PMRP - Messages for pMRP

The following messages are stored in message class PMRP: Messages for pMRP.
It is part of development package PMRP_ENGINE in software component PP-PMR-ENG. This development package consists of objects that can be grouped under "Predictive MRP".
Message Nr
Message Text
000& & & &
001Internal error occurred; import reference ID &1 does not correspond to &2
002Internal error occurred; Update of PMRP_PRODUCT failed
003Internal error occurred; key must not be empty
004Reference ID &1 already exists and cannot be created
005Reference ID &1 does not exist
006The Reference ID cannot be initial
007Simulation ID &1 does not exist
008Simulation ID &1 cannot be created because reference ID &2 does not exist
009Simulation ID &1 already exists and cannot be created
010Reference ID and simulation ID &1 cannot be the same
011Simulation ID cannot be initial
012Import simulation ID &1 does not correspond to &2
013Bucket data must not contain initial values
014Valid-from date &1 must be earlier than valid-to date &2
015Status &1 for reference ID &2 not possible
016Reference ID &1 is already in use; use another ID
017Status &1 for simulation ID &2 not possible
018Simulation ID &1 is already in use by &2
019Problem with factory calendar &1
020Unit of measure &1 is different from &2
021Demand or supply product &1 of MRP area &2 not found
022Start date &1 must be earlier than end date &2
023Invalid bucket category &1
024Reference top-level demand &1 not found
025Simulation top-level demand &1 not found
026Reference plan &1 does not have status 'In Creation'
027Simulation &1 does not have status 'In Creation'
028Top-level demand with ID &1 not found in simulation &2
029No top-level demand found for planning
030Simulation &1 cannot be used due to its status
031Quantity for top-level demand &1 must not be negative
032You can only change data of simulaton &1, but not of simulation &2
033Simulation &1 is not locked for editing
034Problem with the enqueue server
035Stock for product &1 / &2 cannot be negative
036Language cannot be initial
037Language &1 does not exist
038Simulation Description for &1 and Language &2 not found
039Reference ID &1 cannot be deleted; other simulations (&2) still exist
040Original demand cannot be reference top-level demand
041Date &1 cannot be earlier than start date &2 of the reference
042Date &1 cannot be later than end date &2 of the reference
043Product &1 with MRP area &2 is not part of reference &3
044Simluation &1 already exists as a reference
045Reference &1 already exists as a simulation
046There are no products in reference &1
047There are no reference top-level demands in reference &1
048No authorization
049No authorization for plant &1
050No change authorization for plant &1
051You can click Release only once
052Only upper case allowed
053Problem occured during initial planning
054No Bucket list available for Reference ID &1 and Simulation ID &2
055No demand-driven material available or material without demand in &1
056Resource Overload Tolerance must be between 0 and 100
057Durations cannot be negative
058Not more than 2 years of difference between start &1 and end &2 allowed
059Supply ID &1 not filled or found
060A negative quantity for pull-in quantity is not allowed.
061Demand ID not filled or found
062Start and end date are incorrect; please change them
063Choose a value between &1 and &2 percent for resource overload tolerance
064Entered quantity &1 must not exceed demand quantity &2
065Start Date must be in the future
066&&&&
067Description &1 not changed
076Reference ID or Simulation ID &1 contains unallowed characters
077Choose a simulation name without parentheses "(" or ")"
080Change of simulation text has been undone
081Change to consider a resource overload has been undone
082Simulated change of top-level demand has been undone
083Change to reference top-level demand has been undone
084Change of pull-in quantity has been undone
085Change to capacity has been undone
086Change of source of supply has been undone
087Change of simulation text has been redone
088Change to consider a resource overload has been redone
089Simulated change of top-level demand has been redone
090Change to reference top-level demand has been redone
091Change of pull-in quantity has been redone
092Change to capacity has been redone
093Change of source of supply has been redone
100Problem occured during creation of pMRP resources
101No utilization changes
102Instance is not bound
103Increase the value. Change in capacity is too small to be updated.
104Capacity contains negative value
105Resource ID &2 not available for simulation &1
106Decrease the value. Change in capacity is too big to be updated.
107Enter reason text for disregarding issue for resource &1 in simulation &2
108No top-level material available or material without demand in &1
109Inconsistent data for create-by-association. Keys don't match.
110It's not possible to pull in quantity for preproduction/early procurement
111The sum of the pull-in quantity &1 must not exceed the supply &2.
112You can undo or redo only one change at a time.
113You cannot undo nor redo anything, while other objects are being changed.
114There isn't anything to undo.
115There isn't anything to redo.
116Cannot undo nor redo this step.
117Bucket ID &2 and resource ID &3 not available for simulation &1
118No Non MRP Kanban material available for Simulation &1
119No Non MRP material available with MRP Type &1
120No valide Requirements type found for Non MRP materials.
200Table &1 is not supported for IRM rule evaluation
201System did not find any simulations that match your selection criteria
202System didn't find flexible constraints that match the selection criteria
295
300Issue Period for Simulation ID &1 and Resource ID &2 was not found.
301Issue for Simulation ID &1 and Resource ID &2 was not found.
302Issue Period for Simulation ID &1 and Resource ID &2 already changed.
303Please enter a value greater than 100 percent.
Privacy Policy