-up is possible
062Hold-up is in process, see long text for further information
063Problems during the synchronization of the FM-ID occured
064Table &1 contains data in the receiver client &2
065Rule &1 is a global rule, all migration objects need to be redefined
066No masstransfer ID specified for subproject
067Package id not in allowed namespace.
068Table &1 contains a not supported table key and could not be handled
069Table &1 contains no data for the specified package number
070Data Selection is not running, therefore no hold-up is possible
071Too many tables with decimal fields, please choose generic key
072Only aborted/failed executions are shown -> to change use filter settings
073Generation of object(s) started, see monitor to get the progress
074Rework-Job is still running, no changes allowed until it's finished
075Rework-Job is still running, see monitor to get the progress
076Changes saved successfully
077Please save changes first before generating objects
078No object is to be generated
079Object &1 is not generated yet > Call troubleshooting to solve problem
080Object &1 is not calculated/filled yet > Call troubleshooting to solve it
081Object &1 is not loaded yet > Call troubleshooting to solve problem
082All objects were loaded successfully
083No object selected -> Please mark objects before
084Table & is a pool table; no check for table contents is made
085Table & is cross-client and therefore is set to NO_EXIST
086&1 objects marked
087Access key check succeeded
088No valid license available
089License only &1 days valid
090RFC Destination &1 unlocked by user &2.
091RFC Destination &1 locked by user &2.
092User &1 has changed RFC Destination &2.
093All objects are active
094Settings saved successfully
095Objects activated successfully
096No connection to destination &1
097Access keys successfully saved
098Access Key not valid for this function.
099Troubleshooter successfully started, check monitor to track the progress
100&1&2&3&4
101Destination to the central system is not created yet
102Destination to the PCL system is not created yet
103Destination to the sender system is not created yet
104Destination to the receiver system is not created yet
105A communication failure occured, please check next line
106A system failure occured, please check next line
107Connection from the sender to the PCL system does not work fine
108Connection from the receiver to the PCL system does not work fine
109Processing was canceled.
110Password of &1 is initial.
111Package &1 is not active in execution system
112Could not change password of RFC Destination &1.
113Destination &1 already exist
114Could not determine project.
115Huge execution history.
116Destination &1 does not exist
117Please enter a package description
118No active package in the execution system
119Package &1 not active in the execution system
120Phase &1 is not active in the execution system -> Synchronize Package
121Dependent package &1 does not exist in execution system
122User-defined activity &1 could not be inserted
123No destination to execution system found
124RFC error in RFC destination &1 with message text &2.
125Rule &1 was changed and will be redefined, check extended monitor
126Active phase was changed from &1 to &2
127Settings with higher value will be reduced when saving the change
128Transaction is already locked by another user
129No Data Transfer Activity found in Package &1
130No ClientCopy-Profil specified
131ClientCopy-Profil &1 does not exist
132Activity &1 does not support the rerun functionality
133Troubleshooting step &1 could not be started within phase &2
134Phase &1 of troubleshooting step &2 differs from active phase &3
135Stepguid not found for package &1
136Package &1 successfully deactivated
137Call Extended Process Monitor to view subactivity status details
138&1 Subactivities / Tasks have been completed successfully
139&1 Tables have been converted successfully
140Call Extended Monitor to get more detaileds about conversion tasks
141Activity &1 is still running therefore package could not be completed
142User &1 confirmed that the activity &2 is finished successful
143User &1 set the status of activity &2 to not yet finished
144Object &1 was changed but is already loaded and will not be redefined
145Objects need to be regenerated (see longtext)
146RFC-Destinations need to be synchronized again (see longtext)
147Client-Copy profil &1 was chosen - settings saved successfully
148Execution target does not support calling WebDynpro applications
149WebDynpro application &1 does not exist in execution target
150URL could not be generated to WebDynpro application
151This transaction is obsolete (read longtext to discover new functions)
152Manual status change performed by user &1
153The status of the activity was changed from '&1' to '&2'
154Activity 'Check Status of Table' gets started now - check monitor
155Log initialization failed
156Writing log to database failed
157Follow-Up-Phase is not allowed to be changed
158No Meta Interface Variant assigned to object &1
159Maintenance of Meta Interface Variant raised an error
160Notes not attented at this point.
161Attachments not attendet at this point.
162No free package number can be found in defined package number range
163Defined package number range is invalid
164Cluster Conversion activity not found in phase &1
165No object found to be reconverted
166Object &1 restored - Object can now be reconverted
167Auto restart not configured for activity &1
168Database updated failed
169Activity start not possible
170Error while reading data extract mode information
171Issue in updating Block status for scrambling
172Parameter to stop data transfer is reset
180No message selected
181No longtext available for selected message
182Message &1 (&2x): &3
183Data checked successfully
184&1 records checked successfully
185Dependent package &1 does not exist in client &2
200New destination settings applied - check connection status
201System Information checks completed.
202System Information checks running...
203Jobs Control checks completed.
204Jobs Control checks running...
205Semaphores Control checks completed.
206Semaphores Control checks running...
207
208No destinations selected - Mark destinations that should be changed
209Action canceled
210RFC Destination checks running.
211RFC Destination checks successfully completed .
212Synchronization started ....
213Synchronization not possible - internal error
214No destination selected
215More than one destination selected. Please mark only one destination.
216Not all rfc destinations are ready for use. (see long text)
217Not all criteria fulfilled to use destinations.
220Definition of destination &1 is not complete. &2 is initial.
221Definition of destination &1 incorrect - connection not possible
222Login data for destination &1 incorrect - check user / password
223Destinations already exists
224Destination ID &1 does not exists.
225Release lower than 700. Not necessary to change pwds with this program.
226Table &1 has no entries for packid &2.
227Table &1 has no entries for destination id &2.
230Subproject &1 is already existing at destination &2
231Package &1 is already existing at destination &2
233Synchronization not possible due to errors in definition or connection
234Synchronization not possible due to non sync. administrative data.
235Sign &1 unknown. Only I and E as values allowed.
250No authority to change rfc destination.
251Function module RFC_READ_R3_DESTINATION send &1.
252Destination ID &1 already exists.
260Could not insert record into table &1 because entry already existed.
300Selected node not found
301Activity not found
302Activity group successfully maintained
303Activity group is initial,enter an activity group.
304No text available
305Select an existing activity group
306Cannot expand the node
307Selected item not found
308Activity group successfully deleted
309Activity group not found
310Enter an activity group to delete
311Same name is maintained for some other process type
312Enter the description
313No activity groups found under selected process type.
314Please maintain the activities.
315Activity group succesfully created
316You do not have required authorizations to change
317Press enter to see assignment of activities to Activity group
318Activity group is not available.
319Activity group & already exists.
320Process type not found for the given scenario
321Database access failed.
322Deletion process failed.
323No activity groups found
324Assignment of activity is done in all the phases
325No package selected
326No package was loaded
327Package could not be loaded - see log
328RFC-User is not a dialog user
329Parameter to stop data transfer is set
331Error in writing/updating the parameter &1
368Migration Object &1 has been skipped from the transfer
370Due to technical restrictions, monitor needs to be restarted
371Subproject &1 still exist.
372Package &1 is still active in subproject &2
373Subproject &1 has no packages
374Expiration date for application logs couldn�t be calculated
375Setting the expiration date failed in destination &1
435Package information inconsistent - missing subproj. or proj. assignment
436Destinations of package &1 deactivated
437Because of package deactivation RFC Management state set to warning
438Unknown error during RFC call
Privacy Policy