WVLB - Messages for Load Building

The following messages are stored in message class WVLB: Messages for Load Building.
It is part of development package WVLB in software component LO-RFM-PUR-LB. This development package consists of objects that can be grouped under "Retail Load Building".
Message Nr
Message Text
000No currency determined for plant &1
001FM &1 called with wrong or missing input parameter values
002Error calling function module &1
003General Customizing entry missing for automatic load building
004No valid plant data found for plant category &1 specified
005No valid supplier data found
006No valid LB combination of supplier/plant/purchasing org. found
007Restriction profile must be entered in case 1:M (= plant group filled)
008Error &1 calling function module &2
009Only released purchase orders are included in the simulation
010Plant group &1 not defined
011Group &1 entered is not a valid plant group
012No plants found for plant group &1
013In case 1:M, all plants must have same factory calendar
014Program versions can only be started in the background
015Only set one parameter for starting other program versions
016Error occurred executing submit
017Select a correct value for document generation
018Select a valid plant category
019Select a valid restriction profile
020Multiple loads can only be built in simulation mode with planning cycle
021Int. program start and simultaneous parallel processing are not possible
022Parallel processing requires the number of suppliers for each process
023Only maintain the number of suppliers per process for parallel processing
024Load build profile &1 is not defined
025Start of supplier &1 and plant &2
100&1 load building combinations determined
101Load building combination processed with components:
102(supplier / purchasing org. / SSR no. / plants)
103&1 / &2 / &3 / &4
104Load building cancelled due to wrong determination of suppl. service lvl
105Supplier service level for plant &1 and date &2: &3
106Load building cancelled. Definition of restriction profile &1 not found
107No allowed purchase orders found for load
108The following allowed POs were found for load:
109- doc. no.: &1 ; joint delivery date &2
110No allowed materials exist for load
111Load building terminated due to missing purchase orders and materials
112No allowed pur. reqs exist for load
113The following allowed pur. reqs were found for load:
114Load building terminated due to missing requirement element
115Build load: supplier service level = 100%
116Build load: IB pur. reqs. &1 exist for plant &2
117Build load: promotion PO &1 exists for plant &2
118Build load: target (&1) > actual supplier service level (&2) for plant &3
119Load building cancelled as the required criteria are not met
120Load building no longer necessary for the following purchase orders:
121Load building using range of coverage algorithm not required
122Order date for building load using range of coverage algorithm: &1
123Start of range of coverage algorithm
124Load building cancelled due to problems with range of coverage algorithm
125Execute range of coverage algorithm for day &1 and PO load &2
126Remove addition of quantity &1 for material &2 in plant &3
127Delivery date = start date of range of coverage algorithm: &1
128Load building cancelled: no listed material exists
129Delivery date for POs with actual supplier service level from &1 to &2
130Delivery date fror POs for load building from &1 to &2
131Delivery date for promotion purchase orders in building load frm &1 to &2
132Release date for pur. reqs. in building load from &1 to &2
133Delivery date for pur. reqs in building load from &1 to &2
134Release date for IB pur. reqs in building load from &1 to &2
135Reason for termination of ROC algorithm: all restrictions are met
136Reason for termination of ROC alg.: No additional qty in last step!
137Reason for termination of ROC alg.:maximum range of coverage (&1) reached
138Load building not necessary today
139Material &1 cannot be ordered automatically for plant &2
140Current range of coverage in plant &1 for matl &2 (forecast: &4) &3 days
141Range of coverage algorithm terminated after &1 day(s)
142Current range of coverage date: &1
143Carry out more specific method
144Additional quantity determined: &1
145Add quantity of &3 in PO &4 for plant &1 and material &2
146Add quantity of &3 in pur. req. &4 for plant &1 and material &2
147New rounded quantity (rounding value for new unrounded quantity): &1
148Released PO quantities (with delivery date <= &1) for range of coverage:
149The following quantities will be included in load building:
150Current stock of material &2 in plant &1: &3 (initial value for ROC)
151Entries exist in list of results for &1 combinations
152The following new quantities are produced for plant &1 and material &2
153New unrounded quantity (sum of all pur. req. and additional qties): &1
154New target range of coverage: &1
155Material not included as a result of shelf-life (maximum &1 days)
156Supplier service level for plant &1, date &2: &3 (reason: missing forect)
157Qty received (&1) or used (&2) leads to zero quantity
158Program finished due to a serious error
159Purchase order date = &1;delivery date = &2;act.suppl. service level = &3
160Load building carried out (entry in result list)
161No load building carried out (no entry in result list)
162Processing time &1 with the following database access:
163Reading: &1 materials; &2 PO items; &3 purchase requisition items
164Writing: &1 PO items; &2 PR items; &3 result list items (WBO2)
165Creation of purchase requisition for &1/&2 was terminated: &3 &4
166Supplier: &1 / Purch. org: &2 / Suppl.SR: &3 / Plant: &4
167Automatic Load Building Carried Out Successfully
168Load building completed: no relevant material available
169&1 is blocked;
Privacy Policy