KV - Abweichungs-Analyse Kostenstellen und Kostentraeger

The following messages are stored in message class KV: Abweichungs-Analyse Kostenstellen und Kostentraeger.
It is part of development package KV in software component CO-PC-OBJ. This development package consists of objects that can be grouped under "Variance Analysis RK-S/RK-K".
Message Nr
Message Text
000************** General (001-149) ****************************************
001Controlling area & does not exist
002Fiscal year variant & does not exist. Check the assignment
003No authorization for & & in controlling area &
004No authorization for &, & in controlling area &
005Enter an order number
006Processing will be carried out across plants
007No target cost versions selected
008Order number & does not exist. Check your entry
009Order & & was already selected
010No worklist found
011Order does not have status DLV or TECO
012First select the required orders and target cost versions
013Worklist is switched on
014Worklist is switched off
015& orders (items) processed. & of these had errors
016& orders (items) processed. One of these had errors
017No orders (order items) could be processed
018Enter at least one target cost version
019The versions you selected were transferred
020Version & was transferred
021Messages saved under document number &
022No messages found under the number &
023Product cost collectors are always processed by period
024Final delivery period is before data entry period
025Period entered is in the future
026Order type & does not exist. Check your entry
027Order type & not available. Check your entry
028Data records are being processed by &
029System error when locking the data records
030Incorrect entry for locking data records
031No target cost versions exist in controlling area &
032Controlling area: &. Company code currency differs
033Plant & does not exist. Check your entry
034Tgt cost version &: No plan costs in period &, fiscal year &
035Target cost version & not defined. Check your entry
036Variance key & not defined
037No messages found
038Variance variant & not allowed
039& orders (items) processed. No errors in scrap calculation
040One order (item) processed. No errors in variance calculation
041One order (item) processed. Errors during variance calculation
042& orders (items) processed. No errors in variance calculation
043One order (item) processed
044& orders (items) processed
045No messages were issued
046Specify run schedule header or material/plant/production version
047Specify material, plant, and production process
048One order (item) processed. No errors in scrap calculation
049Material & does not exist
050Production version & for material & & does not exist
051No material master record selected
052Saving material master records
053Material master records not changed
054Fiscal year & is invalid
055One order (item) processed. Errors in scrap calculation
056Object type & is not allowed
057No global settings made for repetitive mfg
058There is no text for status & in language &
059Posting period & is not allowed
060No variance calculation possible for order type &
061No scrap calculation possible for order type &
062Variance key & does not allow variance calculation
063Variance key & does not allow scrap calculation
064Variance key &: scrap is calculated through variances
065Processing with administration record active
066Processing with administration record inactive
067No administration records found
068Display of processing progress is switched on
069Display of processing progress is switched off
070& control record(s) were deleted. & control record(s) remain
071Enter date/time or period/fiscal year
072Only target cost versions with reference value type Actual supported
073First select a line
074Select only one line
075No text found
076Caution: messages are from & (user &)
077Some materials in plant & are still locked -> see text
078Program termination: valuation area is not plant level
079Current controlling area: &. Assigned to the order: &
080Select at least one order category
081DO NOT USE
082Parallel processing: Error while processing order (return code &)
083Order & not found
084No logs for application & found
085The logs for application & were deleted
086Select a worklist
087Worklist changed on & at & by user &
088Worklist for transaction & saved
089Selected lines deleted
090Job scheduling is now automatic with respect to plant
091Time: &1&2&3&4
092Administration records for transaction & deleted from INDX file
093Cost object hierarchy check is deactivated
094Worklist for transaction & deleted
095No target cost versions set for transaction &
096Cost object & reached
097Test mode & active
098Cost object & - target cost version & reached
099System error: & & & &
100************** Variances: Calculation (101-150) ************************
101No internal number range exists for & in controlling area &
102Remaining variance still in &
103Remaining variances occurred. See long text
104Inconsistent units of measure (value group &, object &)
105Base unit for material (&1) not same as order unit (delivery unit) (&2)
131Version & in controlling area & does not allow variance calculation
149Data could not be determined
150************** Calculation of Target Costs (151-199) ********************
151Only remaining var. in version & - no target costs for & &
152Order (item) has no material
153Order does not exist
154No standard cost estimate for material & in plant & on &
155Cost estimate with key & does not exist
156No delivery for the material
157Order has no or faulty planned costs or overhead
158Routing/master recipe in actuals differs from qty structure for target
159Reporting point/operation &: WIP cannot be negative
160Material: &. Conversion from & to base unit of measure not possible (&)
161WIP or scrap calculation for parallel operation sequences not possible
162Cannot calculate target costs - itemization missing
163Product cost collector & has no planned costs
164No reporting points found
165No target costs in target cost version & - missing plan for & &
166Measuring point/operation: &. Inconsistent quantities
167No target costs due to invalid cost component split
168No operations found
169No target costs because no price for material & & in currency &
170Cost est. does not exist. Mat./Plant/ProdVers/CostVar/Date: & & & &
171No cost estimate. Mat./Plant/CostVers/CostVar/Date: & & & &
172No cost estimate exists for sales order & &
173No cost estimate exists for project &
174Reference object & not allowed
175Cannot find routing/master recipe for order
176Cannot calculate target costs
177The target cost version is not intended for variance calculation
178The version is not intended for WIP calculation
179Routing/master recipe for order: & & - material: & &
180No calculation of target costs in version & for fixed-price co-products
181Routing/master recipe order: & - material: &
182Cost estimate does not exist. Material/Plant/Process/Date: & & & &
183Production process &1 does not exist
184Valuation at target costs on basis of preliminary cost estimate
185Valuation at target costs on basis of current standard cost estimate
186Valuation at target costs on basis of alternative material cost estimate
187No price for fixed-price co-product &1 &2
188Cost object & was not found
189No overhead could be calculated
190Reporting point/routing: &. Overhead not calculated
191Cannot calculate work in process at target costs
192Cannot calculate scrap variances
193Product cost collector does not allow processing in tgt cost vers &1
194Unit of measure for confirmation cannot be converted
200*********** Target/Scrap/Variance: Orders (201-399) *********************
201Final delivery was not carried out until period &, fiscal year &
202Order belongs to cost object hierarchy &
203Order is locked
204Order is closed
205Not technically completed until period & of fiscal year &
206No suitable settlement rule found for object &
207Order is marked for deletion
208Target cost version & invalid
209Reversal will not generate a control record
210Reversal will not generate a worklist
211You have reached the end of the list
212You have reached the beginning of the list
213Order is assigned to project &
214Order has deletion indicator
215Order has no variance key
216Order is assigned to sales order &
217Order has multiple items (joint production)
218Order is part of a collective order (leading order &)
219No suitable order (item) found
220Object proc.: Runtime (real time) &, runtime (total of tasks) &
221Leading order & belongs to cost object hierarchy &
222Leading order & is assigned to project &
223Leading order & has deletion indicator
224Leading order & has no variance key
225Leading order & assigned to sales order &
226Leading order & has multiple items (joint production)
227No collective orders processed
228Leading order & not found
229Control records saved
230Could not generate worklist
231& (&) is greater than & (&)
232Transaction cannot be executed
233No orders for joint production processed
234Valuation variant & for WIP and scrap not found
235Specify a valuation variant or set the default flag
236Cannot calculate target costs with this cost estimate
237With costing variant type "S" specify a costing variant and version
238Specify an appropriate costing variant
239Delivery date not set. Notify your system administrator
240Date of technical completion not set. Notify your system administrator
241Scrap calculation not supported in joint production
242WIP calculation at target costs not supported in joint production
243No orders for sales order or project processed
244Only orders for sales order or project are processed
245Only orders for joint production are processed
246Only collective orders are processed
247Leading order & is assigned to product cost collector &
248Order assigned to product cost collector &
249Process orders linked to cost object hierarchy: only test run allowed
250Collective orders selected: &
251Period/fiscal year invalid
252Choose a maximum of 5 target cost versions
253The order has the status "Error in cost calculation"
254The planned quantity is in the future
255No costing variant for planned costs in order
400************** Variances: Cost Objects (401-599) ************************
401Cost object & has no variance key
403System error: Cost element & & does not exist
404System error when reading cost element & &
405& hierarchies processed. & hierarchies have variances
406No line items exist. First start processing
407& hierarchies were processed. See error log
408Target cost version & not allowed for & &
409Target cost version & (planned/planned comparison) not allowed
600************** Variances: Cost Center (601-799) *************************
601Controlling area & does not exist. Please check your entry
602Target cost version & not defined in controlling area &
603Enter a cost center
604Specify a cost center group
605Cost center group &/& does not exist
606Target cost version & not defined in controlling area &
607Technical error & in FB G_OBJECT_GET
608No valid cost centers were found in the interval
609Please enter correct interval
610Technical error & in FB G_COMBINATIONS_BUILD
611Technical error & in FB G_COMBINATIONS_GET_EXIT
612Variance variant missing from tgt cost version & in CO area &
614Completed. Data was saved
615Test run completed
616Transaction completed. See messages
617Transaction completed in test run. See messages
618No control data for CO area &, fiscal year & (check your entry)
620The sum of the equivalence numbers is zero
621&
622Technical error: & & &
623Activity type &: Field overflow on operating rate
624&: field overflow during summation
625************** Processing Steps *****************************************
626Step 1: cost center data read
627Step 2: actual costs split according to target costs
628Step 3: costs split according to splitting rules
629Step 4: variances calculated
630************** General Error Messages for List Processing ***************
631Function not possible for totals lines
632Position the cursor on a line in the list
633This is a credit line
634Selected combination has no variances
635Function not possible for this line
636The target cost version you entered does not exist
637No data could be selected for target cost version &
638The list does not contain any data
639Position the cursor on a display field
640********** Define List Variant **************
641Key fields in the list cannot be deleted
642Position the cursor on the display field or in the field list
643First select a field with 'Cut'
644Use 'Cut' to delete or to select fields
645List does not contain any value fields
646Maximum list width (& characters) exceeded
647Display variant & does not exist
648Display variant saved
649Display variants supplied by SAP cannot be changed
650********** Processing ***********************
651Test run without detailed list
652Background processing with only one cost center
653Background processing in test run
654Background processing test run without detailed list
660*** Messages for Selection Variants
661Please specify a selection variant for cost centers
662Selection variant & for cost centers is missing
740*** List Variants ***
741First choose a list variant
742You did not choose a variant for the list structure
750********** Sorting **********
751You selected more than three sort fields
800******** Background Processing/General (800-899) ************************
801Period & is a special period
802Application & not allowed for
803& seconds to go...
804List output in spool request &
805List output to printer &
806Choose at least one entry
807Choose only one entry
808Choose no more than & entries
809& & & &
810Parameter name & has & places. The maximum allowed is 8
811The value of parameter & is too long: & bytes but only 45 are allowed
812Field & incorrectly typed ("&"). P = parameter, S = selection option
813Enter a valid server group
814No valid server group found
815Specify a valid factory calendar
816Enter a valid target server
817No valid factory calender found
818No valid event found
819No valid job found
820No valid operation mode found
821Function &1 is not supported here
822The indicator "only execute on workdays" was set automatically
823The indicator "only execute on workdays" is ignored
824Restrictions are ignored. No start date specified
850No authorization to change the costing view
851No authorization to change the material data in plant &
852No change documents will be written for changes in material master
853Variance calculation cannot be reset - there are dependent entries
863DO NOT USE
864DO NOT USE
865DO NOT USE
866DO NOT USE
867DO NOT USE
868DO NOT USE
869DO NOT USE
870DO NOT USE
871DO NOT USE
872DO NOT USE
873DO NOT USE
874DO NOT USE
875DO NOT USE
876DO NOT USE
877DO NOT USE
878The maximum number of tasks was reduced to &
879Server group & was selected for parallel processing
880Specify a valid host
881No target hosts were found
882Specify a valid variant for report &
883No variants were found for report &
884Specify a server group
885& jobs created for user &
886The job & could not be released
887Error when transferring the print parameters
888If you start immediately, the planned start date is ignored
889Error when locking the request report
890Start date is in the past
891Processing was ended without job scheduling
892Enter a start date
893Latest start date is before planned start date
894Specify a job name
895Job & for user & is &
896Cannot generate report &1
897No report name specified for the SUBMIT. Calling program: &1
898Error in job scheduling. Function module: &1, return code &2-&3
899Error reading domain &, value &
Privacy Policy