EMSG_MICRO_BR -

The following messages are stored in message class EMSG_MICRO_BR: .
It is part of development package EE_LOCAL_MICRO_BR in software component FI-LOC-UT. This development package consists of objects that can be grouped under "Brazilian Micro Generation".
Message Nr
Message Text
000Please specify at least one generation role.
001Please specify at least one generation role for Group Compensation.
002Please specify at least one consumption role for Group Compensation.
003Please specify valid 'from' and 'to' dates for the compensation relation
004& of instln & is not in installation group & for compensation contract &.
005This sequence num is already used for the period specified for group &
006Duplicate sequence number within the TOU group &. Please check.
007'Valid-to' date before the specified 'Valid-from' date. Please check.
008Incorrect Configuration
009Please enter values for all required fields.
010&1 is not a Global TOU Code.
011Please enter all the fields required for &1.
012&1 is not a Generating/Consuming Contract or not defined for Priority.
013Multiple operations within the same transaction is not supported.
014&1 can't consume &2 quantity for &3 TOU Code and &4 Allocation Date.
015Credit already closed for contract &1,TOU code &2,and allocation date &3.
016Credits already closed for the given selection.
017No data found for the given selection.
018This action cannot be performed. Tr. num &1 already reversed.
019Remaining credits cannot be less than zero.This action cannot be perfomed
020No credits available for transfer in contract &1 Alloc.Date &2 and TOU &3
021Please select a valid activity type.
022Database updated successfully.
023Action cancelled : Database not updated
024No records found for given currency. Please check.
025Source and Target TOU specified is same. Please check.
026Source and Target Contract specified is same. Please check.
027Price for target tou &1 for contract &2 on allocation date &3 not found.
028&1 is already defined as generating role for contract &2.
029Only All Old First is selected for contract &1. It is not valid.
030&1 is not a primary contract.Group compensation can not be defined.
031For self compensation contract, only one relationship can be maintained.
032Generating or Consuming Contract should be same as Compensation Contract.
033&1 is not a generating contract. &2 is not defined as generating role.
034All credits already closed for Target Contract.
035Comensation can't be proceed,&1 is not an active compensation contract.
036&1 is not a valid unit of measurement
037&1 is not a valid currency.
038&1 is a primary contract.Self compensation can not be defined.
039Contract &1 is not defined for Brazil.
040The number range number could not be found for the object 'ENUMRGE_BR'.
041The specified number range number interval is not internal.
042A number range object 'ENUMRGE_BR' was not defined.
043The number of numbers requested must be greater than zero.
044Only one number can be drawn at a time in buffering method 'local file'.
045Interval used up. Change not possible
046Puffer Is Full
047Unknown exception occured while generating transaction number.
048Manual reversal not supported for Trans. No &1���
049Data can not be Saved. Priority is not defined for some relationships.
050&1 has a primary contract.Self compensation can not be defined.
051Gen. contract is not relevant as tran. no. &1 linked to act type 05 or 06
052Valid From "&1" is greater than Valid To "&2".
053Please enter transanction number.
054No item selected. Please select items to be deleted.
055No entries to close which are older than 36 months from &1 for &2.
056Action Cancelled.
057Contracts given are not valid or not defined for priority.
058If price is to be specified, please specify both source and target prices
059Remaining credits cannot be less than zero. Tr.No &1 cannot be reversed.
060Selected transactions cannot be reversed.
061Multiple currencies are not supported. Please check the master data.
062No item selected. Please select transactions to be reversed.
063Error during database update.
064Please enter Billing document number.
065Reverse billing document number is empty.
066Multiple units are not supported. Please check the master data.
067Enter the transaction number.
068No data exists!
069Please enter the &1 Generating/Consuming Contract
070Please enter the allocation date.
071Please enter the &1 Global TOU
072Please enter the consumption units.
073Please enter the measurement unit.
074Please enter the price amount.
075Please enter the currency details.
076Hit 'Enter' to upload the data from file before proceeding with execution
077Please enter the file path.
078Please provide document in xls or xlsx format.
079Verify the entries and confirm using "Update database" button.
080Variant operation terminated.
081Variant selected.
082Variant Not saved.
083Variant has been saved.
084Action not performed on few entries.Please check the message log.
085Invalid activity type.
086Price amount cannot be negative.
087Allocation date is less than the move-in date.
088&1 is already defined as consuming role for contract &2.
089Valid Period is overlapping for relationship between &1 and &2.
090Allocation date is greater than move-out date.
091Allocation date is greater than current date.
092Transf. not possible for contract &1 in this execution.
093Credits are already closed for Contracts. Please reverse those manually.
094No data to transfer from source &1 to target &4 from alloc date &2 to &3.
095Billing activity types 01,02,03 cannot be reversed manually.
096No entries to close which are older than 36 months for given selection.
097No billing document exists for selected entry.
098Entered billing documents are either reversed or not valid.
099No relationships exists for given generating contracts on key date &1.
100No global TOU code is specified for operand &1 in billing rate &2.
101No global tou codes are defined in customizing table.
102&1 is not a valid Global TOU Code for operand &2 in billing rate &3.
103&1 is not a valid Global TOU Code.
104Enter values for selection.
105Quantity balance table: preparation duplicated for contract &1 TOU &2.
106Vertrag &1 provides negative quantity for TOU &2 im Zeitraum &3 bis &4.
107Compensation cannot be carried out between different currencies.
108Compensation cannot be carried out between different measurement units.
109Vertrag &1 provides invalid amount for TOU &2 im Zeitraum &3 bis &4.
110Different price amounts - no aggregation for contract &1 TOU &2
111No relationship exists for this primary contract.
112Primary Contract &1 cannot be maintained as Consuming Contract.
113Contract &1 is not moved-in till &2. Please specify "Valid From" date.
114Sum of TOU: &1's Distribution is more than 1 for contract &2
115Sum of TOU &1's Distribution should be 1 for the contract &2
116Correct the TOU Distribution Proportion for the contract &1
117TOU Distribution Group is not maintained for the contract &1
118TOU Distribution Group &1 does not have "Comp.Relationship" maintained
119Self Compensation contract &1 can't have "only distribute" check box set
120Distribution Proportion should be in the range of 0 to 1
121TOU Distribution group should not be maintained for the Consumption &1
122Reversal cancelled for the billing &1, Consumption Billings should be rev
123Contract &1 is not maintained in the compensation configuration
124Please maintain the credit validity in the table EVALIDITYMNTH_BR
125&1 is already maintained as a generating contract .
126Variant BRCOMIMP must be used 1st to create Consumption Qty Balance Table
127Only distribute and Self compensate first can not be set together for &1
128Self Compensation and Distribute first can not be set together for &1
129Sum of TOU: &1's Distribution should be exactly 1 for contract &2
130For "Only Distribute" option, Self distributed energy should be ZERO
131Please check the time slice of &1
132Please maintain the consistency between time slices
133Start processing DB table &1; migration of Distribution Proportion field
134DB table &1 not expected to be migrated; process skipped to next table
135DB table &1 with key &2 and value '&3' is locked by user &4
136SQL injection error - dynamic access to table &1 field &2
137SQL injection error - database table &1 not expected
138An error occurs in SQL statement; not possible to select from DB table &1
139Number of selected lines from DB table &1: &2
140Line key: '&1' - Cannot be updated; new field not empty (&2)
141Line key: '&1' - New field copied from old (&2)
142An error occurs in SQL statement; not possible to update DB table &1
143Total updated Distribution Proportion fields in DB table &1: &2
144Select at least one DB table for migration
145Old field &1 not found in DB table &2; migration not needed.
146New field &1 not found in DB table &2; migration not possible
147Migration cancelled.
148Migration completed successfully.
149All existing values will be replaced. Continue?
150Proportion cannot be greater than 1. Migration failed for contract &1.
151Line key: '&1' - Cannot be updated; Proportion greater than 1 (&2).
152Simulation completed successfully.
153Requested credits greater than available credits (&1).
154If 'Credits' is filled, &1 cannot be blank.
155If 'Source TOU' is filled, &1 cannot be blank.
157Only one configuration of Expiry days can be active.
158Generator(s) is not yet billed, billing of contract &1 canceled.
159Generator(s) bill is outsorted, billing of contract &1 canceled.
Privacy Policy