X4 - APO Core Interface: Interfaces for Manufacturing Orders

The following messages are stored in message class X4: APO Core Interface: Interfaces for Manufacturing Orders.
It is part of development package COCI in software component SCM-APO-INT-PPS. This development package consists of objects that can be grouped under "Production Order: APO Core Interface Add-Ons".
Message Nr
Message Text
000The sales document &1 &2 is not a valid account assignment
001Master data cannot be read in order &1
002Operation &1 cannot be found in order &2
003Operation &1 cannot be found in order &2
004Component &1 cannot be found in order &2
005Component &1 cannot be found in order &2
006Item &3 for material &1 cannot be found in order &2
007Components could not be deleted (see application log)
008Master data was read in order &1
009Operations could not be deleted (see application log)
010Order &1 could not be read
011Error while reassigning components of deleted operations
012Production version &1 for material &2 in plant &3 is locked
013Production version &1 for material &2 is invalid for &4
014Production scheduling profile and order type not determined for order &1
015The issued approval can no longer be reversed (status APG)
016The issued approval can no longer be reversed (change in work center)
017Component &1: Operation not found in order &2
018Function is not currently possible
019DIMP-Specific Processing in Include &1, &2
020Reservation &1, item number &2, record type &3 not found
021Error reading the order header &1 from the document tables
200*********** Reserved for APO-specific messages as of here ************
201No main item transferred in order &1
202Transfer terminated after error occurred during transfer of order &1
203Processing status of order &1: &2 &3 &4
204The creation of operations is not supported
205The creation of components is not supported
206The creation of items is not supported
207Planned order &1 could not be deleted in SAP ECC
208Error during conversion of planned order &1 : Check failed
209Component &1 of order &2 is deleted in the APO order
210CDP order &1 cannot be processed
211Operation &1 of order &2 is deleted in APO
212Error during key comparison (manufacturing order)
213Mapping of components failed
214Processing of order &1 for material &2/&3 production version &4
215Quantity of released order &1 cannot be changed
216Overflow while matching phantoms
217Component &1 for phantom assembly not found in the ECC order
218Phantom assembly (parent) for component &1 was not transferred from APO
219The changed component &1 is configured for phase-out control
220Operation data of ECC order &1 was not changed
221No production version has been entered in ECC order &1
222Order &1 is retransferred to APO
223Explosion date 01.01.1970 was transferred from APO
224Change to component &1 &2 rejected
225No alternative work center was found for operation &1
226No checklist was found for order &1
227No checklist was found for item &1
228No checklist was found for component &1
229No checklist was found for operation &1 / &2
230No header data was transferred for order &1
231No data was transferred for item &1 of order &2
232No data was transferred for component &1 of order &2
233No data was transferred for operation &1 / &2 of order &3
234Material &1 added in APO is not maintained in SAP ECC
235Planned order &1 was already converted to production order &2
236Added component is not contained in an active integration model
237Added item is not contained in an active integration model
238Error when processing operation &1 in order &2
239Component with material &1 plant &2 is deleted from the order
240An original component does not exist for successor &1
241Orders with multiple substitution are not transferred to SAP ECC
250Order &1 retransferred to APO due to different statuses
500*** APO-specific outbound messages ***
501Relationships for order &1 cannot be redirected
502The work center &1 / plant &2 is not in the active integration model
503Control key &1 not relevant to scheduling or is a rework operation
504Operation/phase with duration zero
505Order &1: Operation/phase &2 is not APO relevant
506Setup information for PI operation is ignored
507Order &1: Component &2/&3 is not relevant to APO
508Production scheduling profile does not exist for plant &1, order type &2
509An error occurred for order &1 during the change transfer
510Time conversion from date &1 and time &2 failed
511Conversion of quantity &1 with unit &2 of material &3 failed
512Conversion of duration &1 with unit &2 failed
513Conversion error for the order item with material number &1
514An error occurred for operation &1 of the standard sequence
515Error occurred in the capacity requirement for operation &1
516Error in relationship
517Conversion error: Not all orders were transferred to SAP APO
518Data for the header material of the order could not be converted
519Conversion error for the component with material number &1
520Missing authorizations
521An error occurred for suboperation &1/&2 of the standard sequence
522An error occurred for operation &1 of a parallel sequence
523An error occurred for suboperation &1 / &2 of a parallel sequence
524An error occurred for operation or phase &1
526Error in capacity requirement for phase or operation &1
527Error in capacity requirement for suboperation &1/&2
528Error in capacity requirement for secondary resource &1/&2
529Error for secondary resource &1/&2
530Error in a cross-order relationship (PP/PI)
531Error in a cross-order relationship (PP)
540Error &1 during time conversion; order &2 operation &3
600Program cannot be executed in the background
601Own logical system name could not be determined
602Target system entered is incorrect or cannot be reached
603Internal Error
604No data was found for your selection
605Target system is not permitted
606The queue type could not be determined for the target system
Privacy Policy