MD - Material Requirements Planning (MRP)
The following messages are stored in message class MD: Material Requirements Planning (MRP).
It is part of development package MD in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Application Development R/3 Material Requirements Planning".
It is part of development package MD in software component PP-MRP-BD. This development package consists of objects that can be grouped under "Application Development R/3 Material Requirements Planning".
Message Nr ▲ | Message Text |
---|---|
000 | ****COMMENT: Messages used generally |
001 | Function & is not supported |
002 | System locking error |
003 | Choose a line |
004 | You do not have the necessary authorization for this function |
005 | Consistency check error in program &1 routine &2 |
006 | Background job & was scheduled |
007 | Plant ID is invalid |
008 | MRP controller not found |
011 | Individual project planning for &1 &2 locked |
050 | Selection rule & does not exist |
051 | Display filter & does not exist |
052 | MRP list for material & & & has been created |
053 | Requirements/stock list for material & & & has been created |
054 | Stock/requirements list for material & & & could not be compiled |
055 | MRP list for material & & & could not be compiled |
091 | Only one setting is possible for this option |
095 | Discontinued parts not possible. Discontinuation is controlled by SAP APO |
100 | *****COMMENT: Messages for long-term planning |
101 | No data changed |
102 | Error saving planning scenario & |
103 | Error saving the independent requirements versions for the scenario |
104 | Planning scenario & was saved |
105 | Planning scenario & exists already |
106 | Planned ind. reqmts version & has already been assigned |
107 | Simulation version is same as the version to be replaced |
108 | Finish date lies before the start date |
109 | Planning scenario & does not exist |
110 | Planning scenario & was deleted |
111 | Error deleting planning scenario & |
112 | Version & must be allocated to the scenario first |
113 | Error reading planning scenario & |
114 | Planning scenario & has not been released |
115 | Planning scenario & is blocked by another user |
116 | Scenario & is not available for plant & |
117 | Error saving the plants for the scenario |
118 | Date & lies outside the planning period |
119 | Please adjust dates for the independent requirements versions |
120 | Plant & has already been allocated |
121 | You have not yet allocated any planned indep.reqmts versions |
122 | You have not yet allocated any plants |
123 | Planning scenario & was released and saved |
124 | Version & of the purchasing info system is already being used |
125 | Planning version & has already been allocated to the scenario |
126 | The planned indep.reqmts versions were activated |
127 | No appropriate planned indep.reqmts were found for the version |
128 | Start date not valid for fixed receipts |
129 | Background job could not be created |
130 | You do not have the necess.authorization for this function (see long txt) |
131 | Simulation planned orders cannot be changed manually |
132 | Simulation planned orders cannot be converted |
133 | Simulation planned orders cannot be firmed |
134 | Multi-level replacements are not possible |
135 | Replacements in overlapping periods is not possible |
136 | Please enter a target version |
137 | Simulation version &1 cannot be copied to the same version number |
138 | Planning period in the past |
139 | Version & of stock controlling is used already |
140 | No data saved. Please evaluate scenario first |
141 | Please enter a scenario number not equal to '000' |
142 | Firmed recpts not taken into consideration in planning scenario & |
143 | Planned order &1 does not belong to planning scenario &2 |
144 | No single-item planning exists in planning scenario &. |
145 | Simulative orders should not be displayed or changed using & |
146 | Scenario &1 is not assigned to sales order plant &2 |
147 | Scenario &1 is not set for single-item planning. |
148 | 'Use firm puchase requisitions' without including fixed receipts |
149 | 'Use firm planned orders' without including fixed receipts |
150 | *****COMMENT Messages for : long-term planning / PURCHIS |
151 | No data saved. Please evauluate the scenario for the PURCHI first |
152 | Please specify which planned price (1-3) is to be used |
153 | A new version &1 for info structure S012 will be created |
154 | Version &1 '&2' will be evaluated |
155 | No data for scenario &1 exists in PURCHIS |
156 | Material &1 is a direct production material - function not permitted |
157 | Do not enter planning scenario for copying - function not possible |
158 | Please enter start date |
159 | No data for scenario &1 exist in Inventory Controlling |
160 | *** COMMENT: Calculation of simulative initial stock |
161 | Simulative initial stocks for scenario & were saved |
162 | Error at date entry |
163 | No authorization for plant & |
164 | Planning scenario & has not been assigned any plants |
165 | Simulative opening balance (stock) not allowed with MRP areas |
170 | *** COMMENT: Delete planning scenario |
171 | Firstly delete dependent data for scenario &1 |
172 | No dependent data for scenario &1 has been found |
173 | No dependent data has been selected for deletion |
174 | Check dependent data: &1 |
180 | *** COMMENT: Gross lot sizes |
181 | Enter a gross lot size for the scenario |
182 | Lot size procedure &1 being used is not gross lot size procedure |
183 | Lot size procedure &1 is not defined |
190 | Different periods not possible during activation |
200 | *****COMMENT: Messages for CO integration (Maintain T442C) |
201 | Version &1 is not a planned version |
202 | No planned integration for version &1 in fiscal year &2 |
203 | No change possible as data already transferred |
210 | Error reading version &1 in controlling area &2 |
211 | Version &2 is not maintained for fiscal year &1 |
212 | Please enter a planning scenario |
250 | *****COMMENT: Messages for parallel MRP |
251 | Please check the destinations for parallel MRP |
252 | Total planning run stopped due to &1 terminations (dumps) of &2 materials |
253 | No instance exists for planned order &1 (Please see long text!) |
260 | Error in server group. The system will switch to sequential reading |
261 | Error with RFCs. The system will switch to sequential reading |
300 | *****COMMENT: Capacity planning messages (SAPLM61D) |
301 | Choose a valid field |
302 | Please select a valid field for the display of the pegged capacity |
303 | Please place the cursor on a planned order number |
304 | No capacity load exists for the specified work center |
305 | No work centers with capacity requirements were found |
306 | Processing terminated by the user |
307 | No scheduling log exists |
309 | Program error: internal table & is inconsistent |
310 | No planning calendar exists for the material |
311 | Period & was not found |
312 | No periods exist with overload |
313 | Capacity for planned order has been scheduled |
314 | The scrap quantity was adjusted proportionally |
315 | Please enter start and finish date |
316 | Planned order belongs to another material |
317 | MRP area &1 is not defined in plant &2 |
318 | MRP area &1 has not been defined |
319 | Material &1 is not defined for MRP area &2 |
320 | Enter plant or MRP area |
321 | Plant MRP area and plant must have the same name |
322 | Only plant MRP areas are allowed to have 1 to 4 digits |
323 | MRP area &1 has been marked to be deleted for material &2 |
324 | Material &1 is not defined in plant &2 |
325 | Storage loc. &3 does not belong to the same MRP area as storage loc. &3 |
326 | Storage location &1 does not belong to MRP area &2 |
327 | Enter plant |
328 | The storage location type of MRP area must be allocated a recvg stor. loc |
329 | Capacity overload for capacity &1 and capacity category &2 in period &3 |
335 | When planning with MRP areas, you should use scope of planning |
350 | *****COMMENT: Customizing MRP area |
351 | View &1 is not possible for MRP type &2 |
352 | With MRP area type &1, you are not intended to enter a recvg stor. loc. |
353 | Subcontractor MRP area &1 in plant &2 maintained incorrectly |
354 | With MRP area type 02, you have to enter a receiving storage location |
356 | This function is obsolete - all plants MRP-relevant. |
357 | Plant &1 has already been assigned a different MRP area |
358 | The creation of subcontracting MRP areas is not supported |
363 | Subcontractor &1 has already been allocated to MRP area &2 |
365 | Deletion of MRP area &1 is not possible |
366 | Not possible to delete storage location &3. Used by material &2 |
367 | Not possible to delete MRP area &1, as it is assigned to material &2 |
368 | Storage location &2 is receiving storage location of MRP area &1 |
369 | Only plant MRP area is possible for this element |
370 | Vendor &1 is being used by material &2, therefore cannot be changed |
371 | Function cannot be executed - MRP areas are not activated |
374 | Deletion of MRP Area &1 is not possible |
375 | Deletion of storage location &2 in MRP area &1 is not possible |
376 | Deletion of supplier &2 in MRP area &1 is not possible |
377 | Deletion is not possible because the production system is not available |
380 | Please enter an MRP area profile |
381 | Please enter an MRP area field |
382 | Field &1 not supported in MRP area profile |
383 | Value &1 not allowed for field &2. |
384 | Please enter a numerical value for field &1. |
385 | Negative values not allowed for field &1. |
386 | Entry too long (enter in the format &1) |
387 | Field overflow for field &1: value &2 |
388 | Input must be in the format &1 |
389 | Check Table &1 not allowed |
400 | ***** COMMENT: Exception messages in MRP |
401 | &1: &2 (A1) |
402 | &1: &2 (A9) |
403 | &1: &2 (N1) |
404 | &1: &2 (N2) |
405 | &1: &2 (N3) |
406 | &1: &2 (N4) |
407 | &1: &2 (S1) |
408 | &1: &2 (S2) |
409 | &1: &2 (S3) |
410 | &1: &2 (S6) |
411 | &1: &2 (S7) |
412 | &1: &2 (S8) |
413 | &1: &2 (T2) |
414 | &1: &2 (T3) |
415 | &1: &2 (T4) |
416 | &1: &2 (V1) |
417 | &1: &2 (V2) |
418 | &1: &2 &3 (V3) |
419 | &1: &2 &3 (U1) |
420 | &1: &2 &3 (U2) |
421 | &1: &2 &3 (U3) |
422 | &1: &2 &3 (U4) |
423 | &1: &2 (U5) |
424 | &1: &2 (P1) |
425 | &1: &2 (P2) |
426 | &1: &2 (P3) |
427 | &1: &2 (P4) |
428 | &1: &2 (S9) |
429 | &1: &2 (U6) |
430 | &1: &2 (C1) |
431 | &1: &2 (S4) |
432 | &1: &2 (U9) |
433 | &1: &2 (U8) |
434 | &1: &2 (S5) |
435 | &1: &2 (W1) |
436 | &1: &2 (W2) |
448 | Stock assigned to the follow-up material is too high |
449 | Part to be discontinued; receipt transferred to follow-up material |
450 | ***** COMMENT: New exception message for MD04/MD05 |
451 | The list was created at &1 hours |
452 | The start date of the interval must be before the end date |
453 | Define traffic light for range of coverage: Press F1 for more information |
454 | Define traffic light for exception groups. Press F1 for more information |
455 | The user settings for traffic lights have been saved |
456 | The user settings for traffic lights have been deleted |
457 | Specify a start or finish date, or delete the time interval |
458 | Split reset to days due to error setting up period totals |
459 | The previous material is displayed again. Press ENTER. |
460 | MRP views for &1 not maintained |
461 | Start Date Set to Current Date |
480 | Scheduling carried out successfully |
481 | Scheduling parameters are not maintained in Customizing |
482 | No capacity requirements determined, see customizing |
483 | Routing does not exist |
484 | No valid routing can be selected |
485 | Scheduling terminated, see log |
486 | Scheduling carried out, see log for error messages |
487 | Scheduling executed, see log for information messages |
488 | Exception group 8 is predefined for terminations |
489 | Range of coverage (yellow) may not be less than range of coverage (red) |
490 | &1: Ranges of coverage and exception groups within range of &2 |
491 | &1 for material &2: &3 days' supply is less than limiting value of &4 |
492 | &1 for material &2: Rcpt days' supply 1 &3 is less than limiting value &4 |
493 | &1 for material &2: Rcpt day's supply 2 &3 is less than limiting value &4 |
494 | &1 for material &2: There are exceptions to exception group &3 |
495 | You can display a maximum of &1 curves at the same time |
496 | The display period must be a minimum of 1 day |
497 | The minimum Y value must be less than the maximum Y value |
498 | Range of coverage (green) must not be lower than range of cov. (yellow) |
500 | ***** COMMENT: new exception messages in MRP for components |
501 | &1: Not covered by master production schedule at component level (S8) |
502 | &1: Start date of components in past (T3) |
503 | &1: Finish date of components in past (T4) |
504 | &1: Preference for operation at component level (U1) |
505 | &1: Move operation to component level (U2) |
510 | Overflow: More than 9999 items in BOM recursive for BOM &? |
511 | Could not explode phantom assembly &1 |
512 | Overflow: More than 99 phantom assemblies on level &1 of MatBOM for &2 |
513 | Overflow: more than &1 phantom assemblies for MatBOM &2 &3 &4 |
550 | ***** COMMENT: Messages for grouping |
551 | WBS element has not been defined as a grouping WBS element |
575 | ******Remarks ****Messages for SOA |
576 | Value PeriodTotalTimeMeasure is mandatory for value 2 of agg. code |
577 | Enter the MaterialSupplyAndDemandViewAggregationLevelCode |
578 | Enter the SupplyPlanningAreaID |
579 | Enter the MaterialInternalID |
580 | Enter the SupplyPlanningAreaTypeCode |
581 | MaterialSupplyAndDemandViewAggregationLevelCode &1 does not exist |
582 | Enter the MaterialSupplyAndDemandViewCategoryCode |
583 | MaterialSupplyAndDemandViewCategoryCode &1 does not exist |
584 | Enter a value in the period_totals_time_measure-unit_code field |
585 | SupplyPlanningAreaTypeCode &1 does not exist |
601 | Only total requirements with manual cost collectors are permitted |
650 | ***** COMMENT: messages for BAPIs |
651 | No imported data has been set with the flag for "change" |
652 | Planned order number has not been entered |
653 | Not possible to change component firming indicator with reqmts totaling |
654 | Planned order & cannot be changed manually |
655 | & planned orders have been selected |
656 | Planning scenario & does not exist |
657 | Planned order & exists |
658 | Enter order type |
659 | Enter a planning plant |
660 | There is a conflict in the import parameters. |
661 | No material components in original planned order & |
662 | Imported component data is identical to available data |
666 | No filter for the external view has been created |
667 | Vendor & has been entered in the system. Correct |
668 | Enter vendor |
669 | This is a SAP standard variant. See long text! |
675 | Implementation of the BAdI delivered inconsistent values |
676 | BAdI & implemented multiple times |
677 | BAdI & for the extraction has no active implementation |
700 | *****COMMENT: Messages for missing table entries |
701 | No entry exists with key '&1' '&2' '&3' in Table T460P |
702 | Unit of measure & does not exist |
703 | Special procurement & has not been maintained for plant & |
704 | Lot size & not maintained |
705 | Warehouse cost record & not maintained for plant & |
706 | Release period key & has not been maintained for plant & |
720 | *****COMMENT: Message for maintenance of flexible transaction calls |
721 | Please choose 'New entries' to maintain navigations of your choice |
722 | The display of examples is only possible after choosing 'New entries' |
723 | Enter a sequential number for this navigation |
724 | Enter a transaction code |
725 | Enter a text |
726 | There are no examples for the MRP element &1 |
727 | Please specify either a text or an icon with text |
728 | A pushbutton has been added for the chosen example |
729 | Invalid transaction code or indicator for external system not set |
730 | Material &1 in plant &2 is not APO-relevant |
731 | No APO system connected |
732 | No active APO integration model for material &1 in plant &2 |
733 | No RFC destination for APO system &1 and CIF application case MD |
734 | Not possible to access the transactions in logical system &1 |
735 | Only materials with unit of measure convertible to &1 are displayed |
736 | Not possible to call up in external system without material context |
750 | *****COMMENT: Messages for production lot master data |
751 | &1 for the production lot &2 is already being processed by &3 |
752 | Enter a production lot number |
753 | Project & for production lot already exists |
754 | WBS element & for production lot already exists |
755 | Enter profile or production lot as reference |
756 | Project &1 for &2 does not exist |
757 | WBS element &1 for &2 does not exist |
758 | No data was changed |
759 | Production lot & created |
760 | Production lot & was changed |
761 | Enter production lot or indicator for reference |
762 | Production lot and reference production lot must be different |
763 | Profile &1 of reference production lot &2 is used instead of profile &3 |
764 | Production lot and reference production lot must have the same material |
765 | WBS BOM for production lot & already exists |
766 | WBS BOM for reference production lot & already exists |
767 | Profile & is for non-valuated project stock |
800 | *** Comment **** Check Material Master for APO |
801 | Check MRP type |
802 | Use a suitable lot-sizing procedure |
803 | Location type not found |
850 | *****COMMENT: messages for XPRA's |
851 | & entries were adjested in the planned order |
852 | KBKO records were set up for & planned order records |
853 | Run-time: & ms |
854 | &1 &2 &3 &4 |
855 | Error determining duration of working time |
856 | No available capacities maintained at &1 |
900 | ******Remarks ****Messages for SOA |
901 | AggregationLevelCode &1 does not exist |
902 | Enter the MaterialSupplyAndDemandViewAggregationLevelCode |
903 | Enter the SupplyPlanningAreaID |
904 | Enter the MaterialInternalID |
905 | Enter the SupplyPlanningAreaTypeCode |
906 | SupplyPlanningAreaTypeCode &1 does not exist |
907 | Enter the MaterialSupplyAndDemandViewCategoryCode |
908 | MaterialSupplyAndDemandViewCategoryCode &1 does not exist |
909 | Enter value in period total time measure - Unit Code field |