/ISDFPS/FORCERDEL - Geplanntes Abgrenzen und L�schen

The following messages are stored in message class /ISDFPS/FORCERDEL: Geplanntes Abgrenzen und L�schen.
It is part of development package /ISDFPS/FORCER in software component IS-DFS-OF-FOR. This development package consists of objects that can be grouped under "Package Assignments".
Message Nr ▲
Message Text
001GUID and counter must not be initial
002Relationship type (OTYPE) must not be initial
003The selected operation &1 is not supported
004No relationship exists for selected operation
005Status of relationship between &1 and &2 is not active
006Delimitation date must not be after end of relationship
007Planned &3 exists for relationship between &1 and &2
008Planned delimitation or deleted can be changed only with org. measure &1
009Delimitation planned for relationship between &1 and &2 with date &3
010Deletion planned for relationship between &1 and &2
011Relationship between &1 and &2 was changed
012Data record for planned delimitation or deletion deleted
013Plnd delimitation or deletion does not exist for relatshp btw &1 and &2
014Delimitation date must not be initial
015Relationship does not exist
016Delimitation date must not be before start of relationship
017Planned delimitation or deletion exists; direct delimitation not possible
018Worflow date must not be after end of relationship
019You cannot delete the assignment between &1 and &2
Privacy Policy