WRF_PRC_SCD - Purchasing Scheduling Seasonal Procurement

The following messages are stored in message class WRF_PRC_SCD: Purchasing Scheduling Seasonal Procurement.
It is part of development package WRF_PRC_SCD_DDIC in software component LO-RFM-PUR-SCD. This development package consists of objects that can be grouped under "Seasonal Procurement: DDIC Objects Area of Scheduling".
Message Nr
Message Text
001Date &1 not maintained
002Date ID missing
003Document: &1 item: &2 sched. line: &3: date line ID missing
004Date &1 is inactive
005Description for date &1 in language &2 not maintained
006You have maintained Incoterm but you must enter a transfer date
007Date &1: Planned date &2 overwritten by date &3
008Date &1: Tolerance date &2 overwritten by date &3
009No date description exists for &1
100Transportation chain ID is empty
101Transportation chain &1 &2 does not exist
102No legs exist for transportation chain &1 &2
103Transportation chain header import structure is empty
104&1 is not defined as possible transfer date
105Route &1 - &2 - &3 is not contained in the transportation times table
106Error writing expected events; transportation chain ID &1
107Transportation chain &1 &2 was saved
108Transportation chain &1 &2 was deleted
109Transportation chain &1 &2 was changed
111Transportation chain &1 &2 is blocked; change not possible
112Transportation chain type is empty - maintain at header level
113First leg not unique; select a row
114Ctry/Reg. of orig. &1 and c/r of depart. &2 of prev. leg not the same
115Place of arrival &1 and place of depart. &2 of previous leg not the same
116Loop creation: date &1 (&2) already used as a date
117Loop creation: date &1 already used as preceding date
118Transportation chain &1 &2 already exists
119Last date in &1 must be &2 and not &3
120Transportation chain &1 &2 cannot be changed
121Legs for transportation chain &1 &2 cannot be changed
122Transportation chain &1 &2 cannot be deleted
123Legs for transportation chain &1 &2 cannot be deleted
124Transportation chain &1 &2 cannot be created
125Legs for transportation chain &1 &2 cannot be created
126Date in leg missing
127Preceding date in leg missing
128Informative date &1 cannot have a predecessor date
129Transportation chain &1 &2 cannot be saved
130Point of arrival and point of departure &1 are the same
131Transportation chain &1 &2 does not exist; it will be created
132Actual posting was not updated, date ID from &1 is empty
133No leg found for preceding date &1; no sorting possible
134Dispatch method &1 does not exist
135Transportation chain type changed to "external"
136Saving not possible: no legs maintained
137For the first operative date in &1, preceding date must be &2
138Departure and arrival dates must be maintained for operative dates
139Leg with date &1 cannot be sorted
140Country/Region of departure &1 with region of departure &2 already exists
141Country/Region of departure &1 with region of arrival &2 already exists
142Deletion not possible: supplier &1 is assigned transportation chain &2
143Move time does not exist: locations are deleted
144&1 is still used in transportation chain(s); deletion not possible
145Transportation chain &1 is assigned to supplier(s)
146Purchase order &1 does not exist
147Item & could not be written to the worklist
148Mode of transport missing in leg with c/r of depart. &1 and arriv. &2
149More general leg (without locations) copied for &1 - &2 - &3
150Leg and more general leg do not exist for &1 - &2 - &3
151&1 is still used in dateline(s); deletion not possible
152Subsequent leg &1 - &2 cannot be added to leg &3 - &4
153Select one line only
154Leg &1 - &2 - &3 - &4 was adjusted and move time determined
155No description maintained for &1
156Country/Region of departure &1 not maintained in move time table
157Region of departure &1 not maintained in move time table
158Mode of transport &1 not maintained in move time table
159Date &1 not maintained
160Leg &1 - &2 - &3 has move time zero
161Preceding date &1 already used with operative date (leg with &2)
162Country/Region of arrival &1 not maintained in move time table
163Region of arrival &1 not maintained in move time table
164Only one transportation chain of type &1 can be assigned
165Transportation chain &1 is not assigned to a supplier
166Use WCHAIN1 for creation, WCHAIN2 for change, or WCHAIN3 for display
167Staging date not taken into account if transportation chain assigned
168Maintain staging time for transportation chain with staging date
169Provision time is maintained, but there is no transportation chain
170&1 cannot be used as a date
171Enter a dispatch method
172Cannot find any items for the purchase order &1
173Cannot find any schedule lines for the purchase order &1
174You cannot use transportation chain ID &1; choose another name
175Only mode of transport "Regular" and "Express" possible for internal TC
176Time slot &1 is already contained in the time slot list
200Error with &1 in table &2
301PO &1 item &2 schedule line &3 does not exist
302Unsupported transaction type &1 for automatic mode
303Undefined processing mode &1
304Dateline &1 does not exist
305Call &1: &2 missing
306Availability date not defined
307Errors issued in Delivery Date determination using Transportation Chain
400Error in date calculation
401No date transferred for date calculation
402Error in scheduling
403Error in parameter determination
404No transportation chain is assigned to DC &1 in the supplier master
405Error calling function module &1
406Date change: &1 &2 was changed to &3
407No entry exists in the date table
408Date &1 was changed from &3 to &4 in acc. with delivery cycle &2
409Date &1 was changed from &3 to &4 in acc. with order cycle &2
410Date &1 changed from &2 to &3
411&1 &2 precedes &3 &4 - check the start dates
412&1 &2 is higher than &3 &4 - check start dates
413&1 &2 is before &3 &4, tolerance date of preceding date is adopted
414&1 &2 precedes &3 &4, tolerance date of predecessor was adjusted
415No start date could be determined
416Order and delivery cycle could not be determined
417Customizing for scheduling could not be determined
418Enter a supplier
419Enter an article
420Ship-to party was not transferred to scheduling
421Incoterm was not transferred to scheduling
422No start date was transferred to scheduling
423Site &1 is not a distribution center
424Site &1 is not a store
425Site &1 does not exist
426The dates in the dateline cannot be sorted
427No transportation chain entered for supplier &1
428Start date &1 is invalid
430A dateline without ID is not allowed
431Transfer date cannot be determined - check incoterm &1
432Incorrect assignment of transfer date to incoterm &1
433Order cycle &1 is invalid; order date will be calculated without cycle
434Delivery cycle &1 invalid; delivery date will be calculated without cycle
435Ship-to party missing; GR processing time cannot be determined
436Dateline will be created with default planned delivery time of 99 days
437Simplified date calculation carried out with planned delivery time
438Error in scheduling, date line cannot be calculated
439Automatic date shift will be executed with an interval of zero days
440The interval between 2 dates is greater than 999 days
441You can no longer change the transportation chain at this point
442The time sequence of the start dates is incorrect
443Date lead time or date follow-up time for date &1 will be modified
444The total interval is greater than 999 days
445&1 was changed from &3 to &4 in accordance with delivery cycle &2
446&1 was changed from &3 to &4 in accordance with order cycle &2
447It is no longer possible to change the transportation chain
448System could not determine The calculation type
449It is no longer possible to change supplier/switch transportation chain
450It is no longer possible to switch the internal transportation chain
451Error while transferring actual dates from the old dateline
452Actual start date posted is not last date on dateline
453Incorrect scheduling call; see the long text
454Transfer date for Incoterm &1 found w. normal, but not dispatch method &2
455Combination of distribution center and dispatch method is not permitted
456Combination of store and dispatch method is not permitted
457Date &1 has already been posted and may not be changed
458Incorrect scheduling call, start date was not transferred correctly
459Int.trnsp.chain not maintained in supplying plnt asgt for &1 nor in DC &2
460Change of internal transport chain not possible
461Automatic date shift for the order date is not permitted
462You cannot select the order date as the start date
463Switch to internal transportation chain &1 is not possible
464Switch to internal transportation chain &1 is not possible
465Assignment of ship-to party and transportation chain not permitted
466Combination of ship-to party and dispatch method is not permitted
467Automatic date shift to the past is not permitted
468Scheduling is deactivated
469No transportation chain is assigned to supplier &1
470Transportation chain &1 (&2) for dispatch method &3 is not an ext. TC
471Transportation chain &1 (&2) for dispatch method &3 is not an int. TC
472No transportation chains are assigned to info record and supplier &1
473Date &1 occurs more than once in dateline; this is not permitted
474Informative date without predecessor &1 was transferred without a date
475Informative date without predecessor &1; interval is set to 0
476Date &1 of the informative date &2 is before the order date &3
477Date &1 of the informative date &2 is after the delivery date &3
478Internal transportation chain cannot be copied into the dateline
479No transportation chain is assigned to the info record
480Staging time is zero
481All dates already posted; no start date could be determined
482No date postponement possible since all dates already posted
483The most recently posted date is not in the new transportation chain
484Assign a transportation chain in the supplier master data
485Deleting external transportation chain is not permitted
486Deleting internal transportation chain is not permitted
487No transportation chain is assigned to the info record: see long text
500Date line cannot be checked
501Dateline is not consistent
502Date line &1 date_id &2: incorrect date type
503Date line &: different IDs
504Date line &1 date ID &2: &3 missing
505Date line &1, date &2; plan date is after tolerance date
506Date line &1 date ID &2 incorrect format: &3
507Date line &1: &2 cannot have a preceding date
508Date line &1: &2 must be a operative date
509Date line &1: &2 must have a preceding date
510Dateline &1: &2 is inactive
511Dateline &1, date &2: Predecessor date is not an operational date
512Date line &1 date ID &2; plan date is before predecessor plan date
513Date line &1 date ID &2; tolerance date is before predecessor tol. date
514Date line &1: &2 is predecessor of more than one operative date
515Date line &1: preceding date &2 does not exist in date line
516Header structure of date line missing
517Date line ID missing
518Date ID missing
519Actual posting: &1 &2 &3 &4 &5
520Dateline is empty
521Incoterm1 &1 cannot be determined
522Incoterm2 &1 was determined in scheduling
523Transfer location &1 of dateline differs from Incoterm2 &2
524Only general leg with ctry/reg. &1 since no transfer region is defined
525Incoterm1 was deleted; transfer location will also be deleted
526Cannot determine transfer date &1 in dateline
527Supplier &1 is monitored, but not transfer date &2
528Transfer date is empty
529Date '&1': calculated date is in the past (&2)
530Operational date &1 may not be removed from dateline
531Actual-posted dateline &1 may not be removed from dateline
Privacy Policy