Message Nr ▲ | Message Text |
---|---|
100 | Batch determination not carried out. Assigned GR row not found |
101 | Selection incorrect for selected function |
102 | Selection (combination) is not complete for the function |
103 | Select at least 2 process batches |
104 | You must make only one selection in the GR in this function |
105 | No classification found for the object (plant/material/batch) &1 |
106 | Batch &1 &2 already exists for this order |
108 | Message sent |
109 | Invalid function call |
110 | Message could not be sent |
111 | Process batch reference invalid (material &1 batch &2) |
112 | Function cancelled |
113 | Selected batch is not assigned to an order item |
114 | Function was terminated by the user |
115 | Batch does not exist in selected row |
116 | Cannot be deleted because of assignment to segmentation order &1 &2 &3 |
117 | The chosen process batch cannot be assigned |
118 | Select one PB or GR row and an item of the segment. order |
119 | Input batch cannot be assigned to process batch |
120 | Enter a batch |
121 | Input error for batch to be created |
122 | No configuration data exists (order item &1) |
123 | No configuration data exists |
124 | Batch is not the highest level (item.no/plant/mat./batch: &1 &2 &3 &4) |
125 | Preceding batch missing; assign an input batch |
126 | Batch contains assignments to partitioning orders |
127 | Some partitioning orders have not yet been assigned - please assign them |
128 | Not all process batches have been assigned to order items |
129 | Not all operations requiring confirmation have been confirmed |
130 | Process batch is already assigned to another order item |
131 | Process batch is already being used as an original batch |
132 | PB assignment as PPB only allowed for an order item with OB assignment |
133 | The original batch on the order item must have more than one assignment |
134 | A segmentation order assignment exists for the proc. batch or order item |
135 | Order item is already assigned to another process batch (PPB/OB) |
136 | "Split" function not allowed for a PB with an order item |
137 | Fields of table parameter IT-REF have not been filled correctly |
138 | Partitioning order has to be transferred manually to order item |
139 | Merge function not permitted for a process batch containing an order item |
140 | Enter a batch |
141 | Enter a storage location |
142 | No process batch is assigned to the order item |
143 | No process batches exist for the order |
144 | PPB/OB not at highest level |
145 | Process batch is already assigned; copying not possible |
147 | Process batch is not at the top level; is not deleted |
148 | Process batch already assigned and cannot be deleted |
149 | GR item &1 is already assigned and cannot be deleted |
150 | Unable to set deletion flag for the process batch &1 order &2 |
151 | Class not found; batch cannot be created |
152 | Material cannot be configured; check material master |
153 | No strategy exists for mixing characteristics |
154 | Input parameters incomplete |
156 | PB &1 cannot be deleted as a GR already exists for it |
157 | Batch &1 is not a process batch for the order |
158 | This GR batch has already been assigned to process batch &1 |
160 | Internal data tables inconsistent; cancel confirmation |
161 | Assign all process batches to an item |
162 | Process batch assignment cannot be removed |
163 | Process batch has successor; deletion not possible |
164 | Delete process batch &1 across the combined order |
165 | Delete process batch &1 across the original order |
166 | Batch characteristics cannot be changed as GR already carried out here |
167 | Batch characteristics cannot be changed as GR batch does not exist yet |
169 | Process batch &1 is already assigned; split not possible |
170 | Process batch &1 already assigned; merge not possible |
171 | Cancel confirmations before removing assignment to &1 |
172 | PB not at top level; proposal of actual quantity not possible |
173 | Process batch &1 has successor in combined order |
174 | Process batch &1 already copied; split not possible |
175 | Process batch &1 already copied; merge not possible |
176 | Create segmentation order only with reference to one item |
177 | Create segmentation order only with reference to one process batch |
178 | Assignment of original batch to item &1 not possible |
179 | Operation data cannot be determined |
180 | Seg. order not created (manually terminated or program error) |
181 | Process batch &1 for order &2 not found |
182 | GR batch &1 for order &2 not found |
183 | Plant &1 from material doc. not same as plant &2 specifief for prod.batch |
184 | Original batch cannot be determined using process batch &1 &2 |
185 | Data inconsistency between original and process batch table |
186 | & - process batch - production order ............: & |
187 | Enter a different batch number for the GR batch |
188 | No process batch is assigned to the order item |
189 | An error occurred during comparison of the original batch buffer |
190 | Process this order using transaction CO11N |
191 | Internal Error |
192 | Simultaneous GI and GR for order with co-product items not allowed |
193 | GR batch inconsistent; segmentation order not assigned |
194 | Input parameters incomplete |
196 | PBs exist for order; new seg. orders can only be created for PB |
198 | Batch master record does not exist for batch in selected row |
199 | Reversal qty greater than stock; after reversal, qty will be negative |
200 | Seg. order can only be assigned to another item |
201 | Seg. order can only be assigned to another process batch |
202 | Proc. batch &1 undeletable as succeeding proc. batches exist for template |
203 | Process batch &2 has been copied and therefore cannot be deleted |
204 | Enter a number for the GR batch |
206 | Function cannot be carried out because of several PBs |
207 | Component &1 is not subject to batch management in plant &2 |
208 | Create the BR batch in the Process Batch section of the screen |
209 | The data for the process batch comparison cannot be determined |
210 | Material does not permit copying of GR rows |
212 | Int. batch no. assignment not allowed; function is terminated |
213 | Quantity cannot be converted |
215 | Error opening material document |
216 | All goods receipt batches already valuated |
217 | No process batches exist for the order |
218 | Material &1 does not exist in plant &2 |
219 | PB assignment not unique; GR batch is not created |
220 | PB assignment is not unique; batch determination is cancelled |
221 | Internal batch number assignment not possible in 'Goods Receipt' area |
222 | Batch characteristics cannot be changed as GR batch already created |
223 | GR batch & cannot be created |
224 | Material &1 is not subject to batch management in plant &2 |
225 | Select a process batch |
226 | Select just one goods receipt row |
227 | Select the process batch to be assigned and a goods receipt row |
228 | Select just one process batch |
229 | Select a goods receipt row |
230 | Select a goods issue row |
231 | Select just one goods issue row |
232 | Select a batch |
233 | Select a goods issue row and a process batch |
234 | Select at least one process batch |
300 | Function canceled by user |
301 | Preceding batch &1 not found |
302 | Material &1 not found |
305 | Order &1 does not exist |
306 | Order &1 item &2 does not exist |
307 | Internal Error |
308 | Process batch &1 is flagged for deletion |
310 | Batch &1 invalid |
311 | Process batch processing not allowed for material &1 |
312 | Enter a batch |
313 | Material &1 does not exist in plant &2 |
314 | Material &1 locked by another user |
315 | Plant &1 locked by another user |
316 | Batch &1 locked by another user |
318 | Batch &1 (material &2, plant &3) does not exist |
319 | Error changing batch master |
320 | Master record for original batch &1 locked by &2 |
321 | Enter a batch number |
322 | Special character &1 not allowed |
323 | Error creating batch master |
324 | Error deleting batch master |
326 | Deletion indicator for batch &1 already selected |
327 | Assignment can no longer be changed as GR already exists |
328 | Assignment can no longer be changed as OB exists for item |
329 | Function only valid for top-level process batches |
331 | Assignment not possible as segmentation order exists |
332 | Creating batch & |
333 | A goods receipt has already been posted for process batch &1 |
334 | Assignment not possible; unassigned rows exist for goods receipt item &1 |
340 | Select a process batch and choose 'Enter' |
341 | Confirm confirmation, otherwise there will be no activity data for operat |
343 | Process batch is preceding batch; characteristics should not be changed |
344 | No batch creation possible for material &1 in the 'Goods Receipts' area |
345 | No batch determination possible for material & in 'Goods Receipts' area |
346 | No milestone confirmation possible for process batches |
347 | Enter a quantity |
348 | With process batches, no goods issue takes place for other operations |
349 | Confirmation profile &1 not suited for use with documentary batches |
350 | Confirmation profile &1 uses deprecated functionality of Process batches |