CPWB - General Workbench Messages
The following messages are stored in message class CPWB: General Workbench Messages.
It is part of development package CP in software component PP-BD-RTG. This development package consists of objects that can be grouped under "R/3 Application Development: PP Task Lists".
It is part of development package CP in software component PP-BD-RTG. This development package consists of objects that can be grouped under "R/3 Application Development: PP Task Lists".
Message Nr ▲ | Message Text |
---|---|
000 | ******************** Selection ****************************************** |
001 | No objects found |
002 | Specify selection criteria |
003 | Valid-to date is before valid-from date |
004 | Select at least one object type |
005 | Enter valid-from date |
006 | Enter valid-to date |
007 | Valid-from date and valid-to date must be the same |
008 | Change number does not exist |
009 | EWB: Internal error (Unable to determine short text change number) |
010 | Enter change number |
011 | Select object type |
049 | Call by transaction not supported |
050 | ******************* Messages for context ******************************** |
051 | Enter a task list type |
052 | Enter task list group |
053 | Enter group counter |
054 | Enter sequence |
055 | There is no corresponding task list in the worklist |
056 | Identify the task list in context |
057 | There is no corresponding operation in the worklist |
058 | There is no corresponding sequence in the worklist |
059 | There is no corresponding material allocation in the worklist |
060 | Enter operation ID |
061 | Enter the plant |
062 | Enter material |
063 | Enter item number |
064 | Enter sales document |
065 | Enter an operation number |
066 | Complete entries in context |
067 | Enter operation number or operation ID |
068 | Task list type invalid for transaction |
069 | Enter item ID |
070 | Enter BOM category and number |
071 | Enter BOM category |
072 | Enter BOM number |
073 | Enter BOM alternative |
074 | Enter BOM usage |
076 | Identify BOM in context |
077 | No corresponding bill of material found in worklist |
078 | No corresponding BOM item found in worklist |
079 | Enter material, BOM number, alternative and usage |
100 | ***************** Messages for Effectivity ************************* |
103 | The key date must be between &1 and &2 |
104 | Enter key date |
105 | Processing date lies outside the validity period |
125 | **************** Messages in "Validity" Block ************************** |
126 | Switch to change status of superior object not possible |
127 | Validity window cannot be set as narrow as the key date |
128 | Validity window cannot be set as wide as the selection period |
129 | Assign values to effectivity parameters |
130 | Enter key date |
131 | Components in group mode can only be processed on the key date |
150 | ********************** Operation Overview ******************************* |
151 | OPeration & is locked |
152 | Select operation |
153 | Reference operation cannot be changed |
154 | Some of the selected operations or sub-oper. are not valid |
155 | You have already reached the last selected operation |
156 | First selected activity already reached |
157 | A referenced operation cannot be changed |
158 | Some of the selected opers. are branch or return operations for sequences |
159 | CAPP execution for routing &1 &2, operation &3 is not possible |
160 | Enter operation |
161 | Do not enter an operation ID if you want to copy more than one operation |
162 | You can only copy sub-operations by multi-level copying operations |
163 | Some columns cannot be changed |
164 | Select columns |
165 | Mass change was cancelled |
166 | Operation was not changed |
167 | Inspection characteristic remains unchanged |
168 | Task list header remains unchanged |
169 | &1 of &2 operations have been changed |
170 | Only locked operations can be classified |
171 | Line hierarchy and work center are not defined in the header |
200 | ************************ Task List Overview ************************** |
202 | Select header |
203 | No consistency errors were found. |
205 | The last selected header has already been reached |
206 | The first selected header has already been reached |
207 | Some selected headers are not valid on the key date |
208 | Enter task list usage |
209 | Enter task list status |
210 | Enter unit of measure |
211 | Enter plant for task list |
212 | Do not enter a group counter if you want to copy more than one header |
213 | &1 of &2 task list headers have been changed |
214 | Only locked task list headers can be classified |
250 | *********************** Sequence Overview ******************************* |
251 | Reference sequence is not suitable |
252 | Select sequence |
255 | The last selected sequence has already been reached |
256 | The first selected sequence has already been reached |
257 | Some selected sequences are not valid on the key date |
258 | Enter sequence category |
259 | Enter return operation |
260 | Enter reference sequence |
261 | A standard sequence cannot have a reference sequence |
262 | Entering a sequence number is not allowed during multi-level copying |
263 | Do not enter a sequence number if you want to copy more than one sequence |
264 | Sequence remains unchanged |
300 | ****************** Material Allocation Overview ************************* |
302 | Select material-routing allocation |
304 | Some selected material-routing assignments are not valid on key date |
305 | The last selected material allocation has already been reached |
306 | The first selected material allocation has already been reached |
307 | Some material-routing assignments cannot be deleted |
308 | Material & does not exist |
350 | ****************** Production Resources/Tools Overview******************* |
351 | Select production resources/tools assignments |
352 | Some selected PRTs are not valid on the key date |
353 | Enter characteristic number |
354 | In the PRT &1 there are assignments to characteristics as insp. equip. |
355 | Select maintenance package |
356 | Select trigger point |
357 | Select relationship |
360 | No corresponding production resource/tool in worklist |
361 | Production resource/tool remains unchanged |
362 | & of & production resources/tools have been changed |
370 | ******************** Maintenance Package Overview *********************** |
371 | Select maintenance package |
372 | Some of the selected maintenance packages are invalid on the key date |
400 | ************************ Bill of Material Overview ********************** |
402 | Select BOM header |
405 | The last selected BOM header has already been reached |
406 | The first selected BOM header has been reached |
407 | Some selected BOM headers are not valid on the key date |
412 | Do not enter an alternative, if you want to copy more than one BOM header |
421 | BOM header has not been changed |
422 | Changing & of & BOM headers |
423 | Variant BOMs can only be changed in group mode |
450 | ****************** Inspection Characteristic Overview ******************* |
452 | Select inspection chararcteristic |
453 | Select a dependent characteristic specification |
454 | Some selected inspection characteristics are not valid on the key date |
455 | The last selected inspection characteristic has been reached |
456 | The first selected inspection characteristic has been reached |
457 | At least one selected dependent charact. specificat. invalid on key date |
458 | First selected dependent characteristic specification has been reached |
459 | Last selected dependent characteristic specification has been reached |
460 | No corresponding inspection characteristic found in worklist |
461 | Do not enter a charac. no. if you want to copy more than one insp. char. |
462 | &1 of &2 inspection characteristics have been changed |
500 | ************************* Item Overview ********************************* |
502 | Select item |
503 | Select one item only |
504 | Some selected items are not valid on the key date |
505 | The last selected item has already been reached |
506 | The first selected item has already been reached |
511 | Do not enter an item ID if you want to copy more than one item |
520 | Item has been successfully assigned to the alternative/variant |
521 | Item remains unchanged |
522 | & of & items are changed |
532 | Select subitem |
550 | ****************** Object Dependency Overview *************************** |
551 | Select sequence |
552 | Select operation |
553 | Select production resource/tool |
554 | Select item |
555 | The last selected object dependency already reached |
556 | The first selected object dependency already reached |
560 | Enter change number or key date |
561 | Change number not allowed |
562 | A change number is required for processing |
563 | The change number or key date has changed |
564 | Dependencies cannot be edited |
600 | ******************Classification Overview******************************** |
613 | The change number or key date has changed |
650 | **************** Material Bill of Material Overview ********************* |
652 | Select material-bill of material allocation |
655 | Already reached last material-bill of material allocation |
656 | Already reached first material-bill of material alocation |
662 | Select BOM groups |
700 | ****************** Component Overview ******************************** |
701 | Select operation or enter operation ID in context |
702 | Select item |
703 | Some selected component assignments are invalid on the key date |
704 | Select component assignments |
705 | Last selected component assignment has been reached |
706 | First selected component assignment has been reached |
707 | Component assignments from references cannot be deleted |
710 | Component assignments were created |
711 | Component assignment could not be executed |
712 | Enter operation |
713 | Enter sequence |
714 | You are not authorized to create component assignments |
724 | No corresponding bill of material exists |
725 | You are not authorized to edit the bill of material |
750 | ******************** Selection variants ********************************* |
751 | Selection variant &1 was created |
752 | Selection variant &1 was loaded |
753 | Selection variant could not be created |
754 | Selection variant could not be loaded |
755 | Selection variant &1 was deleted |
756 | Selection variant could not be deleted |
757 | Selection variant &1 is now the default selection variant |
758 | Settings for selection variants could not be saved |
759 | Selection variant &1 does not exist |
760 | Default selection variant has been cancelled |
761 | Selection variant &1 has been deleted and cancelled as the default |
800 | ********************** General Functions ******************************** |
801 | You have to save your worklist before you can unlock |
802 | Unlock not possible (lock management error) |
803 | Enter increment |
804 | Position the cursor on a line in the overview |
805 | Select end of block |
806 | Data has been written in a log |
807 | Enter print default and BOM explosion |
809 | Data must be saved before leaving the Engineering Workbench |
810 | Some task lists cannot be changed, since you do not have authorizations |
811 | Some BOMs cannot be changed, since you do not have the authorizations |
812 | Task list requires a history |
813 | Change master record is displayed in new session |
814 | Material master record is displayed in new session |
815 | Production resource/tool is displayed in new session |
816 | Select columns |
817 | The system cannot sort/filter by some of the selected columns |
818 | Document info record is displayed in a new session |
820 | You cannot activate group mode when the browser is open |
822 | Several objects can not be changed because the authorization is missing |
823 | You do not have authorization for material &1 plant &2 |
824 | You can not change the task list because of change rule &1 &2 |
825 | Valid-from date has incorrect format (&1) |
830 | Internal error when processing a long text |
831 | Long text already exists |
832 | Long text does not exist |
833 | No long text processing possible: &1, &2, &3, &4 |
851 | Entry &1 is not allowed for task list type &2 |
852 | You are not authorized to process QM data in a task list |
853 | Operation is not a group operation, no changes can be made in group mode |
854 | Marking Obsolete is not possible. This BOM is used in Routing &1 |
855 | Marking Obsolete is not possible. This BOM is used in Planning Scope &1 |
856 | Marking Obsolete is not possible. This BOM is used as Production Version |