LD - Logistics Automotive Line Design
The following messages are stored in message class LD: Logistics Automotive Line Design.
It is part of development package LALD in software component PP-FLW. This development package consists of objects that can be grouped under "Logistics Automotive Line Design".
It is part of development package LALD in software component PP-FLW. This development package consists of objects that can be grouped under "Logistics Automotive Line Design".
Message Nr ▲ | Message Text |
---|---|
000 | Work center &1 does not exist in line hierarchy &2 |
001 | Select entries for deletion |
006 | Number of workdays must be at least 1 and cannot exceed 31 |
007 | Please enter value greater than 0 |
008 | Only periods &1, &2 and &3 are allowed |
009 | Please place the cursor on a line segment |
010 | Line hierarchy &1 already exists in plant &2 |
011 | Line hierarchy &1 does not exist in plant &2 |
012 | Internal line hierarchy structure is damaged |
013 | Please enter plant and line hierarchy |
014 | Line segment already exists in hierarchy |
015 | Please select a line segment |
016 | Please only select one line segment |
017 | Please select a line segment |
018 | You did not select a line segment |
019 | Line hierarchy is already being processed by user & |
020 | System error occurred when blocking line hierarchy |
021 | Update termination: line hierarchy &1, plant &2 |
022 | The &1 &2 takt &3 for material &4 has been deleted |
023 | You can only change the number of takts at the lowest level |
024 | No authorization for creating a line in plant & |
025 | No authorization for changing a line in plant & |
026 | No authorization for displaying a line in plant & |
027 | The selected line segment already exists in the graphic |
028 | Line hierarchy & is saved |
029 | Error setting up the network data |
030 | No line has been assigned to the routing |
031 | Graphic screen is already open |
032 | Only &3 takts have been defined for work center &1 in plant &2 |
033 | Select at least one operation |
034 | Line & is not allowed in plant & |
035 | Line was not specified |
036 | Scheduling work center defined is not valid |
037 | The &1 &2 takt &3 for material &4 has been changed |
038 | Line segment selected has already been defined as a feeder line |
039 | You have not selected a line hierarchy. The system cannot save |
040 | Shift entries only allowed for daily dates |
041 | Period ind. entered -> period and takt time necessary |
042 | Enter a period indicator |
043 | An entry already exists for the same date. Please change |
044 | Program error (contact your system administrator) |
045 | More than one sequence on one work center |
046 | Line segment &1 does not exist in line hierarchy &2 |
047 | Takt time for line &1 in plant &2 already being processed by user &3 |
048 | System error occurred when blocking takt time |
049 | Unknown error occurred when blocking takt time |
050 | No materials have been assigned to the line hierarchy |
051 | The takt time could not be saved |
052 | No line hierarchy exists for production line & |
053 | The line segment selected has not been defined as a feeder line |
054 | The line hierarchie contains no line segments which can be selected |
055 | The line segment you entered was not found. |
057 | Error reading components for material & in plant & |
059 | Several valid production versions exist for the line. Please select |
060 | If data changed, please execute function 'refresh line' |
061 | Internal administration table damaged. |
062 | No line segments exist |
063 | Error calculating longest path. Path cannot be displayed |
064 | Op. &1 in sequence &2 in the routing group &3 altern. &4 not found |
065 | Field overflow in scheduling formula in op. &1, seq. &2, grp &3, alt. &4 |
066 | Division by 0 in scheduling formula in op. &1, seq. &2, grp &3, alt. &4 |
067 | Error in operation &1, sequence &2 of routing group &3 altern. &4 |
070 | Selection not possible as value area too large |
071 | The value entered must be at least &1 and maximum &2 |
080 | The takt time was set to the maximum possible value |
081 | Enter a maximum production rate |
082 | Please enter a material |
083 | Production version &1 for material &2 in plant &3 does not exist |
084 | Time unit not maintained for the rate. No takt time calculation |
085 | Line segment &1 is not part of buffered section &2 |
086 | Line segment &1 cannot be selected |
087 | Only &2 takts have been defined for line segment &1 |
088 | Enter the takt |
089 | No materials are assigned to the line hierarchy. Function not possible. |
090 | The exit takt cannot come before or at the same point as the entry takt |
091 | Only &1 takts are defined for the line |
100 | Please select the orders to be checked |
101 | Select just one order |
102 | Select an order |
103 | Please select the orders to be displayed |
104 | No components exist |
105 | Error occurred during conversion of unit of measurement &1 |
106 | Line balances still exist for this line hierarchy |
107 | Planned rates still exist for this line hierarchy |
108 | Units could not be changed because line balances exist. |
109 | Planned rates exist that exceed the maximum rate. |
110 | Update termination |
111 | Material-dependent rates are adapted to the corresponding maximum rate |
112 | No materials have been selected |
113 | You have reached the first selected material |
114 | You have reached the last selected material |
115 | Material &1 already exists Change the existing production rate |
116 | You have reached the first material |
117 | You have reached the last material |
118 | No material-dependent production rates have been maintained |
149 | *************Start operational method sheets from # 150 ***************** |
150 | No operations available for the selection criteria specified |
151 | Enter at least one print template. |
152 | Error at OLE interface (&1). Printing not possible |
153 | Material &1 does not exist in plant &2 |
154 | First of all select a routing |
155 | A valid routing has not been found for the selection criterion |
156 | Data could not be loaded |
157 | A suitable routing has not been found in the production version specified |
158 | Dialog box could not be accessed |
159 | **********Start operational method sheet print from 160 ***************** |
160 | You must enter at least one template |
161 | Enter one version of the line balance |
162 | Data for the components could not be read |
163 | Template entered for individual operation does not exist |
164 | Template entered for cover sheet does not exist |
166 | Enter a line segment for the takts |
167 | The system cannot load the graphic for the OMS |
168 | Line hierarchy &1 is not available in plant &2 |
169 | Data for the operations could not be read |
170 | The line balance specified does not exist |
171 | The material specified is not available in plant &1 |
172 | On specifying an operation also enter the sequence |
173 | "Only changes to ops since:" has been flagged. Please enter a date. |
174 | Data for the production resources/tools could not be loaded |
175 | Line segment &1 does not exist in line hierarchy &2 |
176 | Takt is ignored, as no takts have been maintained in the line segment |
177 | Inspection characteristic data could not be read |
178 | First of all select a production version |
179 | ***************Operational method sheet Customizing from 180************* |
180 | Task list header data could not be read |
181 | Please enter all fields |
182 | Field name invalid, please correct |
183 | The document could not be loaded |
184 | Document could not be deleted |
185 | Data must be saved before carrying out this action |
186 | Function only possible when editing a layout. |
187 | Please select only one layout to be edited. |
188 | Document could not be created. |
189 | Document could not be blocked. |
190 | Document block could not be released. |
191 | The number of the Word table has already been used |
192 | You have not selected a plant |
193 | You have not selcted a line hierarchy |
194 | You have not specified a material |
195 | Document template have been saved |
196 | Layout &1 does not exist |
197 | First of all select a layout |
199 | ******************* Line balancing from 200 *************************** |
200 | Please enter a version |
201 | A line balancing version &2 already exists for line hierarchy &1 |
202 | Line balancing version &1 does not exist |
203 | "Valid from" date is later than "valid to" date |
204 | Please enter "Valid from" and "Valid to" dates |
205 | Please select one line balance only |
206 | Please select a line balance |
207 | Update terminated for line hierarchy &1 plant &2 line balance &3 |
208 | Select one item only |
209 | Please select an item |
210 | Specify routing key in full |
211 | Material &1 already exists in the line balance |
212 | "Valid from" date is in the past |
213 | "Valid to" date is in the past |
214 | Line balance &1 has been deleted |
215 | Material &1 has no reference to a production version |
216 | Active line balances are not allowed to overlap (time) |
217 | Line balance &1 is active and in the area of validity for line balance &2 |
218 | Enter a status |
219 | The indicator "No line balancing" is set for the line hierarchy. |
220 | No unit of measurement has been maintained for execution times |
221 | The indicator "Maximum line balancing" is deleted in line balance &1 |
222 | No routing is assigned to material &1. Function not possible. |
223 | There are no materials in the line balance. |
224 | Not all materials have routings assigned to them. |
225 | No routing is assigned to the material. |
226 | Enter an existing line balance |
227 | There are no suitable production versions for material &1. |
228 | THe line balance has been set to "inactive" |
229 | Please select a valid column. |
230 | The routing entered is not valid for material &1. |
231 | Error during conversion of planned unit of measure &1 to line unit &2. |
232 | Line balance & has been saved. |
233 | Routing &1 &2 &3 is already being used in other line balances. |
234 | Routings are already being used -> Function: "Routing usage". |
235 | The routing you entered does not exist. |
236 | No multiple usage of routings exists. |
237 | "Valid from" date &1 is overwritten by the date from the change no. |
238 | The maximum production rate of an active line balance cannot be 0. |
250 | ***************Rate-based line from 250 ********************************* |
251 | Please enter the start date of the validity period |
252 | Please enter the end date for the validity period |
253 | Enter a rate |
254 | Enter a unit of measure |
255 | Please enter a time unit |
256 | Please enter a unit with dimension 'time' |
257 | Error during conversion &1 in base unit of measure &2 |
258 | Unit &1 cannot be converted into unit &2 of the production line |
259 | Rate entered is greater than the maximum rate for the production line |
260 | Period overlaps have been adjusted |
261 | No unit of measure has been maintained for line hierarchy &1 |
262 | No time unit has been maintained for line hierarchy &1 |
263 | Operative production rate/takt time has been saved. |
264 | The material-dependent rate is larger than the maximum rate of the line |
265 | Material &1 is not maintained in plant &2 |
266 | Material description for material &1 is not maintained in language &2 |
267 | Line hierarchy capacities displayed |
268 | Line hierarchy capacities hidden |
269 | Filter is reset |
270 | Operations have been filtered according to the materials selected |
399 | ************** Line hierarchy from 400 ********************************** |
400 | No buffers can be inserted at the top level |
401 | A buffer has already been defined for the line segment selected |
402 | No line segments can be inserted underneath buffers |
403 | No number of takts can be maintained for a buffer |
404 | The number of takts has been adjusted for the neighboring line segments |
405 | The number of takts has been set to 0 for the subsequent line segments. |
406 | Please position the new line segment on another line segment |
407 | Sort buffers can only be defined on the first level of the hierarchy |
408 | Sort buffers can only be defined in the main production line |
409 | Segments with successors cannot be defined as sort buffers |
410 | A buffer already exists at this point |
411 | A buffer cannot be moved to this point |
412 | No line segments can be appended underneath buffers |
413 | Buffers cannot be transferred |
414 | This data is not maintained for the selected line segment |
415 | No processing profile can be assigned to this line segment |
416 | Please firstly maintain the number of takts for this hierarchy. |
450 | Operations cannot be moved to this area. |
451 | Error while reading operation data. Action terminated. |
452 | Error while writing the operation data. Action terminated. |
453 | Select a line segment/takt. |
454 | The takt to be closed still coontains operations. Action terminated. |
455 | The standard value keys are different for old and new work center. |
456 | Work center &1 is used in sequence &2 and sequence &3. |
457 | The existing operations belong to a different sequence! |
458 | The operation you moved is the branch or return operation of a sequence. |
459 | Operations from reference operation sets cannot be moved. |
460 | There are no free operation numbers available. |