CNV_OR_ANA2 - Analysis: Message Class

The following messages are stored in message class CNV_OR_ANA2: Analysis: Message Class.
It is part of development package CNV_OR_ANA2 in software component CA-LT. This development package consists of objects that can be grouped under "Object-based Transformation: Remote Analysis V2".
Message Nr
Message Text
000&1&2&3&4
001Analysis RUN GUID: &1 in &2
002Start &1 analyzing
003Stop &1 analyzing
004Start table analyzing,task number is &2
005Stop table analyzing,task number is &2
006No configuration information
007There are &1 tasks still running
008No table need to be analyzed
009No content need to be analyzed
010No master table need to be analyzed
011There are &1 tables need to be analyzed
012There are &1 table's content need to be analyzed
013There are &1 master tables need to be analyzed
014Create new job for table task &1 failed
017DON'T change reserved parameter
018Analysis is still running; execution stopped
019All analysis data &1 deleted successfully.
020Analysis &1 is running, delete failed
021Creating retention object failed: &1
022System type: &1
023Run GUID: &1
024Content analysis for application table &1 failed
025Start analysis failed because invalid system type
026Start analysis failed because invalid run GUID
027Getting analyzer failed; analysis stopped
028Step execution GUID: &1
029Analysis option: &1
030Task number: &1
031Maximum of jobs set with &1 due to limited free processes in system
032Analysis finished at &1, &2
033Analysis starting at &1, &2
034No analysis configuration in the system; analysis not execute
035Analysis configuration status is invalid; analysis not execute
036&1 results of table analysis have been committed ended with table &2
037&1 results of content analysis have been committed ended with table &2
038&1 results of master data analysis have been committed ended with BO &2
039Wait &1 seconds for parallel jobs of analysis
040&1 results of table analysis failed to commit ended with table &2
041&1 results of content analysis failed to commit ended with table &2
042&1 results of master data analysis failed to commit ended with BO &2
043&1 tables introduced by the content analysis will be analyzed
044&1 tables to be analyzed in &2 job(s) with analysis type '&3'
045&1 is not authorized to execute analysis
046No table to be analyzed for renumbering analysis
047Content analysis for table &1 failed
048No table assigned to current task
049Analysis finished
050Analysis results are missing for below tables
051Table name: &1
052There are &1 tables pre-processed
053Pre-process table task starting at &1 &2
054Pre-process table finished at &1 &2
055Table &1 is detected with runtime error
056Process configuration of invalid numbers failed
057Analysis created for reanalysis with run GUID &1
Privacy Policy