PPH_MRP - Messages MRP Dispatcher
The following messages are stored in message class PPH_MRP: Messages MRP Dispatcher.
It is part of development package PPH_MRP in software component PP-MRP. This development package consists of objects that can be grouped under "PP on HANA: MRP package".
It is part of development package PPH_MRP in software component PP-MRP. This development package consists of objects that can be grouped under "PP on HANA: MRP package".
Message Nr ▲ | Message Text |
---|---|
000 | &1 &2 &3 &4 |
001 | SQL exception &1 occured: &2 |
002 | Number range not maintained for EBAN |
003 | Total time required for MRP Live on HANA: &1 |
004 | Total time required for classic MRP: &1 |
005 | Total time required for splitting work sets: &1 |
006 | MRP started at &1 and ended at &2: Runtime &3 |
007 | You have no authorization for plant &1 |
008 | You have no authorization for plant &1 and MRP controller &2 |
009 | Enter at least one plant, material, MRP controller or product group |
010 | Overall statistics |
011 | Low-level code &1 |
012 | MRP run finished at &1 &2 |
013 | Tables changed |
014 | Runtime for splitting work sets: &1 |
015 | Runtime for classic MRP: &1 |
016 | Runtime for MRP Live on HANA: &1 |
017 | Reasons why materials are not planned using MRP Live on HANA |
018 | Planning run for material &1 in plant &2 has already been started |
019 | MRP run terminated (help for analysis in note 2432291) |
020 | Materials planned: &1 (classic MRP) &2 (MRP Live on HANA) |
021 | Total runtime: &1 |
022 | Business Function LOG_PPH_MDPSX_READ not active |
023 | Select at least one row |
024 | List restricted according to previously selected row |
025 | Enter a planning mode |
026 | Number range for MRP Live not maintained. See long text. |
027 | Number range for MRP Live not maintained correctly. See long text. |
028 | Function only available for the HANA database system |
029 | Differences in control parameters for MRP Live and classic MRP exist |
030 | Materials that were planned in MRP Live on HANA with warnings |
031 | Error: Duplicate internal key exists |
032 | No resources available for planning |
033 | Select exactly one row |
034 | MRP Live still in process or terminated |
035 | MRP Live terminated |
036 | Table & has type POOL. Refer to note 1928980 for more information. |
037 | This report shall not be run in Customer systems |
041 | Number range exhausted. Please check Number Range Intervals for &1. |
042 | Problem with number ranges for &1. Please check MRP Plant Parameters. |
047 | Cannot start parallel processing, no resources found. Aborted. |
048 | No free Work processes for MRP parallel processing since &1 seconds. |
100 | Number of deleted EBAN: &1 (MRP Live on HANA), &2 (classic MRP) |
101 | Number of deleted EBKN: &1 (MRP Live on HANA) |
102 | Number of deleted EBUB: &1 (MRP Live on HANA) |
103 | Number of created EBAN: &1 (MRP Live on HANA), &2 (classic MRP) |
104 | Number of created EBKN: &1 (MRP Live on HANA) |
105 | Number of created EBUB: &1 (MRP Live on HANA) |
106 | Number of changed planning file entries in DBVM: &1 |
107 | Number of updated quota entries: &1 |
108 | Number of updated RSDB: &1 (MRP Live on HANA) |
109 | Number of selected material-plant combinations: &1 (MRP Live on HANA) |
110 | Number of selected master data for plant rows: &1 (MRP Live on HANA) |
111 | Number of selected master data for MRP area rows: &1 (MRP Live on HANA) |
112 | Number of selected MRP elements (after aggregation): &1(MRP Live on HANA) |
113 | MRP date: &1 |
114 | Number of internally-handled relocations: &1 (MRP Live on HANA) |
115 | Number of deleted PLAF: &1 (MRP Live on HANA), &2 (classic MRP) |
116 | Number of inserted PLAF: &1 (MRP Live on HANA), &2 (classic MRP) |
117 | Number of deleted RESB: &1 (MRP Live on HANA), &2 (classic MRP) |
118 | Number of inserted RESB: &1 (MRP Live on HANA), &2 (classic MRP) |
119 | Number of updated PLAF: &1 (MRP Live on HANA), &2 (classic MRP) |
120 | Number of updated RESB: &1 (MRP Live on HANA), &2 (classic MRP) |
121 | Number of aggregated MDPS read: &1 (MRP Live on HANA) |
122 | No authorization for MRP controller &1 in plant &2 |
130 | Successfully planned |
131 | Never planned |
140 | MRP type is "No MRP" |
141 | Configurable materials cannot be planned with MRP Live on HANA |
142 | MRP Live on HANA only supports external procurement (BESKZ='F') |
143 | Discontinued materials cannot be planned with MRP Live on HANA |
144 | MRP Live on HANA only supports quota arrangemnts for external procurement |
145 | Totaling of requirements not supported |
146 | Planning with forecast demand not supported in MRP Live on HANA |
147 | Material status prevents usage in MRP |
148 | Material status &1 not defined |
149 | Material flagged for deletion |
150 | Scheduling margin key &1 not defined for plant &2 |
151 | Special procurement &1 not defined in plant &2 |
152 | Lot-sizing procedure &1 does not exist |
153 | MRP type &1 does not exist |
154 | MRP with coverage profile not supported in MRP Live on HANA |
155 | MRP with period profile for safety time not supported in MRP Live on HANA |
156 | Splitting quota arrangements not supported in MRP Live on HANA |
157 | Reorder-point planning not supported in MRP Live on HANA |
158 | Creation of schedule lines not supported in MRP Live on HANA |
159 | MRPLive on HANA only supports standard and stock transfer purchase reqns |
160 | Materials with errors |
161 | MRP procedure &1 not supported in MRP Live on HANA |
162 | Only strategy group blank and '10' supported in MRP Live on HANA |
163 | Material is to be planned by external system |
164 | Material manually set to planning in classic MRP |
165 | Optimum lot-sizing procedure not supported by MRP Live on SAP HANA |
166 | Period lot sizes according to posting periods not supported in MRP Live |
167 | Lot-sizing procedure with end of short-term horizon in days not supported |
168 | Period lot sizes only supported for one period |
169 | Classic MRP with error &1(&2) |
170 | More messages exist but are not shown |
171 | Detailed runtime information (milliseconds) |
172 | Overall time spent in MRP Live on HANA: &1 |
173 | ..thereof time for reading MRP elements: &1 |
174 | ..thereof time for checking materials: &1 |
175 | ..thereof time for calculating changes: &1 |
176 | Time for updating tables: &1 |
177 | Time for MRP logic in total: &1 |
178 | Lot-size ind. "Fixing and Splitting" not supported in MRP Live on HANA |
179 | Configured matls produced in-house cannot be planned in MRP Live on HANA |
180 | Share of safety stock for planning not supported in MRP Live on HANA |
181 | Distribution key for quantity produced not supported in MRP Live on HANA |
182 | MRP Live on HANA with error &1(&2) |
183 | No valid BOM or No valid production version |
184 | No valid BOM for phantom material |
185 | No valid BOM status (T415S-KZAMS) |
186 | No valid BOM status (T415S-KZAMS) for sales order or project |
187 | Configurable material and configuration is missing |
188 | Error in BOM explosion |
189 | Class item with cat.&1 for BOM comp.&2 not supported in MRP Live on HANA |
190 | Direct proc. with cat. &1 for comp. &2 not supported in MRP Live on HANA |
191 | Direct proc. with cat. &1 w/o material not supported in MRP Live on HANA |
192 | Direct prod. with cat. &1 for comp. &2 not supported in MRP Live on HANA |
193 | Error in procedure BOM_CHECKS |
194 | BOM re-explosion required but not supported in MRP Live on HANA |
195 | Intra item with cat.&1 for BOM comp. &2 not supported in MRP Live on HANA |
196 | Materials that could not be locked |
197 | Material &1 in plant &2 is already planned by &3 |
198 | Time for updating purchase requisitions: &1 |
199 | Time for inserting planned orders and dependent tables: &1 |
200 | Time for deleting planned orders and dependent tables: &1 |
201 | Time for updating quotation information: &1 |
202 | Time for updating planning file entries: &1 |
203 | Time for updating material status in PPHDBVMSET: &1 |
204 | Separately planned storage location not supported, use MRP areas instead |
205 | Scheduling agreements without release documentation not supported |
206 | Processing status &1 not supported |
207 | No reservations for postprocessing exist |
208 | No message exists for the selected material |
209 | &1 performance logs deleted successfully |
210 | Performance logs could not be deleted |
211 | MRP Live on HANA does not support VC change of BOM item field: &1 |
212 | MRP Live on HANA technical error - expected material not found in RTO: &1 |
213 | Production versions for BOM explosion not supported in MRP Live on HANA |
214 | Configurable matls cannot be planned with MRP Live on HANA: VC not active |
215 | Configd matls produced in-house cannot be planned in MRP Live on HANA |
216 | Subcontracting planning segment not supported |
217 | Stock transfer reservation not supported |
218 | MRP Live on HANA does not support parameter effectivity |
219 | Stock transfer reservation not supported (MRP area &1, sp. procmt key &2) |
220 | Characteristics-based forecasting is not supported in MRP Live |
221 | IPPE/PVS explosion not supported in MRP Live on HANA |
222 | Manufacturer part profile is not supported in MRP Live on HANA |
223 | Material exchange is not supported in MRP Live on HANA |
224 | Repairable Spare Parts not support in MRP Live on HANA |
225 | T161 entry for purchasing document type &1, category &2 is missing |
226 | No valid production version found; BOM explosion not possible |
227 | Error occured for material &1, plant &2 |
228 | AD subcontracting scenario is not supported by MRP Live |
229 | Manufacturer Part Profile: no demand driven planning allowed |
230 | Material exchange: no demand driven planning allowed |
231 | Version controlled BOMs and routings not supported in MRP Live |
232 | Discontinuation: required beyond date |
233 | Scheduling error occured, check master data of plan |
234 | Planning in classic MRP aborted |
235 | Quota quantities exceeded |
236 | Issue marked as Accepted |
237 | Acceptance of Issue revoked |
238 | &1 Issues marked as Accepted |
239 | Acceptance of &1 Issues revoked |
240 | Lot-size proc. with "Overlapping" not supported in MRP Live on HANA |
241 | Direct usage of production version in PIR not support in MRP Live on Hana |
242 | Plng segment &1 not supported in MRP Live on HANA (DIMP Subcontracting) |
243 | Rounding profile in info record not supported by MRP Live on Hana |
244 | Namespace prefix "S" not allowed for Period Profile |
245 | Namespace prefix "S" not allowed for Planning Calendar |
246 | Status Warning: Material should not be used in MRP |
247 | Reord.Point w/ Ext.Req and Repl to Max Stock is not supported in MRP Live |
248 | Recurring regenerative planning jobs with planning mode 3 cannot be run |
249 | Planning Mode 3 should not be run regularly, only in exceptional cases |
250 | Large number of materials. Material list shows first &1 materials. |
251 | Distribution key for quantity required not supported in MRP Live on HANA |
398 | Cannot show details per low-level code; Use All Steps instead |
399 | You cannot run MRP Live and related functions during an upgrade |
400 | Missing authorization for &1 MRP controllers |
401 | MRP started at &1 &2 |
402 | MRP finished at &1 &2 |
403 | Low-level code &1 started at &2 &3 |
404 | Non-regenerative with planning mode: &1 |
405 | Regenerative with planning mode: &1 |
406 | Creation of planning proposals in past allowed |
407 | Number of materials selected for planning: &1 |
408 | Problem occurred: &1 |
409 | Scope: &1 |
410 | BOM components: &1, stock transfer materials: &2 |
411 | Determination of Basic Dates for Planned Orders |
412 | Lead Time Scheduling and Capacity Planning |
413 | MRP Live on Hana cannot read requirements from LiveCache |
414 | Only classic MRP can handle APO relevant materials |
415 | Only Classic MRP can handle Materials relevant for Advanced Planning |