WG - Messages for store order and investment buy

The following messages are stored in message class WG: Messages for store order and investment buy.
It is part of development package WFWW in software component LO-RFM-IFC-IN. This development package consists of objects that can be grouped under "IS-R: SMMS interface".
Message Nr
Message Text
000Client missing in header record, external requirement number &
001Order type missing in header record, external requirement number &
002No ISO currency code in header segment (general part)
003External requirement number missing. Set IDoc number
004Supplier/supplying plant missing. Supply source will be determined
005IDoc segment & will not be analyzed
006Qty not entered -> order item for & will be ignored
007Order date missing in doc. header for req.no & . Today's date will be set
008Delivery date in item & req. no & missing. Today's date will be set
009Qualifier & in segment & is not supported
010Empty identifier in segment & will be ignored
011PO with no. & created
012Order header update not successful for external req. no. &
013Trigger update not successful for external req. number &
014Error initializing order update
015No purch. org. found. Req no. & for client &, store &
016Wrong purch. org. & found in order header data for order &
017No purchasing group in doc. header of store order &
018Total line quantities larger than item quantities
019Delivery date for material & cannot be found. Set system date
020Default for document category & not valid. Value reset
021Unit of measure for store order &, material & cannot be found
022Unauthorized Customizing setting: &; Default value reset
023Unit of measure missing. No search allowed. Order item & incorrect
024Missing unit of measure cannot be found without material number or EAN
025Material no. & does not exist
026EAN & not found. Item cannot be identified
027Req. no. &, item & not identified. No identifier found
028Req. no. &, item &: doc. type, supplier and supplying plant not found
029Item cat. & could not be decoded. Choose &
030No supply source can be found for external req. no. &, material no. &
031Create pur. req. without supply source. Req. &, item &
032Different pur.org. found in supply source determination. Mat. no. &
033Error & occurred in doc. processing
034Error occured in update. No receiving plant entered
035Errors occurred creating store order documents
036Empty document item table transferred
037Purchase requisition created with number &
038No company code found for supplying plant &. No access &
039Error calling dispatcher
040Requested doc. cat. & not allowed. External req. no. &, mat. no. &
041Error buffering order items. Data will be lost if system crashes
042Unknown dispatcher call
043Incorrect MRP controller & sent / determined
044Supplier material number &1 for supplier &2 not found (Call: &3)
045Read error in order item. Item will not be processed
046Supplier & entered = supplying plant &. This is not allowed
047No document could be created for this item
048No supply source could be determined for mat. no. &
049Order processing cancelled for mat. no. &
050Error creating error workflow (position &)
051Wrong menu option on screen &
052Parts of store order items not updated. See integrated inbox.
053No supply source key for material &, plant & found
054Unit sent & cannot be converted to a single SAP unit of measure
055Unit & sent is not ISO unit or cannot be converted to a SAP unit
056No unique supply source determined
057Supplying plant & cannot be the same as the ordering store
058Supplying plant & not maintained in plant master
059Supplying plant & and delivery type & do not match up
060Only 002, 003 and 006 are allowed as qualifiers
061Del. data cannot be derived for order &, material &, supplying plant &
062Rounding off error occurred: Problem: &; Doc. &; Material &
063Quantity rounded off: material &, qty requested was: & &
064No availability check possible. Material &, supplying plant &
065Goods not available. Mat. &, supplying plant &, & requested, & available
066Delivery processing for material & terminated
067No checking rule found for availability check. Supplying plant &
068Collective processing number could not be generated
069Messages could not be saved in table WPLST: Error: &
070Order item not posted for external req. no. &, material &
071Deletion of store order not supported for document type "&"
072You must enter an external req. no. before you can delete a store order
073Deletion of store order failed. Doc. type "&", doc. &. error &
074PO external document &, document & will be deleted
075Store order not deleted, as it was not found. Req.: &, error &
076No entry in table "control store order" for customer &, profile &
077No entry in table "Aggregate taxes". POS sales upload for profile &
078Order confirmation cannot be sent. Error "&" in creating IDoc.
079Order confimration was generated immediately
080Order confimration not necessary
081Check for double PO not possible. Document &, document category &
082Double PO found. Document &, item & will not be posted
083Wrong promotion number. Material &, plant &, promotion &,
084Malfunction in updating document flow. Document: &, error: &
085Insert error & inserting in table WVFB2 with external req. no. &
086No maximum order qty check possible. Material &, supplying plant &
087No maximum order qty check possible. Material &, supplying plant &, Un &
088Delivery created with no. & for external req. number &
089No documents posted, no items with errors
090Sales order created under number &
091For PO copy for material &, send suppliers. Wrong: &/&
092For delivery for doc. &, material &, external supplier & will be included
093Batch input not yet implemented for sales order
094Delivery date outside factory calendar for material &, document &
095Material could not be buffered
096Mat. & will be reordered for customer using Replenishment. Item ignored
097Asynchronous (2-step) processing not supported before release 4.0
098Unknown plant & entered for material &, document &
099Assignment of message in posting delivery to order item failed
100Order quantity increased by quantity of an identical item
101Document category was changed from PO to purchase requisition
102Order item could not be processed for document item
103Delivery item could not be created
104Order item could not be created
105Delivery date was forward-scheduled
106Missing data copied from master data
107Exchange rate cannot be read. Value will be ignored
108Unit of measure & cannot be converted to base unit &. Error &
109Customer data missing for customer &
110BOM explosion not possible for material &
111Material & blocked for &. Material status from &
112Material & blocked for &. Material status from &
113Condition & is unknown and will not be included in the order
114Sales order item could not be created
115Document: & Item: & posting failed for a number of items
116No external supply source determined for requirement no. &, mat. no. &
1170 entered as quantity -> PO not created
118Header condition &: & found for & &. Please add document manually
119Line condition &: & found for & &. Please add the document manually.
120Return not possible for document type &
121No additional data exists
122Deletion of PO quantity only allowed for additional items
123Auto. load building based on individual method: Error &
124No customer no., plant no. or ILN no. found
125Error in sourcing. No supplier found. Material &
126Change and reverse not possible at same time! Item: &1
127Data missing for processing item changes. Item &1
128Error in document during item change. Document: &1
129Item with material &1 does not exist in document &2!
130You can only change or reverse items
131Document item &1 could not be changed
132Item &1 already flagged for deletion!
133The quantity to be changed and the quantity in doc. item &1 are the same
134Material &1 does not exist in item &2 in document &3!
135Supplying plant cannot be determined. Customer &.
136Purchase requisition &1 does not exist
137Material &1 already exists in document &3!
138Document type &1, document &2, item &3 and material &4 have been changed
139No conversion of supplier currency &1 to plant currency &2 is possible
140Costs for currency &1 for plant have been rounded
141Prices for currency &1 for supplier have been rounded
142Currency for plant &1 could not be determined
143Errors occurrred when initializing document &1 of document type &2
144Document type does not exist. Change document cannot be determined!
145Document type contains errors. Change document cannot be determined!
146Only CHANGE, CANCEL or CREATE can be used for items!
147Use action codes '001'. '002' or '003' for order BAPIs
148&1 items in store order processed in &2 (hhmmss): &3 documents created
149Items:&1; Data Enhancement:&2 (hhmmss); Document Creation:&3 (hhmmss); &4
150Migration of condition change pointers has not yet taken place
151Migration of condition change pointers has not yet taken place
152Date cannot occur in the past
153Change pointers that are still needed may be deleted
154Condition change pointer (WIND) could not be updated
155Condition change pointer (WIND) could not be deleted
156&1 condition change pointer was deleted
157'Not Relevant' indicator set for &1 change pointers
158Condition for document type &1 for supply source key &2 was not met
159You have called function module &1, which is no longer valid
160Add item not possible -> New document will be created
161No price maintained for material &1 plant &2 supplier &3
162A MARC entry does not exist for article &2 and plant &3
200No price change pointers were read
201No price changes relevant for change were read
202No price changes worthy of investment read
203A function was selected that is not supported
204An unprocessed document already exists
205Unknown document category in logbook table &1
206No supplier available which satisfies the selection criteria
207No plant avaiable which satisfies the selection criteria
208None of the suppliers takes part in optimized PO-based load building
209No purchase order exists which satisfies the selection criteria
210Infosystem selection variant does not exist
211Cannot determine periodicity of infostructure S083
212No entry found in plant master for plant &1
213Please place the cursor on the appropriate line
214No suitable purchasing info records were read for the selection (EINE)
215No suitable info records were read for the selection (EINA)
216Restriction profile & does not exist
217Purchase orders were bundled under number &
218Purchase orders could not be bundled, number range & does not exist
219No free number in number range object &
220The last number in number range object & has been assigned
221Assigned number of number range object & is in critical area
222System error in store order sub-function. Position &
223System error combining purchase orders. Data was reset
224Partner function &1 is not allowed
225Please enter a collective number or a supplier and plant
226Please enter a restriction profile
227Please maintain at least one further selection parameter
228Only collective number, supplier and plant are used for selection
229Plant category & does not exist
230Error &1 calling user exit &2
231Collective numbers cannot be specified
232Country/Region & does not exist. Correct your entry
233Country/Region &1 and region &2 combination does not exist
234Setting >&1< is not relevant
235Select a different processing mode
236All suppliers are to use optimized purchase-order-based load building
237Enter purchasing group or prices
238No price reduction was determined
300Please select an entry
301Select only one entry
302No info record found for the user entries
303Selected plant must be a distribution center
304System error with &1. Error &2
305No purch. requisitions or purchase orders found for the data entered
306No plant found for the entries
307Purchase order not created for supplier &1 &2 as one already exists
308Material &1 does not exist for plant &2
309PO created for supplier/plant &1 &2, simulation cannot be deleted
310Restriction profile & does not exist. Please enter valid data
311Datea blocked by user &1.
312Restrictuion profile not unique. Automatic search not possible
313The selected line has already been deleted by another user
314PO value for purchase order & could not be determined correctly
315Gross PO weight could not be correctly determined for purchase order &
316PO volumes could not be correctly determined for purchase order &
317PO quantity could not be correctly determined for purchase order &
318Net PO weight could not be correctly determined for purchase order &
319Not possible to assign a joint delivery date
320Joint delivery date must be earlier than all delivery dates
321Joint delivery date is in the past
322Joint purchase order date too late
323Joint purchase order date later than joint delivery date
324Customer number does not exist for plant &
325No data entered in results list
326Automatic PO-based load-building run completed
327Select one or more purchase orders
328No purchasing info records found for data entered
329Status: &
330&1 purchase requisitions selected for material &2
331& order items selected
332Doc. item &, &, & already processed. See results list.
333Additional item: Material &, supplier &, plant &, VSR no. &
334Supplier &1, plant &2, &3 percent supplier service level. No load built!
335PO split not possible. Split module ends with error &1
336Unknown supplier used for selection. Enter another supplier.
337Unknown material used for selection. Please re-enter material.
338Unknown material group used for selection. Please re-enter material group
339Unknown purchasing org. used for selection. Please re-enter pur. org.
340Unknown purchasing group used for selection. Please re-enter pur. group
341None of the suppliers selected participates in Order Optimizing
342Automatic order creation not allowed. See table &1 for &2 &3
343Please position cursor in a header line
344No variants for selection exist
345System error creating purchase orders. Data reset.
346Load build by order date &1 . Supplier &2, plant &3, VSR no. &4
347Error converting to base units of measure. Material &
348Quantity was rounded down to zero. Material &1, plant &2, pur.org. &3
349General Customizing setting missing for auto. load building
350Purchase order created with number &1
351Expiration date &3 exceeded. No additional qty for material &1, plant &2
352Material &1, plant &2. Additional qty &3 &4.
353Max.coverage is &3 days for material &1, plant &2, iteration &4 days
354Max. period of coverage of &3 days reached for material &1, plant &2.
355Supplier service level &3 % for supplier &1, plant &2 greater than &4 %
356No listed items found for supplier &1, plant &2, VSR &3
357No listed materials found for supplier &1, plant &2, VSR &3
358Error occurred when accessing log table for load building lines (WBO2)
359Price falls on &4 for supplier &1, plant &2, material &3
360Info record &1, current price &2, future price &3 &4
361Supplier service level &3 % for supplier &1, plant &2 <= &4 %
362No data entered in results list. Supplier &1, plant &2, VSR &3
363Result of last iteration rejected. Target restriction exceeded
364Adding individual materials to meet multiple restriction
365Nothing for ordering, or purchase order has already been created
366Position the cursor correctly
367Use the new load building transaction WLB13 only.
368Purchase order &1 is blocked by user &2
369You are not authorized to use transaction &1
370Select 2 rows exactly
371Select at least one row
400Invalid input parameter (&1 = &2) calling FM: &3!
401Not all information exists that is required for order splitting
402Errors withour detailed information on calling FM: &1 occurred
403No order item (EKPO) for PO &1 found
404No delivery schedule (EKET) found for PO &1
405No PO header (EKKO) found for PO &1
406Error calling user exit &1 in FM: &2
407Splitting PO &1 using user exit &2 not possible!
408A minimum restriction is not met. Splitting not possible.
409Split not possible based on restrictions entered.
410Restriction category & not valid.
411Split not possible, as only one item exists
412Error in FM: &1, not all order items created.
413Error in FM: &1, two documents generated for a new PO
414Error in FM: &1, error calculating restriction values
415Split not possible. Multiple restriction would not be met
416Do not split collective purchase orders and allocation table POs
449PO &1 rejected: multiple use
450PO &1 rejected: different plants
451PO &1 rejected: different supplier sub-ranges
452PO &1 rejected: plant not in selection range
453PO &1 rejected: Material not in selection range
454PO &1 rejected: material group not in selection range
455PO &1 rejected: supplier material no. not in selection range
456PO &1 rejected: supplier sub-range not in selection range
457PO &1 rejected: delivery date is in past
458PO &1 rejected: delivery date too far in future
459Only select lines that belong to the same supplier
470Delivery date occurs in the past
471Purchase order date must fall between delivery date and today's date
472Purchase order &1 will not be changed as it has already been released
473System error during creation of purchase requisitions. Data was reset
474Processing of article &2 and site &3 failed because of other error items
475Error concerns procurement material &1 of sales material &2.
898&1 is blocked;
899STEPLOG: & "&" & &
Privacy Policy