KOSA - Produktkostensammler
The following messages are stored in message class KOSA: Produktkostensammler.
It is part of development package KKPK in software component CO-PC-OBJ-PER. This development package consists of objects that can be grouped under "Product Cost Collector: Master Data/Processing".
It is part of development package KKPK in software component CO-PC-OBJ-PER. This development package consists of objects that can be grouped under "Product Cost Collector: Master Data/Processing".
Message Nr ▲ | Message Text |
---|---|
000 | ------------------------- General Messages ---------------------------- |
001 | Characteristics entered do not match Controlling level |
002 | No production process &1 or no material/plant/production process |
003 | Cannot determine Controlling level for material &1 |
004 | Run schedule header &1 not valid on selection date |
005 | Costing view of material &1/&2 locked by user &3 |
006 | System error during locking |
007 | Internal error in function module &1 &2 &3 &4 |
008 | No dependent orders/production versions for product cost collector &1 |
009 | Manufacturing order &1 cannot be deleted |
010 | Prod. version &1: Maintain routing in detailed and rate-based planning |
011 | Maintain BOM in production version &1 |
012 | Production version &1 or repetitive mfg indicator cannot be deleted |
013 | Run schedule header &1 cannot be deleted |
014 | First enter the material and plant |
100 | --------------------------- Master Data PKOSA --------------------------- |
101 | Plant &1 does not exist |
102 | No version &3 for material &1 in plant &2 |
103 | No alternative BOM &1 or BOM usage &2 for material &3 found |
104 | Cannot find routing &1 &2 &3 for material &4 |
105 | Product cost collector exists for characteristics of production process |
106 | Cannot create product cost collector for production process &1 |
107 | Cannot determine Controlling level for material &1 in plant &2 |
108 | Cannot link product cost collector to production process |
109 | There is no product cost collector for production process &1 |
110 | Product cost collector created with order &1 and production process &2 |
111 | Costing variant &1 not allowed for precosting product cost collector |
112 | Product cost collector &1 already posted to. See long text |
113 | Database inconsistency for material &1 in plant &2 |
114 | Controlling level does not correspond to existing production processes |
115 | Order type &1 does not exist |
116 | No orders/production versions assigned to product cost collector &1 |
117 | Cannot remove deletion flag |
118 | Cannot set deletion flag for product cost collector &1 |
119 | Default rule STR transferred |
120 | No prel/mixed cost est for Contr. level "Production Plant/Planning Plant" |
121 | Business area is mandatory in company code &1 |
122 | &1 product cost collectors created |
123 | Material: &1 Plant: &2 Order: &3 |
124 | Production version: &1 |
125 | No product cost collector can be created with these selection criteria |
126 | Material &1 has a Controlling level that is not "Production Version" |
127 | Costing lot size outside lot size interval of production version |
128 | No default rule has been defined for order type &1 in plant &2 |
129 | No settlement profile has been defined for order type &1 |
130 | Controlling level not recommended by SAP. See long text |
131 | RA key only appropriate for material with reporting point processing |
132 | No results analysis key specified despite reporting points |
133 | Costing variant &1 not allowed for simultaneous costing |
134 | Log contains no data |
135 | Profit center was not changed in product cost collector &1 |
136 | Business area was not changed in product cost collector &1 |
137 | Planned costing variant was not changed in product cost collector &1 |
138 | Actual costing variant was not changed in product cost collector &1 |
139 | Product cost collector with order number &1 is already being processed |
140 | &1 product cost collectors changed. See log |
141 | No product cost collector was changed. See log |
142 | Product cost collector &1 has status "Deletion flag". No change |
143 | Select at least one product cost collector |
144 | Position the cursor on a material |
145 | Enter the production version |
146 | Enter the planning plant |
147 | Enter all parameters for the routing |
148 | Enter all parameters for the BOM |
149 | Reporting points defined for product cost collector with order no. &1 |
150 | No routing entered in production version &1 |
151 | Cannot change business area for product cost collector &1 |
152 | No posting of actual activity possible without actual costing variant |
153 | No product cost collector as reference found |
154 | Production version &1 for material &2 in plant &3 is locked |
200 | ---------------Product Cost Collector - Preliminary Costing-------------- |
201 | No preliminary cost estimate for product cost collector &1 found |
202 | Preliminary cost estimate for product cost collector &1 created |
203 | Error creating prelim. cost est. for product cost collector &1 |
204 | Costing not possible - routing header unit of measure changed |
205 | Cost estimate with costing date in the past not allowed |
206 | No product cost collector was costed |
207 | &1 product cost collectors costed, of which &2 with errors |
208 | Preliminary costing of product cost coll. &1 terminated - see long text |
209 | No product cost collector selected. Check your entry |
210 | Preliminary cost estimate not created because production version locked |
300 | ----------------- Master Data for Production Process -------------------- |
301 | Production process already exists for the characteristic values |
302 | No production process exists for material &1 in plant &2 |
303 | No production process &1 or no material/plant/production process |
304 | Production process &1 created |
305 | Production process could not be created |
306 | Production process cannot be reselected |
400 | -----------------------------PKOSA_UTIL---------------------------------- |
401 | BOM and routing cannot be changed. See long text |