KP - CO-OM Planung

The following messages are stored in message class KP: CO-OM Planung.
It is part of development package KBAS in software component CO-OM. This development package consists of objects that can be grouped under "Overhead Cost Controlling".
Message Nr
Message Text
000CO-CCA planning
001Version & does not exist
002Revaluation $ does not exist (recheck your entry)
003Maintain number range for controlling area $ transaction $
004Maintain fiscal year variant $ in T009
005Fiscal year variant $ not defined in T009B
006The revaluation data has been posted (doc. numbers -> F1)
007Revaluations reversed (-> long text)
008No revaluations have been reversed
009Version $ does not exist in CO area $ for fiscal year $
010Version $ is blocked in CO area/fiscal year $/$
011Group $ does not exist
012System error: Revaluation $ $ $ has not been completely maintained
013System error: Document numbers cannot be assigned
014System error: Update was not possible
015System error: Update was not possible
016Revaluation has been added
017Revaluation has been changed
018Revaluation has been deleted
019No changes were made
020No other objects exist
021System error: Error when reading internal table
022Version &1 cannot be used in the current CO area &2
024No errors have occurred up to now.
025No revaluation posting was made
030Create a group
031Group & does not exist
032System error: Error during maintenance of group &
033Group & already exists
034You are not authorized to maintain group &
035Place the cursor on a group first
040Remove Unplanable WBS Elements from Layout
050Planning parameter & does not allow planning in transaction currency
060>>>>>>>>>>>> Additional Messages for Plan Revaluation <<<<<<<<<<<<<<<<<<<
061Enter a revaluation
062Variant & saved
063Variant & could not be saved
064No variant was selected
065Error occurred during variant processing
066Variant & does not exist
067Variant & deleted
068& & & &
069No revaluations were entered
070No fiscal year variant exists for controlling area &
071No revaluations were executed
072The revaluations were reversed (document: &1)
073Controlling area data for the variant is inconsistent
074Fiscal year data for the variant is inconsistent
075Version data for the variant is inconsistent
076*********************** General Messages ********************************
077******************** Incorrect Plan Revaluations ************************
078Revaluation & was not executed
079Revaluation &1 was executed successfully (document number &2)
080Revaluation &1 was executed successfully (document numbers &2 - &3)
081Revaluation(s) already executed were reversed (documents: &1 - &2)
082Revaluation(s) already executed were reversed (document: &1)
083Posting for the reversal was not closed (long text)
084Revaluation &1 refers to CO area &2 (see long text)
085Revaluation &1 refers to version &2 (see long text)
086Revaluation &1 refers to fiscal year &2 (see long text)
087Reversal is only possible without batch processing, test run and lists
088Execute test run with detail lists
089Errors in automatic transport
090Database table T823Z could not be adjusted
091Errors in automatic transport. Only display possible
092Definition transferred to all elements in the cost element group
093Copying to cost element groups has been activated
094Copying to cost element groups has been deactivated
100CO area & does not exist; Check your entry
101Revaluation & already exists in fiscal year & version &
102Revaluation & does not exist in fiscal year & version &
103Reference revaluation & &/& does not exist
104Enter FROM/TO values for &, or specify a group
105Specify From-value, or group name
106The From-value is larger than To-value
107Group & does not exist
108Group & does not exist for field &
109Maintain selection criteria for & field
110Period interval &-& overlaps interval &-&
111Function & not possible due to inconsistency
112For controlling area & only & periods are allowed.
113Group & is not assigned to & &
114No relevant data for revaluation &1/&2/&3
115Inconsistent entry in table TKA07 (Plan Version Maintenance)
200********* Error messages for activity price computation *******
201Program names PI...... are reserved for activity price calculation
202Version & is not allowed for planning
203Version & is not allowed for actual postings
204Iterative activity price calculation not run due to errors
205Iterative activity price calculation not run due to errors
206The &3 has diverged (&1)
207Cost centers are not active in &
208Serious system error during reading of internal iteration table
209No activity planning
210System error: Read control segment for activity quantities
211All activity prices are manually entered
215System error: Iteration processor cannot process all field groups
216Results of iterative activity price calculation have been posted
217Update not made due to error
218Posting terminated due to error
219System error: incorrect access to internal table
220Program termination: Error in & routine
221System error: error while reading internal table
222System error: entry missing in iteration table
223Sender in an activity allocation not found.
224Receiver in a plan activity allocation was not found.
225Sender of planned exchange of activities is missing
227System error: error while filling internal table
228Cost center & not found
229System error: error while reading internal table
230Activity price calculation without activity not possible.
231System error: number overflow in posting line
232Version does not exist
233Planning locked by user &
234CCtr & activity type & activity type & > sched. activity
235Sender in an activity relationship has no activity.
236Cost center &, activity type &: Activity < scheduled activity.
237Cost center & activity type &: activity is 0
238Select a line in the list
239Special periods are not processed
240Iterative price calculation terminated
241Values not updated, because debits and credits have not changed
242Cost center & does not exist, but activities exist for it
243&1: As no capacity has been planned, system calculates by activity
244Period & is not allowed
245Cost center & activity type & activity < scheduled activity
246Cost center & activity type &: activity is 0
247Cost center & activity type &: political activity price fluctuates
248Update not started due to error
249Settings for &2 have been saved
250Cost center & activity type &: costs exist although activity 0
251Cost center & activity type &: costs exist although activity 0
252Cost center & activity type &: activity taken although activity 0
253Cost center & activity type &: activity taken although activity 0
254No activities have been posted
255Cost component structure for component split does not exist
256Cost component structure for component split is not active
259No actual activity price calculation planned
260Planning locked by user &
261Process special periods and normal periods separately
262System error: Exception in function module without message
263Cost center & has no object number
264Actual activity price calculation blocked by user &
265An error occurred during the update
266Business process &1 has no object number.
267Ingoing activity relationship in partial iteration.
268Sender in an activity allocation not found.
269Object & not available, but has activity records.
270Activity price calculation without activity not possible.
271Receiver in a plan activity allocation was not found.
272Sender in an activity relationship has no activity.
273&: Activity is less than scheduled.
274&: Activity is zero.
275&: Manually-set activity price varies.
276&: Costs planned or posted despite zero activity
277&: Activity relationship with zero activity.
278Ingoing activity relationship in partial iteration.
279&: Activity relationship with zero activity.
280Cost element &1 is not assigned to a cost component structure
281"&" not allowed for &
282Predistribution of fixed costs locked by &V1&.
283&: Costs planned or posted despite zero activity
284Posting of predistribution of fixed costs resulted in error
285Activity relationship with different object currencies
286Iteration terminated after &V1& steps
287Calculated activity price is too big
288Field overflow with iteration
289Process special periods and normal periods separately
290No fixed cost predistribution possible for version &1
291Actual price determination with different source version and revaluation
292&1: Not all costs could be assigned to the cost component structure
293Cost center & activity type &: Price is negative
294&: Price is negative
295Only one activity revaluation performed
296Enter a cost component structure first
297Cost center & is not valid in the current period
298Object currency: Iterate amounts independently is activated
299Object currency: Iterate amounts independently is deactivated
300Start period of cumulation: Period &
400******************** Function Group KPER *******************************
401CO key & does not exist
402An error occurred during the resource encryption
403Group &1 is not a hierarchiy area of cost center master data
484In kanban &1 batch &2 is not in stock
500<<<< Function group KAIV >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
506An error occurred in the integration validation.
507Field overrun during revaluation of &1.
508Database error: The credit record is missing the debit record.
550<<<<<<<<<<<<<Function group KIPL>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
551You must enter only one object to be planned
552You have not entered a planning object
553Error in reconciliation object &1, category &2
554You did not specify a valid real estate object
555No longer possible to change allocation cost element &1 to &2 with &3
560Error in model record for detailed planning & .
561Error in target version record for detailed planning & .
562Error in number assignment for detailed planning.
563AType category & for &/& is not supported.
564AType category for &/& cannot be set to "Allocatable".
565AType caegory for &/& must be set to "Allocatable".
566Actual AType category & for &/& is not supported.
567Incorrect setting of parameter IRKU02_CUR.
568Incorrect setting of parameter IRKU01_CUR.
569Duplicate planning objects in table IRKU01JA.
570Activity type & cannot be planned using transaction &
571No posting due to locks in the plan data interface.
572Transaction & not allowed for activity type planning
573Activity type & for cost center &, fiscal year &, is not planned.
574Transaction & cannot be planned using a cost element of category &
575You cannot use transaction &
576Double CO object in row & copied to the planning data interface
577Plan version &1 in fiscal year &2 locked for planning
578Field & in table COKA cannot be changed
579Business process &1 cannot be planned with business transaction &2
580No header-assigned networks can be planned
581Enter only one CO object
582Enter only one sender
583Allocation category & not planned for &.
584Allocation category for & cannot be changed to "allocatable".
585Allocation category for & must be changed to "allocatable".
586Enter a resource or a cost element
587No detail planning with resource planning
588Transfer a cost element for resource &1
589Transaction &1 cannot be deleted
590Plan cost element category 90 only on projects and orders
591Unit of measure &1 cannot be converted to resource unit &2
592Primary cost element &1 cannot be planned to business process &2
593Revenue element &1 cannot be planned to business process &2
594Problems converting a currency belonging to a data record of &1
595Fixed quantity for &1 / &2 greater than total quantity
596Info: Error during conversion &1, &2, &3; For details see message &4
597Caution: Error in integration checks; See long text
598Information: Message &2 belongs to &1
599Error in &1, &2, and &3 - see message &4 for details
600<<<<<<< Function group KSPP - transfer services required from logistics
601Maintain transfer control for version & .
602Partial transfer only of activity quantities to plan/SOP order &.
603Plan/SOP order &: Reference to cost center/activity type is missing.
604No activity quantities determined for plan/SOP order &.
605Enter a planning scenario.
606Enter a rough planning version.
607Error during unit conversion to plan-/SOP order &, activity type &
608Simulated plan order & (material &, plant &).
609SOP order & (material & / plant &)
610Plan/SOP order &: Data not transferred due to error in parallel processg
700>>>>>>>>>> Messages for function group KSSV <<<<<<<<<<<<<<
701The number of field groups & exceeds the maximum number &
702The number of periods & exceeds the maximum number &
703The equivalence table is empty, values cannot be apportioned
704The equivalence total is zero, values cannot be apportioned
750>>>>>>>>>> Messages for Function Group KTPB <<<<<<<<<<
751Object &1 still contains planning values in version &2, year &3
752Values not equal to zero on object &1, version &2, year &3.
760>>>>>>>>>> Formula Planning Messages <<<<<<<<<<<<<<<<<<<<<<
761Object editor in formula planning cannot be executed
762You cannot call up the editor here
763Template &1 is ignored for &2; No activity types planned in &3
764Parallel processing for &1 objects with server group &2 started
765Problems with parallel processing; Set maximum package size to &1
766Parallel processing completed successfully with &1 jobs
767Run &1 with &2 (remaining) objects and &3 processes; package size &4
800TKSP1 entries for &1 and &2 not found
850Messages for function group KPOR2CC
851Specify the cost center to be settled for order &1
880Revaluation(s) already made will be reversed
881No reversals were executed
890The revaluation is locked by user &
898Revaluation maintenance is locked by user &
Privacy Policy