000& & & &
001(Error in) routine &: & = '&' not defined
002(Error in) routine &: no entry in internal table & for key &
003(Error in) routine &, selection text: & & &
004Internal error in macro &: parameter & = '&' is not defined
005(Error in) module &: no entry in internal table & for key &
006(Error in) function module &: exception &
007(Error in) macro &: & = '&' not defined
008(Error in) macro &: no entry in internal table & for key &
009(Error in) routine &: SY-SUBRC = & at &
010No more numbers can be assigned internally for this program
011You cannot use function '&' in results analysis
012The memory import under ID & contains errors
013Period was reset from & to & (the maximum value allowed)
014Internal period & < 1
015Results analysis document has more than 1000 items
016The system could not issue a results analysis document number
017(Error) No entry in Table & for & = &
018Header for results analysis documents missing
019(Error in) routine &: parameter/field & is not released
020Program error &: notify your system administrator
021Internal error: & & & &
022Name set for dynamic line IDs is exhausted
023Specify only one company code for this currency
025&&&&
099This item does not exist - check your entries
100Order & does not exist. Check the order number
101WBS element & in project & is not released for billing
102WBS element & does not exist. Please check your entries
103Order & is flagged for deletion. WIP or results analysis not possible.
104& & contains results analysis data and is assigned to & &
105RA must be carried out on sales order & & using the assigned project
106Sales order & does not exist. Please check the order number
107Item & for sales order & does not exist. Please check the item number
108Please enter an item number
109Order items are assigned to different sales orders or projects
110The order is assigned to both a sales order and a project
111The sales order item is not specified in the order
112Results analysis data is calculated through sales order & &
113Sales order & does not exist. Please check the order
114Item & for sales order & does not exist. Please check the order
115Order belongs to WBS element &. RA calculated through WBS element &
116WBS element & does not exist. Check the order
117Results analysis version & canceled. End indicator set to "D"
118Line ID &: Planned quantity but no planned value
119Order & is assigned to a cost object hierarchy with cost object &
120No WIP at actual cost allowed in Product Cost by Period
121WBS element & is neither an external nor an internal billing element
122The fixed price version (&) must differ from the actual version (&)
123Plan version (&) for valuation must differ from fixed price version (&)
124Order & does not exist. Check the order number
125Order & has no cost collector and will not be processed
126Order & is flagged for deletion and cannot be processed
127& & belongs to company code &. Actual data ignored
128Unit of measure & (object) <> & (master). Check statistical key figure &
129RA data only updated in controlling area currency
130RA data exists in company code cur. but this cur. is not calculated
131Object not converted, but company code currency = CO area currency
132Object not converted: No editing in company code currency
133Run schedule header with multiple positions cannot be processed
134Material &: active cost estimate has no cost element plan
135Run schedule header is assigned to sales order or project
136This item has a separate cost collector
137No item -> valuation type undefined
138WBS element & is flagged for deletion - no results analysis possible
139Project & is flagged for deletion
140Collective order & is activity-assigned
141Cross-company valuation with transfer to FI not possible
142Results analysis only for main items
143There is no higher-level item & for item &
144Item & is part of a circular structure
145Item & (&) and item & (&) have different currencies
146The leading order & of the collective order does not exist
147Item & also has a results analysis key (sales order structure = K)
148The order is not a WIP element
149& & is not assigned to any WBS element. Actual will not replace plan
150Error in job scheduling: Function K_BATCH_REQUEST, return code &
151Please schedule background processing with "Execute" function
152The object has the status "Closed"
153& & belongs to business area &: actuals ignored
154Work in process is calculated on the items of the order
155With internal billing elements RA data only in profit center valuation
156Specify up to 25 accounts for simulation "posting to FI"
157No results analysis possible for &1 for objects of type &2: &3
158WBS el. & (level &) is not higher-level WBS el. & (level &)
159Also select the switch "Automatic"
160Cannot save. Eliminate causes of W messages
161There are values for cost element & that are not assigned to any line ID
162WIP calculation not possible for objects of type &1: &2
163Check cross-business-area valuation in results analysis version
164&3 &4 already has results analysis data
165Choose RA period &1 >= starting period &2 from customer enhancement 7
166Customer enhancement 7: use only time frame " " (blank)
167Customer enhancement 7: use only "End" indicator E
168Customer enhancement 7: use only cutoff period D
169With profit basis &1, use only RA type E
170Profit basis &1: Enter a line ID for revenue in the valuation method
171Item &1: Enter the time-based parameters in the billing plan
172Use valuation basis &1 only for WBS elements
173Do not use valuation basis &1 with profit basis &2
174Version &1 is not intended for updated costs. Please change
175Do not use valuation basis &1 with simulation "actual with plan"
176Fill field KSTAR in customer enhancement &1
177Leave field AWKUS in customer enhancement &1 empty
178Fill field ABKAT (= &1) in customer enhance. &2 with permissible value
179Fill field ZLNID (= &1) in customer enhance. &2 with permissible value
180Do not change VRGNG in cust. enhancement &1 from &2 to &3
181Do not change MEINH in cust. enh. &1 for line ID &2 from &3 to &4
182Do not change KSTAR in cust. enh. &1 for line ID &2 from &3 to &4
183Period lock will not be checked for further periods
184Enter a line ID for the variance in the valuation method
185Cross-company valuation with version relevant to settlement not possible
186Maintain cost element for REB reduction by down payment
187Maintain cost element for down payment surplus
188Maintain cost element for planned revenue of valuation
189Maintain cost element for planned costs of valuation
190Plan results analysis does not support RA with dynamic items
191Status &1 reached w/ final RA: Remaining inventory will be canceled
192The calculated reduced actual revenue is too high
193"Results analysis to" year &1 must be same as year of 1st open period &2
194Start collective processing: change parameter 'Displayed Currency'
195Maintain factory calendar for plant &1 for 'Revenue: Days/Period' &2
196Customizing assignment to cost element screen &: valid from & to great
198Service line item &1-&2 (document category &3) does not exist
199Object selection terminated: eliminate all logged errors
200Start of results analysis changed from period & to &
201Choose RA period (&) that is after cutoff period (&)
202Maintain RA cost elements (group &) with transaction OKG2
203Do not use time frame & with results analysis type &
204Cost elem. & for autom. RA differs from cost elem. & for manual RA
205In CO area & create results analysis version &
206Create valuation method in CO area & version & RA key &
207Assign the line IDs for CO area & version & RA key &
208No update of line IDs specified in CO area & version & RA key &
209No status object exists for object to be analyzed
210No entered status set. No results analysis will be performed
211Maintain a valuation method with the status ' '
212Do not use line ID & when defining assignment rules
213No. of posting periods & + no. of special periods & must be <= &
214Controlling area & does not exist
215In CO area & create a number range for business transaction &
216Planned costs for valuation are 0. Please check the object
217Planned revenue for valuation is zero. Please check the object
218Inventory cannot be apportioned to the line IDs
219Method of apportionment for inventory in period & & was changed
220Reserves for unrealized costs cannot be apportioned to the line IDs
221MOA for reserves for unrealized costs in period & & was changed
222Reserves for complaints/commissions cannot be apportioned to line IDs
223MOA for reserves for complaints/commissions in period & & was changed
224Actual cost = 0. Cannot use method of apportionment (&,&)
225Planned cost = 0. Cannot use method of apportionment (&,&)
226Sum across all apportionment numbers = 0. Cannot use MOA (&,&)
227Actual costs of open periods = 0. Cannot use MOA (&,&)
228Plan cost <= actual cost. Cannot use method of apportionment (&,&)
229Balance of closed periods + value of creation of open periods = 0, (&,&)
230The (reduced) plan. rev. = 0, so you cannot use method of apport. (&,&)
231Actual cost = 0. Cannot use method of apportionment (&,&)
232Planned cost = 0. Cannot use method of apportionment (&,&)
233Sum across all apportionment numbers = 0. Cannot use MOA (&,&)
234The data from automatic results analysis were deleted
235The data from manual results analysis were deleted
236All results analysis data deleted
237Confirmation from status management: RA cannot be carried out for object
238Results analysis key not maintained or object invalid
239Results analysis data saved
240Results analysis data was not changed
241Maintain version data for fiscal year & in CO area &
242Planned revenue for valuation = 0, cannot calculate reduced actual revenu
243End of results analysis changed from period & to &
244Unit of measure in order (&) differs from unit of meas. in cost est. (&)
245The costing lot size is zero. Check the cost estimate
246Any automatic results analysis data after & will be deleted
247Do not use line ID & when defining the update
248Any results analysis data after & will be ignored
249Errors occurred. No results analysis carried out for & & in version &
250& & processed in version &
251Planned quantity = 0, quantity-based results analysis not possible
252Confirmation from status management. An error occurred
253Manual entries for cost of sales and transfer of old data of RA deleted
254Results analysis data deleted
255Create results analysis key &
256Results analysis key & is not used for results analysis
257Check the results of WIP calculation
258Use collective processing for results analysis type S
259Revenue change: Maintain COS real. period YYYYMMM in stat. key fig &
260Period YYYYMMM in statistcal key fig. & YYYY outside allowed range
261Period YYYYMMM in statistcal key fig. & MMM outside allowed range
262Company code & has not been maintained
263Changes translated with manual results analysis from & to &
264Error while determining results analysis category (-> COSB-ABKAT)
265Method of apportionment cannot be used due to division by 0 (&,)
266Cost collector & (material & plant & prod. vers. &) has errors
267Product cost collector & has errors
268Order & has errors
269Order & processed (work in process was calculated)
270Product cost collector & processed (WIP was calculated)
271Product cost collector & (material & plant & ProdVersion &) processed
273Cannot calculate WIP for manual product cost collector &
274Control parameters missing for plant &
275Control parameters missing for valuation area &
276No WIP at target costs could be calculated
277RA period &1 is less than or equal to RA period &2 of RA version &3
278Order is WIP element for project: Only RA types F and Z permitted
279Order is WIP element for sales order: Only RA types F and Z permitted
280Order without revenue: Only RA types F and Z permitted
281Processing started for & & &
282No suitable log exists
283& log entries deleted
284The calculated costs are too high
285The calculated revenues are too high
286The profit percentage is too high
287The calculated costs are too high
288The calculated revenues are too high
289There is no object list for postprocessing
290Valuation level has been changed for period &.& to S (summarization lvl)
291Value too large for RA cost element &, RA category &
292Test posting rules: Value too large for account &
293Value too large for RA cost element &, RA category &, line ID &
294Errors have occurred - cannot save
295Only specify versions in operational valuation view
296Dependent vers. for vers. with operational valuation included
297Version &1 in CO area &2 can only be changed through version &3
298In joint production, WIP must be calculated at actual costs
299Use of status change documents: Define cutoff period = D
300Select suitable method for loss realization for revenue-based results ana
301Select suitable method for loss realization for qty-based results analysi
302Profit basis & cannot be used for planned results analysis
303Choose suitable profit indicator for basis "actual values"
304Create a cost element for creating inventory (line ID &)
305Create a cost element for creating reserves (line ID &)
306Create a cost element for the cost of sales (line ID &)
307Create a cost element for the usage of inventory (line ID &)
308Create a cost element for the usage of reserves (line ID &)
309Create line IDs of category "Costs" when defining assignment rules
310Create line IDs of category "Revenue" when defining assignment rules
311Create line IDs of category "Settlement" when defining assignment rules
312Create a cost element for valuated actual costs
313Create a cost element for valuated actual cost of complaints/commissions
314Create a cost element for revenue in excess of billings
315Create a cost element for revenue surplus
316Create a cost element for POC profit increase
317Create a cost element for POC profit reduction
318Create a cost element for POC loss creation
319Create a cost element for POC loss cancellation
320Create a cost element for POC loss realization
321Create cost element for the calculated revenue
322Create a cost element for the calculated costs
323Create a cost element for the capitalized profit
324Create a cost element for creation of reserves for imminent loss
325Create a cost element for usage of reserves for imminent loss
326Create cost elem. for usage of reserves for immin. loss due to value adj.
327Method of apportionment not suitable for creation/usage split
328MOA for reserves for unrealized costs not suitable for creatn/usage split
329MOA for reserves for commissions not suitable for creation/usage split
330Method of apportionment not suitable for "No creation/usage split"
331Method of apport. for res. f.unreal. costs not suitable for'No C/U split'
332Method of apport. for res. for comp. not suitable for 'No C/U split'
333Assignment: Assign line ID & to a single valuation group
334Enter all line IDs in the assignment rules
335Specify the update for line ID &
336Asterisk not allowed as masking character for assignment definition
337Results analysis with profit basis & not possible on sales order
338Profit basis & can only be used with a sales order
339Quantity-based results analysis only possible for sales order
340Manual RA data only if cutoff period & < start of RA &
341Create line IDs of category "Commissions" when defining assignment rules
342Controlling area &, RA version &: transfer of old data active
343Deletion of RA data in CO area &, RA version & blocked
344Create cost element for actual revenue (line ID &)
345End indicator set to '&'
346Profit indicator set to 'M'
347Results analysis type set to 'Z'
348Cancellation of inventories and reserves allowed
349Time frame set to " "
350Do not create line IDs of cat. 'Comp.' when defining assignment rules
351Do not create line IDs of 'Spec. costs' cat. when defining assignmt rules
352Do not create line IDs of 'Costs' cat. when defining assignment rules
353Do not create line IDs of 'Revenue' cat. when defining assignment rules
354Do not create line IDs of 'Settlement' cat. when defining assignmnt rules
355Manual results anlaysis set to "&"
356First cancel settlement
357"No valuation" indicator set. No RA will be carried out on object
358RA for sales order is only possible with plan version 0
359Valuation category & of RA version <> valuation category of basic version
360Make an entry in the "Line ID overrun" field in the valuation method
361Only profit indicator 'K' allows manual entry of the cost of sales
362Only results analysis type 'E' allows manual entry of the cost of sales
363Production order has status DLV/TECO: Set "cancel WIP"
364Customizing for WIP calculation: maintain status DLV and TECO
365Results analysis type & cannot be used for planned results analysis
366Profit base & cannot be used with results analysis type &
367Do not use results reserve &2 with profit indicator &1
368Do not use results reserve &2 with results analysis type &1
369Do not use profit indicator &2 with results analysis type &1
370Profit basis & can only be used for projects
371Profit basis & can only be used for project structure "P"
372Res. anal. not possible for project structure P with profit basis &
373Results analysis type S only for orders with periodic settlement
374Definition of cutoff period set to &
375Apportionment of WIP set to '&'
376Cancellation of WIP allowed set to '&'
377Valuation basis set to '&'
378Assign all costs of cost element & to line ID of category K
379RA type S: Please set final results analysis to '&'
380Valuation level set to '&'
381Cross-company valuation only if no transfer to FI
382Create stat key figure "&" for qty-based RA with key figure cat. 2
383Create statistical key figure '&' with type 2
384Qty-based RA with internal order or project: use profit basis C
385Profit basis qty & cannot be used for planned results analysis
386Results reserve indicator set to '&'
387With (reference) version 000 use actual and/or plan results analysis
388Do not use "Simulate actual with plan" with RA type &
389Transfer to FI only possible for actual results analysis
390Version in valuation method set by system to 000
391Use profit indicator "R" only with results analysis type "E"
392Use profit indicator "R" with valuation basis O, Q, or S
393Do not use profit indicator R with profit basis &
394Results res. F: Make entry in "Line ID costs" in valuation methods
395Do not use results reserve & with profit basis &
396Do not use valuation basis 0 to 9 with profit basis X
397With profit indicator K you must choose loss realization method K
398Results analysis key &: RA type S only compatible with RA type Z
399Cost element & (line ID &) already used for line ID &
400Enter results analysis form
401Enter a line ID for results analysis form &
402Define assignment for line ID & or choose a different line ID
403Do not enter a line ID for results analysis form &
404Results analysis form & unknown. Check your entry
405RA form & with line ID & is unknown. Check your entry
406Enter CUC ' '
407Enter CUC "B" or "V"
408Enter CUC "B" or A"
409Only RA forms B, R, and K are suitable for line ID &
410Only RA forms P and K are suitable for line ID &
411Only RA form K is suitable for line ID &
412No RA forms are suitable for line ID &
413Maintenance of cost of sales not released. Check entry
414Only RA form D is suitable for line ID &
415Final results analysis carried out on object. No manual changes possible
416RA data being deleted or has been deleted. No manual changes possible
417Enter B for creation and cancellation
418Delete RA data for version & before transferring legacy data
419Only use if profit indicator is set to percentage of completion
420Only use if profit indicator is not set to percentage of completion
421Assignment finds line ID & with a category that is not K or D
422Results analysis form & cannot be maintained manually
423Manual changes not possible for results analysis type S
424Data not yet saved. Please process the next currency
425Select cost-of-sales period that is before results analysis period
426Commitment indicator set to "&"
427With RS header/production version use only RA type S or Z
428Do not use special function 'A' here
429Profit basis qty & can only be used with SD sales order
430Enter cost element for variance in results analysis version
431Plan overrun "F-H", assignment of line IDs: combine & with & or &
432With status control "C" enter status CRTD in valuation method
433Complete the assignment
434Enter a line ID of category K or D
435Planned results analysis not allowed with this version
436Basic RA version must have valuation category "&" (operational valuation)
437Simulation only possible for valuation category "&" (operational valuatio
438Planned RA only possible for valuation category & (operative valuation)
439Basic version setting: & entries for valuation & for actual data
440Profit indicator "&" cannot be used for planned results analysis
441Manually change only results analysis versions in operational valuation
442"Split creation/usage" must be the same in versions & and &
443Version & saved. Process and save dependent version &
444Vesion & saved. All dependent versions were processed
445Version & not changed. Process and save dependent version &
446Version & not changed. All dependent versions were processed
447Also delete data of dependent version &
448Correct the dependent versions for version & of results analysis
449Use only results analysis form "B" or "R" with production orders
450& falls before the old cutoff period &
451Version data not changed
452Version data changed
453Enter a results analysis version
454Processing for all results analysis versions. RA version entered ignored.
455Specify material/plant/production version
456No run schedule header found
457No product cost collector for material & plant & ProdVersion &
458Run schedule header & has no product cost collector
459Product cost collector & has no results analysis key
460Associated product cost collectors have no results analysis key
461Product cost collectors without results analysis key ignored
462Order & has no results analysis key
463Reconcile profile with central version maint. in CO area &
464Create a results analysis version for valuation view &
465Reconcile version number of WIP/results analysis with actual version
466Reconcile the actual versions with results analysis version &
467Nonoperational valuation views not active
468Transaction data exists for WIP calculation or results analysis
469Version with nonoperational valuation can only reference version 000
470Use (plan value) overrun "&" only with valuation basis O or 0-9
471WIP at target costs: No valuation difference vs. operational valuation
472Version data also changed for nonoperational valuation view of CO area
473No versions for WIP/RA defined in controlling area &
474Only committment indicator "E" allows credit-based results analysis costs
475No planning data dispayed in closed periods
476Plan and actual data not displayed with manual processing only
477Assign all cost elements with actual data to a line ID
478Assign all cost elements with planned values to a line ID
479Enter an allowed "Valid from" period in the assignment
480Customer enhancement 2: sum of changes to actual data is not zero
481No parallel valuation with results analysis type B
482Make an entry in the "Line ID costs" field in the valuation method
483With results analysis type & set Quantities to &
484Do not use Quantities = & with results analysis type &
485Use Quantities = " " (blank) with multiple valuation
486Line ID & contains breakdown structure values: Do not record quantities
487Qty ID &: Use only with profit basis C, E, F, or X
488Use Quantities = & only with overrun A
489Use Quantities = & only with results reserve A, E, F or G
490Project hierarchy processing & is no longer supported
491Profit basis & is no longer supported
492Problems with quantity conversion of & into & for line ID &
493Method of apportionment O: Set RA type to E and profit indicator to M
494Plan costs < actual costs. Method of apportionment not applicable (&,&)
495Planned costs = 0 --> method of apportionment not applicable (&,&)
496Cost element &1 in controlling area &2 does not exist on &3
497Time frame "&" not permitted. Set to " " (blank)
498Total value of period (&1) and fixed portion (&2) do not agree
499The value that was added (&1) and the fixed portion (&2) do not agree
500& objects processed. Errors occurred on & objects
501No messages exist for log
502Log saved under &
503Log & deleted
504Logs deleted
505Change in WIP(periodic) is 0 but was not 0 last time WIP was calculated
506No log marked for deletion
507Log saved because work list generated
508System error, table TJ06: Tj06-VRGNG=&, TJ06-ISTAT=&, TJ06-INACT=&
509DO NOT USE
510WIP at target costs only supported if operational valuation = legal val.
511Field overflow --> Method of apportionment not applicable
512Problems reading cost element itemization for material & in plant &
513Define cutoff period for WIP calculation / results analysis
514Use of period-based status: Define cutoff period = D or E
515Error reading project structure. Repeat processing
516DO NOT USE
517Controlling area &1 is inconsistent
518Revenue affecting net income of a line ID is too large
519Revenue affecting net income of a line ID is too large
520Revenue affecting net income of a line ID is too large
521Reserves for unrealized costs of a line ID is too large
522The customer enhancement is either not active or not coded
523Not relevant because no changes have been determined
524For results analysis form 0, enter a line ID of category U
525For results analysis form 0, set the transaction to " "
526Processing completed
527Processing completed, but errors occurred
528Field overflow --> MOA cannot be used (category &, RA form &)
529Set transaction = " " or select letter from the set &1
530Results analysis data is to be posted to &1 &2: RA key is missing
531RA data is to be posted to &1 &2. The object is missing from object list
532You want to post RA data to &1 &2. This is not supported
533Results analysis category &3 cannot be posted to &1 &2
534You can only use profit basis & with an SD sales order or project
536Other currencies in results analysis do not support COSSP and COSPP
537Other currencies in results analysis do not support CO value type &1
538Table KKAG_TUNE(_DETAIL): option &1 cannot be applied, reason code &2
550Error from user module & without separate message
551Error in user module &, line ID & cannot have results analysis data
552Data saved
553Period &1 has not been defined in service &2
554An error has occurred in service &1
560Buffer control: Set OBJECTS_ACTIVE same as CO_COST_TOTALS_ACTIVE
561Buffer control: object status has changed from &1 to &2
562Buffer does not support advance read for collective processing
575Results analysis version does not need to be converted in any client
576Results analysis version successfully converted in all clients
577Assignment successfully converted in client &
581Converting Customizing data for results analysis ...
582Not necessary to convert assignment in client &
583Not necessary to change table & for WIP calculation and results analysis
584Table & modified/converted in all clients for WIP calc. and results anal.
600& the indicator "WIP/results analysis"
601Create a results analysis version with operational valuation view
602RA data exists for version 0. RA key cannot be deleted
603First cancel settlement
604One or more settlements have taken place
605RA data exists for versions other than version 0
606First cancel settlement
607One or more settlements have taken place
608No reset of "WIP/results analysis" - entries exist in &
625Assign company code &, RA key & to line IDs
626Assign: (version/cost element/...) = &
627Create results analysis key &
628Results analysis key & not intended for determining capitalization values
629The object has no results analysis key
630Please select results analysis key for results analysis
631Choose RA key for transaction-based revenue deferral
632Only delete results analysis key once all accrual calculations reversed
633Please cancel the settlement first
634Only set results analysis key if all accruals/deferrals are cleared
635Results analysis key trans.-based rev. accrual cal. only on billing elem.
636First delete the results analysis key for trans.-based results analysis
650(&) Install function module 'KKA_BAUABGR_KRED_SICHERN' correctly
651Maintain assignment for CO area & and cred. RA key & (V_TKKA2)
652(&) Install function module 'KKA_BAUABGR_KRED_HOLEN' correctly
653Enter account &1 in table V_TKKA2 as a debit down payment
654Enter account &1 in table V_TKKA2 as a debit down payment request
655Enter account &1 in table V_TKKA2 as a debit value adjustment
656Enter account &1 in table V_TKKA2 as a debit receivable
673TransactCurrServ: strategy &1 does not support Commitments = &2
674TransactCurrServ: strategy &1: down payt clearing only w. Commitments = G
675Parallel processing of several transaction currencies not supported
676Transaction currency service RA: period sequence must be ascending
677Transaction currency service RA: strategy &1 not supported
678PS Cash Service: REF_PERIOD '&1' is not supported for USE_COFP '&2'
679PS Cash Service: TAX-TAX_CALC '&1' not supported for USE_COFP '&2'
680PS Cash Service: Tax ID '&2', ctry/reg. tax loc. '&3': ctype '&1' missing
700Results analysis document & was already reversed
701Results analysis document & is a reverse document
702Results analysis document & is a reversed reverse document
703Results analysis document & is not in CO area &
704Results analysis document & has no items
705Transaction &1 cannot be reversed
710*** 710 to 799 Reserved for Document-Based Results Analysis ***
711Results analysis by document only with results analysis type B
712Results analysis type & is not processed
715Cost line ID & must be category K or ..... see long text
716Revenue line ID & must be category E or ... see long text
717Enter a line ID for "Line ID revenue" in the valuation method
719Results analysis is not allowed in profile &
720Valuation method for CO area &, but profile & belongs to CO area &
721Enter profile for resource-related billing in valuation method
722Assign cost element &1 to a line ID in the assignment
723Assign revenue element &1 to a line ID in the assignment
724Add component BUKRS to include table CI_ADK0_RA2 (Note 672991)
725Add component GSBER to include table CI_ADK0_RA2 (Note 673210)
726Amount in company code &1 for RA category &2 is not zero (Note 672991)
727Amount in business area &1 for RA category &2 is not zero (Note 673210)
750Dynamic line ID &1 is not defined
751Dynamic line IDs deactivated: production orders not supported
752Dynamic line IDs deactivated: only &2 original line IDs supported
753Dynamic line IDs deactivated: results analysis type &1 not supported
754Profit indicator &1: dynamic line IDs deactivated
755Dynamic line IDs deactivated: profit basis &1 not supported
756Dynamic line IDs deactivated: planned value overrun &1 not supported
757Transaction &1: dynamic line IDs deactivated
799*** 710 to 799 Reserved for Document-Based Results Analysis ***
800<<***Messages for WIP Calculation***>>
801Report data may differ from data determined in test run
802Display function determines posted data. A reversal was not performed.
803Product cost coll. & for RS header & flagged for deletion
804Order category &1 is not supported
805Periodic calculation of WIP is not allowed for order category &1
806WIP explanation only available for valuation at target costs
807WIP explanation not available
808For order &1, the WIP in company code currency &2 is not saved
809Current controlling area: & Assigned to cost object: &
810Current controlling area: & Assigned to product cost collector: &
811None of the selected objects has a results analysis key
812Choose a valid layout -> F4
813The order is assigned to product cost collector &1
814WIP explanation not available
815Data of order header &2 not available for order item &1
816No object was selected
817No orders are assigned to the cost object
818Planned quantities and goods received quantities could not be read
819Overflow while reading planned quantities and goods received quantities
820Simulation of posting in FI only possible with execution type "display"
821WIP at target cost only possible with Product Cost by Period
822No authorizations => values of affected objects set to zero
823No authorization to analyze data from plant &1
824No authorization to display data for valuation view &1
825Authorizations missing => cannot display data
826No authorization to display data from profit center &1
827No authorization to display data from company code &1
828No authorization to change data from plant &1
829No authorization to change data from profit center &1
830No authorization to change data from company code &1
831No authorization to change data from valuation view &1
832No authorization to change data from valuation view &1
833ML WIP is not supported KKA0 for plant &1.
834ML WIP is not supported for plant &1, please use KKAO.
835WIP-calculation executed successfully
836WIP revaluation active. Hana WIP determination cannot be used
850Document display in test run only possible with individual processing
851WIP for order category &1 in valuation &2 not calculated
852WIP for target costs in valuation &1 is not allowed
853COGM in valuation &1 is not active i company code &2
860*** Messages for New Revenue Recognition ***
861Error & when transferring revenues to results analysis.
862Please enter cost element for actual revenue adjustment (line ID &).
880ATTENTION: Fiscal year &1 entered is far ahead in the future.
899The list has been copied to the clipboard