V1 - Verkaufsbelegbearbeitung

The following messages are stored in message class V1: Verkaufsbelegbearbeitung.
It is part of development package VA in software component SD-SLS. This development package consists of objects that can be grouped under "Application development R/3 Sales".
Message Nr
Message Text
000*** Messages for sales order processing ************************
001Consider the minimum quantity for item &1: &2 &3
002Consider delivery unit &2 &3 in item &1
003Transaction & is not possible
004No valuation level is defined for plant $
005System: The header status record does not exist
006This document cannot be deleted
007The document has not been saved. Therefore, it cannot be deleted
008&1 &2 deleted
009Material &1 is managed as customer material &2 (please check)
010It was not possible to determine the material number
011You cannot enter schedule line data for item &
012Process incompletion log before saving
013The default date is not copied into existing schedule lines
014Material &1, condition &2 : unit of measure &3 is not allowed
015Shipping condition & is not defined
016The customer reference date lies in the future. Please check
017The customer reference date is in the past. Please check
018Material & does not exist
019No goods accepted on &1. The next possible date is: &2
020Material &1 has status: &2
021Select one object only
022Item category & is not defined for non-material items
023For basic item &, more than one item is copied
024Goods accepted from &1 to &2 and from &3 to &4
025Goods accepted from &1 to &2
026No goods accepted on the specified delivery date
027Material status & is not defined
028Material &1 has status: &2
029Material &1 has status: &2
030Material &1 is not defined for sales from &2
031Country/Region & is not defined
032Customer & is not defined for sales from &
033For item &1, the following has been invoiced: &2 &3
034You can only display material items
035All selected items have been processed
036Subsequent documents already exist for item &
037Company code & is not defined
038The credit limit has been exceeded by &1 &2
039The credit limit has been exceeded by &1 &2 (delivery block)
040Customer &1 has delivery block: &2
041No data was changed
042Sales document &1 is currently being processed by &2.
043The sales document cannot be blocked
044Enter a document number between &1 and &2
045Enter the document number
046Enter the sales document type
047Enter the sales organization
048Enter the distribution channel
049Enter the division
050Order reason &1 is not defined for sales organization &2
051Sales office &1 is not defined for sales area &2 &3 &4
052Sales group &1 is not defined for sales office &2
053Enter a sales office for the sales group
054Enter a smaller quantity
055Goods issue has already been carried out. Note change to acct assignment
056The document has already been invoiced. Note change to acct assignment
057The material availability date cannot be in the past
058Mat.availability date must be before loading date. Please check date
059Material availability date must be before goods issue date
060The loading date cannot be in the past. Please check date
061Loading must take place before goods issue. Please check date
062Goods issue cannot be carried out in the past
063Transportation scheduling cannot be carried out in the past
064Transportat.scheduling must take place before loading. Please check date
065Transportation scheduling must take place before goods issue
066The loading date cannot be after the delivery date
067The material availability date cannot be after the delivery date
068The transportation sched.date cannot be after the delivery date
069The goods issue date cannot be after the delivery date
070Create number range & for object RV_BELEG (sales doc.)
071Valuation type & is not defined
072Caution: You are changing the project account for generated network &
073Enter a lower probablility
074Delivery priority & is not defined
075There are no more items to be displayed
076There are no more schedule lines to be displayed
077Check the quantity.
078Please note partial delivery: Make one delivery on the requested date
079NB: Customer wants complete delivery
080NB: Customer wants the order to be delivered completely
081Consider the subsequent documents
082No availability check can be carried out for material &
083No availability check can be carried out for material &
084Factory calendar & does not exist
085Date &1 is before the beginning of factory calendar &2
086Date &1 is after the end of factory calendar &2
087Material pricing group & is not defined
088For country/region &1, tax category &2 is not defined
089For tax category &1, indicator &2 is not defined
090The quantity confirmed for &1 cannot delivered until &2
091Date & is not valid
092Purchase requis.&1 item &2 can no longer be changed
093Processing release types cannot be changed from &1 to &2
094You can only maintain purch.reqs for sched.lines with quantities > 0
095The document entered is not a sales document
096Sales order item &1 &2 has been cancelled
097Sales order item &1 &2 has already been delivered
098Schedule line & does not exist
099Already ordered for item &1: &2 &3
100The changes could not be copied to sales order &
101Purchase requisitions can only be created for items assigned to a plant
102No output has been selected for printing
103Output was successfully issued
104Output could not be issued
105Field &1 &2 is not defined in incompletion procedure &3
106The delivery priority has been changed
107The delivering plant will not be copied into the existing items
108Reorder point for item &1 has been exceeded: &2 &3
109Profit center &1 is not defined on &2 for plant &3
110BOM explosion of item & had to be terminated
111The plant is missing for BOM explosion of item &
112You do not have the authorization to explode the bill of material
113The system did not find a valid bill of material
114The BOM could not be exploded
115Profit center cannot be entered for an item without a plant
116Valuation area & is not defined
117Material & has been excluded
118Material & is not listed and therefore not allowed
119Text for sales document type &1 is missing in language &2
120Item &1: Batch expires on &2
121Item &: Check batch
122Availability check was carried out
123Batch &1 in plant &2 does not exist
124Credit release: error reading document &
125Enter the item number
126The sales order item & contains a different material
127Sales order item & has a different plant
128For reasons of cost management, item & cannot be deleted
129Account assignment category & has not been defined
130Project number is not allowed
131The business transaction cannot be carried out
132Settlement to CO object prevents assignment of project
133Project account assignment is not possible
134Account assignment cannot be carried out because of different origin no.
135Serial number & does not exist
136Sales order item &1 &2 is not defined for settlement
137Requirement type can only be entered for items with a plant
138Planning allocation cannot be carried out for material &
139The sales document is assigned to WBS element &
140Project definition &1 entry <> that from sales order &2
141You have no authorization for activity &1 in plant &2
142There are not enough item numbers free for a structure explosion
143Check milestones in the billing plan for item &
144Item number & is not numerical
145Transation & is missing in table T180
146Credit control area & does not exist
147Automatic credit check: info structure & does not exist
148Credit control area & has not been defined
149Order receipt/delivery not allowed; credit data not maintained
150Static credit check: credit limit exceeded &1 &2
151Static credit check: credit limit exceeded (data cannot be saved) &1 &2
152Dynamic credit check has been exceeded & &
153Dynamic credit check: credit limit exceeded (data cannot be saved) &1 &2
154Order receipt/delivery not possible, credit customer blocked
155Credit check: maximum document value exceed
156Credit check: maximum document value exceeded (cannot be saved)
157Company code & not defined
158Sales organization & does not exist
159Business data &1 &2 &3 &4 does not exist
160Critical credit data changed
161Critical credit data changed - no updating possible
162Credit check (next customer check date has passed)
163Credit: Next customer check date passed (cannot be saved)
164Credit check (maximum percentage for open items exceeded)
165Credit: Maximum percentage for open items exceeded (cannot be saved)
166Oldest of open items overdue
167Credit check: oldest open items overdue (cannot be saved)
168Maxmimum dunning level exceeded
169Credit check: Maximum dunning level exceeded (cannot be saved)
170Credit user check 1 unsuccessful &1 &2
171Credit user check 1 unsuccessful &1 &2 (cannot be saved)
172Credit user check 2 unsuccessful &1 &2
173Credit user check 2 unsuccessful &1 &2 (cannot be saved)
174Credit user check 3 unsuccessful &1 &2
175Credit user check 3 unsuccessful &1 &2 (cannot be saved)
176Credit release: error during release in document &
177Programming error: subsequent function & does not exist in table TVFO
178Subsequent function not possible from SD document
179For automatic credit check, enter credit group
180Credit group only necessary for automatic credit check
181Personnel master record & does not exist
182Maintain communication data in personnel master record &
183Goods issue from delivery not possible due to credit block
184Goods issue from delivery not possible due to block
185Picking from delivery not possible due to block
186Please enter a plant in item & first
187There are open quotations for this sold-to party
188There are open contracts for this sold-to party
189There are open quotations and open contracts for this sold-to party
190Material & is a competitive product
191Serial numbers can only be maintained for items assigned to a plant
192Serial number profile is missing for material &1 in plant &2
193No serial numbers are maintained for item &
194There are open quotations for material &
195There ae open contracts for material &
196There are open quotations and open contracts for material &
197Select either static or dynamic credit limit check
198Sales document item &1 &2 is not defined for the transaction
199Error occurred when connecting up to the SAP configurator
200Condition key &1 &2 &3 is not defined (T685)
201No text is defined for language &1 usage &2 appl.&3 cond.type &4 (T685T)
202Condition key &1 &2 is not defined (T685A)
203Item &1 condition &2: Unit of measure &3 not permitted
204Condition & cannot be processed manually
205Condition & cannot be processed manually
206Condition &1 is missing in pricing procedure &2 &3 &4
207Condition & is determined during automatic pricing
208Condition &1: Error in converting exchange rate from &2 to &3
209New pricing performed
210Select condition for details
211New valuation carried out for the document
212No pricing procedure could be determined
213Condition & is not allowed as header condition
214Condition & is not allowed as item condition
215Requirements are not fulfilled for condition &1
216No condition record was found for condition &1
217Taxes have been re-determined
218The reason for rejection has been changed
219The reason for rejection has been cancelled
220The billing period is on the &
221Please check the billing date: &
222Please check the date of services rendered
223For item &, there are several schedule lines with order quantities
224The new delivery date was copied for the possible items
225Taxes could not be determined correctly
226Condition & cannot be deleted
227New pricing is no longer possible
228No cost could be determined for item &
229Condition type & is not determined using condition records
230Tax group & for availability check is not defined
231Condition & is not allowed for this transaction
232Freight is redetermined
233& is not a percentage; enter a currency
234Plant has been changed
235Plant has been changed back
236Item &: Plant cannot be copied
237Contribution margin for item & is too low
238Requirement & has not been fulfilled
239Condition & cannot be entered manually
240Shipping point & does not exist
241Date &1 is not valid in factory calendar &2
242Date &1 is not valid in factory calendar &2
243Date &1 lies before beginning of factory calendar &2
244Date &1 lies after the end of factory calendar &2
245Factory calendar & is not valid
246Requirement type & is not defined
247Data transfer module is not allowed
248Delivery/transportation scheduling cannot be carried out
249Customer-expected price differs from net price for item &.
250Requirements class & is not defined
251The item cannot be marked as statistical
252The number of serial numbers for material $ is greater than the quantity
253Plant cannot be changed after the serial numbers have been entered
254Calculation could not be read from the clipboard file
255The batch number of item & is cancelled
256No item with quantity could be proposed
257There is no text for special stock &1 in language &2
258Special stock & is not defined
259You cannot call up the availability display for external special stock
260&1 &2 has been saved (delivery &3 created)
261&1 &2 has been saved (no delivery created)
262Delivery cannot be created for a rush order
263Item & can not be invoiced according to the billing plan
264You are not authorized to unblock
265Internal error: billing plan for item & cannot be deleted
266Serial numbers can only be entered for individual requirements
267Billing plan cannot be maintained if active in document
268Billing plan & saved
269Project account assignment of existing items is not adjusted
270Ship-to party rejects product attribute &1 for &2
271Quantity of &2 &3 remains after product selection (item &1)
272Item & cannot be deleted.
273Higher-level item & is a product selection item.
274Item &
275Purchase requisition & is being processed.
276Reason for substitution & does not exist.
277End of general warnings
278Item & is not relevant for check (checking group is missing).
279No search procedure could be determined for &1 &2.
280Batch determination cannot be carried out because subsequent docs exist.
281Material &1 in item &2 is not handled in batches.
282Availability check not allowed for item &.
283The material in item & cannot be changed.
284Sales order &2 for delivery &1 has already been archived.
285Serial number maintenance is not allowed.
286Billing plan type only required if relevant for billing acc.to bill.plan
287If relevant for billing acc.to billing plan, enter billing plan type
288Costing is carried out with quantity &1 &2
289Costing cannot be carried out because order quantity is missing
290Costing values cannot be copied because condition type is missing
291Unit costing terminated due to error
292Take into account the complete delivery agreement
293The customer requires complete delivery: Item & has not been confirmed
294The earliest delivery date in delivery group &1 is &2
295You have already selected & as the complete delivery date
296You have already set date &2 for delivery group &1
297Quantity could not be converted from &1 to &2
298Delivery group &1: Item &2 contains no confirmed schedule lines
299All delivery groups were cancelled because complete delivery is requested
300System: Incorrect access to Table GVBAP (&1 &2)
301Enter delivery groups
302SD document & is not in the database or has been archived
303Transaction group & cannot be allocated to any transaction (T180, TVAK)
304Incorrect access to Table LFGKO (&)
305Delivery group & consists of only one item
306Configuration strategy &1 &2 does not exist
307Customer wants complete delivery, but there are & deliv.groups in doc.
308There are diff.delivery groups despite complete delivery being required
309Item & cannot be assigned to a delivery group
310The cursor is not on a line that can be selected
311&1 &2 has been saved.
312Sales document type & is not defined
313Sales organization & is not defined
314Distribution channel & is not defined
315Division & is not defined
316Sales area &1 &2 &3 is not defined
317Sales group & is not defined
318External number assignment is not defined for document type &
319A document with number & already exists
320No item category available (Table T184 &1 &2 &3 &4)
321Item category &1 is not defined for item &2
322Incorrect index structure for table &
323Select one or more items
324Item category & is not defined
325Index not found during reading (&)
326Plant & is not defined
327There are no more selected items
328Function code & is not defined on the CUA interface
329The higher-level item & cannot be the current item
330The higher-level item &1 must be smaller than the current item &2
331Item & does not exist
332The higher-level item & cannot be the current item
333System error: Index &1 for table &2 does not exist
334Higher-level item must be equal to or greater than &
335System error: Schedule line &1 for item &2 does not exist
336Item &1 already has a schedule line for date &2 &3 &4
337Schedule line for date &1 &2 &3 &4 already exists
338Item & exists already; the entry will be ignored
339You cannot change the item number
340There are no more selected schedule lines
341Select the desired schedule line
342You cannot delete all schedule lines for item &
343You cannot delete all sub-items for item &
344No date has been entered for schedule line &1 &2
345Date &1 period &2 is not valid
346The specified period & is not defined
347Transaction &1 &2 &3 is not defined
348Schedule line category & is not defined
349System error: The higher-level item & does not exist
350Do you want to change the data in the sub-item ?
351Enter a material for item &
352Schedule line &1 &2 cannot be deleted
353Schedule line category & is not defined
354No text defined for schedule line cat.& (Table TVEPT)
355Process sales document type &1 with transaction &2
356Item screen sequence group not possible for item category &
357System: Item &2 for schedule line &1 is in the work area
358Ship.condition &1 loading grp &2 plant &3 StLoc &4 not defined
359Shipping point & is not defined
360Configuration not possible for material &1 : Reason &2 --> Help
361Subs. function '&2' not possible: Item &1 is not completely configured
362No items exist
363Variable-sized item & requires unit of measure "piece"
364Sales unit & is not defined
365No weight calculation possible if base quantity is zero
366Storage location &1 in plant &2 is not defined
367No weight and volume determination is possible for this item
368Enter the sold-to party
369Sales from sales organization &1, dist. chan.&2, plant &3 are not defined
370Division &1 in the header deviates from division &2 in the item
371Enter a new schedule line for item & if necessary
372In partner determination procedure &1, partner function &2 is not defined
373No scheduling possible
374System error: Output &1 &2 &3 is not defined
375No sold-to party is necessary for this order type
376The higher-level item & allows no sub-items
377Item category & is not defined as a sub-item
378&1 &2 for schedule line &3/&4 can no longer be changed
379There is a shortage of &3 &4 for item &1 on &2
380Error when processing &1
381Enter a unit of measure for the quantity
382Material &1 is not defined for sales org.&2, distr.chan.&3, language &4
383Enter a material or an item category
384Sales unit &1 is not defined for item &2
385Item & already exists
386Enter the requested delivery quantity
387Delivery block & is not defined
388Delivery block & is not defined
389Billing block & is not defined (Table TVFSP)
390Billing block & is not defined
391Material &1 does not exist in plant &2 in country/region &3
392Material &1 does not exist in storage location &2 &3
393Item category will be redetermined
394Enter the requested delivery date
395Sales unit will be re-determined
396Billing type & is not defined
397Invalid schedule line numbers in schedule line processing: &1 &2
398Terms of payment & are not defined
399Date is in the past
400The period is in the past
401The schedule line categ. will be redetermined
402Route & is not defined
403The header business data does not apply to item &
404Conversion factors will be redetermined
405Factors not equal to 1 are only possible for alternative units of measure
406Material & is marked for deletion
407Sales office & is not defined
408Address & is not defined
409Check the order quantities of all schedule lines
410Shipping point & is not defined for this transaction
411Product hierarchy & is not defined
412Product hierarchy & is not defined
413Target unit of measure will be redetermined
414Target unit of measure &1 is not defined in item &2 for material &3
415Reason for rejection & is not defined
416Reason for rejection & is not defined
417Customer group & is not defined
418Customer group & is not defined
419Price group & is not defined
420Price group & is not defined
421Price list type & is not defined
422Price list type & is not defined
423Customer &1 has been assigned order block: &2
424District & is not defined
425District & is not defined
426The schedule line quantity is already: &1 &2
427Item does not match schedule line (program error)
428Schedule line quantity is larger than target quantity
429Price group & is not defined
430Price group & is not defined
431Gross weight should be larger than net weight
432Tolerance limits are not required in the case of unlimited tolerance
433Copying material in any value contract items is not permitted
434No schedule line category could be determined during quantity adjustment
435Sales order reason & is not defined
436Sales order reason & is not defined
437Date & is in the past
438Currency & is not defined
439Currency & is not defined
440Enter either value days or a value date
441Value days/date cannot be specified for terms of payment &
442Periodic and coll.invoice ID may only be changed to blank
443Payment method is not defined
444"From date" must be smaller than "To date"
445A schedule line with date &2 already exists for item &1
446The quotation is only valid from &
447The sales document is only valid from &
448The sales document is only valid until &
449Exchange rate of &1 in &2 for date &3 could not be determined
450Exchange rate will be re-determined
451Valid exchange rate is: &
452For local currency, the exchange rate must be 1
453Statistics:The currency from &1 in &2 for date &3 could not be determined
454Credit: Exchange rate from &1 in &2 by date &3 could not be determined
455& & is blocked and therefore cannot be adjusted
456Item &1 can only be changed by configuring material &2 (item &3)
457Order type & is not defined
458Purchase order type '&' is not defined
459Found variant &1 has not been created in sales org &2 dist. channel &3
460Delivery block has been changed
461The delivery block was cancelled
462The billing block was changed
463The billing block was cancelled
464The route could not be determined
465A shipping point cannot be specified for an item without plant
466Complete delivery is not appropriate due to partial dely &1 of item &2
467Partial dlv.of item & not possible: order must be delivered in full
468No.of partial deliveries not appropriate due to partial deliv.ind.&
469Item & cannot be configured
470Material number is re-determined from customer material number
471Copying in sales document type &1 from &2 &3 &4 has not been defined
472The copying routine number for table & is missing in table TVCPA
473Copying &2 &3 &4 to &1 is not defined
474Material in item & does not exist
475Item category for item & cannot be determined
476Item & is not copied from the reference document
477Schedule line &1 &2 is not copied from the reference document
478Material in item & does not exist in plant/storage location
479Schedule line categ.for schedule line &1 &2 cannot be determined
480The quantity cannot be copied into item &
481Alternative item & cannot be current item
482Alternative item &1 must be smaller than the current item &2
483Only item & is allowed as an alternative item
484Alternative item itself is alternative to item &
485Select item & or an alternative item
486Select only one alternative to basic item &
487The item is already the basic item for alternative item &
488Item &1 is the basic item for alternative item &2
489Item &1 cannot be deleted because of subsequent document &2
490Total quantity of reference item is only &1 &2
491Reference item has reason for rejection &1: &2
492Item &1 cannot be deleted because document &2 refers to it
493Item & was created through full reference. Please check
494Reference quantity: &1 &2 (total referenced: &3 &4)
495&1 &2 already referenced
496For item &1, subsequent delivery of &2 &3 has been made free of charge
497&1 &2 for item &3 can no longer be changed automatically
498Credit memo request already exists for item &1: &2 &3
499There are already returns for item &1: &2 &3
500Quantity is larger than target quantity of reference: &1 &2
501Target qty of reference: &1 &2 (total referenced: &3 &4)
502Order type '&3' has not been defined in &1
503Item has been created by full reference
504Basic item has higher-level item &
505Item & is missing in table YVBAP
506Schedule line &1 &2 is missing in table YVBEP
507Business data for item & is missing in table YVBAP
508In table YVBFA entry &1 &2 &3 &4 is missing
509In table YVBUP entry &1 &2 is missing
510In table YVBUK entry & is missing
511Item number must be less than &1 or greater than &2
512Item &: Please change the reason for rejection in the main item
513In table YVBEG entry & is missing
514No authorization for displaying sales documents in &1 &2 &3
515No authorization for maintaining sales documents in &1 &2 &3
516No display authorization for document type &
517No maintenance authorization for document type &
518For item &1, the following has already been invoiced: &2 &3
519Route will be re-determined
520No authorization for deleting sales documents in &1 &2 &3
521No authorization for deleting document type &
522Sales order type & is blocked for processing
523Credit memos already exist for item &1: &2 &3
524Only quantity 1 &1 is allowed (Item &2)
525Partner &2 (function &1) is on the Sanctioned Party list for ctry/reg. &3
526Assigned ship-to party &1 is on boycott list for country/region &2
527Assigned payer &1 is on boycott list for country/region &2
528Serial numbers of item & not copied
529Serial number maintenance is only possible for configurable materials
530Item & cannot be deleted due to packing proposal
531No document selected (enter document number or selection)
532Numbers in number range &1 for object &2 are almost used up
533The last number in number range &1 for object &2 has been assigned
534Item & is automatically calculated by production order (assembly process)
535Technical objects can only be maintained for values with whole numbers
536An application must be supplied for the selected structure scope
537Components correlate significantly only if a structure scope exists
538Manual alternative is only reasonable if a structure scope exists
539Only document categories with sales order character are allowed
540The screen sequence group is not defined
541Credit check incorrect: Payer does not exist in document
542Schedule line cannot be deleted due to purchase order &1 and item &2
543Item & is not relevant for costs
544Delete purchase order &1, item &2
545There is no CO data on item & available
546Plant does not exist for product selection of item &
547Reason for rejection is within the contract start and end dates of item
548Exchange rate setting has been deleted, adjust billing plan
549Cost estimate has not yet been created
550Item & contains a different controlling area
551There are no items for settlement
552Max cond. basis of &1 exceeded for cond. type &2. (Open Qty = &3)
553Item & cannot be deleted due to error in classification
554Maintain account assignment category
555The sales document is not yet complete: Edit data
556PO type is missing: Purchase requisition will be deleted/not created
557There are no condition records in the order
558Incompletion order/planned order cannot be processed directly > Help
559Inconsistency between contract activity and completion rule
560Valuation type &2 is determined for batch &1
561Field overflow in case of weight or volume determination
562Availability check for material & only occurs at plant level
563MRP area active! & check against planning material is not permitted
564Item & is a leg: Availability check is not defined
565It was not possible to determine a batch
566The cost report for costing cannot be displayed
567The costing data in the cost report are possibly not up-to-date
568Value & is not defined for customer group 1
569Value & is not defined for customer group 2
570Value & is not defined for customer group 3
571Value & is not defined for customer group 4
572Value & is not defined for customer group 5
573Value & is not defined for material pricing group 1
574Value & is not defined for material pricing group 2
575Value & is not defined for material pricing group 3
576Value & is not defined for material pricing group 4
577Value & is not defined for material pricing group 5
578Structure explosion for item & is not possible
579Subsequent function '&' not possible: Item & was rejected
580Costing for item &1 has terminated with an error
581You cannot cancel the alternative item number
582Material group & has not been defined
583Purchase order & does not exist in the system (see long text)
584Purchase order item &1 in purch. order &2 does not exist
585Material &1 does not correspond to the material in purchase order &2 - &3
586Analysis for listing/exclusion has been turned on
587Analysis for listing/exclusion has been turned off
588Analysis for material determination has been turned on
589Analysis for material determination has been turned off
590Delivery of &2 &3 has already been made for item &1
591The system does not adjust quantities for dependent items
592Period cannot be determined with calender &
593Requirements for item & are not MRP relevant - Configuration missing
594Max. length of purchase order no. for affiliated companies is & digits
595Variant &2 has replaced configurable material &1
596The system could not sort component & - It has been placed at the end
597Delete purchase order &1 and item &2 first
598Batch number &1 transferred to item &2
599No business area can be determined for item &
600No maintenance authorization for document type &
601Item has no open quantity - Check fixed quantity ID
602A production order with withdrawal already exists for item &
603A production order already exists for item &
604A production order is available for item &
605Incorrect pricing - Missing license data for condition type &
606Change the assembly type for item & is not allowed
607Check the product attributes for the new ship-to party
608You cannot maintain the serial number because the charges are missing
609&1 &2 saved (partial delivery &3 has been created). See long text
610If you work with serial numbers, use individual requirements
611Direct procurement in sched.agree. with SA rel. not required (SchedLine&)
612Changing date/quantity may result in different BOM - Please configure
613Item & from the configuration can no longer be automatically deleted
614Check tax exemption &1
615Identical schedule lines are merged on comparison
616Change in invoice date: The billing date is redetermined
617No item category for component &1 (T184: &)
618Sub-item &1: Reason for rejection could not be changed
619The schedule line has already been ordered with purchase order &
620Deadlines have already been billed for item & (billing plan)
621Item &: Delivery date not changed
622Sub-item & has too many serial numbers
623Change to maximum &1 (old &2) - see long text
624Change to up-to-date &1 (old &2) - see long text
625Delivery item category & is not provided
626Maintaining serial numbers only possible, if valuation type is specified
627Enter a smaller quantity
628Configuring is not possible for material &
629JIT delivery schedules are not permitted in MAIS scheduling agreements
630Found material variant &1 has status: &2
631You cannot enter new delivery costs
632Do not change figures set to 0 date/cumulative qty set to 0 date manually
633Please enter at least the customer material number for selection
634A JIT delivery schedule already exists-entry is cancelled
635The from time is later than the until time
636Please complete the times
637The pickup date cannot be copied into existing schedule lines
638Scheduling is only possible for assembly items with network
639The item cannot be added to this block
640Department & is not available
641Item &1: Material &2 is defined from item category &3
642Please enter a value lower than 1 billion
643The WBS element for item & is deleted
644Enter a sales area
645Material group hierarchy level &1 has not been created (class &2)
646No suitable form of payment guarantee for entering payment card in proced
647Customer attribute & is not defined
648Do not copy from &1 &2 to items w/ positive receiving point determination
649There is no product proposal module assigned to the item
650No export licenses are assigned to this document yet
651You can only carry out this function in change mode
652Export control is only carried out in simulation mode
653Export licenses cannot be redetermined
654Export licenses are redetermined after saving
655Product proposal &2 does not contain material &1
656Material &1 does not correspond to product hierarchy &2
657Material &1 does not match product proposal &2 or product hierarchy &3
658Seasonal factor:validity period start must be before validity period end
659Cannot display credit limit as no credit management account is available
660Referenced master contract & does not exist
661Referenced document & is not a group master contract
662Group referencing procedure & is not defined
663Referencing this sales document category is not possible
664Reference to master contract &1 is not permitted acc. to ref. procedure
665'&3' field copied from master contract
666Field '&3' proposed from master contract
667Free goods analysis is switched on
668Free goods analysis is switched off
669Check if A/R summary has exceeded time limit:exceeded by days/hours &1 &2
670Check if A/R summary has exceeded time limit &1 &2 (do not save)
671Value contract control only functions with completion rule 'E'
672Inconsistency between completion rule and relevance for billing document
673Schedule lines are not permitted for value contract items
674Field &1 in table &2 is not defined here
675Target value from contract &1, item &2 has been exceeded
676Target value from contract &1, item &2 has been exceeded
677Credit data will not be redetermined
678This function is not permitted according to copying control
679Create a correction delivery if necessary
680Create a delivery order correction if necessary
681The free goods qty is equal to/larger than requested delivery qty & &
682The determined material variant & has a deletion flag
683Delivery time & is not defined
684Free goods could not be determined for item & (reason &)
685Only rule &3 is allowed for field &1 in table &2
686You must always specify a partner function for table &
687Please enter the field name
688Partner function &1 is not defined for field &2
689Enter a rule
690Master contract field '&3' is not valid for the lower level contract
691'Referencing procedure' is only relevant for master contracts
692'Reference to master contracts' is not relevant for this document type
693Caution: The referencing procedure has possibly already been used
694There is no VAT registration number for company code &1 country/region &2
695Target value from contract &1, item &2 has been exceeded
696Service order cannot be processed for item &, as quantity > 1
697Temporary error: &
698Item &1 already has a preceding document
699The payment guarantee form is not suitable for entering financial docs
700Maintain print parameters: Output &1, organiz. &2
701Maintain access to print parameters: Applic.&1, output &2 (VK01/details)
702Maintain EDI data for partner &1, application &2, output &3
703Maintain print parameters: Output1 &, org. &2, dist.chan. &3, div. &4
704Maintain print parameters: Output &, sales office
705Maintain print parameters: Output &1, sales group &2
706Invalid access type for output &
707Maintain table TNAPR for output &1, type &2, application &3
708Pricing cannot take place for item &1
709According to copy requirements, item &1 cannot be copied
710Billing plans with dates based on values still have to be adjusted
711Costing did not finish normally but document has been saved
712Item &1 has already been billed
713Assembly order or network cannot be created from transaction &
714Service order &1 for item &2 can no longer be changed automatically
715The billing plan type is invalid. See F4 Help
716Working hours &1 for factory calendar &2 are invalid
717Required quantity 0 and rounded qty greater than 0 is not permitted
718This billing plan cannot be used in Sales
719Billing plan references cannot be transported
720Item &1 rounded to &2 &3. Rounding reasons: &4 -> long text
721Free goods in quantity of & & have already been delivered for item &
722Prod. selection for item & is not possible due to active ingredient mgmt
723Log key: data for changed master contract
724Item & may not be deleted (free goods inclusive quantity)
725Customer &1 has exactly one quotation: &2
726Customer &1 has exactly one outline agreement/contract: &2
727Exactly one quotation exists for material &1: &2
728Material &1 has exactly one outline agreement/contract: &2
729Contract &1 has been successfully assigned to the document header
730Contract &1, item &2 have been assigned successfully to item &3
731Manual sub-items are not permitted for free goods (item &)
732Place the cursor on a message
733Master contract &1 is currently being processed (by user &2)
734Master contract & cannot be blocked
735Select an existing item
736Credit control area for company code & is not permitted
737Next change to main item redetermines the free goods quantity
738&1 is not permitted as sold-to party and is copied as ship-to party
739Field '&1' cannot be changed, &2 &3 &4 ready for input
740Sales document type & is not defined as the source document type
741Processing with delivery orders:third-party bus. trans. not permitted
742Conversion factors from material &1 for unit of measure &2 are missing
743Target unit of measure has changed. Check target quantity.
744Item &3 may contain a maximum of &1 serial numbers (instead of &2)
745Sales document type & is not defined as target document type
746Item &1 has already been billed. Header exch. rate copied
747A rounding rule has not been saved for company code &1 and currency &2
748You cannot select assembly order & for deletion
749The system determined free goods with quantity 0 for item &
750The delivery date is outside promotion period &1 - &2
751Promotion is not available
752Promotion & does not have an order period
753Promotion &1 for item &2 is invalid
754Changing the pricing date may render promotion price invalid
755Enter a valid delivering plant
756There is no available promotion
757Material or unit of measure is not in promotion
758The document cannot be deleted at the moment
759Service message &1 assigned to the document does not allow you to delete
760Header promotion number &1 is invalid for item &2
761Unpermitted combination of business object &1 and sales doc. category &2
762Maintain plant & for the sales area
763No availability check is possible for item &1
764Adjust billing plan, if necessary
765Select an entry
766No items could be deleted
767Costing is not possible unless a plant is specified
768Unpermitted values for KZVBR &1 or SOBKZ &2 for acc. assignment cat. &3
769'Update lower level contracts' is only relevant for master contracts
770PurchReq. delivery scheduling is not permitted for purchasing item cat. &
771From and to pickup times are identical - please check
772Billing plan data cannot be processed for document type &1
773Item & cannot be deleted because of order bill of material
774Item & cannot be deleted because of sales order stock
775Sales order stock exists for item &
776User &1 still has open workitems in their inbox for this document
777Contract data cannot be edited for document type &1
778Sales order type &1 is processed with transation &2
779Maintain both the purchase order type and item category fields
780No authorization for maintaining in sales area &1 &2 &3
781You cannot display credit insurance because no data is available
782No more free goods can be determined for item &
783A product hierarchy has not been assigned to item &1
784Availability check for material variants only allowed w/ schedule lines
785Further processing is not possible without a pickup date
786The pricing date is not automatically adjusted
787Sales document &1 is currently blocked by an active workflow
788Item &: Pickup date is before shipping point calendar &
789Item &: Pickup date could not be checked
790Item &: Pickup date is after shipping point calendar &
791Item &: Pickup data is not valid in shipping point calendar &
792Item &: Shipping point calendar & is not valid
793Transaction &1 is only for internal use
794Evalution of validity type is not allowed for this item
795Unit of measure for item &1 has been copied from item &2
796& & has been selected for deletion
797There is no purchase requisition for the selected schedule line
798& & cannot be deleted
799Sales document &1 has been selected for archiving
800Document is complete
801Pricing error: Mandatory condition & is missing
802Pricing error: Field overflow
803Pricing error: Exchange rate conversion
804Pricing error: Quantity conversion
805A preceding document has already been assigned to the document header
806Internal pricing error
807Please enter factors for quantity conversion
808Consolidated value for item & could not be determined
809Manual product selection not possible. Material &1 was replaced with &2
810Plant can no longer be changed
811Item & can be configured but there is no configuration
812Requirements class & is not relevant for assembly
813Sales order & needs a transfer of requirements
814Item & has no active requirements
815Selected schedule line &2 for item &1 does not contain any quantities
816Assembly process only possible for engineer or cust. make-to-order prod.
817Delivery block &1 does not allow requirements
818&1 can no longer be changed in the sales document
819The configuration trace has been activated
820The configuration trace has been deactivated
821Do not mix schedule lines with and without purchase order types
822Parameter effectivity type has changed. Call up configuration
823A variant matching procedure has been assigned to &1 entries.
824An availability check cannot be implemented for material &1
825Variant matching procedure &1 has not been defined
826Factory calendar &1 has not been defined
827Item &1: Packing proposal has been copied from reference document item
828Account assignment group for customer &1 has not been defined
829The sold-to party you have entered is a default sold-to party
830Dunning key &1 has not been defined
831Dunning key &1 has not been defined
832Country/region &1 has not been defined
833Usage indicator &1 has not been defined
834Referencing procedure &1 is not defined
835Payment guarantee procedure &1 is not defined
836Internal financial document number &1 does not exist
837Enter the ship-to party
838A value cannot be set for &1 in sub-items
839Accrual key &1 for order accrual is not defined
840Pricing procedure &1 is not defined
841Planning delivery schedule instruction &1 is not defined.
842Material-freight group &1 is not defined
843Assortment module &1 is not available in the system
844Text edit control cannot be created
845Print parameter &1 is not defined
846You cannot change field &1 due to the system configuration
847Changes to sales document type are not possible (item category of item &)
848Select one entry
849Subsequent function '&' not possible due to a credit block
850BOM items for item & are being redetermined
851Partial delivery value &1 is not defined
852Requirements planning for delivery schedule types &1 is not defined
853Check &1 for partner authorization is not defined
854Internal error in communication between configuration and sales doc.&1
855The order quantity of the generic article is not equal to variant total
856&1 &2 was saved (several deliveries were generated)
857Item &1 has already been billed. Header data was not copied
858The system did not find a profile for the order progress report
859Assembly of production order &1 is blocked due to exceeded credit limit
860Engineering change status for reference item &1 has been copied
861A valid repair procedure has not been assigned to the repair request
862A short text has not been found for activity &1 and language &2
863Only returns delivery type for repair order returns is permitted
864Enter &1
865Enter a quantity
866A service order has not been found for action '&1'
867According to Customizing, activity &1 is not defined here
868You cannot delete the entry
869Action '&4' can only be processed manually in &2 &1
870Repairs processing with cost management only for the main item
871Serial number &1 has already been assigned to another action
872There are no notifications for this repair order
873The system cannot find a serviceable material for the selected item
874The system could not find an inspection lot for action '&1'
875You can only reach the repairs screen with a repair request
876No confirmation data available from repair stock &1 &2 &3
877Automatic proposals are not possible for action '&1'
878A time could not be determined
879Repair items could not be generated automatically for &1 and &2
880A repair procedure is not permitted for the item
881&3: &1 serial number(s) (instead of &2) must be maintained
882According to Customizing, repair indicator &1 is not defined
883Billing relevance &1 and MRP profile &2 may be inconsistent
884External alphanumeric document number must be in capital letters
885Enter either a correction delivery/ES agt consignment issue correction
886The document has already been billed
887Returns/ret.pack.pick-ups do not write a shipping due index (repair proc)
888You cannot change order type &2 after you've pressed <Enter>
889Text for alternative sales document &1 is missing in language &2
890Start of processing SDXPRA01
891&1 sales documents were changed
892Error table VBKD in program SDXPRA01
893&1 &2 not copied from the configuration
894Engineering change status of the scheduling agreement has not been copied
895XPRA SDXPRA01 Stop, read the longtext and the report documentation
896Error during mass-update of table TVVF
897&1 incompletion procedure entries successfully modified
898Error in mass-update of table VBKD
899&1 &2 &3 &4
900You are not permitted to copy bills of materials
Privacy Policy