000The allowance plan start date must be earlier than the end date.
001The total assigned quantity (&2) exceeds the allowed quantity (&1).
003&1 assignments created successfully.
004&2 follow up plan(s) for plan &1 created successfully.
006FE &1 is only valid from &2 to &3 and does not match the plan period.
007FE &1 does not have a UUID. This could produce an incorrect hierarchy.
009Force element has not been selected correctly. Please try again.
010FMPO or variant has not been selected correctly. Please try again.
011Follow-up plans for &1 that do not contain a quantity cannot be created.
013Other plan (&1 from &2 to &3) already exists with simliar dates.
014You must enter a quantity to complete plan &1.
020Only specify positive values.
022Plan &1 (FE &2) is not set to complete. Status change is not possible.
023Plan &1 is set to complete.
024Plan &1 created successfully.
030&1 is a mandatory field. Please provide a value.
040You are not authorized to create a plan.
041You are not authorized to change a plan.
042You are not authorized to delete a plan.
050Reset for plan &1 is not possible. &2 assignments still exist.
051Plan &1 was reset. &2 FUPs were deleted.
052Reset for plan &1 failed.
100No evaluation path for usage type &1 exists. Check Customizing.