RM - Messages for Repetitive Manufacturing

The following messages are stored in message class RM: Messages for Repetitive Manufacturing.
It is part of development package MD04 in software component PP-REM. This development package consists of objects that can be grouped under "Repetitive Manufacturing".
Message Nr
Message Text
001Argument & not contained in table &
002Invalid entry in table &
003Routing & & & does not exist
004Error determining the supply area for WM
005Dependent requirements are already blocked
006WM material provision carried out successfully
007Specific. of warehouse coordinates for mat. & in plant & not correct
008No open components exist for WM provision
009WM provision for part of the components already carried out
010General settings in Customizing not maintained for repetitive mfg
011Internal program error ( & & & & )
012Statistic S025 and S225 not to be updated according to LIS Customizing
013Routing not defined for mat. & and production version &
014Entry of actual data not allowed according to status check
015According to selections, no production version is to be costed
016BOM for material & and production version & not defined
017Dependent requirements of RS quantities of & & adjusted
018Dependent requirements will be adjusted
019Error in stock determination caused termination
020User &1 is blocking production version &2 of mat. &3
021No production versions could be found for selection
022Production lot &2 is blocked by user &1
023Change not possible as similar postprocessing records created
024Confirmation for prodn lot only poss. in case of nonvaluated proj. stock
025No cost estimate possible for this product cost collector
026A new costing is carried out for product cost collector &1
027Inventory Mgmt: Sufficient qties of material & in plant & not available
028Routing &1 &2 &3 contains no reporting points
029Product cost collector &1 cannot be determined
030Run schedule quantities still exist for production version &1
031Dependent requirements for material & / production version & not adjusted
032Plant &1 does not exist
033Confirmation for this material, plant, and version only possible in MES
034Repetitive mfg profile &: planned order reduction must be activated
040Repetitive manufacturing profile &1 inconsistent
041Choose a valid line or terminate the dialog
045Material & in plant & marked for deletion
050Enter either a reference qty or choose "Components"
051Enter reference quantity or choose "activities"
053Movement type & not maintained
054Serial numbers with automatic batch number assignment not supported
055Movement types & and & are not consistent
056Serial numbers with partial reversal not supported
057Entry of act. data w. activity posting and partial reversal not supported
060Cancellation terminated because backlogs from backflushing exist
061No PDC confirmation number transferred
062No confirmation number transferred
065No. of serial numbers assigned does not correspond to confirmation qty
066No production type was selected
070Error reading document log information &
071Cancellation for & because material document exists in document log
073No document log information exists for the selection criteria
074First confirm the reporting points individually
075The worklist is empty for these selection options
076No confirmation processes to be carried out selected
078Error determining the cost estimate
079Material & in plant & not defined as a reporting point material
080Entry of actual data at reporting point for mat. & in plant & not allowed
081Reporting point & for material &, plant &, version &, does not exist
082Error updating the reporting point quantity
083Confirm. qty for reporting point exceeds confirmed qty for predecessor RP
084You have not entered reporting point & for material &, plant &, version &
085GR confirmation quantity exceeds qty confirmed for last reporting point
086No GR with backflush in case of reporting point logic w. autom. GR option
087Further operations have been defined after the last reporting point
088GR quantity > RP quantities: Temporary requirement inconsistency possible
090Error reading the special stock for material & and vendor &
093Specify a plant
094Rep. point does not exist as operation in standard cost estimate
095Error resetting the reporting point quantities due to inconsistencies
096Goods receipt now, backflush later, not for reporting point material
097Cost estimate created for material & with version & in plant &
098Enter material, plant and production version first
099Error creating cost estimate for material & with percentage & in plant &
100Material & does not exist in plant &
102To storage location & does not exist for material & in plant &
103To storage location & in plant & does not exist
104Costing variant & does not exist
105No costing variant exists in product cost collector &1
106Costing type & does not exist or is not allowed
107The quantities of all reporting points are initial
108Reporting points for material &, version & reduced successfully
109Quantity at reporting point &1 less than quantity at follow-on RP
110Repetitive manufacturing not allowed for material & in plant &
111Error reading reporting point information
112Error determining the cost collector
113REM profile &1 is not correctly maintained for material
114Ord.type in cost collec.does not suit the definition in the RM profile
115Incorrect order type in REM profile
116Product cost collector & & & was not found
117No backlog exists for run schedule header &
118Blocking indicator is set in run schedule header &
119Stge loc. & for material & in plant & does not exist
120Run schedule header & cannot be selected
121RS header for mat. &, version & in plant & and this date does not exist
122Run schedule header for material & in plant & does not exist
123No postprocessing records exist for these selection criteria
124Confirm. qty > plnd order qty (There will be overdelivery for pl. order)
125No planned orders available for sales order. BOM is exploded
126Yield confirmed too large
127Scrap quantity confirmed too large
128Planned order &1 not allowed for make-to-order production
129Please enter a material
130Please enter material and/or planned order
131Planned order & is a planned order for preplanning
132Planned order & is only allowed for make-to-order production
133Planned order & only allowed for Kanban procedures
134Planned order & only allowed for long-term planning
135Planned order & does not exist
136No planned orders exist for the selection criteria
137Enter either material or production version for selection
138No planned orders exist for sales order & and item &
139Error creating the planned order
140No preliminary costing possible with nonvaluated make-to-order production
141Max. 98 production versions are allowed for costing per prod. version
142Error inserting the link between prod.version and cost estimate
143No planned orders exist for production lot &
144No sales orders were found for material &1
145Product cost collector & & & cannot be determined specifically
146No version exists in planned order &1.
147No sales order was selected
148REM not allowed for plant/material/version &1/&2/&3
149Production version not found
150Production version not found for selection criteria & & & &
151Production version cannot be specifically identified
152Planned order cannot be specifically identified
153The system could not find the planned order you entered
154Cost estimate for product cost collector &1 was not successful
155No item has been selected
156Invalid combination of version and planned order
157Invalid combination of material and planned order
158Invalid combination of plant and planned order
159Invalid combination of planning plant and planned order
160Revision level not found
161Invalid combination of material and production lot
162Invalid combination of plant and production lot
163The material you entered does not exist in the sales order
164The sales order does not exist in the plant you entered
165No authorization for: &1 in plant &2
166Run schedule header & is blocked by another user
167System locking error
168Sales order &2 is blocked by user &1
169Production version &1 for material &2 in plant &3 is locked
170No material components exist
171Please enter sales order number and item for the selection
172Invalid combination of plant and run schedule header
173A maximum of six activities allowed
174You must enter activities
175Existing standard cost estimate cannot be used
176Excess when converting to unit of measure in routing header
177Specify entry qty of material with serial no. reqmt. w/o decimal places
178Please use the unit of entry of the reporting point
179Enter either the confirmation quantity or the scrap quantity
180Please enter a quantity to be confirmed or a scrap quantity
181Error converting the creation unit of measure
182Reason for scrap deleted
183Account assignment object is blocked by user &1
184Actual-data entry will be posted (No material document will be generated)
185Enter the to storage location or maintain default values
186Activities posted
187GR with document & posted
188GR and GI with document & posted
189GR and partial GI with document & posted
190GR with document & and activities posted
191GR and GI with document & and activities posted
192GR and partial GI with document & and activities posted
193GI with document & posted
194Partial GI with document & posted
195Material movement with document & reversed
196Material movement with document & and activity posting reversed
197Backlogs from backflush were created, changed, or deleted
198Backlogs from backflush were created or changed
199Discrepancies from backflush remain unchanged
200Please enter a production line
201Please enter a planning ID
202Please enter either the production line or the planning ID
203No materials with missing quantities exist
204No PAUF overdelivery possible if goods issue posting is decoupled
205Planned order & already distributed; Direct confirmation not possible
206Run schedule headers with no production lines/Pl-IDs found
207All reporting points found without confirmation
208No reporting point found that suits the selection
210Reversal - material documents cannot be reversed
211Collective postprocessing NOT carried out successfully for all items
212Collective entry of act. data NOT carried out successfully for all items
213Document is postprocessing document and cannot be cancelled
214Postprocessing for material &1 with version &2 was terminated
215GI posted with document & and activities
216Partial GI posted with document & and activities
217Activity posting cancelled
218Neither material movement nor activity posting was reversed
219Collective postprocessing carried out for all items
220Collective entry of actual data carried out for all items
221Entry of actual data for material &1 with version &2 faulty
222Entry of actual data carried out for material & with version &
223For mat. & with version &, entry of actual data for rep. point & faulty
224For mat. & with version &, entry of actual data carried out for RP &
225For mat. & with verison &, reporting point & reduced incorrectly
226For mat. & with version &, reporting point & reduced
227Postprocessing for material &1 with version &2 was not successful
228Phantom assembly & must not be bulk material
229Correction delivery being generated
230Postprocessing records exist for confirmation that is to be cancelled
231Sales order & / & does not exist
234Routing &1 &2 &3 not valid on posting date &4
235Error for material & in plant & with version &
236(Production) plant cannot be determined
237The system cannot carry out the reporting point confirmation
240Log does not exist
241No production version was transferred
242Quantities still on line for production version &1
248Backlog from backflushing will be processed
250Please position cursor
251Backlog from backflushing will be deleted
252There are no backlogs from backflushing
253Are you sure you want to delete backlog from backflushing?
254Postprocessing record(s) changed
255Selected item deleted
260Select a valid line
261Please place cursor on a document log, single-line
262Place cursor on an element of the document log single line
263Update of batch where-used list was reset
265Indicator for component withdrawal using DTS logic has been reset
266Run schedule quantities insufficient for DTS logic
267The order quantity must not be smaller that the DTS quantity
268DTS planned order &1 cannot be deleted
269Indicator for 'Planned Order on Reversal' using DTS logic was reset
270Withdrawal sequence not found
271Error determining consignment vendor
273Immediate backflush in update task is not possible
281Control key of the reporting point operation has changed
282Reporting point confirmation in past not possible
290All capacity reqmts for planned order will be deleted, as routing deleted
299Reporting point changed, but still decoupled confirmation to be posted
300Error creating line items for reporting points (PZPE)
301Error changing line items for reporting points (PZPE)
302Error creating period values for reporting points (PZPP)
303Error changing period values for reporting point (PZPP)
304Error creating total records for reporting point (PZPS)
305Error changing total records for reporting point (PZPS)
306Error reading material master record for material &1 and plant &2
307Error deleting reporting point period values (PZPP)
308Error deleting reporting point collective record (PZPS)
309Production version cannot be deleted as RP quantities exist
310No reporting points exist
311According to REM profile &, reporting points not allowed
312Reporting point procedure is not active for REM profile &1
313REM profile &1 for material &2 not found in plant &3
314Error deleting reporting point line item (PZPE)
316Reporting point structure will be set up again
317Reporting points will be created. Please check consistency
318Rep.pnts cannot be set up again as rep.pnt records from previous period
319Delete not possible as inspection lot & exists
320Runtime cannot be changed
322Posting in previous period can cause negative ref. qty in current period
323Check parallel to production not active for RS header
324No inspection lots can be created for RS header with production orders
325Inspection lot & for material &, plant &, version & created
326Inspection lot &1 cannot be reversed
327Inspection lot cannot be created due to inconsistent QM data
328Inspection lot cannot be created as max. lot size = 0
329Transfer parameter &1 not filled in function module &2
330Incorrect call of function module &
331Yield and scrap cannot be posted at the same time
332Only reporting point postings allowed in the current or previous period
333Posting records exist in future period
334Posting would activate future RP structure, therefore not allowed
335Posting not allowed in previous period as RP deleted in current period
336Error at status check for inspection lot &1
337Posting leads to overflow
338Inconsistencies between production version and run schedule header
339Routing not found
340Not possible to change the reporting point structure for the date entered
341Date entered is invalid
342Reporting point data not found
343Posting cannot be reversed
344Cannot determine controlling area
345No single documents exist for run schedule header &1
346No document exists for document number &1
347Run schedule header &1 does not exist
348No routing in production version &1 &2 &3
349Error determining inspection lot for production version &1
350vvvvvv from here on: Messages for new pull list vvvvvvvvvvvvvvvvv
351Please enter material, production version and quantity
352Function is not yet supported
353Please limit the selection criteria for planned orders further
354Error reading withdrawal types
355Materials with consignmt withdr. are excluded from stock transfer
356No production versions could be found for selection
357No planned orders could be found for selection
358No dependent requirements could be found for selection
359Please enter an explosion date
360Limit sel. criteria for indiv.customer planned orders further
361Please check the unit of measure proposal
362Invalid unit of measure
363Sales order & & does not suit plant/material selection
364No suitable item types were found
365No indiv.customer planned orders were found to suit the selection
367Errors occured when initializing WM data (see log)
368Warnings appeared when initializing WM data (see log)
369This pull list is a prototype
372Materials will be deleted from the list
373The first detail screen has already been displayed
374The last detail screen has already been displayed
375No further lines have been selected
376Only the line that was selected first was taken into account
378Errors occurred during stock transfer
381Withdrawal type & is not provided for material & in plant &
385Select a line for which a stock transfer is possible
386No replenishment source could be determined
388& individual reqmts were processed
389WM staging for split individual requirement & & not possible
390WM staging of picking parts not possible
391Reservation & could not be blocked: no WM material staging
392Errors occurred in WM material staging (see log)
393Warnings issued in WM material staging (see log)
400Product cost collector has not yet been created
401Search strategy for profile & for for production type & not defined
402Rep. points for version &1 / material &2 / plant &3 will not be created
410No reporting points found for mat. &, plnt &, vers. &, costColl. &
411No product cost collector found for mat &, plant &, version &
412Production version &1 of mat. &2, plant &3 is not valid on &
413Error reading RP data: mat. &, plant &, version &, prod.cost coll. &
414No product cost collector selected: mat. &, plant &, version &
415Reporting point confirmation only possible with kanban
416Reporting point confirmation not allowed with kanban
417Carry out reporting point confirmation in kanban
430No authorization for displaying the component list
450---> from here: messages for PDC
451Record type & invalid: no processing
452PDC number &1 has already been posted
453PDC number &1 exists several times already
454PDC number &1 does not exist
455PDC number &1 has already been reversed
456PDC no. &1 already exists
457PDC no. &1 is a reversal document
458PDC no. &1 is a postprocessing document
459Decoupled confirmation has already been post-executed for PDC no. &1
460PDC no. &1 is a decoupled confirmation document
461Backflush type &1 in selected process &2 is not allowed
462Posting date and/or document date was/were not transferred
463Material could not be determined
464Special procurement key for material &1 missing
465Special procurement key &1 for plant &2 not found
466No reporting point passed on
467Enter a confirmation quantity
468No reporting point needed
470Confirmation number &1 does not exist
471Confirmation number &1 already exists
472Confirmation number &1 has already been cancelled
473Confirmation number &1 is a reversal document
474Confirmation number &1 is a postprocessing document
475Decoupled confirmation has already been post-executed for conf. no. &1
476Confirmation number &1 is a decoupled confirmation document
480Planning order & not suitable for make-to-order/repetitive manufacturing
481Planning order & not suitable for SO-related production/repet. manufact.
500Function not possible as make-to-order segment comes first
501Access with a start date <= &
502Warning: you are changing a Kanban planned order
504Inbound delivery & being generated. No material document will be created
505Inbound delivery & being generated. Goods issue will be posted
506Correction delivery & being generated. No material doc. will be created
507Correction delivery & being generated. Material document will be created
600vvvvvvvvv from here on: Rep. Mfg. profile assistant vvvvvvvvvvvvvvvvvvv
601Enter the profile to be created
602Profile & already exists. Change your entry.
603An error occurred while saving the profile
604Profile & has been saved
605The template you are using is for profiles for make-to-stock production
606The template you are using is for profiles for make-to-order production
607The make-to-stk/make-to-ord. process cannot be recognized in the template
620Errors occurred creating the RP overview (see log)
650Assistant could not check if objects can be transported
651The configuration of your system or client does not allow transports
652No updates without transport order
653Postprocessing records are independent of the version for mat. &
680Failure cost processing in plant & for REM is not active
681Only enter rework in reporting point backflush
682Failure cost data for scrap only when posting assembly scrap
700********* From here: Messages for 4.0 Confirmation **************
701Scrap confirmation to reporting point not possible if RP quantities exist
702Scrap confirmation at RP not possible if no RP quantities exist
703Data for previous reporting points will be automatically posted
704No routings could be found to suit this selection criteria
705Archiving object could not be created
706Incorrect access to archiving object
707Error recording the archiving record
708Error recording the archiving object
709Error recording the statistics information
710Error closing the archive file
711Archive file could be be opened for deleting
712Customizing data could not be found
713Error accessing archive file
714Archive file could not be opened to read
715Error reading archiving information
716Group name & does not exist
717System error. Check system log to analyze the error
718Programming error. PBT environment has already been initialized
719All systems are busy at present
720All servers are busy. & attempt after 30 seconds
721& suitable data records were found
722Different PBT groups cannot be initialized
724Communication or system error when receiving the message
725Program error in function module &
726Processing of the backflush was terminated
727Inspection lot cannot be created for an expired production version
728In the current scenario, partial processes are posted immediately
729Partial proc. posted immediately when conf. sales order w/o cost coll.
730In case of confirmation w. 'Correction', subprocesses posted immediately
731In case of conf. w. 'doc-neutr. cancell.', subprocesses are posted immed.
732In case of RP conf. for planned order, subprocesses are posted immmed.
733In case of conf. for production lot, subprocesses are posted immediately
734In case of final conf. w. qties on line, subprocesses are posted immed.
735Error reading Customizing entry for LIS
736No planned order found for document log number &
737No planned order found for key 'plnum = &'
738GR quantity for confirmation & > total GR quantity for planned order &
739The partial processes are posted immediately for component scrap
740Diff. search strategies for diff. production strategies not allowed
741No reporting points allowed for make-to-order REM
745Cost estimate with costing date in the past not allowed
749Collective mess. for mat. & in plant & with version & not executed on &
750Collective confirmation carried out for mat. & in plant & with version &
751Material document & was posted
752Activity document & & was posted
753Reporting point document & was posted
754Backlog single document & was posted
755If the cumulative record is changed, all individual records are adjusted
756No quantity change allowed if individual postprocessing records
757Inconsistencies exist in the postprocessing records of material &
758Documents were created
759Numbering of "RSPOS" carried out for "RSNUM" = &
760No matching user with name & found
761User &1 does not have RFC authorization
762Separate aggregation of goods issues and activities not possible
763Unit of measure in routing header changed. Costing not possible
764At least one item was not deleted due to non-cumulated backlogs
765Item cannot be deleted (non-cumulated backlogs)
769You are not allowed to change partially confirmed planned order &1
770Cancellation not poss. because decoupled conf. already post-executed
771Cancellation not possible because RP document &1 not cancellable
780Parallelization type of confirmation processes not yet defined
781vvvvvvvvvvv Error messages for 4.6A
782Enter a quantity
783Enter either sales order, planned order or material
784Detailed settings not possible in case of activity confirmation
785User wants to limit selection further
786Incorrect authorization profile for authorization object &1
787No authorization for: &1 in plant &2, storage location &3
788Material number or planned order required
790Only "scrap confirmation at reporting point" possible
791Reporting point & was deleted: Document can no longer be cancelled
792Confirmation type reset to assembly confirmation
793Switched to "Propose all components"
794Switched to "Propose all operations"
795Sales order copied from the planned order
796Cancelled by user
797Entry variant no longer exists
799***** From here: messages for actual confirmation of activities ********
800First operation is already reached
801Last operation is already reached
810Error during unit conversion
811When calculating differences, actual activity must be > target activity
812Activity type in row & for cost center & not allowed
813Selected row is already an excess activity row
814Target activity is 0. No differences will be calculated
815No row was selected
816In row &, no activity unit has been specified
817Not all rows could be deleted
818Work center & does not exist in plant &
819You have not selected an operation
820Reference qty zero (Target confirmation of all operations not possible)
821No activity type has been specified in row &
822Confirmation data set to target value of new work center
823No rows will be deleted
824No operation requiring confirmation exists in the routing
825You must have maint. at least one standard value parameter per operation
826A maximum of six activity parameters possible
827No activities posted
828Error in actual cost calculation
829Postprocessing record with weblnr = & was not locked
830If you change quantity 0, dummy components are not adjusted
831Activity posting document & & no longer exists
832Cost collector & blocked
840No entering of rework when subsequently posting previous reporting points
841Subseq. pstg of prev. reporting point qties not allowed f. kanban process
849*** From here: messages for reversing reprocessing records ****
850No confirmation documents exist
851All postprocessing records have been postprocessed
852No postprocessing records exist for run schedule header &
853No postprocessing record exists for confirmation document &
854No postprocessing record has yet been postprocessed
855No material could be postprocessed
856No backlogs are created nor are withdrawal quantities corrected
857There are inconsistencies in the postprocessing records
858No changes were made
859Postprocessing terminated
860Caution: changes reversed
861Insert entry in table AFFW_CNEU has no corresponding RSPOS
862Confirmation carried out without reference to a RS header
863Please enter a sales order item for the sales order
864Production lot & does not exist
865No postprocessing records found
866No inspection lot found for material &, plant &, version &
867No inspection lot found for material &, plant &
868No inspection lot could be created
870Negative activities only for delta activity postings
871Transfer problem when converting run schedule headers
872Production version & for material & is blocked due to internal conversion
873Reporting point structure & & & was set up again
874Routing header changed (UoM). Not possible to set up rep. points again
880No version was selected
881No inspection lot exists for the version
882Either select versions or place cursor on version row
883No authorization for accessing inspection type & in plant &
884Inspection data for mat. & & & no longer current
885Only postprocessing records with positive quantities are allowed
886The +/- sign cannot be changed for postprocessing records
887Changed REM profile regarding generation of postprocessing records
888No postprocessing records allowed to exist anymore for related assemblies
889Material & & & could be postprocessed
890Material & & & could not be postprocessed
891Confirmation cancellation unsuccessful
892Storage location &1 in plant &2 is subject to HU management
893No operations to confirm exist after the last reporting point
894Decoupled confirmation not possible for documentary batches
895Storage location & of component & is EWM-managed
Privacy Policy