FINOC - Organizational Changes: Backend Messages

The following messages are stored in message class FINOC: Organizational Changes: Backend Messages.
It is part of development package FINS_ORGL_CHANGE_BACKEND in software component FI-GL-REO. This development package consists of objects that can be grouped under "Organizational Change Backend Logic".
Message Nr
Message Text
001&2 job is currently running.
002&1 already processed. Object list can't be changed in production system.
003&1 is already completed. The object list can't be changed.
004&1 is already completed. It can't be activated again.
005Internal Error: Job started with job type &2 and ended with job type &3.
006&1 is already completed. It can't be processed again.
007&1 is already completed. It can't be set to complete again.
008&1 hasn't been processed. It can't be set to complete.
009&1 is already processed. It can't be activated again.
010&1 was successfully processed.
011&1 was successfully simulated.
012There's no simulation ledger. So, no data was processed for &1.
013Simulation started for &1.
014Processing started for &1.
015Activation started for &1.
016&1 was successfully activated.
017Completion started for &1.
018&1 was successfully completed.
019You aren't authorized to create organizational change &1.
020Cannot activate and simulate at the same time. Select only one action.
021Activation for orgl change &1 was finished with errors.
022Processing for orgl change &1 was finished with errors.
023Simulation for orgl change &1 was finished with errors.
024Completion for orgl change &1 was finished with errors.
025Unknown job type &1.
026WBS element &1 is assigned to asset &2. Orgl change isn't possible.
027The new profit ctr &2 and WBS element &3, have different company codes.
028The runtime table for WBS elements cannot be filled.
029Transfer postings for company code &1 and ledger &2
030Transferring AP/AR open items for company code &1 and ledger &2.
031WBS element &2 is included in orgl change &1, which is incomplete.
032Simulation run for orgl change &1 was finished with warnings.
033Enter a new profit center that is different than the old profit center.
034WBS element &1 is assigned to purch. order &2. Orgl change not possible.
035WBS element &1 isn't a billing element.
036No extension ledger with the correct type exists.
037There are missing document splitting characteristics for controlling.
038&1 and &2 are missing document splitting characteristics for CO.
039Profit center &2 for project &1 is locked.
040WBS element &4 is in orgl change &1 with eff. date on or after &3.
041&1 is missing document splitting characteristics for controlling.
042Activation run for orgl change &1 was finished with warnings.
043Can�t process orgl change &2 before effective date &1 in prod. systems.
044Orgl change &2 is &1. Only inactive orgl changes can be deleted.
045You aren't authorized to change profit center &1 for WBS element &2.
046Profit center &2 for billing element &1 doesn�t exist or is invalid.
047Internal Error: Simulation ledger must be supplied.
048Orgl change &2 is &1. Only incomplete orgl changes can be updated.
049Organizational change &1 has neither WBS elements nor projects to process
050Processing run for orgl change &1 was finished with warnings.
051Organizational change &1 couldn't be completed. Please process again.
052Organizational change &1 couldn't be completed. Please process again.
053Organizational change &1 couldn't be completed. Please process again.
054Organizational change &1 couldn't be completed. Please process again.
055Organizational change &1 couldn't be completed. Please process again.
056&1 journal entries were posted.
057You aren't authorized to simulate organizational change &1.
058You aren't authorized to process organizational change &1.
059You aren't authorized to activate organizational change &1.
060WBS element &1 doesn't exist.
061Project &1 doesn't exist.
062Organizational change &1 has special characters, which aren�t allowed.
063Project &1 isn't an internal project or a customer project with revenue.
064The new profit center is the same as the old profit center (&1).
065Profit center &2 for project &1 doesn�t exist or is invalid.
066Project &3 is included in orgl change &1 with eff. date on or after &4.
067Project &1 is included in orgl change &2, which is incomplete.
068You aren't authorized to change profit center &1 for project &2.
069Profit center &2 for project &1 is locked.
070Profit center &2 for WBS element &1 is locked.
071Profit center &2 for WBS element &1 is locked.
072Enter an organizational change name.
073Internal Error: Ledger/company code (&1/&2) combination isn't valid.
074Internal Error: Organizational change &1 doesn't exist.
075Transfer posting for open item assigned to CO: JE &1/&2/&3 created.
076Transfer posting for open item assigned to MAT: JE &1/&2/&3 created.
077Transfer posting for open item assigned to CO: &1 journal entries.
078Transfer posting for open item assigned to MAT: &1 journal entries.
079Completion run for organizational change &1 was finished with warnings.
080Transfer posting for open items assigned to &4: JE &1/&2/&3 created.
081Transfer posting for open items assigned to &2: &1 journal entries.
082No simulation ledger exists for ledger &1 and company code &2.
083Internal Error: No package selection specified or format isn't supported.
089Transfer postings are missing. Organizational change can't be completed.
090Transfer postings were created for ledger &1.
091The project of WBS element &1 has not yet reached status '&2' or higher.
092The project &1 has not yet reached status '&2' or higher.
093Enter a posting date for organizational change &1.
094The new profit center is the same as the old profit center (&3).
095Profit center &3 for sales order &1/sales order item &2 is locked.
096Sales order &2/sales order item &3, is already in orgl change &1.
097Sales order &3/&4 is in orgl change &1 with later or same eff. date.
098Sales order &1/sales order item &2, doesn't exist.
099Profit center &3 for sales order &1/sales order item &2 is invalid.
100Enter an effective date.
101The new profit center is the same as the old profit center (&1).
102Orgl change &1 is completed. Reorganization isn't possible.
103Sales order &1/sales order item &2, has cost object assignment.
104Source product &3/plant &4 is invalid. Orgl change isn't possible.
105Current profit ctr &4 differs from manually-entered old profit ctr &3.
106Orgl change &1 is completed. Reorganization isn't possible.
107Field &1 from finoc_rule_soi standard view isn't in customized view &2.
108Sales order/item &1/&2 has invalid source product/plant &3/&4.
109Sales order/item &1/&2 has invalid profit ctr derivation source type &3.
110Clearing info is missing. Organizational change can't be completed.
150-------------------- Master Data Change --------------------
151&1 &2 &3: Settlement rule cannot be changed.
152&1 &2 &3: Profit center in settlement rule is different.
153Updated WBS element master data for company code &1.
154Updated sales order master data for company code &1.
155Organizational change &1 couldn't be completed. Please process again.
156Organizational change &1 couldn't be completed. Please process again.
157The master data changes were caused by an organizational change.
158Purchase order &1 item &2 cannot be locked.
159Project &1 cannot be locked.
160Organizational change &1 couldn't be completed. Please process again.
161Product master for product &1 and plant &2 is locked.
162Production order master for order &1 with type &2 is locked.
163You aren't authorized to change master for product &1 and plant &2.
164You aren't authorized to change order master for order &1 with type &2.
201Activation job has been scheduled for &1.
202Processing job has been scheduled for &1.
203Completion job has been scheduled for &1.
204Simulation job has been scheduled for &1.
205Activation job couldn't be scheduled for &1.
206Processing job couldn't be scheduled for &1.
207Completion job couldn't be scheduled for &1.
208Simulation job couldn't be scheduled for &1.
209Organizational change &1 is locked.
210Updated purchase order master data for company code &1.
211Updated project master data for company code &1.
212You can't edit orgl change &1 because it's locked by &2.
213Job for orgl change &1 couldn't be started because it's locked by &2.
214You can't edit orgl change &1 because a background job is running.
215Updated customer project master data for company code &1.
216Updated internal project master data for company code &1.
217Updated product for company code &1.
218Updated production order master data for company code &1.
250------------------ Accounting Interface, Postings
251Transfer posting with &1/&2/&3, in orgl change &4, can't be reversed.
252Transfer posting for WIP in projects: Journal entry &1/&2/&3 created.
253Transfer posting for WIP in projects: &1 journal entries created.
254Transfer posting for WIP in WBS elements: Journal entry &1/&2/&3 created.
255Transfer posting for WIP in WBS elements: &1 journal entries created.
256Transfer posting for product inventory: Journal entry &1/&2/&3 created.
257Transfer posting for product inventory: &1 journal entries created.
258Transfer posting for WIP on production orders: JE &1/&2/&3 created.
259Transfer posting for WIP on production orders: &1 journal entries.
260Posting period &1 &2 isn't open for company code &4 and ledger &3.
261Company code &1 is already processing.
262&1 &2
300Only one document type can be added for transfer postings.
301Only one entry for COA &1 allowed when account range isn't specified.
302"Account Number to" is less than "Account Number from".
303Entries for chart of accounts &1 have overlapping account ranges.
304Enter �Account Number to� for chart of accounts &1.
305Enter an account for chart of accounts &1.
306Chart of accts &1 has identical entries with and without acct ranges.
307Assign a document type for transfer postings.
351Document quantity is negative. Please contact SAP.
352There�s no posting key for transaction key &1.
650------------------- Staging
651Jobs for organizational changes can't run at the same time.
652Internal Error: Staging isn't active. Contact SAP.
653Internal Error: Staging is active. Contact SAP.
654Internal Error: Staging wasn't processed after activation. Contact SAP.
655Object &3 with type &2 wasn't processed by organizational change &1.
656Internal Error: Staging in PO listener wasn't run. Contact SAP.
657Internal Error: Staging in WBS listener wasn't run. Contact SAP.
658Orgl change &1 is running at same time as orgl change &2.
700-------------------- Notifications
701Simulation successful
702Simulation failed
703Activation successful
704Activation failed
705Processing successful
706Processing failed
707Completion successful
708Completion failed
709Organizational Change
710Orgl Change
801Hierarchies aren't supported by the database system.
802Product &1 doesn't exist. Please check your entry.
803Product &1 for plant &2 doesn�t exist or is invalid. Please check entry.
804Profit center &3 for product &1 doesn't exist.
805Product &1 and profit center &3 have different company codes.
806The valuation area for the product must be the plant.
807Product &2 is included in orgl change &1, which is incomplete.
808Product/plant combination (&3/&4) is included in orgl change &2.
809The new profit center &3 for product &1 and plant &2 is locked.
810The old profit center &3 for product &1 and plant &2 is locked.
811Enter a new profit center that is different than the old profit center.
812
813Can't change profit center. WBS element &1 is part of orgl change &2.
814Can't change profit center. Project &1 is part of orgl change &2.
815Can�t change profit center for product/plant combination &1/&2.
816Errors occurred during &2 for organizational change &1.
Privacy Policy