RU - Messages for order completion confirmation

The following messages are stored in message class RU: Messages for order completion confirmation.
It is part of development package CO in software component PP-SFC. This development package consists of objects that can be grouped under "Application Development ERP PP Production Orders".
Message Nr
Message Text
001Enter confirmation number or order/sequence/operation/suboperation
002Order & not found, check entry
003Plant & not found, check entry
004Material &1 not found in plant &2, check entry
005Sequence &1 is not defined in order &2, check entry
006Sequence &1 operation &2 not found in order &3, check entry
007Confirmation no. &1 does not correspond to operation &2, check entry
008No operations exist in order &
009Order & contains no operations that can be confirmed
010No parameters defined for plant &1 order type &2
011Operation &1 of sequence &2 does not require confirmation
012Release operation &1 of sequence &2
013No confirmations can be made, order is not fully (or partially) released
014Operation &1 of sequence &2 is already finally confirmed
015& is after validity period of factory calendar, check date
016& is before validity period of factory calendar, check date
017Factory calendar not in buffer. Contact system administrator
018Date & is invalid (check entry)
019Posting date is in the past, check entry
020Confirmation no. & not found, check entry
021Confirmation no. &1 does not correspond to order &2, check entry
022Confirmation no. &1 does not correspond to sequence &2, check entry
023Select an operation
024Preceding operation &1 of sequence &2 not yet confirmed
025Operation &1 of sequence &2 externally processed, confirm via goods rcpt
026Operation &1 of sequence &2 cannot be confirmed
027Enter a date with the time
028Two operation times are not in ascending order
029According to factory calendar & (&) is not a workday (check entry)
030Date &, time & is in the future
031Check the new activities for work center & in plant &
032Work center & does not exist in plant & (check your entry)
033Confirmed activity must not be smaller than 0 (check entry)
034Confirmed quantity must not be smaller than 0 (check entry)
035Confirmed activity must not be greater than 0 (check entry)
036Underdelivery not allowed for final confirmation (check entry)
037Confirmed quantity is smaller than underdelivery tolerance
038Confirmed quantity greater than overdelivery tolerance
039Activities are recalculated due to quantity change (please note)
040Personnel master record & not found (check entry)
041Conf. no. & does not correspond to sub-operation & & (check entry)
042Sequence & operation & sub-operation & not found in order &
043Posting date must not be in the future
044You have no authorization in plant & for order type &
045Operation & sub-operation & of sequence & is externally processed
046Operation & sub-operation & of sequence & must not be confirmed
047Operation & sub-operation & of sequence & does not require confirmation
048Function "summary confirmation" for op. & of seq. & not supported
049Order & is already confirmed
050The operation data must be transferred for the confirmation
051Orders of the order type & cannot be confirmed
052The order header data must be transferred for the confirmation
053Standard confirmation is not possible for operation & sequence &
054Operation & of sequence & does not require confirm./is not open
055Operation & sub-operation & of sequence & does not require conf./not open
056You have not authorization for plant & order type &
057Order & is deleted (you cannot carry out confirmations)
058Select a sub-operation
059Enter a reason for scrap variance
060Invalid reason & plant & (check entry)
061Select line with confirmation
062Confirmation & counter & is already cancelled
063No sub-operations exist for operation & of sequence &
064Order & has not yet been confirmed
065Degree of processing must range from 0 to 100 (check entry)
066Sub-operation & is already manually confirmed
067Sub-operation & is already finally confirmed
068Sub-operation & is already confirmed by & percent
069Enter a unit of measure for activity &
070No plant sections exist for plant &
071Wage type & is not valid for personnel number or plant
072No confirmation has been carried out & & &
073Posting date & is earlier than release date & of the order
074Date & is earlier than order release date &
075Operation & of sequence & is already partially confirmed
076Status management does not allow any confirmations
077Alternative qty unit & cannot be converted into base unit &
078Unit & cannot be converted into unit &
079Record type & is not assigned to an activity
080Total no. of confirmations transferred: & of which & incorrect
081No confirmation data to be transferred from subsystem
082Error in RECEIVE_TABLE: data transfer not possible
083Error in RESPON_TABLE: data transfer was not confirmed
084Order type & not found (check entry)
085Error in determining actual costs for order &
086Order & is already being processed
087No actual costs for network & (check log)
088Quuantities cannot be specified for sub-operations
089Date & is in the future
090No backflushed items found in need of posting
091& goods movements have been successfully executed
092For operation & sequence & only a summary confirmation is possible
093The summary condfirmation does not cause an update
094No text defined in language & for order type &
095No text defined in language & plant & for reason &
096Work center & is not defined for routing type &
097No open operation requiring confirmation exists for order &
098No sub-operation in sequence & operation & requires confirmation
099Saving not necessary, data was not changed
100Confirmation of order & saved
101Confirmations are saved
102No sub-operation can be confirmed in sequence & for operation &
103Operation & is confirmed with the sub-operation
104PDC error record of confirmation & is deleted
105Confirmation of network & saved
106You can only cancel one confirmation per operation and transaction
107Confirmation of order & is cancelled
108Confirmation of network & is cancelled
109Confirmations saved (Goods movements: &, failed: &)
110Confirmation saved (Goods movements: &, failed: &)
111No open sub-operation allowing confirmation exists in sequ. & op. &
112No open sub-operation requiring confirmation exists for seq. & op. &
113No operation in order & is open and allows confirmation
114No operation in order & requires confirmation
115Please enter confirmation number
116Several operations were identified as the last operation in order &
117Total quantity confirmed not equal to planned quantity to be confirmed
118& goods movements were entered as a background job
119Error in material & order & item &
120Activity & cannot be entered
121Activity & is not defined (confirmation is not possible)
122Confirmation & counter & does not exist (check entry)
123You cannot cancel confirmation & counter &
124You have no authorization for Transaction &
125Order & is not released
126Network & is not released
127Conf. no. & does not belong to order & (check entry)
128Last selected confirmation reached
129First selected confirmation reached
130Goods movement could not be posted in the background
131Personnel master & does not exist in plant & (Check entries)
132Material & not found in plant & (check entry)
133Material & & is not handled in batches
134Batch & & & & not found (check entry)
135Storage location & not found for material & in plant &
136Storage location & not yet created for material &
137Structure explosion not possible for technical object in order &
138Order & has no object reference
139Overdelivery is not permitted (Check entry)
140Position the cursor on a filled field
141Goods movements redetermined due to quantity change
142Confirmation triggered by milestone
143Confirmation is part of milestone confirmation - Check goods movements
144Confirmation is milestone confirmation - Check goods movements
145Deviation of work is maintained, but not active -> please check
146Deviation of duration is maintained, but not active -> please check
147No goods movements were posted with the confirmation
148Unit & does not exist -> check your entry
149Dimensions differ between unit entered (&) and op. unit &
150Save manually entered confirmations before saving standard confirmation
151Enter order number
152Error when assigning number for object &
153Internal number assignment for object & (numbers are in critical area)
154Internal number assignment for object (last number was assigned)
155Confirmations were created at header level for order &
156Confirmations have been entered at operation level for order &
157Confirmation with counter & does not exist/has been cancelled
158Internal no. assignment for error record document: No. in critical area
159Internal assignment of doc. no. error record: last number assigned
160You have reached the last selected operation
161You have reached the first elected operation
162The degree of processing is already & %
163Number of confirmations saved for order &: &
164& confirmations saved (goods movements: &, errors: &)
165Operation without unit: unit & is copied into the operation
166Error in number assignment for error document (goods movement)
167Entering a final confirmation will set the remaining work to zero
168Entry 'No remaining work': Entry is set to zero
169Not enough data entered to select operation
170You are not authorized to carry out a confirmation
171Operation does not exist (check entry)
172Operation cannot be selected due to parameter settings
173Network & is deleted (you can no longer enter a confirmation)
174Confirmation data are incorrect
175Error document & & for material & is being processed
176Confirmation does not exist or has been cancelled
177You are not authorized to process work center & &
178Invalid confirmation record class &
179Mixed confirmation types (time ticket/time event) are not allowed
180Sequence of time events not adhered to
181Quantity deviation for GR items from inspection points
182You can only process one pool per transaction
183Enter either user or organizational unit
184Enter organizational unit and type
185Enter an agent
186Select an operation with confirmation(s)
187System: Wrong application
188Individual capacity & / & does not exist (check entry)
189Final confirmation exists for indiv. cap. &/&
190Individual cap. &/& is already manually confirmed
191Select an individual capacity
192No individual capacities exist
193Goods movements are posted on &
194& PDC error records processed
195Automatic goods receipt for order & is not possible
196You have no authorization for order type & plant &
197No. of confirmations saved: &
198No error records exist for selection criteria specified
199Confirmation was entered in a different application
200************************** N e t w o r k s ******************************
201Select a confirmation line
202Start date is later than finish date - please check
203Start time is later than finish time - check entry
204Unit & is not a time unit - enter a time unit
205Maintain a unit for the duration
206Enter confirmation or network
207Activity & not found in network &
208Activity & element & not found in network &
209Actual date(s) is in the future (check parameters)
210Work is confirmed - maintain the work center
211Enter either forecast finish or forecast duration
212Network & contains no activities (check entry)
213Select an operation
214No (open) element found for activity &
215Activity & does not require confirmation/is not open
216Activity & element & does not require confirmation/is not open
217You have maintained the actual work - please enter a unit of measure
218Actual work + remaining work deviates by more than &% from planned work
219Actual duration + remaining duration deviates by more than &% from schd.
220No open activity exists for network &
221Network & has not yet been confirmed
222Internal error in processing of long text
223Varying dimension for work units
224Network & is already being processed
225Unit & is invalid
226Date & is before the end of factory calendar &
227Date & is before the end of factory calendar &
228Start date cannot be determined (calendar &)
229You do not have the authorization for MRP group & in plant &
230Actual/remaining work and degree of processing inconsistent
231Final confirmation exists for network &
232Network & has been confirmed at header level
233Network & has been confirmed at activity level
234Pool & does not exist
235List does not contain selected confirmatios
236&1 list entries were saved as pool &2
237Pool & has been deleted
238Operation & cannot be confirmed
239The new or changed confirmation was copied
240The cancelled confirmation was copied
241Pool & already exists
242Confirmation pool &1 is already being processed by &2
243The pool of confirmations & cannot be locked
244There are no entries in the confirmation pool
245Select at least one confirmation line
246Enter remaining activity or indicator FINISHED
247Enter either remaining work or set the final confirmation indicator
248Enter either degree of processing or set the final confirmation indicator
249Check degree of processing and remaining work.
250Actual work + remaining work exceeds planned work
251Actual duration + remaining duration exceeds planned duration
252Enter a unit of dimension TIME
253You should enter a personnel number to call up time leveling
254100% of planned time already recorded - please check
255No incorrect confirmations were found
256Default values for user & deleted
257Default values for user & changed
258Default values for user & created
259Default values for user & set
260No user-dependent default values exist
261Select a line with the personnel number
262Select a line with a work center
263Place the cursor on a field in the list
264Internal error when sorting
265You have not selected any columns yet
266Capacity category and split number must be maintained together
267Enter execute start and execute finish
268No record was found for selection
269& & & already in list - check remaining work
270Formula &1 for calculating work contains division by zero!
271No confirmation that could be processed was found for network &
272Goods movements are redetermined because of status change
273Confirmation cancelled, goods movement: &, incorrect: &
274Please enter either actual start and actual finish or none of the fields
275Phase/operation & secondary resource & in process order & does not exist
276Phase/operation & in process order & does not exist (please check entry)
277No error can be displayed for line selected
278All incorrect confirmations in the system will be read
279Select at least one confirmation
280Select one confirmation only
281At least one confirmation was not checked
282Changes cannot be transferred
283Operation &1 in order &2 does not exist
284Operation &1 suboperation &2 in order &3 do not exist
285Order cannot be displayed
286&1 confirmations can be saved without errors
287No remaining duration/forecast finish possible for final confirmation
288Confirmation only possible after saving
289Goods movements retermined because of date change
290Activity type missing - confirmation will be saved without actual costs
291You are not authorized to carry out mass cancellation of confirmations
292Forecast work of operation exceeds maximum work
293Actual work exceeds maximum work
294Remaining work exceeds maximum work
295Confirmation saved, goods movements: &, deliveries: &, faulty: &
296& goods movements and & deliveries carried out successfully
297Detail screen called too many times. Save your work and leave application
298&1 function called too many times. Save your work and leave application
299************************** PM - Order ********************************
300Controlling area of work center (&) differs from order (&)
301The cursor should not be on an empty line
302Enter a plant for the work center
303Only &2 decimal places are permitted for unit of measure &1
304Select a line in the data entry section
305On entering a techn. object the other entries are ignored
306No standing order could be calculated for a techn. object
307No standing order was selected
308Select a line with the standing order
309No standing order is assigned to the functional location
310No standing order is assigned to equipment &
311Value help activity type: Enter plant, work center, posting date
312Actual or planned work center is adopted from operation/operation element
313Activity type filled - maintain workplace also
314Service type copied from work center
315Counter & of Confirmation & for order & is cancelled
350********************** API Prodn/Proc Ord Conf **************************
351Order &1: Movement indicator &2 is not allowed for goods receipt.
352Order &1: Item number is mandatory for goods receipt.
353Order &1: Item number &2 is not relevant for goods issue.
354Order &1: Quantity must be positive for By-Products.
355Not all mandatory fields are filled for the goods movement. See docum.
356Not all mandatory fields are filled for the cancel process. See docum.
357No confirmation data for the goods movement available in the same LUW.
358Fatal error during Save phase.
359Material &1 does not exist in order &2 with item &3.
360Order &1: Reservation &2 is not relevant for goods receipt.
361Order &1 in confirmation does not match order &2 in goods movement.
362Order &1 reservation &2 item &3: Movement Indicator &4 is not allowed.
363No order found for confirmation &.
364Reservation &1 with item &2 is not assigned to order &3.
365Material &1 is not assigned to reservation &2 item &3 of order &4.
366Plant &1 is not assigned to reservation &2 item &3 of order &4.
367Create and cancel processes can�t be executed together in one ChangeSet.
368Enter confirmation number or order/sequence/operation.
369Enter confirmation number or order and operation.
370Confirmation &1 Counter &2 does not exist or has been cancelled.
371Different business processes can�t be executed together in one ChangeSet.
372Business process can�t be identified. See documentation.
373Order &1: Property "&2" not allowed for "Create"; confirmation not posted
374No confirmation data available in the API interface.
375Plant &1 does not exist in order &2 with item &3.
376For reservation &1 item &2 of order &3, no goods issue can be posted.
377Special Stock Type &1 is not assigned to resvn. &2 item &3 of order &4.
378Sales order &1 is not assigned to reservation &2 item &3 of order &4.
379Sales order item &1 is not assigned to resvn. &2 item &3 of order &4.
380WBS element &1 is not assigned to reservation &2 item &3 of order &4.
381Order &1: ISO Code &2 is EntryUnit &3, not EntryUnit &4 which you entered
382Order &1: &2 &3 is not a valid record type for time events. See docu
383Order &1: &2 &3 is unknown. See documentation
384Order &1: Do not enter &2 and &3 for record type &4. See documentation
385Order &1: Enter &2 and &3 for record type &4. See documentation
386Order &1, Property &2: &3 is not a valid time
387Conf. &: Cancelling multiple conf. counters not allowed in one ChangeSet
388ChangeSet composition not supported. See documentation.
389Contents of ChangeSet do not match. See documentation.
390Different Proposal Data can�t be executed together in one ChangeSet.
391No optional params for conf category 'TE' and 'HDR' allowed. See docum.
392Order &1: Corresponding Units of Measures are not equivalent
400************************P D C - A N A L Y S I S**************************
401There are no subsystem confirmations
402Record type & is not supported
403The time event was already reported for order &
404Error when deleting confirmations from table RUECK, RC = &
405No authorization for HR pair formation
406Pair formation: Conflict with subsequent confirmation for order &1
407Pair formation: Conflict with previous confirmation for order &3
408Pair formation: Start confirmation is missing for order &1
409Time determination: Work center & does not exist in plant &
410Time determination: Capacity type & not defined for work center &
411Actual time determination: SI unit is missing
412Processing mode & is not supported
413Error when reading order data (CO_RU_CONFIRMATION_PREPARE)
414Error when checking confirmation data (CO_RU_CONFIRMATION_CHECK)
415Error in number assignment for number range object PD_SEQ_NR
416Error in HR plausibility check (HR_EVENT_CHECK)
417Error when creating document records (CO_RU_CONFIRMATION_ADD)
418Error when starting with buffer table, RC = &1
419Error when updating document records
420Error when cancelling the original confirmation (Table TEVEN)
421Application indicator is missing or has the wrong value
422Error when creating cancellation (Table PDSNR)
423Error when creating time event (Table TEVEN)
424Error when creating time event (Table PDSNR)
425Previous order & is not yet confirmed
426Goods receipt items cannot be entered
427Highlighted items need to be processed
428Posting period & & is locked (check posting date)
429Adhere to sequence when canceling time events
430Actual data for QM characteristics of operation & missing
431Actual data for QM characteristics of sub-operation & & are missing
432& selected error records cannot be processed
433Invalid PDC communication channel &
434Quantities are not permitted for error handling operations
435The time event contains no confirmation data
436The time event record time is not supported
437No confirmations were transferred
438Errors in PD processing, RC =
439Storage location &1 does not exist
440Error in actual time determination
441Saving not necessary - no confirmations were created
442Up until now only & & confirmed for predecessors & / &
443Up until now only & & confirmed for preceding operation &
444Incorrect split quantity (check entry)
445You can only charge off in connection with final confirmation
446Transaction was cancelled, confirmation was not saved
447A serial number must be assigned to material & in plant &
448Identification number & and personnel number & are not compatible
449Enter personnel number or number of time recording ID card
450Personnel no. or no. of time recording ID card cannot be entered
451No error in actual cost calculation for order &
452Error in goods movements
453System error: At least one quantity field contains negative values
454& items cannot be processed
455No resource for parallel process exists
456Service & cannot be created manually
457Operation & for order & has been confirmed
458Quantity to be confirmed is less than the quantity confirmed up to now
459Operation & in sequence & cannot be confirmed by progress confirmation
460Milestone operation &1 of sequence &2 in order &3 not yet confirmed
461Selected operation & in sequence & is a milestone operation!
462Process control & is not defined for order category &
463No error record was found for selection
464& confirmations are processed by other users
465Previous operation already finally confirmed
466Operation & in sequence & cannot be confirmed by progress confirmation
467Subordinate order in collective order is already finally confirmed
468Confirmation procedure & is already active
469HR data transfer already active!
470All changes have been saved
471Item is not allowed
472Changes are not written to a transport request
473Transfer & KANBAN control cycles to ALE
474Transfer & KANBAN containers to ALE
475Transfer & KANBAN container status to ALE
476No operations were selected
477Transfer & operations to ALE
478No subsystem groupings were maintained
479No work centers relevant to subsystems were selected
480No PDC-related order types defined
481Transfer & operations and & labor-related records to ALE
482Transfer & work centers to ALE
483Transfer & variances to ALE
484Transfer & units of measure to ALE
485Transfer & activity types to ALE
486Transfer & plants to ALE
487Transfer & order statuses to ALE
488Transfer & material dependent units of measure to ALE
489Error when calling up rounding routine with unit &
490Problems in parallel processing of a confirmation process
491Account number of supplier or creditor & does not exist
492"Max. selected GM" with incorrect GMs can lead to problems
493Invalid entry: Job repetition can lead to infinite loop
494Order & closed
495Network & has been completed
496Withdrawal posting to batch totals record is not possible
497No control parameters were defined for application &
498No goods movements can be entered for the sub-operation
499No quantities can be confirmed for the sub-operation
500System error when writing error pool
501Enter a search string
502Only the first 100 entries were found
503No entries found
504No authorization for & selected orders
505&1 confirmations are incorrect. For details see parameter DETAIL_RETURN
506Work center is missing for order &1 sequence &2 operation &3
507& goods movements could not be processed
508The chosen function is not available in repetitive manufacturing
509No business process has been defined for operation or work center
510A confirmation function can only be executed in dialog mode
511Confirmation & with counter & does not exist
512&1 entries were deleted
513&1 confirmations were executed
514No confirmations could be executed
515Error in the assignment of activities to work center &1/&2
516&1 planned confirmations have been saved
517Logical system &1 is incorrect
518No order number was entered for operation &
519No operation number was entered for order &
520Pair formation: End message for start time &1 &2 is missing
521Only &1 &2 for previous operation &3 from order &4 has been confirmed
522Underdelivery found on posting predecessor
523Dependent goods movement was incorrect
524Confirmation &1 / &2 is already processed
525Line &: Confirmed quantity is smaller than underdelivery tolerance
526Line &: Total confirmed qty does not equal planned qty to be confirmed
527Line &1: Preceding operation &2 has not been confirmed yet
528Line &1: Only &2 for predecessor &3 / &4 has been confirmed
529No production orders can be selected for the selection condition
530Entering quantities is not allowed for the entered time event
531Confirmation with external key &1 not found
532Confirmation cannot be successfully saved
533&1 is already activated
534PP-PDC: A problem occurred when creating IDOCs
535Order split for order &1 has been executed
536Progress confirmation not possible for rework operation
537Additional sub-operations/secondary resources are open
538You must first manually page through to check all entries.
539Data cannot be filtered in the delta download
540Confirmation terminated due to incorrect actual costs
541Confirmation terminated due to incorrect goods movements
542Termination flag. Actual costs only in connection with actual costs log
543Termination flag. Goods movement only in connection with goods move. log
544Problems during parallel processing of the download
545Task &1 with error: &2
546Changing the movement type from goods receipt to goods issue not allowed
547A lock was set for work center & plant &
548A deletion flag was set for work center & in plant &
549Division through zero: Operation quantity of milestone operation is zero
550Division through zero: Gross header quantity of order & is zero
551Requirements quantity from batch totals records not taken into account
552Operation &1 is selected as an added operation
553Order &1 is selected as an added order
554Overview contains plus/minus components from engineering change mgmt
555HR data transfer executed, now refresh the list
556&1 actual costs are intended for background processing
557All HR future change records will be posted
558WIP batch functionality not active
559No operation could be confirmed for order &
560No phase could be confirmed for order &
561It was not possible to assign batch characteristics to any goods movement
562Error when classifying a goods receipt batch
563SFC &1 has already been confirmed (mile stone confirmation &2 &3)
564Enter permitted origin (2 (PP) or 6 (PP-PI))
565Processing time: overflow in order &1 operation &2
566An error occurred for another goods movement in the posting document.
567Dependent records also selected.
568Changes saved also for dependent items.
569You cannot edit any entries for serialized materials (read-only).
570Confirmation request in communication channel & was transferred to ALE
600************************ Single screen entry ****************************
601User settings were saved
602User settings could not be saved
603User interface predefined, because there is no definition in Customizing
604No header area exists
605Enter a profile
606Profile &1 &2 reprocessing indicator does not exist
607Field &1 contained in area &2 and &3
608'Clear' indicator removed, because this is not possible for part.confirm.
609Profile &1 is already defined as the standard profile
610Before saving enter confirmation number or order/sequence/operation
611First enter confirmation number or order/sequence/operation
612Actual data cannot be proposed for a sub-operation
613Profile &1 has already been created
614User settings could not be deleted
615User settings have been deleted
616Select a language
617Customer enhancement is not yet active
618Confirmation profile used: &1
619Detail area in area &1 and area &2 selected twice
620Attention: Transferred goods movements are not adjusted!
621Enter confirmation number or order/sequence/phase/secondary resource
622Enter confirmation number or order/sequence/phase before saving
623First enter confirmation number of order/sequence/phase
624Check of detail areas without errors
625Order not suitable for transaction &2; F4 help not possible
626Quantity layout &1 does not exist
627Enter a shift grouping
628Enter a quantity layout
629Enter a proposal type for determination of the shift group
630Enter a proposal type for determination of a quantity layout
631Enter a proposal type to show customer fields
632Not possible to save confirmation (Choose Enter)
633Detail area WIP batch not selectable (Customizing not active)
634Confirmation profile &1 is not valid for order type &2
635Confirmation profile &1 is not valid
700No entry exists for transaction & in table T158
701Entries for transaction & are missing in table T158B
702An application for posting goods movements is already active
703Set one indicator for the time unit proposal
704Future change records for background processing exist for order &
705Future change records for background processing exist for order &
706Enter just one indicator for the screen control
707Scrap for order &1 in plant &2 must not be confirmed
750**** Messages for ALV Grids in Reprocessing Transactions ****
751All confirmations are being read - limit selection
752Select at least one option
753No postprocessing records found
754Overview was updated
755Future chnge rec. does not come from a confirmation, display not possible
756Future change rec. comes from repetitive manufact.; display not possible
757Select at least one goods movement
758Select one goods movement only
759Deletion flag is active, therefore this function is not possible
760Detail display is only available for preselected goods movements
761No goods movements were determined for the selected objects
762Error records does not originate from a confirmation, no display possible
763Storage location could not be changed for all selected entries
800Choose one selection option
801Choose a valid line
802Choose one parameter
803Termin.: DELETE Tab. &: Of & records, & records have been updated
804Termin.: INSERT Tab. &: Of & records, & records have been updated
805Termin.: UPDATE Tab. &: Of & records, & records have been updated
806Invalid call of a method for confirmation
807DELETE Table &: & records posted successfully from & records
808INSERT table &: & records posted successfully from & records
809CHANGE table &: & records posted successfully from & records
887Terminated because of error in SAP enhancement &
888*** System message: &
889*** System Message: & & & &
892Value combination of parameters &1 and &2 not supported
895Confirmation is posted twice for & &; SUBRC = &
898Conversion program finished: no conversion of status 'withdrawal failed'
899& System status 'withdrawal failed' converted successfully
Privacy Policy