/SAPAPO/CURTO - CURTO: Production Data Structure Generated From R/3 Data
The following messages are stored in message class /SAPAPO/CURTO: CURTO: Production Data Structure Generated From R/3 Data.
It is part of development package /SAPAPO/CURTO in software component SCM-APO-INT-MD-PDS. This development package consists of objects that can be grouped under "Generate Production Data Structure from ERP Data".
It is part of development package /SAPAPO/CURTO in software component SCM-APO-INT-MD-PDS. This development package consists of objects that can be grouped under "Generate Production Data Structure from ERP Data".
Message Nr ▲ | Message Text |
---|---|
001 | Inconsistent call of modules/methods &1 |
002 | No usage found in production data structures (from R/3) |
003 | Planning version &1 does not exist |
004 | &1 is non-variable part |
005 | Activity &1 &2 &3 &4 does not exist |
006 | Location &1 does not exist |
007 | Incorrect assignment of object dependencies for component |
008 | Product &1 does not exist in location &2 |
009 | Error when accessing application log |
010 | Start loading PP/DS production data structure for product &1, location &2 |
011 | Error creating PP/DS production data structure |
012 | No source found for material &1, location &2 with name &3 |
013 | Component assignment &1 &2 &3 &4 does not exist |
014 | Error during component assignment &1 &2 &3 &4 |
015 | Error during component assignment for material &1 |
016 | A scrap factor larger than 100% is not allowed (operation &1) |
017 | Op. &1 activity &2: The successor of the activity is the activity itself |
018 | Variable bucket consumption: resource &1, operation &2, activity &3 < &4 |
019 | Variable cont. consumption: resource &1, operation &2, activity &3 < &4 |
020 | No bucket consumption for resource &1, operation &2, activity &3 |
021 | Variable duration and capacity reqmts: resource &1, operation &2, act. &3 |
022 | Component assignment &1 to dynamic setup activities &2 &3 not allowed |
023 | Operation &1, activity &2: Minimum interval > Maximum interval |
024 | Operation &1, activity &2: Invalid activity type |
025 | Invalid input/output indicator for material &1 |
026 | Invalid material consumption indicator for material &1 |
027 | Inconsistent validity interval for material &1 |
028 | Inconsistent validity interval for operation &1, activity &2 |
029 | The minimum lot size is larger than the maximum lot size |
030 | Explosion of master data view components |
031 | Explosion of master data view activities |
032 | Explosion of master data view modes |
033 | Explosion of components without configuration with date &1 |
034 | Explosion of components with configuration and date &1 |
035 | Explosion of components with date &1 |
036 | Explosion of activities without configuration with date &1 |
037 | Explosion of activities with configuration and date &1 |
038 | Explosion of activities with date &1 |
039 | Explosion of modes without configuration with date &1 |
040 | Explosion of modes with configuration and date &1 |
041 | Explosion of modes with date &1 |
042 | VC relevant components are not allowed in CDP BOMs |
043 | Error determining the class assignment for CDP product &1 |
044 | Interface implementation for class &1 is missing (component &2) |
045 | ABAP class &1 does not exist (component &2) |
046 | ABAP class &1 is inactive (component &2) |
047 | Error adding selection condition for PDS header |
048 | Warning when adding selection condition for PDS header |
049 | Cost function &1 not found |
050 | PP/DS PDS comparison function is valid of PI 2004_1_46B |
051 | No inconsistent data found |
052 | Background processing: Check the log in the application log |
053 | Log does not exist |
054 | The selected data has already been retransferred to SAP APO |
055 | Retransfer of PP/DS production data structure executed |
056 | Background processing: No inconsistent data found |
057 | Background processing: Executed without "automatic retransfer" |
058 | PP/DS PDS for product &1 location &2 prod. version &3 was retransferred |
059 | PP/DS PDS for product &1 location &2 prod. version &3 is inconsistent |
060 | PP/DS PDS for product &1 location &2 production version &3 &4 |
061 | Background processing: Executed with "automatic retransfer" |
062 | No comparison for product &1 location &2 production version &3 &4 |
063 | The log contains comparison information |
064 | Enter '&1' |
065 | An internal error occurred in the R/3 system: The transfer was terminated |
066 | No location product was found for the selection criteria |
067 | The PP/DS PDS &1 &2 &3 was not found |
068 | Component &1 is not CDP-relevant but has class for requirements |
069 | Product &1 is used as master output and dummy |
070 | No output components found |
071 | The output component has no variable consumption |
072 | Resource &1 is not SNP-relevant |
073 | Unit &1 of bucket consumption does not fit to dimensions of resource &2 |
074 | There are several modes for operation &1, activity &2 |
075 | Resource &1 is not assigned to model &2 |
076 | Material &1 is not SNP-relevant |
077 | Header material &1 is not SNP-relevant |
078 | Operation &1 activity &2 mode &3: Multiple calendar resources defined |
079 | Operation &1 activity &2: Multiple modes with identical primary resource |
080 | Operation &1 activity &2: No mode found |
081 | Recursion: Header material &1 is also a component |
082 | Operation &1 activity &2: Invalid mode linkage type |
083 | Operation &1 activity &2: Cover flag only valid within operation |
084 | Operation &1 activity &2: Dynamic setup as preceding activity |
085 | Operation &1 activity &2: Only End-Start Relationship valid in operation |
086 | Operation &1: Inconsistent primary resources or mode priorities |
087 | The name &1 for the source of supply is not valid |
088 | Operation &1: Mode coupling via primary resource is inconsistent |
089 | Operation &1: Mode coupling via mode number is inconsistent |
090 | Product &1 cannot be configured and does not have a configuration |
091 | No comparison for product &1 location &2 BOM Usage/Alt. &3 &4 |
092 | Only BOM PDS exist, comparison not possible for product &1 in location &2 |
093 | Product &1 is marked for deletion at location &2 |
094 | Scheduling agreement successfully sent. |
095 | Dead Lock occurred. Resend necessary. |
096 | Number range issue (/SAPAPO/SC) |
097 | No subcontractor found in PPDS. Please create. |
098 | Costing/Sch. Agr. details not sent for PDS. Please resend PDS. |
099 | Costing details sent successfully for subcontracting PDS |
100 | Error when creating model assignment (/SAPAPO/TRPMOD) |
101 | Error when writing header data for R/3 production data structure |
102 | Error when converting duration &1 &2 into seconds |
103 | Mode &1 &2 &3 is not assigned to an activity |
104 | No authorization to change &1 |
105 | No authorization to create &1 |
106 | No authorization to delete &1 |
108 | Costing Details Successfully deleted for PDS. |
109 | Scheduling Agreement Succfully deleted. |
110 | Costing/Sch. Agr. details not deleted for PDS. |
111 | Costing/Sch. Agr. deleted in PPDS. |
112 | No PDS found, comparison not possible for product &1 in location &2 |
200 | Account assignment object not found for sales order item &1 |
201 | Account assignment object for WBS element &1 not found |
300 | PDS &1: Generation suppressed in planning version &2. |
803 | Error during update of PP/DS production data structure to the liveCache |
804 | Error in dependency in PP/DS production data structure |
807 | Activity &1 for a sequence group does not exist |
808 | Activity &1 does not exist for a sequence |
809 | Product &1 does not exist |
810 | Resource &1 does not exist |
811 | Campaign-relevant resource &1 used in secondary resource |
812 | Bottleneck ressource &1 used in multiple superordinate operations |
813 | Product &1 Location &2 TRPROD entries are inconsistent |
814 | /SAPAPO/COMPALTZ entry missing for &1 &2 &3 &4 |
815 | Parallel and alternative sequences are not supported in SNP |
816 | Error during SNP registration |
817 | No single or multiple resources &1 can be used in SNP PDS |
818 | The relationships are inconsistent &1 &2 &3 |
819 | The planning file entry could not be set |
849 | Output quantity cannot be determined for Source of Supply &1 |
850 | Error transferring the PP/DS production data structure |
851 | Product &1 does not exist |
852 | Resource &1 does not exist |
853 | Several modes with the same number &4 at activity &1 &2 &3 |
854 | The PP/DS production data structure could not fill PPM &1 properly |
855 | Setup matrix &1 with key &2 from R/3 does not exist in SAP APO |
856 | Unit &1 not yet defined in SAP APO |
857 | Order quantity cannot be changed |
858 | No capacity requirement for scheduling-relevant resource (mode) |
859 | Inconsistent setup information at the primary resources of activity &1 |
860 | No activity matches explosion quantity (&1) or explosion date (&2) |