/SAPAPO/CTM1 - CTM: Messgaes
The following messages are stored in message class /SAPAPO/CTM1: CTM: Messgaes.
It is part of development package /SAPAPO/CTM in software component SCM-APO-SDM. This development package consists of objects that can be grouped under "Capable-To-Match".
It is part of development package /SAPAPO/CTM in software component SCM-APO-SDM. This development package consists of objects that can be grouped under "Capable-To-Match".
Message Nr ▲ | Message Text |
---|---|
000 | ***General messages ***************************************************** |
001 | ************************************************************************* |
002 | ------------------------------------------------------------------------- |
003 | Select a line |
004 | &: not yet implemented |
005 | &1 +++ Start: &2 &3 |
006 | &1 +++ End: &2 &3 |
007 | Complete your entries |
008 | Select a valid line |
009 | Select at least one entry |
010 | You are not authorized to run the selected function |
099 | Calling &1 for not supported application &2, only supporting &3 |
100 | *** Messages, Interface and CTM Planning Profile ************************ |
101 | Error when determining model - check planning version |
102 | There is no information about descriptive characteristics (-> long text) |
103 | This function cannot be executed; see long text |
104 | Critical component &1 at &2 has not received any distribution receipts |
105 | No distribution receipts (SNC-planned) for your master data selection |
106 | Distribution receipt (SNC-planned) exists for non-critical comp. &1 at &2 |
200 | Strategy setting for late demand fulfillment is reset |
201 | Planning profile &1 does not exist |
202 | Planning profile &1 already exists |
203 | CTM planning profile &1 is incomplete (complete planning version) |
204 | Planning version &1 does not exist |
205 | CTM planning profile & is incomplete. Complete the time stream |
206 | Time stream &1 does not exist |
207 | Planning start date is not within the planning calendar |
208 | Planning end date is not within planning calendar |
209 | Time stream &1 is not a CTM time stream |
210 | Enter the requested start date |
211 | Specify the period category |
212 | Specify the number of periods |
213 | Maintain the time stream definition entries |
214 | Deletion is not possible. Time stream &1 still used in profile &2 |
215 | Master data selection and profile have to be defined for the same model |
216 | Starting date is after end date |
217 | Horizon not valid; change the specified dates |
218 | Inconsistent planning profile or time stream |
219 | Select a row |
220 | Do not change or delete this entry |
221 | Sequence must be numbered continuously |
222 | There are duplicate entries for the search sequence |
223 | CTM planning profile &1 is incomplete. Amend search strategy |
224 | Search strategy &1 does not exist |
225 | Deletion is not possible. Search strategy &1 still used in profile &2 |
226 | Search strategy does not exist |
227 | Search strategy already exists |
228 | Demand time is in the past |
229 | Lower limit is larger than the upper limit |
230 | More than one text exists for language &1 |
231 | Enter language |
232 | Change the minimum portion of partial delivery |
233 | Enter a value below 100 |
234 | Enter a value equal to or over 100 |
235 | Time stream &1 already exists |
236 | Enter a valid time stream |
237 | Enter a name for the CTM planning profile |
238 | You can only use this setting with the regenerative planning plan. mode |
239 | Use a time stream without gaps |
240 | Enter a model |
241 | Model &1 does not exist |
242 | Enter an order selection |
243 | You have not changed order selection &1 |
244 | Deletion not possible. Order selection &1 still used in CTM profile &2 |
245 | Order selection &1 was deleted |
246 | Order selection &1 does not exist |
247 | You can only enter prioritization criteria &1 once |
248 | Enter a search strategy |
249 | Setting only possible with delete mode: "All not firmed orders" |
250 | Operation cannot be performed in display mode |
251 | You have not made any changes |
252 | Data was saved |
253 | First save changes in planning profile &1 |
254 | Database error occurred while saving |
255 | You have selected the active version |
256 | Planning version locked by user &2, CTM profile &1 |
257 | Planning version locked by CTM profile &1 |
258 | CTM Customizing was saved |
259 | Transaction locked by user &1. Display only |
260 | Master data selection is deleted when you save the CTM profile |
261 | CTM profile &1 already created by user &2 |
262 | CTM profile &1 has been locked by user &2. Display only |
263 | Specify a category |
264 | You can only enter category &1 once |
265 | Transportation lane from &1 to &2 not contained in the model used |
266 | Transportation lane from &1 to &2 has been selected already |
267 | In-house prod. source of supply &1 is not contained in the model used |
268 | In-house production source of supply &1 has been selected already |
269 | Specify start and end date |
270 | Specify a duration |
271 | CTM profile is currently locked by user &1 |
272 | Specify parameter name |
273 | Order selection &1 does not exist |
274 | Peg IDs could not be determined for order selection area &1 |
275 | Combining the Planning and Delete Modes is not Allowed |
276 | Specify the type of ATP category for the filter |
277 | If the sequence is from Customizing you have to enter the sort profile |
278 | Sort profile from Customizing has not been specified |
279 | CTM profile is locked by another user |
280 | Prioritization Criterion &1 is not Supported |
281 | Special sorting is not set for criterion "&1" |
282 | Special sorting has not been maintained in Customizing for criterion "&1" |
283 | Special sorting is supported for criterion "&1" |
284 | Specify a package size |
285 | Order selection &1 is locked by user &2; display only |
286 | Order selection &1 is being created by user &2 |
287 | Time stream &1 was saved |
288 | Search strategy &1 was saved |
289 | Specify a category for receipt elements |
290 | Specify a category for demand elements |
291 | Specify a category for every order category |
292 | Enter a weekday |
293 | Name &1 does not exist for flexible periods |
294 | CTM does not support the procedure specified for plan explosion |
295 | Specify a Variant for Supply Distribution |
296 | Variant &1 for Supply Distribution Does Not Exist |
297 | Specify a variant for dynamic master data selection |
298 | Variant &1 for master data selection does not exist |
299 | Specify a time unit |
300 | *** Master data check messages ************************************* |
301 | No procurement type is specified for the location product |
302 | The planning start date is in the past |
303 | The specified supply limits are not in use |
304 | No source of supply was found for product &1 at location &2 |
305 | No suitable source of supply was found due to the lot size |
306 | No available capacity for resource &1 at location &2 |
307 | No base unit of measure was maintained for product &1 and location &2 |
308 | Lot size entries for product &1 and location &2 are inconsistent |
309 | Available capacity was not checked for resource &1, location &2 |
310 | Location product &1 and &2 is not contained within the planning scope |
311 | Inconsistent validity period for in-house prod. source of supply &1 |
312 | Inconsistent lot size entries for selection of source of supply &1 |
313 | Source of supply &1 has no operations |
314 | Source of supply &1 has activities with no operations assigned |
315 | The operation has no number |
316 | Operation &1 has no activities |
317 | Activity &1 has not been assigned to an operation |
318 | Activity &1 has no mode |
319 | Activity &1 has no output components and no successors |
320 | CTM time stream &1 is not used in any CTM profile |
321 | Input components are always consumed at the start of an activity |
322 | Output components are always available at the end of an activity |
323 | Logical component &1 has no product |
324 | Inconsistent validity period for component &1 in source of supply &2 |
325 | Validity period for component &1 is outside validity period for source &2 |
326 | Validity of component &1 does not correspond with validity of source &2 |
327 | Mode &1 has no primary resources |
328 | No values specified for variable and fixed duration of mode &1 |
329 | Mode &1 has an incorrect mode priority |
330 | Incorrect reference type; only end-start relationship is possible |
331 | Minimum interval of activity relationship is larger than maximum interval |
332 | You have not specified an order selection |
333 | Demand selection &1 has no suitable location products |
334 | Plan &1 is not active |
335 | The pegging IDs for CTM profile &1 could not be determined |
336 | Location product &1, &2 is not assigned to the current model |
337 | CTM does not support option 'produce within a shift' |
338 | Primary resource consumption not specified for mode &1 |
339 | CTM does not support option 'Align with Grid' |
340 | Component &1 is also the primary product of source of supply &2 |
341 | Navigation is only supported for PPM and iPPE sources of supply |
342 | Resource &1 is not assigned to the current model |
343 | CTM does not support this resource type |
344 | Plan &1: Activity &2 has more than one successor |
345 | Plan &1: Activity &2 has more than one predecessor |
346 | Plan &1 has more than one activity without successors |
347 | Plan &1 has more than one activity without predecessors |
348 | No data found for resource &1 |
349 | Resource must have 100% capacity load |
350 | No plan exists for in-house production source of supply &1 |
351 | External proc. for product &1, location &2; source of supply &3 not used |
352 | Resources can only be checked with in-house prod. sources of supply |
353 | Select a node |
354 | The desired function is not available for the selected object. |
355 | Resource &1: Unscheduled breaks are not supported by CTM! |
356 | Lot size data for transportation lane &1 -> &2 (&3) inconsistent! |
357 | Production horizon for product &1, location &2 lower than standard value |
358 | Production horizon for product &1, location &2 larger than standard value |
359 | Stock transfer horizon for product &1, loc. &2 lower than standard value |
360 | Stock transfer horizon for product &1, loc. &2 larger than standard value |
361 | Planned deliv. time for product &1, location &2 is below standard value |
362 | Planned deliv. time for product &1, location &2 is above standard value |
363 | Minimum lot size for product &1, location &2 lower than standard value |
364 | Minimum lot size for product &1, location &2 larger than standard value |
365 | Maximum lot size for product &1, location &2 is lower than standard value |
366 | Maximum lot size for product &1,location &2 is larger than standard value |
367 | Fixed lot size for product &1, location &2 is lower than standard value |
368 | Fixed lot size for product &1, location &2 is larger than standard value |
369 | Lot size round. value for product &1, loc. &2 is lower than stand. value |
370 | Lot size round. value for product &1, loc. &2 is larger than stand. value |
371 | Minimum lot size for transportat. lane &1 -> &2 lower than standard value |
372 | Min. lot size for transportat. lane &1 -> &2 larger than standard value |
373 | Maximum lot size for transportat. lane &1 -> &2 lower than standard value |
374 | Maximum lot size for transportat.lane &1 -> &2 larger than standard value |
375 | Rounding value for transportat.lane &1 -> &2 is lower than standard value |
376 | Rounding value for transport. lane &1 -> &2 is larger than standard value |
377 | Minimum lot size for source of supply &1 is lower than standard value |
378 | Minimum lot size for source of supply &1 is larger than standard value |
379 | Maximum lot size for source of supply &1 is lower than standard value |
380 | Maximum lot size for source of supply &1 is larger than standard value |
381 | Validity start for source of supply &1 is smaller than standard value |
382 | Validity start date for source of supply &1 is larger than standard value |
383 | Validity end date for source of supply &1 is smaller than standard value |
384 | Validity end date for source of supply &1 is larger than standard value |
385 | Scrap for activity &1 (source of supply &2) is smaller than stndrd value |
386 | Scrap for activity &1 (source of supply &2) is larger than standard value |
387 | A deletion flag has been set for product &1 in location &2 |
388 | Goods receipt cannot be planned for source of supply &1 |
389 | Planning parameter &1 is obsolete |
390 | Value &2 of planning parameter &1 is obsolete |
391 | No suitable source of supply was found due to the lot size |
392 | Source of supply &1 cannot be used due to the lot size |
393 | Order details will not be checked |
394 | Leading product of FFF subset & not contained in planning scope |
395 | Location product &1/&2 can only be replaced and cannot be procured |
396 | Bucket-oriented planning does not support this resource type |
397 | Location product &1/&2 is also main receipt of source of supply &3 |
398 | Component &1 in in-house-production source of supply &2 is a sub product |
399 | Settings for cont. planning, PP/DS master data and PP/DS orders were made |
400 | *** CTM Planning run messages (Interface) ************************* |
401 | Error occurred during CTM planning run &1 &2 &3 &4 |
402 | Data has been reset |
403 | Model data uploaded |
404 | Planning version data was uploaded |
405 | Planning run completed |
406 | RFC error. (Call: &1; error group: &2; key: &3; message: &4) |
407 | Interal error. Invalid order category &1 |
408 | Individual query was launched |
409 | Log file cannot be opened |
410 | No in-house production source of supply found for model &1 |
411 | No &1 exists according to order and master data selection |
412 | No planning periods exist |
413 | No supply categories exist |
414 | No resources exist |
415 | No stock exists |
416 | Model &1 has no transportation lanes |
417 | Error occurred while resetting planning engine |
418 | Error occurred while uploading model data |
419 | Error occurred while uploading planning version data |
420 | ==> &1 Resources Read |
421 | Error occurred while reading the sources of supply (in-house production) |
422 | ==> &1 sources of supply read (in-house production) |
423 | No source of supply found for external procurement |
424 | ==> &1 sources of supply read (external procurement |
425 | Internal error occurred while generating operations |
426 | Internal error: Order &1 inconsistent |
427 | Pegging quantity of receipt &1 exceeds planning-relevant quantity by &2 |
428 | Pegging quantity of demand &1 exceeds planning-relevant quantity by &2 |
429 | ==> &1 Pegging lane created |
430 | ==> &1 Production orders created |
431 | ==> &1 Transport orders created |
432 | ==> &1 Purchase Requisition Created |
433 | Invalid selection period for capacity data |
434 | Error when reading current CTM profile |
435 | Internal error &1 when reading resource header data |
436 | ==> Available capacity read for &1 bucket resources |
437 | ==> Available capacity read for &1 time-continuous resources |
438 | ==> &1 demands were fulfilled completely and on time |
439 | ==> &1 demands were fulfilled completely, but late |
440 | ==> &1 demands only partially fulfilled, but on time |
441 | ==> &1 demands only partially fulfilled, and late |
442 | ==> &1 demands not fulfilled |
443 | ==> &1 FFF subsets read |
444 | Delivery date for demand &1 was postponed (airline reservation) |
445 | ==> &1 substitutions read |
446 | Fixed pegging between order &1 and order &2 was deleted |
447 | Order &1: Activity in liveCache was scheduled differently from CTM |
448 | Order &1: Processing times differ for activities in liveCache |
449 | Application logs of parallel CTM planning runs |
450 | Date was set to January 19, 2038 |
451 | ==> Forecast consumption was executed for &1 location products |
452 | ==> &1 Substitution orders created |
453 | CTM engine: Package no. &1 finished --- liveCache: Package no &2 finished |
454 | Error creating an order: Customizing could not be read |
455 | Explanations for CTM planning run |
456 | Result indicators for CTM planning run |
457 | ==> &1 Product/Location Combinations Read |
458 | Simulation: Pegging between Order &1 and Order &2 Would Be Deleted |
459 | Simulation: Order &1 Would Be Deleted |
460 | CTM results -> liveCache: Package number &1 |
461 | ==> &1 location(s) read |
462 | ==> &1 calendar(s) read |
463 | &1 substitution orders for stock transport orders omitted |
464 | Error occurred during supply distribution run &1 &2 &3 &4 |
466 | Inconsistent input data, table &1 (&2 &3 &4) |
467 | Inconsistent input data, table &1, product &2, location &3 |
468 | Error while writing back the results |
469 | Planning run was terminated |
470 | Low hard disk capacity on CTM engine &1 server, available: &2 MB |
471 | Trace file deactivated |
472 | Input data being written to file (&1) |
473 | Output data being written to file (&1) |
474 | |
475 | Product &1 at loc. &2 is not consistent with time-dep. LocProd hierarchy |
476 | |
477 | Internal error &1 when reading resource block header |
500 | *** CTM planning run messages (Engine) **************************** |
501 | Order number &1 (internal) is not in range [&2 .. &3] |
505 | Demand date &1 does not lie in the planning period |
508 | No entry components exist for in-house production source of supply &1 |
509 | No valid product/location data for demand &1 |
510 | Node &1 of the solution tree could not be assigned |
511 | Product &2, location &3 is not in master data selection |
512 | Source of supply &1 has no plan |
513 | Source of supply &1 has no planning activity |
514 | No mode for activity &1 of plan &2 |
515 | Resource &2 not in master data selection |
516 | No activity created for planned order &1 |
517 | Bucket factor for resource &1 is zero |
518 | Interface defines bucket parameters for non-bucket resource &2 |
519 | Start time of a bucket for resource &3 was adjusted |
520 | Resource &3 has bucket with length &4 |
521 | Minimum duration (&1) is too short (PPM &4; activity &2; mode &3) |
522 | Possible overflow (activity &1 in bucket resource &2, capacity &3) |
523 | Possible overflow (activity &1 in bucket resource &2) |
524 | Possible overflow (activity &1 in bucket resource &2) |
525 | Possible overflow (bucket resource &1, actual value &2) |
526 | Resource demand has not been maintained for primary resource &2 (mode &1) |
527 | Resource has not been maintained for primary resource &1 (mode &2) |
528 | Total (&1) incoming quota arrangements for loc. (&2) greater than 100% |
530 | Total (&1) incoming quota arrangements for loc. (&2) greater than 100% |
531 | Total (&1) incoming quota arrangements for loc. (&2) greater than 100% |
532 | Total (&1) incoming quota arrangements for loc. (&2) greater than 100% |
533 | Possible surplus (requirement quantity &1 is too large) |
534 | Resource &1 has buckets with invalid lengths |
535 | Resource &1 has buckets with length 0 |
536 | Specified time for scheduling demand &1 exceeded |
537 | Calendar &1 does not have validity intervals |
540 | Planning terminated due to inconsistent model |
541 | Product &1 in location &2 contained in a loop |
542 | Product &2 is not included in the master data selection |
570 | CTM engine cannot allocate any more memory, consumption (maximum): &1 MB |
571 | Internal error has occurred (&1 &2 &3 &4) |
572 | Internal error has occurred |
573 | CTM engine version: &1 |
574 | Selectcondition/Procedure ignored: &1 not supported. |
575 | Reference characteristic &1 &2 ignored; not supported |
576 | Mode &1 has a zero duration but consumes a resource &2. |
577 | Mode &1 uses resources which don't have the same bucket grid. |
578 | The plan &1 contains a non linear activity sequence. |
579 | Calendar of resource &1 does not allow the PPMs/PDSs &2 to be scheduled. |
600 | *** Demand Prioritization ********************************************** |
601 | Error occurred during demand prioritization; see log |
602 | Demand prioritization completed |
603 | Demand selection period is not in planning horizon |
604 | ==> &1 Demands Determined |
605 | Customizing: Key Figure Assignment not Unique |
606 | There are no substitutions because "Do not apply rules" is selected |
607 | ==> &1 rules were found |
608 | You can display the replacements for the last interval |
609 | Demand information is locked by another user |
700 | *** Supply Categorization ********************************************* |
701 | Error occurred during supply categorization; see log |
702 | Order &1 was deleted because it wasn't firmed |
703 | Product &1 does not exist |
704 | Location &1 does not exist |
705 | Error: Order &1 could not be deleted |
706 | Supply categorization completed |
707 | Supply category &1 does not exist |
708 | Enter a supply category |
709 | Product &1 does not exist in location &2 |
710 | Version &1 already exists |
711 | Version &1 does not exist |
712 | Enter a product |
713 | Enter a location |
714 | Specify an ID for the Supply Limits |
715 | Maintain the assignment of supply limits to supply categories |
716 | Assign supply limits to the supply categories |
717 | Category &1 is a predefined default category and cannot be used |
718 | Internal error occurred while calculating periods |
719 | Enter product, location and time period |
720 | The time period entered overlaps with an existing time period |
721 | Product &1 at location &2 has been selected |
722 | &1 Supply limits do not exist |
723 | ==> &1 Unfixed Orders Deleted |
724 | ==> &1 Fixed Pegging Lanes Deleted |
725 | Simulation: ==> &1 Unfixed Orders Would Be Deleted |
726 | Simulation: ==> &1 Fixed Pegging Lanes Would Be Deleted |
727 | ==> &1 Supplies Determined |
740 | Version &1 does not belong to model &2 |
741 | Versions of master data selection and CTM profile do not match: &1 and &2 |
777 | Available memory on optimization server is low (available: &1%) |
800 | *** Miscellaneous ************************************************ |
801 | CTM planning run completed |
802 | Connection to liveCache is not currently possible |
803 | Connection to CTM engine is not possible (RFC destination &1) |
804 | Error in server selection |
805 | CTM planning run is not yet completed |
806 | Status of CTM planning profile &1 was reset |
807 | RFC connection is not open |
808 | RFC connection not known |
809 | Error in server selection. All servers used |
810 | RFC connection for optimization server &1 not maintained in Customizing |
811 | Error occurred when releasing optimization server |
812 | Error occurred when processing the language-dependent descriptions |
813 | Error occured when setting up tree structure; function &1 |
814 | Error in CTM planning, see the log for details |
816 | Error occurred when setting up tree structure; method &1 |
817 | Internal error in method &1 |
818 | Select orders from liveCache |
819 | Order selection ended |
820 | No entry was determined for order &1 |
822 | Pegging area for product &1 in location &2 not found |
823 | Enter positive values only |
824 | RFC queue &1 is still reserved, see qRFC monitor (outbound queues) |
825 | Error when creating orders: Invalid queue name |
826 | Error when saving the simulation version |
827 | Error when opening a simulation version |
828 | COM error |
829 | Function terminated because of an error (-> Log) |
830 | CTM optimization server with ID &1 does not found or is not active |
831 | Enter an offset that is larger than zero |
832 | Specify the procurement type replaced and the new procurement type |
833 | Enter a rule |
834 | Rules are not supported for parallel CTM runs |
835 | Parallel processing profile &1 does not exist |
836 | Parallel processing not active for planning profile &1 |
837 | Parallel processing profile &1: Server group &2 does not exist |
838 | Planning explanation data cannot be saved due to maximum limit of 2GB |
840 | No messages for CTM profile &1 |
841 | No messages for &1 |
845 | Explanation profile does not exist |
850 | Task &1 +++ Start: &2 &3 |
851 | Task &1 +++ End: &2 &3 |
852 | Split model +++ Start: &1 &2 |
853 | Split model +++ End: &1 &2 |
854 | ==> &1 submodels generated |
855 | Task &1: &2&3 |
856 | Task &1: Error during CTM planning |
875 | Header PPM &1 has no sublevel PPM |
876 | Different unit of measures in header level PPM &1 and sublevel PPM &2 |
877 | PPM/PDS &1 for header product &2 is not assigned to PPM/PDS hierarchy |
878 | Production location is not the same as for header PPM/PDS &1 |
879 | No source of supply determined for sublevel product &1 at location &2 |
880 | Resource must be the same as for the header PPM/PDS &1 |
881 | Header PPM &1 and sublevel PPM &2 have different validities |
882 | Input component &1 is missing in the sub level PPM/PDS &2 |
883 | Material quantity of &1 is not consistent with header level PPM/PDS &3 |
884 | Input component &1 is a header product in sublevel PPM/PDS &2 |
899 | &1 &2 &3 &4 |