MPE_PLAN_ENG_SNPSHT - Message class for Engineering Snapshots
The following messages are stored in message class MPE_PLAN_ENG_SNPSHT: Message class for Engineering Snapshots.
It is part of development package MPE_PLAN_ENG_SNPSHT in software component PP-PEO. This development package consists of objects that can be grouped under "Snapshot Object for Engineering Handover".
It is part of development package MPE_PLAN_ENG_SNPSHT in software component PP-PEO. This development package consists of objects that can be grouped under "Snapshot Object for Engineering Handover".
Message Nr ▲ | Message Text |
---|---|
000 | Snapshot created successfully for matl &1, plant &2, usage &3, altern. &4 |
001 | Snapshot creation failed for material &1, plant &2, usage &3, altern. &4 |
002 | Snapshot updated for material &1, plant &2, BOM usage &3, alt. BOM &4 |
003 | Snapshot update failed for matl &1, plant &2, BOM usage &3, alt. BOM &4 |
004 | Invalid engineering BOMs were found |
005 | Invalid document references were found |
006 | Engineering snapshot not found |
007 | Engineering BOM for the header not found in the object references |
008 | Planning scope already exists for matl &1, plant &2, usage &3, altern. &4 |
009 | Multiple snapshots found for matl &1, plant &2, usage &3, alternative &4 |
010 | Planning scope creation failed for matl &1, plnt &2, usage &3, altern. &4 |
011 | Engineering BOMs not found in the snapshot (ID &1, revision &2) |
012 | EBOM for matl &1, plant &2, and BOM usage &3 not consistent with snapshot |
013 | Different versions or alternates found for one material in the EBOM list |
014 | Eng. change cycle prepared for matl &1, plant &2, usage &3, alt. BOM &4 |
015 | EBOM (matl &1, plnt &2, usage &3, alternative &4) not found in hierarchy |
016 | Engineering snapshot revision &1 could not be read for change calculation |
017 | Relevant planning scopes not found for the EBOM changes in the snapshot |
018 | No changes found between curr. revision &1 and prev. revision of snapshot |
019 | Change preparation not initiated |
020 | Change record creation failed |
021 | Change record exists with the same or higher revision for the snapshot |
023 | Change record exists for all EBOM versions with target planning scope |
024 | EBOM version for matl &1, plant &2, usage &3, alternative &4 not released |
025 | Invalid material &1 |
026 | Invalid plant &1 |
027 | Invalid BOM usage &1 |
028 | Invalid engineering BOM found |
029 | Content for change record not provided after grouping |
030 | Cannot add plng scope for matl &1, plnt &2, usage &3, alt. &4 in grouping |
031 | Change record type &1 not compatible with engineering snapshot |
032 | Cannot find default change record type configured for external no. range |
033 | Cannot find default change record type configured for internal no. range |
034 | Provide change record type that is configured for internal number range |
035 | BOM usage &1 not relevant for production |
036 | Number range interval not assigned in snapshot configuration |
037 | Only BOM or document item deletion changes found for snapshot revision &1 |
039 | Planning scope creation failed |
040 | Change record creation failed |
041 | Change preparation failed |
042 | Revision with successful auxiliary data prep. for same DIR already exists |
043 | Auxiliary data preparation must be done to initiate change preparation |
044 | Material &1 is not found in plant &2 |
045 | Error while retrieving the snapshot core instance |
046 | Change preparation cannot be triggered for multiple snapshots |
047 | Number range &1 is external. Please use internal number range interval. |
048 | Number range &1 is not valid. |
049 | Auxiliary data preparation cannot be retriggered |
050 | Change Record preparation cannot be retriggered |
051 | Reference object type &1 is not valid |
052 | More than one visual DIR can not be added in a snapshot |
053 | You are not authorized to create this engineering snapshot. |
054 | Visual DIR is missing |
055 | One or more EBOM version are older than the ones in previous Snapshot rev |
056 | You are not authorized to change this engineering snapshot. |