MPE_MIGRATION_MSG -

The following messages are stored in message class MPE_MIGRATION_MSG: .
It is part of development package MPE_PLAN_BOM_MIGRATION in software component PP-PEO. This development package consists of objects that can be grouped under "Manufacturing Planning - Bom Migration Tool".
Message Nr
Message Text
000Production order not found
001Material number &1 does not exist
002Plant &1 does not exist
003MRP controller &1 does not exist
004Production supervisor &1 does not exist
005Buyoff details not found not for given order
006SAS Operation Activity &1 is not valid
007SAS Serialized Products &1 is not valid
008Please enter a positive integer number
009BOM usage &1 invalid
010Order details not found
011Please pass a valid production order.
012No revelant data found
013BOM atatus &1 invalid
014Please enter correct deletion indicator
015Operation details not found for given order
016Order details not found
017BOM migration is not posssible for the given material
018Hold details not found for given order
019Operation activity not found for given order
020Incorrect data
021Deletion indicator cannot be set for given material
022BOM cannot be migrated
023Routing was migrated with group &1 material &2
024Production version not updated
025BOM version exists
026Routings migrated successfully
027BOM version exists for material &1
028Update of production order & in progress
029Assigned BOM is not yet converted or released
030&1 &2 &3 &4
031Routing header change states not found
032BOM change states not found
033Operation change states not found
034Variant & exists
035User &1 is not authorized to modify routing
036Materials migrated successfully
037BOM &1 for material &2 has been migrated successfully
038Routing not found for entered material(s) &
039Target BOM usage is not version controlled
040Configurable material &1 cannot be migrated
041Phantom material &1 cannot be migrated
042BOM assigned to routing &1 plant &2 group &3 is not converted or released
043Error loading material &1 routing &2 plant &3 group &4
044BOM for matl &1 plant &2 usage &3 altern. &4 not converted or released
045No BOMs converted or released
046No BOMs assigned to the routings
047Material & Plant & Routing &, &
048Components not found for material &1 plant &2 routing &3 group &4
049No data found for the selection criteria
050Select at least one record.
051No routing exists with valid change states
052Control key &1 not suitable for migrating subcontracting operations
053Transfer of components to and from the external processor not supported
054Provide control key suitable for subcontracting operation
055&1 routings migrated without BOM assignment.
056Effectivity mismatch in the following item: &1 &2
057Manual input canceled
058Error during ECN creation
Privacy Policy