TPM_TRIL1 - Messages from the Income Ledger

The following messages are stored in message class TPM_TRIL1: Messages from the Income Ledger.
It is part of development package FTR_INCOME_LEDGER in software component FIN-FSCM-TRM-TM-AC. This development package consists of objects that can be grouped under "Treasury: Income Ledger".
Message Nr
Message Text
000*** Customizing ***
001Update type for position management procedure &1 not defined
002No present value type exists in one-step rate valuation procedure &1
003No present value type exists in security valuation procedure &1
004No NPV with NPV type &3 exists for transaction &2 on &1
005No NPV with NPV type &3 is available for concl. of contract for option &2
100*** Application ***
101Valuation area &1 is not released for hedge accounting
103Posted hedge accounting flows for transaction &3 exist after key date
104As at &1, no reclassification flows exist
105No hedge accounting flows exist for company code &1, transaction &2
106Reclassified OCI amount of &1 &2 has been reversed
107The amounts to be reset from valuation and classification are not equal
108Transaction &2 does not exist in valuation area &3
109No foreign crcy valuation procedure defined for trans. &2 in val. area &3
110No general valuation class exists for transaction &1 in company code &2
111There is no position for transaction &1 in co.code &2 and val.area &3
112There are no bus. transactions for trans. &1 in co.code &2 val.area &3
113Hedge accounting is not set up in valuation area &1 (CC &2)
114Check underlying transaction for transactn &2 in CoCd &1 (see long text)
115Posted reclassification flows for hedged item &4 exist after key date
116Hedged item &4: Key date is before start of reclass. of equity capital
117Hedged item &1: Only dedesignated hedging relationships are processed
118Posted hedge accounting flows for hedged item &4 exist after key date
119Factor &1 is not between 0 and 1
120Reclass. amount &1 does not match current equity capital balance &2
121Reclassification at the end of term is only possible after realization
122Multiple positions for transaction &1 in company code &2 and val. area &3
131Reclassification cannot be reversed
132Manual reclassification on &1 first needs to be reversed
140Hedging relationship &1 and transaction &2 use different measurements
141Hedging relationship &1 is inconsistent
200*** Migration ***
201System could not determine an update type for flow type &1
202TRIL: No valuation/realization business trans. avail.for trans. &1 on &2
300*** Reporting ***
301Internal error: Transaction number or key date has not been entered
302Internal error: Data inconsistency in subledger for BT with ID &1
303Transaction &1 in company code &2 is not a hedging instrument (VA = &3)
899System error - contact SAP
Privacy Policy