PCA - Message Class for Production Campaign

The following messages are stored in message class PCA: Message Class for Production Campaign.
It is part of development package COPC in software component PP-PI-PCM. This development package consists of objects that can be grouped under "Production campaign".
Message Nr
Message Text
001You have not selected a radio button
002Enter a production campaign number
003Enter a material number
004Enter a master recipe or routing
005Enter a resource network
006No order has been selected
007Production campaign & has been created
008Production campaign & is not intended for external number assignment
009Production campaign & has been changed
010Production campaign & already exists
011& new items were added to the campaign
012No further orders have been added to the campaign
013No planned orders could be added to the campaign
014The order could not be added
015No position selected
016New items added to the campaign
017Campaign & does not exist
018& planned orders could not be updated
019Process orders could not be updated or created
020Error during insert: of &1 records, &2 records were updated
021Error during update: of &1 records, &2 records were updated
022Error during delete: of &1 records, &2 records were updated
023Error during insert: of &1 records, &2 records were updated
024Error during update: of &1 records, &2 records were updated
025Error during delete: of &1 records, &2 records were updated
026Error during insert: of &1 records, &2 records were updated
027Error during update: of &1 records, &2 records were updated
028Error during delete: of &1 records, &2 records were updated
029The validity end date precedes the validity start date
030Total quantity of the items &1 is larger than the prod. camp. quantity &2
031& planned orders have been converted
032Nothing was selected
033Enter a valid setup/clean-out recipe (group and number)
034Enter a quantity or unit
035No order type was entered
036A number range was not maintained for the production campaign
037A number range was not maintained for the internal number assignment
038Enter a basic end date
039The takt unit was changed in &
040Production campaign & was deleted
041You can only go directly to the planned order after saving
042Use the dimension "TIME"
043Unit of measure &1 does not correspond to the units of material &2
044Enter a plant
045Material number &1 does not exist
046Order &1 is a planned order. Convert it before confirming.
047Order &1 is a production order. Confirm it separately.
048Order type &1 not intended for process orders
049Order &1 is already confirmed (final)
050Order &1 only has a temporary order number
051&1 orders were confirmed
052No orders could be confirmed. See the log
053Check the confirmation log
054An order was confirmed
056The quantity to be confirmed is smaller than 0
058No goods movements to be processed were found
059Goods movements containing errors for order &1
060You are not authorized to display the campaign
061You are not authorized to change the campaign
062You are not authorized to create the campaign
063Termination while confirming. Campaign processing was terminated.
064External number assignment: only one planned order can be converted
065No planned orders selected
066Orders that were changed or deleted will not be converted
067Planned order to be created lies outside campaign validity period
068Basic finish date lies outside campaign validity period
069Basic fin. date &1 of pl. order &2 lies outside campaign validity period
070Basic start date &1 not possible
071Calculated basic finish date &1 not possible
072Production order &1 will be deleted
Privacy Policy