MPE_MAPROJ - Message Class for Assign and Un-Assign End Item to Project
The following messages are stored in message class MPE_MAPROJ: Message Class for Assign and Un-Assign End Item to Project.
It is part of development package MPE_INSTALLATION in software component PP-PEO. This development package consists of objects that can be grouped under "Manufacturing Plan & Exec - Installation Kits".
It is part of development package MPE_INSTALLATION in software component PP-PEO. This development package consists of objects that can be grouped under "Manufacturing Plan & Exec - Installation Kits".
Message Nr ▲ | Message Text |
---|---|
000 | The project &1 does not exist. |
001 | End item project assigned to BOM hierarchy successfully |
002 | BOM-PS assignment entries could not be created |
003 | BOM-PS assignment entries could not be updated |
004 | BOM-PS assignment entries could not be deleted |
005 | No released BOM version found for end item |
006 | No valid items found in the BOM version of end item |
007 | End item could not be assigned to project due to error during update |
008 | Enter a project definition for the end item. |
009 | Enter a material for the end item. |
010 | Enter a plant. |
011 | Enter a BOM usage. |
012 | Enter an alternative BOM. |
013 | The material & does not exist or is not activated. |
014 | Only end item materials can be assigned to the project. |
015 | Only serialized materials can be assigned to the project. |
016 | End item BOM is invalid. |
017 | BOM usage & does not support execution. |
018 | End item assignment to project exists for the given parameter effectivity |
019 | End item material must be unitized. |
020 | End item BOM must only have major assemblies as components. |
021 | End item BOM must only have serialized components. |
022 | End item BOM must only have unitized components. |
023 | Enter parameter effectivity values |
024 | Error while generating TECHS for the given parameter effectivity |
025 | Error while reading serial number profile configuration |
026 | Error while generating equipment number and serial number |
027 | Error while generating ID of serialized product |
028 | Project already assigned to end item. |
029 | BOM usage & does not support version BOMs. |
030 | Enter a network or WBS element to create the network |
031 | Enter an MRP controller. |
032 | Enter a planner group. |
033 | Network is already assigned to a different BOM. |
034 | Invalid ID of serialized product. |
035 | Could not determine end item project |
036 | Network & is invalid. |
037 | Network &1 is not assigned to end item project &2. |
038 | WBS element & does not exist. |
039 | WBS element &1 is not assigned to the end item project &2. |
040 | Major assembly BOM must only have installation kits as components. |
041 | Error while updating TECHS of network |
042 | Network already assigned for serialized product ID & of major assembly. |
043 | BOM already assigned for serialized product ID & of major assembly. |
044 | No released BOM version found for major assembly. |
045 | BOM and network successfully assigned to major assembly |
046 | Update error while assigning BOM and network to major assembly |
047 | Reservations updated successfully |
048 | Error while updating reservations |
049 | No valid items found in the BOM version of major assembly |
050 | No valid items found in the BOM |
051 | Activities without reference points already exist for the network &. |
052 | Error while deleting serialized product IDs of BOM-PS assignment |
053 | Error while updating parent activity of nested major assembly |
054 | Parent activity details of major assembly are missing |
055 | Network activity relationships created successfully |
056 | Error while creating network activity relationships |
057 | Error while locking BOM PS entries |
058 | No new released BOM version found |
059 | No changes found in the end item BOM version |
060 | End item BOM explosion successful |
061 | Error while updating BOM explosion for end item |
062 | No changes found in the major assembly BOM version |
063 | Major assembly BOM explosion successful |
064 | Error while updating BOM explosion for major assembly |
065 | End item project has been released already |
066 | End item project has been unassigned successfully |
067 | End item project could not be unassigned due to error during update |
068 | Project not yet assigned to end item |
069 | Enter a WBS element. |
070 | Assignment of end item to project has been initiated in the background. |
071 | BOM not found for material & |
072 | Assigment of BOM and wbs/network has been initiated in the background |