000 | Creation of a new work package & & & & not possible |
001 | Revision &1 &2 successfully created |
002 | Revision &1 plant &2 changed. See change documents for details. |
003 | No dates are assigned to the revision |
004 | Order(s) locked. Processing was not possible. |
005 | Notification &1 assigned to revision &2, plant &3 |
006 | Revision &1 does not exist in maintenance planning plant &2 |
007 | Notification &1 does not exist |
008 | Revision &1 was deleted |
009 | Update error |
010 | Notification &1 already assigned to (other) revision |
011 | Notification &1 belongs to other functional location than revision |
012 | Unexpected error &1 &2 &3 |
013 | Update of DIWP_DISP table not poss.(work pckges to be displayed per user) |
014 | Remove assignments to notifications and save before deleting the revision |
015 | No revision with assigned notifications found |
016 | Not possible to change the database table &1 |
017 | Error in function module FUNC_LOCATION_HIERARCHY |
018 | Selection successful |
019 | Select just one notification |
020 | Hierarchy of functional locations could not be broken down |
021 | No valid entry found |
022 | Internal error during status handling |
023 | At least one order was not created for rev. &1. See log file for details. |
024 | To create a new tree, enter a functional location |
025 | Select a node |
026 | Selection terminated |
027 | No data import |
028 | Revision &1 of plant &2 saved successfully and without error |
029 | There are no changes to save |
030 | Revision &1 / &2 is locked by user &3 |
031 | First open a revision to which the notifications can be assigned |
032 | An error occurred while editing the Favorites List |
033 | Assignment of notification &1 to revision &2 could not be removed |
034 | Only one entry out of the Favorites List may be displayed |
035 | Save the revision before simulating the order creation |
036 | An error occurred during the database update |
037 | Entry in internal table not found |
038 | An unexpected error occurred |
039 | Filter is deleted |
040 | Select an item from the list |
041 | No details available |
042 | Select notification(s) that should be deleted from the tree |
043 | Select node(s) that should be deleted from the tree |
044 | Assignment of notification &1 to revision &2 (plant &3) was removed |
045 | Status of revision &1 does not allow closure (setting of status 'CLSD') |
046 | Excluded task list: &1 / &2 (Revision &3, Nofification &4) |
047 | Notification &1 is not assigned to a functional location |
048 | Notification &1 does not refer to the task list |
049 | Revision has changed. Save before new simulation. |
050 | Order creation was canceled |
051 | Undefined error during collection of task list information |
052 | No task list assigned |
053 | Revision &1 of plant &2 was incorrectly saved |
054 | Notification &1 was removed from revision &2 |
055 | Notification &1 was added to revision &2 |
056 | All entries are obligatory - enter the required data |
057 | Error removing notification &1 from revision &2 (plant &3) |
058 | Error adding notification &1 to revision &2 |
059 | Error modifying database table DIWPS from revision &1 |
060 | Work center is not consistent with plant of the work center |
061 | Run the simulation before order creation |
062 | Revision &1 not found |
063 | No revision for functional location &1 |
064 | There is no revision with network number &1 |
065 | No revision created by &1 |
066 | No task list to explode |
067 | Error modifying database table DIWPS_CR |
068 | Database table DWIPS_CR successfully modified |
069 | Temporary order &1 may not be displayed in IW33 |
070 | & temporary orders cleared; &1 cannot be cleared due to errors |
071 | Assignments removal for rev. with "exploded" status not currently poss. |
072 | Revision &1 notif. &2 task list &3: order &4 successfully saved |
073 | No temporary orders exist |
074 | Open revision first |
075 | Only table IFLOT will be accepted as value |
076 | Allowed values for the field name are: TPLNR, EQART and TYPBZ |
077 | Entered characteristic is not valid |
078 | An entry for table &1 field &2 already exists |
079 | Revision &1 notif. &2 task list &3: temporary order &4 not saved |
080 | No network was selected |
081 | More than one network selected |
082 | No revision is assigned to the network &1 |
083 | No characteristics/parameters are assigned to revision &1 |
084 | Saving characteristics/parameters for revision &1 failed |
085 | Work center does not exist in specified plant |
086 | You may only choose one parameter per characteristic |
087 | A revision is already assigned to network &1 |
088 | No revision is open for the assignment to network &1 |
089 | Network &1 was assigned to revision &2 |
090 | Characteristics for the revision are already displayed in the tree |
091 | Error in node of the overview tree |
092 | No revision is assigned to the network &1 |
093 | Error detected for Customizing settings (Notification &1) |
094 | Assignment failure: notification &1, revision &2, plant &3 |
095 | Error during assignment to revision &1 maintenance plant &2; (see log) |
096 | Error in task list hierarchy |
097 | Error during creation of orders |
098 | Error during creation of order for revis. &1 notif. &2 task list &3 &4 |
099 | Order for revision . &1 notific. &2 task list &3 &4 successfully created |
100 | Errors occurred during the explosion of the task list |
101 | Hierarchy of functional location &1 could not be exploded |
102 | Entry already exists in database table DIWPS_FAVORITE |
103 | Customizing for Maintenance Event Builder (MEB) not set up correctly |
104 | You may not flag more than one entry as fleet relevant |
105 | Required start time of notification & is before start time of revision |
106 | No notifications selected |
107 | Customer exit not active |
108 | Selected notification does not contain a functional location |
109 | Save before performing this function |
110 | Select one assigned and one unassigned network to reallocate a revision |
111 | Revision &1 could not be reallocated to network &2 |
112 | Revision &1 successfully reallocated to network &2 |
113 | Status(es) of order(s) do not allow deassignment of notifications |
114 | Error reading order status |
115 | No network assigned to revision |
116 | No revision open |
117 | No orders exist |
118 | Order &1 not found |
119 | Status object &1 not found |
120 | Status of object &1 is released or closed |
121 | Error setting status "Do Not Execute" for order &1 |
122 | Revision must be opened first |
123 | Exploded revision contains unexploded notifications. Create orders. |
124 | Orders already exist for task lists |
125 | Status of revision &1 does not allow assignment of notification(s) |
126 | Order &1 exists for revision &2 task list &3 &4 |
127 | Error when saving the orders |
128 | Status of notification &1 does not allow assignment/deassignment |
129 | Status of revision does not allow deassignment of notification(s) |
130 | Allowed values for the field name are: EQART and TYPBZ |
131 | In Customizing transaction DIWPSC3 no dataset is flagged for fleet |
132 | Network &1 was deassigned from revision &2 |
133 | Assignment of network &1 to revision &2 could not be removed |
134 | Status of at least one notification does not allow closure of revision |
135 | Status of at least one order does not allow closure of revision |
136 | Status 'Closed' successfully set for revision &1 |
137 | Status 'Released' successfully set for revision &1 |
138 | Status of revision &1 does not allow release (setting of status 'REL') |
139 | Status of at least one notification does not allow release of revision |
140 | Status of revision &1 does not allow update of orders |
141 | Revision &1 is MEB-controlled and can only be closed by MEB |
142 | Status of at least one functional loc. does not allow closure of revision |
143 | Revision &1 is MEB-controlled: Change of network reference is not allowed |
144 | Revision &1 is MEB-controlled: Setting of time interval is not allowed |
145 | Notification &1 is MEB-controlled: Notification cannot be completed |
146 | Start date lies in the past |
147 | End date is before start date |
148 | Order creation necessary after deassignment of notification(s) |
149 | Deassignment of revision to network is not possible due to order status |
150 | Displayed order data includes any changes not yet saved |
151 | Orders of revision were scheduled successfully |
152 | Orders of revision could not be scheduled |
153 | Change in task list (hierarchy) reference |
154 | Change of task list (hierarchy) reference in notification &1 |
155 | Deassignment of notification &1 not possible due to locked order |
156 | Revision has no functional location assigned, order creation not allowed |
157 | Caution when assigning network &1 activity &2 to order &3 |
158 | Order assignment to network activity prohibited due to status of network |
159 | Order &1 is locked |
160 | Warning was output during assignment of network &1 activity &2 |
161 | Message was written to the log, review log for details |
162 | Order &1 is MEB-controlled and assigned revision &2 &3 is not released |
163 | Assignment of network &1 activity &2 to order &3 prohibited |
164 | Main work center and plant are missing on network &1 |
165 | Order(s) for notification &1 already created |
166 | At least one order could not be released |
167 | At least one order could not be completed |
168 | Work center cannot be updated for revision |
169 | Object &1 is not certified |
170 | Error when trying to access certification of object &1 |
171 | Reducing the confirmed work is not allowed |
172 | Error while saving messages |
173 | Order Was Created Successfully |
174 | Error occured when trying to certify completion |
175 | * Completion certification |
176 | Status of Notification &1 does not allow certification of completion |
177 | Status of operation &1 &2 does not allow certification of completion |
178 | Status of order &1 does not allow certification of completion |
179 | Tasklist (hierarchy) &1 &2 &3 is inactive. No orders created. |
180 | Notification & Is Not Reset |
181 | Completion of notification & is not certified |
182 | Status check for the notification resetting gave a warning |
183 | Notification & reset successfully |
184 | Completion of notification & certified successfully |
185 | Select a processing type (order creation or order assignment) |
186 | Revision table does not exist |
187 | Database conversion not possible for table T352R |
188 | One or more records were not updated in T352R |
189 | Maintain dates manually in client &1 plant &2 revision &3 network &4 |
190 | Network &1 record missing - can't convert client &2 plant &3 revision &4 |
191 | Transaction & could not be deleted |
192 | Select a processing type (order creation or order assignment) |
193 | Assignment of WBS element &1 for order &2 not allowed |
194 | Internal error during assignment of WBS element &1 for order &2 |
195 | Status 'Closed' successfully revoked for revision & |
196 | Revision &1 has status LOKZ |
197 | The planning board does not support the user interface technology & |
198 | Status of revision & does not allow reversal of 'completed' status |
199 | At least one order status does not allow the revision to be released |
200 | * Messages for Hierarchical Task List Builder |
201 | You cannot assign a subordinate task list to a non-hierarchical task list |
202 | Subordinate task list &1 &2 &3 is only valid until &4 |
203 | You cannot remove the top task list in the hierarchy from the tree |
204 | Plant of all task lists for the hierarchy must be &1 |
205 | An error occurred in document tables |
206 | Enter group and group counter |
207 | Task list &1 &2 &3 does not exist (at keydate). |
208 | You cannot view hierarchical task lists |
209 | You can only remove subordinate task list from an unchanged hierarchy |
210 | Selected task list is not configurable |
211 | Hierarchical task list &1 &2 &3 saved |
212 | Task list &1 &2 &3 is not hierarchical |
213 | Task list cannot be inserted |
214 | Enter a piece of equipment |
215 | Enter a functional location |
216 | You cannot set the exclusion flag for the top task list |
217 | Task list &1 &2 &3 is not used in a hierarchy |
218 | You can only create a task list for equipment &1 or a general task list |
219 | You can only create task list for functional loc. &1 or general task list |
220 | Enter a functional location |
221 | Enter a piece of equipment |
222 | The work center exists in more than one plant |
223 | You cannot add a hierarchical task list to this node |
224 | You can only add a hierarchical task list to this node |
225 | Deletion flag for task list &1 &2 &3 is set; function aborted |
226 | Task list &1 &2 &3 is not valid at key date |
227 | Task list cannot be inserted as subord. task list because of recursion |
228 | No usage found for task list &1 &2 &3 |
229 | You cannot insert a task list for a different equipment than &1 |
230 | You can not insert a task list for the functional location |
231 | You cannot insert a task list for the equipment |
232 | You cannot insert a task list for a different func.loc. than &1 |
233 | Selected task list cannot be moved |
234 | No maintenance planning plant specified |
235 | Only task list types &1 and &2 allowed |
236 | You cannot remove selected task list from the hierarchy. |
237 | Task list &1 &2 &3 already exists in hierarchy. |
238 | Task list type, task list goup and group counter are required |
239 | Do you want to jump to the maintenance of non-hierarchical task lists? |
240 | Do you want to cancel the selection of |
241 | operations from |
242 | this task list |
243 | all task lists |
244 | Task list &1 &2 &3 was changed. Insertion not possible. Save first |
245 | Task list &1 &2 &3 is not hierarchical. Dependencies cannot be set |
246 | On key date &1 changes are only possible with change number &2 |
247 | Change number &3 requires &1 &2 &3 to maintain object dependencies |
248 | A change number is required to maintain object dependencies &2 &3 |
249 | Change number &4 is required to maintain task list header data |
250 | At least one screen area must be active |
251 | Status of order &1 does not allow assignment to notification &2 |
252 | Notification & has no technical object assigned |
253 | Status check for assigning notification & returned a warning |
254 | Status check for assigning order & returned a warning |
255 | No order created for message &1. Tasklist &2 &3 &4 is inactive |
256 | Order &1 cannot be archived; revision &2 does not have status DLT |
257 | Order &1 cannot be archived; message &1 does not have status MARC |
259 | Order creation started in transaction &1 by &2 at &3 on &4 |
260 | Order creation ended in transaction &1 by &2 at &3 on &4 |
261 | Status of revision &1 does not allow status LOKZ to be set |
262 | Deletion indicator in revision &1 can be activated |
263 | &1 deletion indicator can be activated |
265 | Start date of network is in the past |
266 | End date of network is in the past |
267 | Order not created for task list &1/&2/&3; see long text for details |
268 | Revision cannot be archived; Status is not DLT |
269 | Revision cannot be archived; notification has not been archived |
270 | Action not allowed since order &1 cannot be deactivated |
271 | Selection variant & does not exist |
272 | Mandatory fields for work center (VAPLZ and VAWRK) not maintained |
273 | Mandatory fields for dates (REVBD, REVBZ, REVED and REVEZ) not maintained |
274 | Maintenance planning plant could not be derived from maintenance plant |
275 | Revision cannot be archived; order has not been archived |
276 | Revision cannot be archived; wait time has not expired |
277 | Choose at least one view of the planning board |
281 | TL/HTL cannot be archived; used in TL/HTL &1 |
282 | TL/HTL cannot be archived; usage checks failed |
283 | HTL cannot be archived; usage checks for subordinate TL/HTL &1 failed |
284 | TL/HTL cannot be archived; used in MPD document &1 |
285 | TL/HTL cannot be archived; used in notification &1 |
286 | TL/HTL does not exist at key date |
287 | TL/HTL cannot be archived; used in maintenance item &1 |
288 | Subordinate TL/HTL reorganized |
289 | Subordinate TL/HTL can be reorganized |
290 | HTL cannot be archived; subordinate TL/HTL &1 used in notification &2 |
291 | HTL cannot be archived; subordinate TL/HTL &1 used in MPD doc. &2 |
292 | HTL cannot be archived; subordinate TL/HTL &1 used in maintenece item &2 |
293 | HTL cannot be archived; subordinate TL/HTL &1 used in HTL |
298 | TL/HTL is locked and cannot be archived |
300 | Revision &1 for plant &2 not found |
301 | Revision &1 of maintenance plant &2 locked by user &3 |
302 | All open revisions for this client will be selected |
303 | Enter your selection criteria |
304 | Status object &1 not found |
305 | Error occurred during tree expansion |
306 | Error occurred during tree collapse |
307 | Only root nodes may be deleted |
308 | Subtree cannot be deleted due to errors |
309 | Only revision objects may be moved |
310 | Notification(s) successfully assigned. See log file for detail |
311 | Inconsistency in notification &1 |
312 | Notification &1 locked by user &2 |
313 | Notification &1 lock error |
314 | Status of order &1 does not allow deassignment of notification &2 |
315 | Deassignment of notification &1 from revision &2 not allowed |
316 | Error occurred in buffered cross-reference table |
317 | Revision &1 / plant &2 already released |
318 | Notification &1 not MEB-controlled |
319 | Notification &1 out of timeframe of revision &2 / plant &3 |
320 | Order & created for task list & in revision & |
321 | Error creating order for task list &1 &2 &3 in revision &4 |
322 | Revision &1 has been changed. Change/display of revision not possible |
323 | Revision contains unsaved orders. No create/change of revision possible |
324 | Network &1 already assigned to (other) revision |
325 | Assignment of revision to network is not possible due to order status |
326 | No order created for tl &1, exclusion set in parent task list &2 &3 &4 |
327 | Maintenance plant is not valid |
328 | Number range for plant &1 has reached critical interval |
329 | Data to create a revision is incomplete. Try again |
330 | Planning plants of task list (hierarchy) and revision are different |
331 | Notification(s) successfully deassigned. See log file for details |
332 | Could not assign network &1 to revision &2 |
333 | Order(s) assigned to network activities. See log for details |
334 | Completed revisions may not be changed |
335 | Enter a value for the maintenance planning plant |
336 | Enter a value for the revision |
337 | Entered selection criteria inconsistent |
338 | Planning plant of notificatn &1 is different from revision planning plant |
339 | Network &1 not assigned to any revision |
340 | More than one revision has been selected |
341 | Order &1 is MEB-controlled -> no notification assignment possible |
342 | No operation was selected for task list & & &, therefore no order created |
343 | Content of notification field '&1' differs from notification: &2 |
344 | Order data could not be determined. Details in revision log file |
345 | Order &3 not assigned to network &4. Customizing entry required |
346 | Order(s) not assigned due to missing customizing. See log file |
347 | Select one revision node |
348 | Select one or several revision nodes |
349 | Order type not maintained for revision type & |
350 | Maintain revision work center and the plant |
351 | Revision dates are not maintained |
352 | Revision short text is not maintained |
353 | Order &1 locked by user &2 |
354 | Notification &1 is not assigned to revision &2 / &3 |
355 | Assignment to project not unique for order & |
356 | Revision &/& does not have a network or WBS element assigned |
357 | Multiple revisions exist with the external reference & |
358 | No revision with external reference & exists |
360 | Order still assigned, deletion of revision & / & not allowed |
361 | Business transaction &1 not allowed for revision &2 / &3 |
362 | A warning occurred when executing business trans. &1 for revision &2 / &3 |
363 | Notification &1 cannot be reset due to status |
364 | Select one notification node |
365 | Equipment of notification &1 is not installed in tech. object of revision |
366 | Notification Status Does not Allow Order Creation for Message &1 |
367 | A revision cannot be assigned to a WBS element and a network |
368 | No new orders created for revision &1/&2 |
369 | Malfunction start in notification & not defined => Deferral not possible |
370 | Enter either functional location or equipment |
371 | Order was not created because task list is not included. See Log. |
372 | Order has not been created because of tasklist exclusion |
373 | Message output during processing; see revision log |
374 | No revisions selected |
375 | Job to schedule revision &1/&2 created |
376 | Start/end of revision &1/&2 violated |
377 | &1 object(s) set to status LOKZ |
380 | >>> Emergency Order Creation Start (&1/&2/&3)! |
381 | <<< Emergency Order Creation End (&1/&2/&3) ! |
400 | *** AUTHORIZATIONS *** |
401 | No authorization for assignment of notification from revision & / & |
402 | No authorization for deassignment of notification from revision & / & |
403 | No authorization to create orders for revision &/& |
404 | No authorization to release revision & / & |
405 | No authorization to complete revision & / & |
406 | You do not have authorization to change revision &/& |
407 | You do not have authorization to create revision &/& |
408 | You do not have authorization to schedule revision &1/&2 |
409 | No authorization for project assignment of orders for revision &1/&2 |
410 | Not all notifications selected - no authorization for tech. object |
411 | Not all revisions selected due to lack of authorization for tech. object |
412 | No authorization for complete data: Cannot change revision & |
413 | No authorization group for tech. object: Cannot assign notification & |
414 | No auth.group for tech.object: Cannot remove assignment of notification & |
415 | No dis./chng auth.for complete data; partial data in revision & selected |
416 | Action canceled |
417 | Not all revisions selected dueto lack of authorization for planning plant |
420 | Order &1 for message &2 was assigned to revision &3, plant &4 |
421 | Assignment of order &1 for message &2 to revision &3, plant &4 deleted |
422 | Message &1 is not assigned to a revision |
423 | At least one order was not created |
424 | Release the order before certification |
430 | Status does not allow order generation for message &1 |
500 | BAdI implementation & does not exist |
501 | Status of revision &1 does not allow deletion |
503 | >> WPS2 parallel processing started by: &1 at: &2 on: &3 << |