RM - Messages for Repetitive Manufacturing
The following messages are stored in message class RM: Messages for Repetitive Manufacturing.
It is part of development package MD04 in software component PP-REM. This development package consists of objects that can be grouped under "Repetitive Manufacturing".
It is part of development package MD04 in software component PP-REM. This development package consists of objects that can be grouped under "Repetitive Manufacturing".
Message Nr ▲ | Message Text |
|---|---|
| 001 | Argument & not contained in table & |
| 002 | Invalid entry in table & |
| 003 | Routing & & & does not exist |
| 004 | Error determining the supply area for WM |
| 005 | Dependent requirements are already blocked |
| 006 | WM material provision carried out successfully |
| 007 | Specific. of warehouse coordinates for mat. & in plant & not correct |
| 008 | No open components exist for WM provision |
| 009 | WM provision for part of the components already carried out |
| 010 | General settings in Customizing not maintained for repetitive mfg |
| 011 | Internal program error ( & & & & ) |
| 012 | Statistic S025 and S225 not to be updated according to LIS Customizing |
| 013 | Routing not defined for mat. & and production version & |
| 014 | Entry of actual data not allowed according to status check |
| 015 | According to selections, no production version is to be costed |
| 016 | BOM for material & and production version & not defined |
| 017 | Dependent requirements of RS quantities of & & adjusted |
| 018 | Dependent requirements will be adjusted |
| 019 | Error in stock determination caused termination |
| 020 | User &1 is blocking production version &2 of mat. &3 |
| 021 | No production versions could be found for selection |
| 022 | Production lot &2 is blocked by user &1 |
| 023 | Change not possible as similar postprocessing records created |
| 024 | Confirmation for prodn lot only poss. in case of nonvaluated proj. stock |
| 025 | No cost estimate possible for this product cost collector |
| 026 | A new costing is carried out for product cost collector &1 |
| 027 | Inventory Mgmt: Sufficient qties of material & in plant & not available |
| 028 | Routing &1 &2 &3 contains no reporting points |
| 029 | Product cost collector &1 cannot be determined |
| 030 | Run schedule quantities still exist for production version &1 |
| 031 | Dependent requirements for material & / production version & not adjusted |
| 032 | Plant &1 does not exist |
| 033 | Confirmation for this material, plant, and version only possible in MES |
| 034 | Repetitive mfg profile &: planned order reduction must be activated |
| 040 | Repetitive manufacturing profile &1 inconsistent |
| 041 | Choose a valid line or terminate the dialog |
| 045 | Material & in plant & marked for deletion |
| 050 | Enter either a reference qty or choose "Components" |
| 051 | Enter reference quantity or choose "activities" |
| 053 | Movement type & not maintained |
| 054 | Serial numbers with automatic batch number assignment not supported |
| 055 | Movement types & and & are not consistent |
| 056 | Serial numbers with partial reversal not supported |
| 057 | Entry of act. data w. activity posting and partial reversal not supported |
| 060 | Cancellation terminated because backlogs from backflushing exist |
| 061 | No PDC confirmation number transferred |
| 062 | No confirmation number transferred |
| 065 | No. of serial numbers assigned does not correspond to confirmation qty |
| 066 | No production type was selected |
| 070 | Error reading document log information & |
| 071 | Cancellation for & because material document exists in document log |
| 073 | No document log information exists for the selection criteria |
| 074 | First confirm the reporting points individually |
| 075 | The worklist is empty for these selection options |
| 076 | No confirmation processes to be carried out selected |
| 078 | Error determining the cost estimate |
| 079 | Material & in plant & not defined as a reporting point material |
| 080 | Entry of actual data at reporting point for mat. & in plant & not allowed |
| 081 | Reporting point & for material &, plant &, version &, does not exist |
| 082 | Error updating the reporting point quantity |
| 083 | Confirm. qty for reporting point exceeds confirmed qty for predecessor RP |
| 084 | You have not entered reporting point & for material &, plant &, version & |
| 085 | GR confirmation quantity exceeds qty confirmed for last reporting point |
| 086 | No GR with backflush in case of reporting point logic w. autom. GR option |
| 087 | Further operations have been defined after the last reporting point |
| 088 | GR quantity > RP quantities: Temporary requirement inconsistency possible |
| 090 | Error reading the special stock for material & and vendor & |
| 093 | Specify a plant |
| 094 | Rep. point does not exist as operation in standard cost estimate |
| 095 | Error resetting the reporting point quantities due to inconsistencies |
| 096 | Goods receipt now, backflush later, not for reporting point material |
| 097 | Cost estimate created for material & with version & in plant & |
| 098 | Enter material, plant and production version first |
| 099 | Error creating cost estimate for material & with percentage & in plant & |
| 100 | Material & does not exist in plant & |
| 102 | To storage location & does not exist for material & in plant & |
| 103 | To storage location & in plant & does not exist |
| 104 | Costing variant & does not exist |
| 105 | No costing variant exists in product cost collector &1 |
| 106 | Costing type & does not exist or is not allowed |
| 107 | The quantities of all reporting points are initial |
| 108 | Reporting points for material &, version & reduced successfully |
| 109 | Quantity at reporting point &1 less than quantity at follow-on RP |
| 110 | Repetitive manufacturing not allowed for material & in plant & |
| 111 | Error reading reporting point information |
| 112 | Error determining the cost collector |
| 113 | REM profile &1 is not correctly maintained for material |
| 114 | Ord.type in cost collec.does not suit the definition in the RM profile |
| 115 | Incorrect order type in REM profile |
| 116 | Product cost collector & & & was not found |
| 117 | No backlog exists for run schedule header & |
| 118 | Blocking indicator is set in run schedule header & |
| 119 | Stge loc. & for material & in plant & does not exist |
| 120 | Run schedule header & cannot be selected |
| 121 | RS header for mat. &, version & in plant & and this date does not exist |
| 122 | Run schedule header for material & in plant & does not exist |
| 123 | No postprocessing records exist for these selection criteria |
| 124 | Confirm. qty > plnd order qty (There will be overdelivery for pl. order) |
| 125 | No planned orders available for sales order. BOM is exploded |
| 126 | Yield confirmed too large |
| 127 | Scrap quantity confirmed too large |
| 128 | Planned order &1 not allowed for make-to-order production |
| 129 | Please enter a material |
| 130 | Please enter material and/or planned order |
| 131 | Planned order & is a planned order for preplanning |
| 132 | Planned order & is only allowed for make-to-order production |
| 133 | Planned order & only allowed for Kanban procedures |
| 134 | Planned order & only allowed for long-term planning |
| 135 | Planned order & does not exist |
| 136 | No planned orders exist for the selection criteria |
| 137 | Enter either material or production version for selection |
| 138 | No planned orders exist for sales order & and item & |
| 139 | Error creating the planned order |
| 140 | No preliminary costing possible with nonvaluated make-to-order production |
| 141 | Max. 98 production versions are allowed for costing per prod. version |
| 142 | Error inserting the link between prod.version and cost estimate |
| 143 | No planned orders exist for production lot & |
| 144 | No sales orders were found for material &1 |
| 145 | Product cost collector & & & cannot be determined specifically |
| 146 | No version exists in planned order &1. |
| 147 | No sales order was selected |
| 148 | REM not allowed for plant/material/version &1/&2/&3 |
| 149 | Production version not found |
| 150 | Production version not found for selection criteria & & & & |
| 151 | Production version cannot be specifically identified |
| 152 | Planned order cannot be specifically identified |
| 153 | The system could not find the planned order you entered |
| 154 | Cost estimate for product cost collector &1 was not successful |
| 155 | No item has been selected |
| 156 | Invalid combination of version and planned order |
| 157 | Invalid combination of material and planned order |
| 158 | Invalid combination of plant and planned order |
| 159 | Invalid combination of planning plant and planned order |
| 160 | Revision level not found |
| 161 | Invalid combination of material and production lot |
| 162 | Invalid combination of plant and production lot |
| 163 | The material you entered does not exist in the sales order |
| 164 | The sales order does not exist in the plant you entered |
| 165 | No authorization for: &1 in plant &2 |
| 166 | Run schedule header & is blocked by another user |
| 167 | System locking error |
| 168 | Sales order &2 is blocked by user &1 |
| 169 | Production version &1 for material &2 in plant &3 is locked |
| 170 | No material components exist |
| 171 | Please enter sales order number and item for the selection |
| 172 | Invalid combination of plant and run schedule header |
| 173 | A maximum of six activities allowed |
| 174 | You must enter activities |
| 175 | Existing standard cost estimate cannot be used |
| 176 | Excess when converting to unit of measure in routing header |
| 177 | Specify entry qty of material with serial no. reqmt. w/o decimal places |
| 178 | Please use the unit of entry of the reporting point |
| 179 | Enter either the confirmation quantity or the scrap quantity |
| 180 | Please enter a quantity to be confirmed or a scrap quantity |
| 181 | Error converting the creation unit of measure |
| 182 | Reason for scrap deleted |
| 183 | Account assignment object is blocked by user &1 |
| 184 | Actual-data entry will be posted (No material document will be generated) |
| 185 | Enter the to storage location or maintain default values |
| 186 | Activities posted |
| 187 | GR with document & posted |
| 188 | GR and GI with document & posted |
| 189 | GR and partial GI with document & posted |
| 190 | GR with document & and activities posted |
| 191 | GR and GI with document & and activities posted |
| 192 | GR and partial GI with document & and activities posted |
| 193 | GI with document & posted |
| 194 | Partial GI with document & posted |
| 195 | Material movement with document & reversed |
| 196 | Material movement with document & and activity posting reversed |
| 197 | Backlogs from backflush were created, changed, or deleted |
| 198 | Backlogs from backflush were created or changed |
| 199 | Discrepancies from backflush remain unchanged |
| 200 | Please enter a production line |
| 201 | Please enter a planning ID |
| 202 | Please enter either the production line or the planning ID |
| 203 | No materials with missing quantities exist |
| 204 | No PAUF overdelivery possible if goods issue posting is decoupled |
| 205 | Planned order & already distributed; Direct confirmation not possible |
| 206 | Run schedule headers with no production lines/Pl-IDs found |
| 207 | All reporting points found without confirmation |
| 208 | No reporting point found that suits the selection |
| 210 | Reversal - material documents cannot be reversed |
| 211 | Collective postprocessing NOT carried out successfully for all items |
| 212 | Collective entry of act. data NOT carried out successfully for all items |
| 213 | Document is postprocessing document and cannot be cancelled |
| 214 | Postprocessing for material &1 with version &2 was terminated |
| 215 | GI posted with document & and activities |
| 216 | Partial GI posted with document & and activities |
| 217 | Activity posting cancelled |
| 218 | Neither material movement nor activity posting was reversed |
| 219 | Collective postprocessing carried out for all items |
| 220 | Collective entry of actual data carried out for all items |
| 221 | Entry of actual data for material &1 with version &2 faulty |
| 222 | Entry of actual data carried out for material & with version & |
| 223 | For mat. & with version &, entry of actual data for rep. point & faulty |
| 224 | For mat. & with version &, entry of actual data carried out for RP & |
| 225 | For mat. & with verison &, reporting point & reduced incorrectly |
| 226 | For mat. & with version &, reporting point & reduced |
| 227 | Postprocessing for material &1 with version &2 was not successful |
| 228 | Phantom assembly & must not be bulk material |
| 229 | Correction delivery being generated |
| 230 | Postprocessing records exist for confirmation that is to be cancelled |
| 231 | Sales order & / & does not exist |
| 234 | Routing &1 &2 &3 not valid on posting date &4 |
| 235 | Error for material & in plant & with version & |
| 236 | (Production) plant cannot be determined |
| 237 | The system cannot carry out the reporting point confirmation |
| 240 | Log does not exist |
| 241 | No production version was transferred |
| 242 | Quantities still on line for production version &1 |
| 248 | Backlog from backflushing will be processed |
| 250 | Please position cursor |
| 251 | Backlog from backflushing will be deleted |
| 252 | There are no backlogs from backflushing |
| 253 | Are you sure you want to delete backlog from backflushing? |
| 254 | Postprocessing record(s) changed |
| 255 | Selected item deleted |
| 260 | Select a valid line |
| 261 | Please place cursor on a document log, single-line |
| 262 | Place cursor on an element of the document log single line |
| 263 | Update of batch where-used list was reset |
| 265 | Indicator for component withdrawal using DTS logic has been reset |
| 266 | Run schedule quantities insufficient for DTS logic |
| 267 | The order quantity must not be smaller that the DTS quantity |
| 268 | DTS planned order &1 cannot be deleted |
| 269 | Indicator for 'Planned Order on Reversal' using DTS logic was reset |
| 270 | Withdrawal sequence not found |
| 271 | Error determining consignment vendor |
| 273 | Immediate backflush in update task is not possible |
| 281 | Control key of the reporting point operation has changed |
| 282 | Reporting point confirmation in past not possible |
| 290 | All capacity reqmts for planned order will be deleted, as routing deleted |
| 299 | Reporting point changed, but still decoupled confirmation to be posted |
| 300 | Error creating line items for reporting points (PZPE) |
| 301 | Error changing line items for reporting points (PZPE) |
| 302 | Error creating period values for reporting points (PZPP) |
| 303 | Error changing period values for reporting point (PZPP) |
| 304 | Error creating total records for reporting point (PZPS) |
| 305 | Error changing total records for reporting point (PZPS) |
| 306 | Error reading material master record for material &1 and plant &2 |
| 307 | Error deleting reporting point period values (PZPP) |
| 308 | Error deleting reporting point collective record (PZPS) |
| 309 | Production version cannot be deleted as RP quantities exist |
| 310 | No reporting points exist |
| 311 | According to REM profile &, reporting points not allowed |
| 312 | Reporting point procedure is not active for REM profile &1 |
| 313 | REM profile &1 for material &2 not found in plant &3 |
| 314 | Error deleting reporting point line item (PZPE) |
| 316 | Reporting point structure will be set up again |
| 317 | Reporting points will be created. Please check consistency |
| 318 | Rep.pnts cannot be set up again as rep.pnt records from previous period |
| 319 | Delete not possible as inspection lot & exists |
| 320 | Runtime cannot be changed |
| 322 | Posting in previous period can cause negative ref. qty in current period |
| 323 | Check parallel to production not active for RS header |
| 324 | No inspection lots can be created for RS header with production orders |
| 325 | Inspection lot & for material &, plant &, version & created |
| 326 | Inspection lot &1 cannot be reversed |
| 327 | Inspection lot cannot be created due to inconsistent QM data |
| 328 | Inspection lot cannot be created as max. lot size = 0 |
| 329 | Transfer parameter &1 not filled in function module &2 |
| 330 | Incorrect call of function module & |
| 331 | Yield and scrap cannot be posted at the same time |
| 332 | Only reporting point postings allowed in the current or previous period |
| 333 | Posting records exist in future period |
| 334 | Posting would activate future RP structure, therefore not allowed |
| 335 | Posting not allowed in previous period as RP deleted in current period |
| 336 | Error at status check for inspection lot &1 |
| 337 | Posting leads to overflow |
| 338 | Inconsistencies between production version and run schedule header |
| 339 | Routing not found |
| 340 | Not possible to change the reporting point structure for the date entered |
| 341 | Date entered is invalid |
| 342 | Reporting point data not found |
| 343 | Posting cannot be reversed |
| 344 | Cannot determine controlling area |
| 345 | No single documents exist for run schedule header &1 |
| 346 | No document exists for document number &1 |
| 347 | Run schedule header &1 does not exist |
| 348 | No routing in production version &1 &2 &3 |
| 349 | Error determining inspection lot for production version &1 |
| 350 | vvvvvv from here on: Messages for new pull list vvvvvvvvvvvvvvvvv |
| 351 | Please enter material, production version and quantity |
| 352 | Function is not yet supported |
| 353 | Please limit the selection criteria for planned orders further |
| 354 | Error reading withdrawal types |
| 355 | Materials with consignmt withdr. are excluded from stock transfer |
| 356 | No production versions could be found for selection |
| 357 | No planned orders could be found for selection |
| 358 | No dependent requirements could be found for selection |
| 359 | Please enter an explosion date |
| 360 | Limit sel. criteria for indiv.customer planned orders further |
| 361 | Please check the unit of measure proposal |
| 362 | Invalid unit of measure |
| 363 | Sales order & & does not suit plant/material selection |
| 364 | No suitable item types were found |
| 365 | No indiv.customer planned orders were found to suit the selection |
| 367 | Errors occured when initializing WM data (see log) |
| 368 | Warnings appeared when initializing WM data (see log) |
| 369 | This pull list is a prototype |
| 372 | Materials will be deleted from the list |
| 373 | The first detail screen has already been displayed |
| 374 | The last detail screen has already been displayed |
| 375 | No further lines have been selected |
| 376 | Only the line that was selected first was taken into account |
| 378 | Errors occurred during stock transfer |
| 381 | Withdrawal type & is not provided for material & in plant & |
| 385 | Select a line for which a stock transfer is possible |
| 386 | No replenishment source could be determined |
| 388 | & individual reqmts were processed |
| 389 | WM staging for split individual requirement & & not possible |
| 390 | WM staging of picking parts not possible |
| 391 | Reservation & could not be blocked: no WM material staging |
| 392 | Errors occurred in WM material staging (see log) |
| 393 | Warnings issued in WM material staging (see log) |
| 400 | Product cost collector has not yet been created |
| 401 | Search strategy for profile & for for production type & not defined |
| 402 | Rep. points for version &1 / material &2 / plant &3 will not be created |
| 410 | No reporting points found for mat. &, plnt &, vers. &, costColl. & |
| 411 | No product cost collector found for mat &, plant &, version & |
| 412 | Production version &1 of mat. &2, plant &3 is not valid on & |
| 413 | Error reading RP data: mat. &, plant &, version &, prod.cost coll. & |
| 414 | No product cost collector selected: mat. &, plant &, version & |
| 415 | Reporting point confirmation only possible with kanban |
| 416 | Reporting point confirmation not allowed with kanban |
| 417 | Carry out reporting point confirmation in kanban |
| 430 | No authorization for displaying the component list |
| 450 | ---> from here: messages for PDC |
| 451 | Record type & invalid: no processing |
| 452 | PDC number &1 has already been posted |
| 453 | PDC number &1 exists several times already |
| 454 | PDC number &1 does not exist |
| 455 | PDC number &1 has already been reversed |
| 456 | PDC no. &1 already exists |
| 457 | PDC no. &1 is a reversal document |
| 458 | PDC no. &1 is a postprocessing document |
| 459 | Decoupled confirmation has already been post-executed for PDC no. &1 |
| 460 | PDC no. &1 is a decoupled confirmation document |
| 461 | Backflush type &1 in selected process &2 is not allowed |
| 462 | Posting date and/or document date was/were not transferred |
| 463 | Material could not be determined |
| 464 | Special procurement key for material &1 missing |
| 465 | Special procurement key &1 for plant &2 not found |
| 466 | No reporting point passed on |
| 467 | Enter a confirmation quantity |
| 468 | No reporting point needed |
| 470 | Confirmation number &1 does not exist |
| 471 | Confirmation number &1 already exists |
| 472 | Confirmation number &1 has already been cancelled |
| 473 | Confirmation number &1 is a reversal document |
| 474 | Confirmation number &1 is a postprocessing document |
| 475 | Decoupled confirmation has already been post-executed for conf. no. &1 |
| 476 | Confirmation number &1 is a decoupled confirmation document |
| 480 | Planning order & not suitable for make-to-order/repetitive manufacturing |
| 481 | Planning order & not suitable for SO-related production/repet. manufact. |
| 500 | Function not possible as make-to-order segment comes first |
| 501 | Access with a start date <= & |
| 502 | Warning: you are changing a Kanban planned order |
| 504 | Inbound delivery & being generated. No material document will be created |
| 505 | Inbound delivery & being generated. Goods issue will be posted |
| 506 | Correction delivery & being generated. No material doc. will be created |
| 507 | Correction delivery & being generated. Material document will be created |
| 600 | vvvvvvvvv from here on: Rep. Mfg. profile assistant vvvvvvvvvvvvvvvvvvv |
| 601 | Enter the profile to be created |
| 602 | Profile & already exists. Change your entry. |
| 603 | An error occurred while saving the profile |
| 604 | Profile & has been saved |
| 605 | The template you are using is for profiles for make-to-stock production |
| 606 | The template you are using is for profiles for make-to-order production |
| 607 | The make-to-stk/make-to-ord. process cannot be recognized in the template |
| 620 | Errors occurred creating the RP overview (see log) |
| 650 | Assistant could not check if objects can be transported |
| 651 | The configuration of your system or client does not allow transports |
| 652 | No updates without transport order |
| 653 | Postprocessing records are independent of the version for mat. & |
| 680 | Failure cost processing in plant & for REM is not active |
| 681 | Only enter rework in reporting point backflush |
| 682 | Failure cost data for scrap only when posting assembly scrap |
| 700 | ********* From here: Messages for 4.0 Confirmation ************** |
| 701 | Scrap confirmation to reporting point not possible if RP quantities exist |
| 702 | Scrap confirmation at RP not possible if no RP quantities exist |
| 703 | Data for previous reporting points will be automatically posted |
| 704 | No routings could be found to suit this selection criteria |
| 705 | Archiving object could not be created |
| 706 | Incorrect access to archiving object |
| 707 | Error recording the archiving record |
| 708 | Error recording the archiving object |
| 709 | Error recording the statistics information |
| 710 | Error closing the archive file |
| 711 | Archive file could be be opened for deleting |
| 712 | Customizing data could not be found |
| 713 | Error accessing archive file |
| 714 | Archive file could not be opened to read |
| 715 | Error reading archiving information |
| 716 | Group name & does not exist |
| 717 | System error. Check system log to analyze the error |
| 718 | Programming error. PBT environment has already been initialized |
| 719 | All systems are busy at present |
| 720 | All servers are busy. & attempt after 30 seconds |
| 721 | & suitable data records were found |
| 722 | Different PBT groups cannot be initialized |
| 724 | Communication or system error when receiving the message |
| 725 | Program error in function module & |
| 726 | Processing of the backflush was terminated |
| 727 | Inspection lot cannot be created for an expired production version |
| 728 | In the current scenario, partial processes are posted immediately |
| 729 | Partial proc. posted immediately when conf. sales order w/o cost coll. |
| 730 | In case of confirmation w. 'Correction', subprocesses posted immediately |
| 731 | In case of conf. w. 'doc-neutr. cancell.', subprocesses are posted immed. |
| 732 | In case of RP conf. for planned order, subprocesses are posted immmed. |
| 733 | In case of conf. for production lot, subprocesses are posted immediately |
| 734 | In case of final conf. w. qties on line, subprocesses are posted immed. |
| 735 | Error reading Customizing entry for LIS |
| 736 | No planned order found for document log number & |
| 737 | No planned order found for key 'plnum = &' |
| 738 | GR quantity for confirmation & > total GR quantity for planned order & |
| 739 | The partial processes are posted immediately for component scrap |
| 740 | Diff. search strategies for diff. production strategies not allowed |
| 741 | No reporting points allowed for make-to-order REM |
| 745 | Cost estimate with costing date in the past not allowed |
| 749 | Collective mess. for mat. & in plant & with version & not executed on & |
| 750 | Collective confirmation carried out for mat. & in plant & with version & |
| 751 | Material document & was posted |
| 752 | Activity document & & was posted |
| 753 | Reporting point document & was posted |
| 754 | Backlog single document & was posted |
| 755 | If the cumulative record is changed, all individual records are adjusted |
| 756 | No quantity change allowed if individual postprocessing records |
| 757 | Inconsistencies exist in the postprocessing records of material & |
| 758 | Documents were created |
| 759 | Numbering of "RSPOS" carried out for "RSNUM" = & |
| 760 | No matching user with name & found |
| 761 | User &1 does not have RFC authorization |
| 762 | Separate aggregation of goods issues and activities not possible |
| 763 | Unit of measure in routing header changed. Costing not possible |
| 764 | At least one item was not deleted due to non-cumulated backlogs |
| 765 | Item cannot be deleted (non-cumulated backlogs) |
| 769 | You are not allowed to change partially confirmed planned order &1 |
| 770 | Cancellation not poss. because decoupled conf. already post-executed |
| 771 | Cancellation not possible because RP document &1 not cancellable |
| 780 | Parallelization type of confirmation processes not yet defined |
| 781 | vvvvvvvvvvv Error messages for 4.6A |
| 782 | Enter a quantity |
| 783 | Enter either sales order, planned order or material |
| 784 | Detailed settings not possible in case of activity confirmation |
| 785 | User wants to limit selection further |
| 786 | Incorrect authorization profile for authorization object &1 |
| 787 | No authorization for: &1 in plant &2, storage location &3 |
| 788 | Material number or planned order required |
| 790 | Only "scrap confirmation at reporting point" possible |
| 791 | Reporting point & was deleted: Document can no longer be cancelled |
| 792 | Confirmation type reset to assembly confirmation |
| 793 | Switched to "Propose all components" |
| 794 | Switched to "Propose all operations" |
| 795 | Sales order copied from the planned order |
| 796 | Cancelled by user |
| 797 | Entry variant no longer exists |
| 799 | ***** From here: messages for actual confirmation of activities ******** |
| 800 | First operation is already reached |
| 801 | Last operation is already reached |
| 810 | Error during unit conversion |
| 811 | When calculating differences, actual activity must be > target activity |
| 812 | Activity type in row & for cost center & not allowed |
| 813 | Selected row is already an excess activity row |
| 814 | Target activity is 0. No differences will be calculated |
| 815 | No row was selected |
| 816 | In row &, no activity unit has been specified |
| 817 | Not all rows could be deleted |
| 818 | Work center & does not exist in plant & |
| 819 | You have not selected an operation |
| 820 | Reference qty zero (Target confirmation of all operations not possible) |
| 821 | No activity type has been specified in row & |
| 822 | Confirmation data set to target value of new work center |
| 823 | No rows will be deleted |
| 824 | No operation requiring confirmation exists in the routing |
| 825 | You must have maint. at least one standard value parameter per operation |
| 826 | A maximum of six activity parameters possible |
| 827 | No activities posted |
| 828 | Error in actual cost calculation |
| 829 | Postprocessing record with weblnr = & was not locked |
| 830 | If you change quantity 0, dummy components are not adjusted |
| 831 | Activity posting document & & no longer exists |
| 832 | Cost collector & blocked |
| 840 | No entering of rework when subsequently posting previous reporting points |
| 841 | Subseq. pstg of prev. reporting point qties not allowed f. kanban process |
| 849 | *** From here: messages for reversing reprocessing records **** |
| 850 | No confirmation documents exist |
| 851 | All postprocessing records have been postprocessed |
| 852 | No postprocessing records exist for run schedule header & |
| 853 | No postprocessing record exists for confirmation document & |
| 854 | No postprocessing record has yet been postprocessed |
| 855 | No material could be postprocessed |
| 856 | No backlogs are created nor are withdrawal quantities corrected |
| 857 | There are inconsistencies in the postprocessing records |
| 858 | No changes were made |
| 859 | Postprocessing terminated |
| 860 | Caution: changes reversed |
| 861 | Insert entry in table AFFW_CNEU has no corresponding RSPOS |
| 862 | Confirmation carried out without reference to a RS header |
| 863 | Please enter a sales order item for the sales order |
| 864 | Production lot & does not exist |
| 865 | No postprocessing records found |
| 866 | No inspection lot found for material &, plant &, version & |
| 867 | No inspection lot found for material &, plant & |
| 868 | No inspection lot could be created |
| 870 | Negative activities only for delta activity postings |
| 871 | Transfer problem when converting run schedule headers |
| 872 | Production version & for material & is blocked due to internal conversion |
| 873 | Reporting point structure & & & was set up again |
| 874 | Routing header changed (UoM). Not possible to set up rep. points again |
| 880 | No version was selected |
| 881 | No inspection lot exists for the version |
| 882 | Either select versions or place cursor on version row |
| 883 | No authorization for accessing inspection type & in plant & |
| 884 | Inspection data for mat. & & & no longer current |
| 885 | Only postprocessing records with positive quantities are allowed |
| 886 | The +/- sign cannot be changed for postprocessing records |
| 887 | Changed REM profile regarding generation of postprocessing records |
| 888 | No postprocessing records allowed to exist anymore for related assemblies |
| 889 | Material & & & could be postprocessed |
| 890 | Material & & & could not be postprocessed |
| 891 | Confirmation cancellation unsuccessful |
| 892 | Storage location &1 in plant &2 is subject to HU management |
| 893 | No operations to confirm exist after the last reporting point |
| 894 | Decoupled confirmation not possible for documentary batches |
| 895 | Storage location & of component & is EWM-managed |