CPWB - General Workbench Messages

The following messages are stored in message class CPWB: General Workbench Messages.
It is part of development package CP in software component PP-BD-RTG. This development package consists of objects that can be grouped under "R/3 Application Development: PP Task Lists".
Message Nr
Message Text
000******************** Selection ******************************************
001No objects found
002Specify selection criteria
003Valid-to date is before valid-from date
004Select at least one object type
005Enter valid-from date
006Enter valid-to date
007Valid-from date and valid-to date must be the same
008Change number does not exist
009EWB: Internal error (Unable to determine short text change number)
010Enter change number
011Select object type
049Call by transaction not supported
050******************* Messages for context ********************************
051Enter a task list type
052Enter task list group
053Enter group counter
054Enter sequence
055There is no corresponding task list in the worklist
056Identify the task list in context
057There is no corresponding operation in the worklist
058There is no corresponding sequence in the worklist
059There is no corresponding material allocation in the worklist
060Enter operation ID
061Enter the plant
062Enter material
063Enter item number
064Enter sales document
065Enter an operation number
066Complete entries in context
067Enter operation number or operation ID
068Task list type invalid for transaction
069Enter item ID
070Enter BOM category and number
071Enter BOM category
072Enter BOM number
073Enter BOM alternative
074Enter BOM usage
076Identify BOM in context
077No corresponding bill of material found in worklist
078No corresponding BOM item found in worklist
079Enter material, BOM number, alternative and usage
100***************** Messages for Effectivity *************************
103The key date must be between &1 and &2
104Enter key date
105Processing date lies outside the validity period
125**************** Messages in "Validity" Block **************************
126Switch to change status of superior object not possible
127Validity window cannot be set as narrow as the key date
128Validity window cannot be set as wide as the selection period
129Assign values to effectivity parameters
130Enter key date
131Components in group mode can only be processed on the key date
150********************** Operation Overview *******************************
151OPeration & is locked
152Select operation
153Reference operation cannot be changed
154Some of the selected operations or sub-oper. are not valid
155You have already reached the last selected operation
156First selected activity already reached
157A referenced operation cannot be changed
158Some of the selected opers. are branch or return operations for sequences
159CAPP execution for routing &1 &2, operation &3 is not possible
160Enter operation
161Do not enter an operation ID if you want to copy more than one operation
162You can only copy sub-operations by multi-level copying operations
163Some columns cannot be changed
164Select columns
165Mass change was cancelled
166Operation was not changed
167Inspection characteristic remains unchanged
168Task list header remains unchanged
169&1 of &2 operations have been changed
170Only locked operations can be classified
171Line hierarchy and work center are not defined in the header
200************************ Task List Overview **************************
202Select header
203No consistency errors were found.
205The last selected header has already been reached
206The first selected header has already been reached
207Some selected headers are not valid on the key date
208Enter task list usage
209Enter task list status
210Enter unit of measure
211Enter plant for task list
212Do not enter a group counter if you want to copy more than one header
213&1 of &2 task list headers have been changed
214Only locked task list headers can be classified
250*********************** Sequence Overview *******************************
251Reference sequence is not suitable
252Select sequence
255The last selected sequence has already been reached
256The first selected sequence has already been reached
257Some selected sequences are not valid on the key date
258Enter sequence category
259Enter return operation
260Enter reference sequence
261A standard sequence cannot have a reference sequence
262Entering a sequence number is not allowed during multi-level copying
263Do not enter a sequence number if you want to copy more than one sequence
264Sequence remains unchanged
300****************** Material Allocation Overview *************************
302Select material-routing allocation
304Some selected material-routing assignments are not valid on key date
305The last selected material allocation has already been reached
306The first selected material allocation has already been reached
307Some material-routing assignments cannot be deleted
308Material & does not exist
350****************** Production Resources/Tools Overview*******************
351Select production resources/tools assignments
352Some selected PRTs are not valid on the key date
353Enter characteristic number
354In the PRT &1 there are assignments to characteristics as insp. equip.
355Select maintenance package
356Select trigger point
357Select relationship
360No corresponding production resource/tool in worklist
361Production resource/tool remains unchanged
362& of & production resources/tools have been changed
370******************** Maintenance Package Overview ***********************
371Select maintenance package
372Some of the selected maintenance packages are invalid on the key date
400************************ Bill of Material Overview **********************
402Select BOM header
405The last selected BOM header has already been reached
406The first selected BOM header has been reached
407Some selected BOM headers are not valid on the key date
412Do not enter an alternative, if you want to copy more than one BOM header
421BOM header has not been changed
422Changing & of & BOM headers
423Variant BOMs can only be changed in group mode
450****************** Inspection Characteristic Overview *******************
452Select inspection chararcteristic
453Select a dependent characteristic specification
454Some selected inspection characteristics are not valid on the key date
455The last selected inspection characteristic has been reached
456The first selected inspection characteristic has been reached
457At least one selected dependent charact. specificat. invalid on key date
458First selected dependent characteristic specification has been reached
459Last selected dependent characteristic specification has been reached
460No corresponding inspection characteristic found in worklist
461Do not enter a charac. no. if you want to copy more than one insp. char.
462&1 of &2 inspection characteristics have been changed
500************************* Item Overview *********************************
502Select item
503Select one item only
504Some selected items are not valid on the key date
505The last selected item has already been reached
506The first selected item has already been reached
511Do not enter an item ID if you want to copy more than one item
520Item has been successfully assigned to the alternative/variant
521Item remains unchanged
522& of & items are changed
532Select subitem
550****************** Object Dependency Overview ***************************
551Select sequence
552Select operation
553Select production resource/tool
554Select item
555The last selected object dependency already reached
556The first selected object dependency already reached
560Enter change number or key date
561Change number not allowed
562A change number is required for processing
563The change number or key date has changed
564Dependencies cannot be edited
600******************Classification Overview********************************
613The change number or key date has changed
650**************** Material Bill of Material Overview *********************
652Select material-bill of material allocation
655Already reached last material-bill of material allocation
656Already reached first material-bill of material alocation
662Select BOM groups
700****************** Component Overview ********************************
701Select operation or enter operation ID in context
702Select item
703Some selected component assignments are invalid on the key date
704Select component assignments
705Last selected component assignment has been reached
706First selected component assignment has been reached
707Component assignments from references cannot be deleted
710Component assignments were created
711Component assignment could not be executed
712Enter operation
713Enter sequence
714You are not authorized to create component assignments
724No corresponding bill of material exists
725You are not authorized to edit the bill of material
750******************** Selection variants *********************************
751Selection variant &1 was created
752Selection variant &1 was loaded
753Selection variant could not be created
754Selection variant could not be loaded
755Selection variant &1 was deleted
756Selection variant could not be deleted
757Selection variant &1 is now the default selection variant
758Settings for selection variants could not be saved
759Selection variant &1 does not exist
760Default selection variant has been cancelled
761Selection variant &1 has been deleted and cancelled as the default
800********************** General Functions ********************************
801You have to save your worklist before you can unlock
802Unlock not possible (lock management error)
803Enter increment
804Position the cursor on a line in the overview
805Select end of block
806Data has been written in a log
807Enter print default and BOM explosion
809Data must be saved before leaving the Engineering Workbench
810Some task lists cannot be changed, since you do not have authorizations
811Some BOMs cannot be changed, since you do not have the authorizations
812Task list requires a history
813Change master record is displayed in new session
814Material master record is displayed in new session
815Production resource/tool is displayed in new session
816Select columns
817The system cannot sort/filter by some of the selected columns
818Document info record is displayed in a new session
820You cannot activate group mode when the browser is open
822Several objects can not be changed because the authorization is missing
823You do not have authorization for material &1 plant &2
824You can not change the task list because of change rule &1 &2
825Valid-from date has incorrect format (&1)
830Internal error when processing a long text
831Long text already exists
832Long text does not exist
833No long text processing possible: &1, &2, &3, &4
851Entry &1 is not allowed for task list type &2
852You are not authorized to process QM data in a task list
853Operation is not a group operation, no changes can be made in group mode
854Marking Obsolete is not possible. This BOM is used in Routing &1
855Marking Obsolete is not possible. This BOM is used in Planning Scope &1
856Marking Obsolete is not possible. This BOM is used as Production Version