REMPT - Message Class for REM Planning Table (Rel. 99)
The following messages are stored in message class REMPT: Message Class for REM Planning Table (Rel. 99).
It is part of development package MD04 in software component PP-REM. This development package consists of objects that can be grouped under "Repetitive Manufacturing".
It is part of development package MD04 in software component PP-REM. This development package consists of objects that can be grouped under "Repetitive Manufacturing".
Message Nr ▲ | Message Text |
---|---|
000 | ************** General Messages ******************************** |
001 | General program error. Please notify SAP development |
002 | Argument & not contained in table & |
003 | General error. Please inform SAP |
004 | System locking error |
005 | No entries in Table &1 found |
010 | Function no longer supported from release 4.6A |
011 | Error reading an internal table |
020 | File cannot be opened |
021 | Changes were copied |
022 | No changes were made |
023 | Data may not be up-to-date -> renew |
024 | Please select at least one output object |
025 | Select at least one planning segment |
029 | If necessary, limit the selection further |
030 | The limitations are not permitted simultaneously |
031 | No elements exist for the selection |
032 | No detailed data can be displayed |
033 | Entry is not allowed |
034 | No pegged requirements exist |
040 | The selection parameters for user & were saved |
041 | The selection parameters for user & were deleted |
042 | The saved column width for user & could not be set |
043 | Planning results were not saved |
050 | ******************** Select ***************************** |
051 | Function not possible for selected row |
052 | Function not possible for selected rows |
053 | Selection function not possible for row selected |
054 | Select a period of time |
055 | Check the selections |
056 | No quantities found in period entered/selected |
057 | This function does not make sense for the "Overdue" column |
058 | Select a column |
059 | This function is not possible for the selected column |
060 | This function is only possible for one cell |
061 | This function is only possible for one column |
062 | No stock requirements in selected period |
063 | Place cursor on a requirements row |
080 | ******************** Plant / MRP area ********************************* |
081 | Production version &1 is not valid in MRP area &2 |
101 | ************ Processing functions **************************** |
103 | Backflush not possible for selected production line |
104 | Function not possible: all quotas are zero |
105 | Processing indicator was set |
106 | Processing indicator was deleted |
107 | No range of coverage profile has been maintained |
108 | Function not possible for simultaneous quantity input |
109 | Selected function cannot be used for the element |
110 | Invalid cursor position for executing selected function |
115 | Daily split not allowed for period "shift" |
116 | Shift split is only allowed for period "shift" |
120 | Changes were made to master plan |
121 | Daily split carried out |
150 | ************************ Lines / Versions **************************** |
151 | No lines have been selected |
152 | Select one line only, or select the section clearly assigned to it |
153 | Please place the cursor on a row with a production line |
154 | Production line not available in the planning table |
155 | Production line and version are not compatible |
156 | No previous production line exists |
157 | No following production line exists |
159 | Select at least one planning segment |
160 | Line hierarchy &1 does not have a planning segment |
161 | Line &1 has several capacity segments: No dispatching possible |
170 | No version entered, sel. ind will be deleted |
180 | Production version & is locked |
190 | ********************* Material ********************************* |
191 | Select one material only |
192 | Only select one material |
193 | All materials cannot be hidden |
194 | No materials have been selected |
195 | Please choose a material |
196 | No previous material exists |
197 | No following material exists |
200 | Material &1 &2 is blocked for single-item planning by user &3 |
201 | No requirements for material &1, plant &2 exist for selection |
202 | No production for material &1, plant &2 exists for selection |
203 | No planned orders found for material &1, version &2 |
204 | Material & & cannot be produced in-house |
210 | Material & does not exist in plant & |
211 | No planned data exists for material &, plant & |
230 | ********************* Dates / Periods **************************** |
231 | Only possible to sort by start date with period. printing and per. shift |
232 | Function not possible for the period 'shift' |
233 | Period "shift" only possible with production dates |
234 | Periodic display is only possible with production dates |
235 | Only possible to print list with period, shift or day |
237 | The period "Month" cannot be expanded (already the largest period) |
238 | The period "Shift" cannot be expanded (smallest period) |
239 | Only months are displayed in the user-defined period split |
240 | No planning calendar can be selected |
241 | No valid calendar ID was entered |
242 | Date lies outwith the period of examination |
243 | Enter the data in ascending sequence |
249 | Invalid date |
250 | Date &1 is not valid. Enter a new date. |
251 | The dispatching period has been set to &1 days (=&2) |
260 | Expanding and collapsing periods not possible for planning calendar |
261 | In lead time scheduling, shift is not contained in period split |
270 | *************** Distribution function ************* |
271 | Distribution key - initial |
272 | Distribution key not maintained in Table & |
273 | Please maintain the distribution function |
285 | ************************ Run schedule header ********************** |
286 | No run schedule header exists for this selection |
287 | No valid run schedule header exists in this time |
288 | Repetitive mfg not allowed for material & & |
289 | Run schedule header & is blocked |
300 | *************** Capacity data / Scheduling |
301 | Date adjust. level incorrect: Plant &1 / ord.type &2 / prod.sched. &3 |
302 | No lead time scheduling: Plant &1 / order type &2 / prod.sched. &3 |
303 | No capa. data determined: Plant &1 / Ord. type &2 / Prod. sched. &3 |
304 | No capactiy planning active |
310 | Scheduling error: & |
311 | Problems occurred when scheduling plnd ord. for mat. &1, version &2 |
312 | Scheduling not executed for plnd orders of material &1, version &2 |
313 | Scheduling levels not maintained in Customizing |
314 | No capacity requirements were determined (see Customizing) |
315 | No prod. dates for material &1, version &2, production line &3 |
316 | Detailed or rate-based sched. and sequencing active simultaneously |
320 | Capacity category of work center &1 was set to &2 |
321 | Scheduling and capacity calculation of & have different bases |
350 | ******************* Planned/production/process orders **************** |
351 | Planned orders for material &1, version &2 flagged for conversion |
352 | Planned order for material &1 on the &2 was not created |
353 | Planned order &1 for material &2 on the &3 was not changed |
354 | Planned orders for material & could not be converted |
355 | Function not possible for newly created planned order |
356 | Action &2 already executed for planned order &1. No change |
360 | Final delivery has already been made for partial order & |
361 | Partial order cannot be released |
370 | Production/process orders cannot be changed in long-term planning |
371 | No released production order was selected |
372 | No open reservations exist for production order & |
373 | Production order & has already been finally confirmed |
400 | ************************** Units of measure *********************** |
401 | Conversion of unit of measure &1 to unit of measure &2 not possible |
402 | Conversion of material & to unit of measure & not possible |