/PLMI/AL_GSS_R2MR_SU - Messages to Sync. Unit Handling in Recipe to Master Recipe

The following messages are stored in message class /PLMI/AL_GSS_R2MR_SU: Messages to Sync. Unit Handling in Recipe to Master Recipe.
It is part of development package /PLMI/AL_GSS_R2MR in software component PLM-WUI-RCP. This development package consists of objects that can be grouped under "Guided RCP to Master Recipe Synchronisation".
Message Nr
Message Text
000&1/&2/&3 BOM does not exist in plant &4
001Master recipe usage &1 does not exist
002Master recipe profile &1 does not exist
003Master recipe status &1 does not exist
004Control recipe destination &1 does not exist
005Process instruction category &1 does not exist
006Synchronization cannot be started; enter control recipe destination
007Synchronization cannot be started; enter profile
008Synchronization cannot be started; enter usage
009Synchronization cannot be started; enter status
010You have not defined master recipe default parameters
011Synchronization unit number generation failed
012Make settings for transferring process parameters
013No target characteristic assigned to basic proc. parameter characteristic
014Characteristic &1 is not valid
015Synchronization unit has no change number mapping in status Not Aligned
016Make Customizing settings
017Production version &1 already exists for material &2 and plant &3
018Production version &1 is invalid
019Synchronization unit &1 has change number settings &2
020Synchronization unit &1 has been created
021Synchronization unit &1 does not exist
022Synchronization unit &1 has been deleted
023Changes have been saved
024Proc. instruction category &1 is not assigned to control recipe dest. &2
025Master recipe group &1 and group counter &2 are already used
026Master recipe group &1 with group counter &2 already exists
027Deletion is not possible; synch. unit has already been synchronized
030You are not authorized to display the synchronization unit
031You are not authorized to delete the synchronization unit
032You are not authorized to change the synchronization unit
033You are not authorized to create the synchronization unit
040Enter a material to create the synchronization unit
041Material BOM usage is mandatory to create the synchronization unit
042Material BOM alternative is mandatory to create the synchronization unit
043Enter a plant to create the synchronization unit
044Master recipe group is mandatory to create the synchronization unit
045Master recipe group counter is mandatory to create the sync. unit
046Enter a control recipe destination to create the synchronization unit
047Using a change number is mandatory
048Using a change number is not allowed
049Technical error occurred when changing mapping status
050Multiple resources found for equipment requirement &1
051No exactly matching resources found for equipment requirement &1
052You cannot map equipment requirements on process level
053No resource found for equipment requirement &1
054No Customizing found for pp. class &1, plant &2, ctrl. rec. dest. &3
055Cannot map characteristic &1 to &2 in process instruction category &3
056Master recipe group &1 is not valid
057Production version &1 is already used in another synchronization unit
058Make entries in Customizing for profile &1
059Maintain factory calendar for plant &1
060Validity of change number &1 is earlier than valid. of last aligned c. n.
061Maintain company code in plant &1
062Production version is mandatory to create the synchronization unit
063The order of process parameters has been changed under &1
064Recipe version is not ready for synchronization
065The given change number does not have a Valid From date
066Process element &1 has been moved to parent process element &2
067Equipment requirement &1 has been moved to parent process element &2
068No class assigned for equipment requirement &1
069Control recipe dest. has been changed to &1 for phases of operation &2
070You cannot map the primary EQR &1 without any characteristics
071Resolve all the "Error" severity conflicts with proposal before saving
072The order of process elements has been changed under &1
073The order of equipment requirements has been changed under &1
074Change number &1 does not support classification processing
075Change number &1 does not support master recipe processing
076Equipment requirement &1 has been changed to primary
077Equipment requirement &1 is no longer primary
078Solve attribute-related conflicts before structural conflicts
079EQR &1 is no longer primary, EQR &2 has been changed to primary
080Control recipe destination has been changed to &1 for phase &2
081You cannot move an EQR and change it from/to prim. res. at the same time
082When adjusting process instruction &1, the related PIs are also remapped
083The change number you entered is not active
084Master recipe is locked for processing with change number &1
085You cannot map a process parameter on process or stage level
086Classification is locked for processing with change number &1
087Change number &1 is marked for deletion
088Alternative recipe is not ready for synchronization
089Solve structural conflicts before deletion-related conflicts
090Process parameter &1 has been moved to parent process item &2
091Enter a valid recipe
092Valid-from date of change number must be &1 or earlier
093Valid-from date of change number must be &1 or later
094Valid-from date must be &1 or earlier
095Valid-from date must be &1 or later
096New equipment requirement &1 and Operation has mapped Prim. Res.
Privacy Policy