KV - Abweichungs-Analyse Kostenstellen und Kostentraeger
The following messages are stored in message class KV: Abweichungs-Analyse Kostenstellen und Kostentraeger.
It is part of development package KV in software component CO-PC-OBJ. This development package consists of objects that can be grouped under "Variance Analysis RK-S/RK-K".
It is part of development package KV in software component CO-PC-OBJ. This development package consists of objects that can be grouped under "Variance Analysis RK-S/RK-K".
Message Nr ▲ | Message Text |
|---|---|
| 000 | ************** General (001-149) **************************************** |
| 001 | Controlling area & does not exist |
| 002 | Fiscal year variant & does not exist. Check the assignment |
| 003 | No authorization for & & in controlling area & |
| 004 | No authorization for &, & in controlling area & |
| 005 | Enter an order number |
| 006 | Processing will be carried out across plants |
| 007 | No target cost versions selected |
| 008 | Order number & does not exist. Check your entry |
| 009 | Order & & was already selected |
| 010 | No worklist found |
| 011 | Order does not have status DLV or TECO |
| 012 | First select the required orders and target cost versions |
| 013 | Worklist is switched on |
| 014 | Worklist is switched off |
| 015 | & orders (items) processed. & of these had errors |
| 016 | & orders (items) processed. One of these had errors |
| 017 | No orders (order items) could be processed |
| 018 | Enter at least one target cost version |
| 019 | The versions you selected were transferred |
| 020 | Version & was transferred |
| 021 | Messages saved under document number & |
| 022 | No messages found under the number & |
| 023 | Product cost collectors are always processed by period |
| 024 | Final delivery period is before data entry period |
| 025 | Period entered is in the future |
| 026 | Order type & does not exist. Check your entry |
| 027 | Order type & not available. Check your entry |
| 028 | Data records are being processed by & |
| 029 | System error when locking the data records |
| 030 | Incorrect entry for locking data records |
| 031 | No target cost versions exist in controlling area & |
| 032 | Controlling area: &. Company code currency differs |
| 033 | Plant & does not exist. Check your entry |
| 034 | Tgt cost version &: No plan costs in period &, fiscal year & |
| 035 | Target cost version & not defined. Check your entry |
| 036 | Variance key & not defined |
| 037 | No messages found |
| 038 | Variance variant & not allowed |
| 039 | & orders (items) processed. No errors in scrap calculation |
| 040 | One order (item) processed. No errors in variance calculation |
| 041 | One order (item) processed. Errors during variance calculation |
| 042 | & orders (items) processed. No errors in variance calculation |
| 043 | One order (item) processed |
| 044 | & orders (items) processed |
| 045 | No messages were issued |
| 046 | Specify run schedule header or material/plant/production version |
| 047 | Specify material, plant, and production process |
| 048 | One order (item) processed. No errors in scrap calculation |
| 049 | Material & does not exist |
| 050 | Production version & for material & & does not exist |
| 051 | No material master record selected |
| 052 | Saving material master records |
| 053 | Material master records not changed |
| 054 | Fiscal year & is invalid |
| 055 | One order (item) processed. Errors in scrap calculation |
| 056 | Object type & is not allowed |
| 057 | No global settings made for repetitive mfg |
| 058 | There is no text for status & in language & |
| 059 | Posting period & is not allowed |
| 060 | No variance calculation possible for order type & |
| 061 | No scrap calculation possible for order type & |
| 062 | Variance key & does not allow variance calculation |
| 063 | Variance key & does not allow scrap calculation |
| 064 | Variance key &: scrap is calculated through variances |
| 065 | Processing with administration record active |
| 066 | Processing with administration record inactive |
| 067 | No administration records found |
| 068 | Display of processing progress is switched on |
| 069 | Display of processing progress is switched off |
| 070 | & control record(s) were deleted. & control record(s) remain |
| 071 | Enter date/time or period/fiscal year |
| 072 | Only target cost versions with reference value type Actual supported |
| 073 | First select a line |
| 074 | Select only one line |
| 075 | No text found |
| 076 | Caution: messages are from & (user &) |
| 077 | Some materials in plant & are still locked -> see text |
| 078 | Program termination: valuation area is not plant level |
| 079 | Current controlling area: &. Assigned to the order: & |
| 080 | Select at least one order category |
| 081 | DO NOT USE |
| 082 | Parallel processing: Error while processing order (return code &) |
| 083 | Order & not found |
| 084 | No logs for application & found |
| 085 | The logs for application & were deleted |
| 086 | Select a worklist |
| 087 | Worklist changed on & at & by user & |
| 088 | Worklist for transaction & saved |
| 089 | Selected lines deleted |
| 090 | Job scheduling is now automatic with respect to plant |
| 091 | Time: &1&2&3&4 |
| 092 | Administration records for transaction & deleted from INDX file |
| 093 | Cost object hierarchy check is deactivated |
| 094 | Worklist for transaction & deleted |
| 095 | No target cost versions set for transaction & |
| 096 | Cost object & reached |
| 097 | Test mode & active |
| 098 | Cost object & - target cost version & reached |
| 099 | System error: & & & & |
| 100 | ************** Variances: Calculation (101-150) ************************ |
| 101 | No internal number range exists for & in controlling area & |
| 102 | Remaining variance still in & |
| 103 | Remaining variances occurred. See long text |
| 104 | Inconsistent units of measure (value group &, object &) |
| 105 | Base unit for material (&1) not same as order unit (delivery unit) (&2) |
| 131 | Version & in controlling area & does not allow variance calculation |
| 149 | Data could not be determined |
| 150 | ************** Calculation of Target Costs (151-199) ******************** |
| 151 | Only remaining var. in version & - no target costs for & & |
| 152 | Order (item) has no material |
| 153 | Order does not exist |
| 154 | No standard cost estimate for material & in plant & on & |
| 155 | Cost estimate with key & does not exist |
| 156 | No delivery for the material |
| 157 | Order has no or faulty planned costs or overhead |
| 158 | Routing/master recipe in actuals differs from qty structure for target |
| 159 | Reporting point/operation &: WIP cannot be negative |
| 160 | Material: &. Conversion from & to base unit of measure not possible (&) |
| 161 | WIP or scrap calculation for parallel operation sequences not possible |
| 162 | Cannot calculate target costs - itemization missing |
| 163 | Product cost collector & has no planned costs |
| 164 | No reporting points found |
| 165 | No target costs in target cost version & - missing plan for & & |
| 166 | Measuring point/operation: &. Inconsistent quantities |
| 167 | No target costs due to invalid cost component split |
| 168 | No operations found |
| 169 | No target costs because no price for material & & in currency & |
| 170 | Cost est. does not exist. Mat./Plant/ProdVers/CostVar/Date: & & & & |
| 171 | No cost estimate. Mat./Plant/CostVers/CostVar/Date: & & & & |
| 172 | No cost estimate exists for sales order & & |
| 173 | No cost estimate exists for project & |
| 174 | Reference object & not allowed |
| 175 | Cannot find routing/master recipe for order |
| 176 | Cannot calculate target costs |
| 177 | The target cost version is not intended for variance calculation |
| 178 | The version is not intended for WIP calculation |
| 179 | Routing/master recipe for order: & & - material: & & |
| 180 | No calculation of target costs in version & for fixed-price co-products |
| 181 | Routing/master recipe order: & - material: & |
| 182 | Cost estimate does not exist. Material/Plant/Process/Date: & & & & |
| 183 | Production process &1 does not exist |
| 184 | Valuation at target costs on basis of preliminary cost estimate |
| 185 | Valuation at target costs on basis of current standard cost estimate |
| 186 | Valuation at target costs on basis of alternative material cost estimate |
| 187 | No price for fixed-price co-product &1 &2 |
| 188 | Cost object & was not found |
| 189 | No overhead could be calculated |
| 190 | Reporting point/routing: &. Overhead not calculated |
| 191 | Cannot calculate work in process at target costs |
| 192 | Cannot calculate scrap variances |
| 193 | Product cost collector does not allow processing in tgt cost vers &1 |
| 194 | Unit of measure for confirmation cannot be converted |
| 200 | *********** Target/Scrap/Variance: Orders (201-399) ********************* |
| 201 | Final delivery was not carried out until period &, fiscal year & |
| 202 | Order belongs to cost object hierarchy & |
| 203 | Order is locked |
| 204 | Order is closed |
| 205 | Not technically completed until period & of fiscal year & |
| 206 | No suitable settlement rule found for object & |
| 207 | Order is marked for deletion |
| 208 | Target cost version & invalid |
| 209 | Reversal will not generate a control record |
| 210 | Reversal will not generate a worklist |
| 211 | You have reached the end of the list |
| 212 | You have reached the beginning of the list |
| 213 | Order is assigned to project & |
| 214 | Order has deletion indicator |
| 215 | Order has no variance key |
| 216 | Order is assigned to sales order & |
| 217 | Order has multiple items (joint production) |
| 218 | Order is part of a collective order (leading order &) |
| 219 | No suitable order (item) found |
| 220 | Object proc.: Runtime (real time) &, runtime (total of tasks) & |
| 221 | Leading order & belongs to cost object hierarchy & |
| 222 | Leading order & is assigned to project & |
| 223 | Leading order & has deletion indicator |
| 224 | Leading order & has no variance key |
| 225 | Leading order & assigned to sales order & |
| 226 | Leading order & has multiple items (joint production) |
| 227 | No collective orders processed |
| 228 | Leading order & not found |
| 229 | Control records saved |
| 230 | Could not generate worklist |
| 231 | & (&) is greater than & (&) |
| 232 | Transaction cannot be executed |
| 233 | No orders for joint production processed |
| 234 | Valuation variant & for WIP and scrap not found |
| 235 | Specify a valuation variant or set the default flag |
| 236 | Cannot calculate target costs with this cost estimate |
| 237 | With costing variant type "S" specify a costing variant and version |
| 238 | Specify an appropriate costing variant |
| 239 | Delivery date not set. Notify your system administrator |
| 240 | Date of technical completion not set. Notify your system administrator |
| 241 | Scrap calculation not supported in joint production |
| 242 | WIP calculation at target costs not supported in joint production |
| 243 | No orders for sales order or project processed |
| 244 | Only orders for sales order or project are processed |
| 245 | Only orders for joint production are processed |
| 246 | Only collective orders are processed |
| 247 | Leading order & is assigned to product cost collector & |
| 248 | Order assigned to product cost collector & |
| 249 | Process orders linked to cost object hierarchy: only test run allowed |
| 250 | Collective orders selected: & |
| 251 | Period/fiscal year invalid |
| 252 | Choose a maximum of 5 target cost versions |
| 253 | The order has the status "Error in cost calculation" |
| 254 | The planned quantity is in the future |
| 255 | No costing variant for planned costs in order |
| 400 | ************** Variances: Cost Objects (401-599) ************************ |
| 401 | Cost object & has no variance key |
| 403 | System error: Cost element & & does not exist |
| 404 | System error when reading cost element & & |
| 405 | & hierarchies processed. & hierarchies have variances |
| 406 | No line items exist. First start processing |
| 407 | & hierarchies were processed. See error log |
| 408 | Target cost version & not allowed for & & |
| 409 | Target cost version & (planned/planned comparison) not allowed |
| 600 | ************** Variances: Cost Center (601-799) ************************* |
| 601 | Controlling area & does not exist. Please check your entry |
| 602 | Target cost version & not defined in controlling area & |
| 603 | Enter a cost center |
| 604 | Specify a cost center group |
| 605 | Cost center group &/& does not exist |
| 606 | Target cost version & not defined in controlling area & |
| 607 | Technical error & in FB G_OBJECT_GET |
| 608 | No valid cost centers were found in the interval |
| 609 | Please enter correct interval |
| 610 | Technical error & in FB G_COMBINATIONS_BUILD |
| 611 | Technical error & in FB G_COMBINATIONS_GET_EXIT |
| 612 | Variance variant missing from tgt cost version & in CO area & |
| 614 | Completed. Data was saved |
| 615 | Test run completed |
| 616 | Transaction completed. See messages |
| 617 | Transaction completed in test run. See messages |
| 618 | No control data for CO area &, fiscal year & (check your entry) |
| 620 | The sum of the equivalence numbers is zero |
| 621 | & |
| 622 | Technical error: & & & |
| 623 | Activity type &: Field overflow on operating rate |
| 624 | &: field overflow during summation |
| 625 | ************** Processing Steps ***************************************** |
| 626 | Step 1: cost center data read |
| 627 | Step 2: actual costs split according to target costs |
| 628 | Step 3: costs split according to splitting rules |
| 629 | Step 4: variances calculated |
| 630 | ************** General Error Messages for List Processing *************** |
| 631 | Function not possible for totals lines |
| 632 | Position the cursor on a line in the list |
| 633 | This is a credit line |
| 634 | Selected combination has no variances |
| 635 | Function not possible for this line |
| 636 | The target cost version you entered does not exist |
| 637 | No data could be selected for target cost version & |
| 638 | The list does not contain any data |
| 639 | Position the cursor on a display field |
| 640 | ********** Define List Variant ************** |
| 641 | Key fields in the list cannot be deleted |
| 642 | Position the cursor on the display field or in the field list |
| 643 | First select a field with 'Cut' |
| 644 | Use 'Cut' to delete or to select fields |
| 645 | List does not contain any value fields |
| 646 | Maximum list width (& characters) exceeded |
| 647 | Display variant & does not exist |
| 648 | Display variant saved |
| 649 | Display variants supplied by SAP cannot be changed |
| 650 | ********** Processing *********************** |
| 651 | Test run without detailed list |
| 652 | Background processing with only one cost center |
| 653 | Background processing in test run |
| 654 | Background processing test run without detailed list |
| 660 | *** Messages for Selection Variants |
| 661 | Please specify a selection variant for cost centers |
| 662 | Selection variant & for cost centers is missing |
| 740 | *** List Variants *** |
| 741 | First choose a list variant |
| 742 | You did not choose a variant for the list structure |
| 750 | ********** Sorting ********** |
| 751 | You selected more than three sort fields |
| 800 | ******** Background Processing/General (800-899) ************************ |
| 801 | Period & is a special period |
| 802 | Application & not allowed for |
| 803 | & seconds to go... |
| 804 | List output in spool request & |
| 805 | List output to printer & |
| 806 | Choose at least one entry |
| 807 | Choose only one entry |
| 808 | Choose no more than & entries |
| 809 | & & & & |
| 810 | Parameter name & has & places. The maximum allowed is 8 |
| 811 | The value of parameter & is too long: & bytes but only 45 are allowed |
| 812 | Field & incorrectly typed ("&"). P = parameter, S = selection option |
| 813 | Enter a valid server group |
| 814 | No valid server group found |
| 815 | Specify a valid factory calendar |
| 816 | Enter a valid target server |
| 817 | No valid factory calender found |
| 818 | No valid event found |
| 819 | No valid job found |
| 820 | No valid operation mode found |
| 821 | Function &1 is not supported here |
| 822 | The indicator "only execute on workdays" was set automatically |
| 823 | The indicator "only execute on workdays" is ignored |
| 824 | Restrictions are ignored. No start date specified |
| 850 | No authorization to change the costing view |
| 851 | No authorization to change the material data in plant & |
| 852 | No change documents will be written for changes in material master |
| 853 | Variance calculation cannot be reset - there are dependent entries |
| 863 | DO NOT USE |
| 864 | DO NOT USE |
| 865 | DO NOT USE |
| 866 | DO NOT USE |
| 867 | DO NOT USE |
| 868 | DO NOT USE |
| 869 | DO NOT USE |
| 870 | DO NOT USE |
| 871 | DO NOT USE |
| 872 | DO NOT USE |
| 873 | DO NOT USE |
| 874 | DO NOT USE |
| 875 | DO NOT USE |
| 876 | DO NOT USE |
| 877 | DO NOT USE |
| 878 | The maximum number of tasks was reduced to & |
| 879 | Server group & was selected for parallel processing |
| 880 | Specify a valid host |
| 881 | No target hosts were found |
| 882 | Specify a valid variant for report & |
| 883 | No variants were found for report & |
| 884 | Specify a server group |
| 885 | & jobs created for user & |
| 886 | The job & could not be released |
| 887 | Error when transferring the print parameters |
| 888 | If you start immediately, the planned start date is ignored |
| 889 | Error when locking the request report |
| 890 | Start date is in the past |
| 891 | Processing was ended without job scheduling |
| 892 | Enter a start date |
| 893 | Latest start date is before planned start date |
| 894 | Specify a job name |
| 895 | Job & for user & is & |
| 896 | Cannot generate report &1 |
| 897 | No report name specified for the SUBMIT. Calling program: &1 |
| 898 | Error in job scheduling. Function module: &1, return code &2-&3 |
| 899 | Error reading domain &, value & |