/IBX/PE_PROC_SRV - Nachrichten der Prozesssteuerung

The following messages are stored in message class /IBX/PE_PROC_SRV: Nachrichten der Prozesssteuerung.
It is part of development package /IBX/PE_PROC_SRV in software component FS-RBD-IPX. This development package consists of objects that can be grouped under "Process Control".
Message Nr
Message Text
001No object could be generated for reporting object category &1
002No settings were found for reporting object category &1
003No settings were found for area &1
004No area could be determined for transaction code &1
005A worklist could not be created
010A class name could not be determined for processing group &1
011Processing group "&1" is deactivated for diff. value "&2" (step "&3")
012Class &1 for processing group &2 could not be generated
013No further step was found (current step: &1)
014No entry found for processing group &1
015Processing group &1 has not been defined
016Class &1 for processing group &2 is not a bundle subprocess
017Class &1 for processing group &2 is not a single record subprocess
018Single record subprocess step &1 could not be found
019The subsequent step for step &1 does not have type "Single Record"
020The generated class has the wrong type
021Class "&1" does not implement an interface compatible with the group cat.
022Class "&1" implements more than 1 processing group interface
023Interface "&1" is not valid for processing groups.
024Processing group category "&1" is not permitted at this assignment level.
025No object found for selection condition for classes.
030Work process information could not be determined (SY-SUBRC &1 )
031The job could not be generated, see SYSLOG
032The job contains invalid job data, see SYSLOG
033Job Name Not Specified
034The report could not be added to the job
035The job could not be started immediately
036No valid start conditions defined for the job
037The job could not be completed and scheduled
038The specified job does not contain any steps to be executed
039The specified job does not exist
040The job could not be exclusively locked for processing
041The specified target server group does not exist
042Errors for scheduled but unreleased jobs
043Process &1 (process number &2) was terminated
044No background processes found
045Additional information on transaction ST22 (runtime errors)
050The program was ended with errors
051The program was terminated with errors
052The program was ended successfully
053Error when selecting application data for object list
054Error at start of processing in a parallel job
055Error at end of processing in a parallel job
060Restrict the class name or processing group
061CAUTION: The where-used list may be incomplete
Privacy Policy