OPS_SE_PRS - Project Management: Messages for Service Enabling
The following messages are stored in message class OPS_SE_PRS: Project Management: Messages for Service Enabling.
It is part of development package PLM-SE_PRS_XI_PROXY_T in software component PS. This development package consists of objects that can be grouped under "".
It is part of development package PLM-SE_PRS_XI_PROXY_T in software component PS. This development package consists of objects that can be grouped under "".
Message Nr ▲ | Message Text |
---|---|
000 | &1 is mandatory. |
001 | Exception &1 has occured for the field &2 |
002 | Mandatory field &1 is not filled |
003 | Project &1 cancelled |
004 | Project &1 &2 released |
005 | Project WBS Element &1 &2 released |
006 | Incompatible &1 party Internal-ID and Rolecode. |
007 | Data overflow for &1. |
008 | The project change type code does not exist |
009 | Mandatory field &1 not provided |
010 | Attribute & is not supported |
011 | UUID &1 for element &2 does not comply to required pattern |
012 | Exactly-once request cannot be locked: &1 (error code &2) |
013 | Exactly-once request timed out (message UUID &1) |
014 | Internal error in exactly-once processing (message UUID &1) |
015 | Internal error storing response for request message UUID &1 |
016 | Project Network &1 updated successfully |
017 | Project Network &1 update check successful |
018 | Please enter the duration in any one unit only |
019 | Project Activity &1 updated successfully |
020 | Project Activity &1 update check successful |
021 | Update failed. ChangeStateId does not match. |
022 | Error while creating Milestone. Please check input |
023 | Error while creating NetworkHeader |
024 | NetworkHeader created successfully |
025 | Error while updating Milestone. Please check input |
026 | Error while deleting Milestone. Please check input |
027 | Please check the Network and Activity ID |
028 | Milestone &1 cannot be created |
029 | Milestone &1 cannot be deleted |
030 | Milestone &1 cannot be changed |
031 | Can't create Network-relationship with &1-&2, &3-&4 |
032 | Can't change Network-relationship with &1-&2, &3-&4 |
033 | Can't delete Network-relationship with &1-&2, &3-&4 |
034 | Project WBS Element &1 read successfully |
035 | Project Network &1 and Activity &2 read successfully |
036 | In Processing Condition either enter both &1 and &2 or leave them blank |
037 | Project Network &1 &2 released |
038 | Project Network &1 is locked/doesn't exist |
039 | Project Activity &1 &2 released |
040 | Project Activity &1 &2 is locked/doesn't exist |
041 | Project &1 is locked/doesn't exist |
042 | Project Activity created successfully |
043 | Project Activity could not be created |
044 | Project WBS Element &1 is locked/doesn't exist |
045 | Action Code &1 not supported for &2 |
046 | &1 with value &2 not found |
047 | No material input found for the given criteria |
048 | There has been another update for the Project Change. Cannot update now! |
049 | Project Network &1 could not be released. |
050 | Project Change is either already in process or already completed. |
051 | Project Change updated. |
052 | ChangeStateID is a mandatory parameter |
053 | Invalid currency code |
054 | Upper Boundary is less than the Lower Boundary in the selection criteria |
055 | Entered IntervalBoundary is not supported or wrong input |
056 | All Project Definition under specified range could be determined |
057 | No information could be determined for entered Project Definition range |
058 | All WBS Element under specified Project Definition could be determined. |
059 | Both Conditions Maximum and Unlimited together could not be processed |
060 | Select atleast one processing Conditions or QueryHitsMaximum value is 0 |
061 | No WBS Element could be determined |
062 | ResponsibleEmployeeParty &1 is doesn't exist |
063 | No Project Activity could be determined |
064 | Please enter atleast one of &1 or &2 or &3 |
065 | In Processing Condition please enter &1 |
066 | Network Element could be determined. |
067 | No Network Element could be determined. |
068 | Kindly enter atleast one Project ID |
069 | Attachment of WBS Element &1 could be determined |
070 | WBS Element &1 does not exist |
071 | Attachment of Activity &1 could be determined |
072 | Project Party &1 found successfully |
073 | Party Role code &1 does not exist |
074 | Enter activity element |
075 | Enter Network ID |
076 | Enter WBS Element |
077 | Enter Project ID |
078 | Enter Party Role Code |
079 | Project activity found successfully |
080 | Project activities do not exist |
081 | Enter Party ID |
082 | Projects found successfully |
083 | All Material under specified Condition could be determined |
084 | Invalid Project id |
085 | Invalid Network |
086 | Invalid Activity |
087 | Invalid Material |
088 | Invalid Material description |
089 | Invalid Material or Material description |
090 | Name for &1 &2 could not be determined |
091 | &1 conversion failed: No external code exists for internal code &2 |
092 | Field &1 not found in table &2 |
093 | Entry &1 in &2 does not exist in table &3 |
094 | The content of &1 exceeds the field length of the target field |
095 | Party Role code &1 is not support by this service |
096 | Invalid value &1 for the field &2 |
097 | Org Check failed for Sales Org:&1, Distr. Channel:&2 and Division: &3 |
098 | Project &1 created successfully |
099 | Project &1 changed successfully |
201 | Enter a mandatory issue category catalog ID |
202 | No categories were found for catalog ID & language |
203 | No parent categories were found for catalog ID |
204 | No assignment exists for catalog ID and filter code |
205 | The catalog ID is not assigned to a notification or request type |
206 | No result for combination filter code and parent category |
207 | No categories could be selected due to data entered |
208 |