DPR_CALC - cProjects Costing Integration

The following messages are stored in message class DPR_CALC: cProjects Costing Integration.
It is part of development package FINR3_CPROJECTS in software component CO. This development package consists of objects that can be grouped under "cProjects/CO Integration".
Message Nr
Message Text
000&1 &2 &3 &4
001The system could not determine the active plan version
002Cost/revenue rate &1: organizational unit &2 does not exist
003Currency &1 does not exist
004Cost/revenue rate &1, &2: currency or unit of measure is initial
005Cost/revenue rate &1, &2: currency &3 does not exist
006Cost/revenue rate &1, &2: unit of measure &3 does not exist
007Data has been edited already by &1
008Cost/revenue rate &1 is not valid in organization &2
009Maintain an activity type for cost/revenue rate &1
010Maintain a revenue element for cost/revenue rate &1
011Maintain a cost element for cost/revenue rate &1
012Internal order &1 for the project &2 is currently locked
013Internal order &1 for the project &2 could not be saved
014There is no internal order for project &1
015Cost/revenue rate &1, &2: inconsistent data record (fields PLVAR, OTYPE)
016Cost/revenue rate &1, &2: incorrect plan version
017Check the messages for the order &1
018No cost center could be determined for organizational unit &1
019No cost/revenue rate has been assigned to &1 "&2"
020Internal error: Calling costing leads to exception
021Internal order &1 does not contain a costing variant
022No costing variant exists in controlling scenario &1
023No organizational unit has been entered in the project
024No active plan version could be determined for organizational unit &1
025Input data is incomplete for organizational unit &1
026Archiving: Wrong call for selecting costing data
027Archiving: No costing was found
028Archiving: Costing search produced unexpected result
029Costing is locked - no changes are possible
030No account assignment exists for the project definition - no costing
031Start/finish dates &1 &2 do not match start/finish dates of the project
032No cost/revenue type: Check costing log in ERP
033No cost center could be determined for the account assignment element &1
034Internal order &1 for the project &2 could not be read
035Costing for the project &2 could not be saved
036Project &1 is unknown in Accounting
037Cost element &1 in the controlling area &2 does not exist
038Rollback: Account assignment must be reset
039PS project &1 for the project &2 is currently locked
040Ctrarea &1: Activity type &2 (fr.&3) does not contain an alloctn cost el.
041Internal order &1 for project &2: Costing cannot be deleted
100Execute test run
101Data import is not possible
102Display import details
103Display result details
104&1 log entries deleted
105Enter a value in every parameter
112Program was terminated - qualification T77S0->PLOGI/QUALI
113System table checks were successful
114Program was terminated by user
115Personnel numbers must be selected for processing
Privacy Policy