S2L - Produktionsversorgung: Nachrichten allgemein
The following messages are stored in message class S2L: Produktionsversorgung: Nachrichten allgemein.
It is part of development package DI_S2L in software component IS-A-S2L. This development package consists of objects that can be grouped under "Production Supply".
It is part of development package DI_S2L in software component IS-A-S2L. This development package consists of objects that can be grouped under "Production Supply".
Message Nr ▲ | Message Text |
|---|---|
| 000 | ----- reserved for general error texts until 099 ----- |
| 001 | &1 &2 &3 &4 |
| 002 | Unknown error &1 |
| 003 | Entry &2 &3 &4 is not in table &1 |
| 004 | Time Limit in RFC exceeded |
| 005 | Unknown error occurred in BAdI implementation |
| 006 | &1&2&3 |
| 007 | Error during RFC access in logical system &1 |
| 008 | Material &1 not planned in APO |
| 009 | Time stream &1 was not generated for scheduling profile &2 |
| 010 | Time stream was not generated for factory calendar &1 |
| 011 | Global settings do not exist |
| 012 | Global settings were loaded |
| 013 | Global settings were deleted |
| 014 | Global settings were saved |
| 015 | No logical system found for material &1 and plant &2 |
| 016 | No logical system could be determined |
| 100 | *** up to 299 for planning model and supply_situation *** |
| 101 | Control cycle &1 is not intended for automatic supply |
| 102 | Automatic supply is not supported for single orders |
| 103 | Control cycle &2 is locked by user &1 |
| 104 | Supply segment is excluded from planning |
| 105 | Error calculating the planning horizon |
| 106 | Error calculating the selection horizon |
| 107 | Error calculating the earliest replenishment lead time |
| 108 | No authorization for creating replenishment elements |
| 110 | The control cycle was entered in the lock list |
| 500 | ----- Reserved for Selection Screen Until 549 ----- |
| 501 | IPPE-specific restrictions will not be considered |
| 502 | Enter a planning horizon |
| 503 | Restrict the selection further |
| 504 | Error during iPPE explosion |
| 505 | No control cycles could be selected for the data entered |
| 506 | Select at least one control cycle category |
| 507 | No replenishment proposals are generated |
| 508 | No log saved if no validity period maintained |
| 509 | Planning horizon lies in the past |
| 600 | ---- Up to 649 reserved for APO Interface ---- |
| 602 | Requirements cannot be determined for APO System &1 |