MD06 - MRP Area
The following messages are stored in message class MD06: MRP Area.
It is part of development package MD06 in software component MM-CBP. This development package consists of objects that can be grouped under "Development Material Requirements Planning".
It is part of development package MD06 in software component MM-CBP. This development package consists of objects that can be grouped under "Development Material Requirements Planning".
Message Nr ▲ | Message Text |
---|---|
001 | No MRP area is available for plant &1 |
002 | No MRP area is available for client &1 |
003 | Material &1 has not been maintained for MRP area &2 |
004 | Enter an MRP area |
005 | Termination during INSERT: DBPR &1 &2 -3 & already exists |
006 | Termination during READ: DBPR &1 &2 not found |
007 | Enter MRP area and/or plant |
008 | MRP area &1 has not been stored |
009 | MRP area &1 is not assigned to plant &2 |
010 | Material &1 of MRP area &2 is assigned to ref. material consumption |
011 | Material &1 in MRP area &2 is already used as ref. material consumption |
012 | MRP area &1 has already been assigned to material |
013 | Material Requirements Planning at MRP area level is not active |
014 | MRP area &1 flagged for deletion |
015 | MRP area &1 is a plant MRP area. Not possible to use |
016 | MRP area flagged for deletion |
017 | No MRP area data has been changed |
018 | Special procurement key not allowed for MRP area type |
019 | Transfer plant does not correspond to plant MRP area |
020 | The corresponding plant parameters are used for control |
021 | Storage location &3 does not belong to MRP area |
022 | Details Screen not possible. No MRP area data exists |
023 | Correct forecast values of MRP area &1 |
024 | Correct the MRP data of MRP area &1 |
025 | Define a special procurement key |
026 | Maintain forecast data first |
027 | Destination MRP area &1 has already been assigned to material |
028 | Function not possible. Reference MRP area &1 same as dest. MRP area &2 |
029 | Reference and destination MRP area are different MRP area types |
030 | Not possible to create; Storage location stock not included in MRP |
031 | Not possible to create; storage location stock planned separately |
032 | Function not possible; Material master record is selected for one process |
033 | Function not possible; MRP area data has already been stored |
034 | Reference MRP area &1 has not yet been assigned to material |
035 | Function not possible; destination MRP area &1 is type &2 |
036 | Storage location &1 does not belong to MRP area &2 |
037 | Material does not exist in external procurement storage location & |
038 | Forecast only possible if you enter a period indicator |
039 | Reference MRP area for plant &1 does not exist |
040 | MRP group not maintained at material master level |
041 | MRP area flagged for deletion |
100 | ****COMMENT: Messages of FM: MD_MRP_AREA_CHECK |
101 | Error in Customizing. Plant MRP area &1 in plant &2 does not exist |
102 | Error in Customizing. Plant MRP area &1 in plant &2 exists more than once |
103 | Error in Customizing. No plant has been entered for plant MRP area &1 |
104 | Error in Customizing. Plant &2 is assigned to several MRP areas |
105 | Error in Customizing. Storage location view of MRP area &1 does not exist |
106 | Error in Customizing.Storage location &1 is assigned to several MRP areas |
107 | Error in Customizing. Creditor in subcontractor MRP area &1 not assigned |
108 | Error in Customizing. Creditors in MRP area &1 assigned several times |
109 | Error in Customizing. No subcontractor has been entered for MRP area &1 |
110 | Error in Customizing. No plant has been entered for MRP area &1 |
111 | Error in Customizing. No recvg storage location entered for MRP area &1 |
112 | Error in Customizing. No storage location entered for MRP area &1 |
113 | Error in Customizing. Storage location entered for subcon. MRP area &1 |
114 | Error in Customizing. Different plant entries for MRP area &1 |
115 | Error in Customizing. No stor. location entered for stor.loc. MRP area &1 |
116 | Error in Customizing. Subcontractor &1 in several MRP areas |
117 | Error in Customizing. Storage location &1 used by MRP area &2 |
200 | ****COMMENT: Messages for report BI_DIBE_TEST |
201 | MRP area &1 for material &2 is already assigned |
250 | ****COMMENT: Message for FB MD_MRP_LEVEL_CREATE |
251 | Incorrect parameter: Processing session is not defined |
401 | Errors occurred creating MRP areas |
402 | No entries exist in the log |
403 | There are no materials in the system for these selection parameters |
404 | There is no MRP area data for these selection parameters |
405 | No authorization to process planning data |
406 | No authorization to process forecast data |
407 | MRP area &1 created as copy of &2 |
408 | Function module called incorrectly - MRP profile not entered |
409 | No MRP are could be found with these selection criteria |
410 | MRP area &1 created as copy of plant |
411 | No MRP areas exist under these selection parameters |
412 | MRP area &1 created with profile |
413 | Profile of MRP area &1 changed |
414 | MRP area &2 is not assigned to material &1 |
415 | No field has been selected for the data transfer |
416 | MRP area &2 has already been assigned to material &1 |
417 | MRP area &1 created with data |
418 | Data from MRP area &1 changed |
419 | MRP profile has not been entered |
420 | MRP area &1 in plant &2 does not exist |
421 | Deletion flag for MRP area &1 has already been set |
422 | Deletion flag for MRP area &1 has already been reset |
423 | Deletion flag for MRP area &1 has been set |
424 | Deletion flag for MRP area &1 has been reset |
425 | Simulative mode chosen |
427 | PP-MRP: Storage loc. &1 of plant &2 is still assigned to an MRP Area. |