/SAPAPO/CURTO - CURTO: Production Data Structure Generated From R/3 Data
The following messages are stored in message class /SAPAPO/CURTO: CURTO: Production Data Structure Generated From R/3 Data.
It is part of development package /SAPAPO/CURTO in software component SCM-APO-INT-MD-PDS. This development package consists of objects that can be grouped under "Generate Production Data Structure from ERP Data".
It is part of development package /SAPAPO/CURTO in software component SCM-APO-INT-MD-PDS. This development package consists of objects that can be grouped under "Generate Production Data Structure from ERP Data".
Message Nr ▲ | Message Text |
|---|---|
| 001 | Inconsistent call of modules/methods &1 |
| 002 | No usage found in production data structures (from R/3) |
| 003 | Planning version &1 does not exist |
| 004 | &1 is non-variable part |
| 005 | Activity &1 &2 &3 &4 does not exist |
| 006 | Location &1 does not exist |
| 007 | Incorrect assignment of object dependencies for component |
| 008 | Product &1 does not exist in location &2 |
| 009 | Error when accessing application log |
| 010 | Start loading PP/DS production data structure for product &1, location &2 |
| 011 | Error creating PP/DS production data structure |
| 012 | No source found for material &1, location &2 with name &3 |
| 013 | Component assignment &1 &2 &3 &4 does not exist |
| 014 | Error during component assignment &1 &2 &3 &4 |
| 015 | Error during component assignment for material &1 |
| 016 | A scrap factor larger than 100% is not allowed (operation &1) |
| 017 | Op. &1 activity &2: The successor of the activity is the activity itself |
| 018 | Variable bucket consumption: resource &1, operation &2, activity &3 < &4 |
| 019 | Variable cont. consumption: resource &1, operation &2, activity &3 < &4 |
| 020 | No bucket consumption for resource &1, operation &2, activity &3 |
| 021 | Variable duration and capacity reqmts: resource &1, operation &2, act. &3 |
| 022 | Component assignment &1 to dynamic setup activities &2 &3 not allowed |
| 023 | Operation &1, activity &2: Minimum interval > Maximum interval |
| 024 | Operation &1, activity &2: Invalid activity type |
| 025 | Invalid input/output indicator for material &1 |
| 026 | Invalid material consumption indicator for material &1 |
| 027 | Inconsistent validity interval for material &1 |
| 028 | Inconsistent validity interval for operation &1, activity &2 |
| 029 | The minimum lot size is larger than the maximum lot size |
| 030 | Explosion of master data view components |
| 031 | Explosion of master data view activities |
| 032 | Explosion of master data view modes |
| 033 | Explosion of components without configuration with date &1 |
| 034 | Explosion of components with configuration and date &1 |
| 035 | Explosion of components with date &1 |
| 036 | Explosion of activities without configuration with date &1 |
| 037 | Explosion of activities with configuration and date &1 |
| 038 | Explosion of activities with date &1 |
| 039 | Explosion of modes without configuration with date &1 |
| 040 | Explosion of modes with configuration and date &1 |
| 041 | Explosion of modes with date &1 |
| 042 | VC relevant components are not allowed in CDP BOMs |
| 043 | Error determining the class assignment for CDP product &1 |
| 044 | Interface implementation for class &1 is missing (component &2) |
| 045 | ABAP class &1 does not exist (component &2) |
| 046 | ABAP class &1 is inactive (component &2) |
| 047 | Error adding selection condition for PDS header |
| 048 | Warning when adding selection condition for PDS header |
| 049 | Cost function &1 not found |
| 050 | PP/DS PDS comparison function is valid of PI 2004_1_46B |
| 051 | No inconsistent data found |
| 052 | Background processing: Check the log in the application log |
| 053 | Log does not exist |
| 054 | The selected data has already been retransferred to SAP APO |
| 055 | Retransfer of PP/DS production data structure executed |
| 056 | Background processing: No inconsistent data found |
| 057 | Background processing: Executed without "automatic retransfer" |
| 058 | PP/DS PDS for product &1 location &2 prod. version &3 was retransferred |
| 059 | PP/DS PDS for product &1 location &2 prod. version &3 is inconsistent |
| 060 | PP/DS PDS for product &1 location &2 production version &3 &4 |
| 061 | Background processing: Executed with "automatic retransfer" |
| 062 | No comparison for product &1 location &2 production version &3 &4 |
| 063 | The log contains comparison information |
| 064 | Enter '&1' |
| 065 | An internal error occurred in the R/3 system: The transfer was terminated |
| 066 | No location product was found for the selection criteria |
| 067 | The PP/DS PDS &1 &2 &3 was not found |
| 068 | Component &1 is not CDP-relevant but has class for requirements |
| 069 | Product &1 is used as master output and dummy |
| 070 | No output components found |
| 071 | The output component has no variable consumption |
| 072 | Resource &1 is not SNP-relevant |
| 073 | Unit &1 of bucket consumption does not fit to dimensions of resource &2 |
| 074 | There are several modes for operation &1, activity &2 |
| 075 | Resource &1 is not assigned to model &2 |
| 076 | Material &1 is not SNP-relevant |
| 077 | Header material &1 is not SNP-relevant |
| 078 | Operation &1 activity &2 mode &3: Multiple calendar resources defined |
| 079 | Operation &1 activity &2: Multiple modes with identical primary resource |
| 080 | Operation &1 activity &2: No mode found |
| 081 | Recursion: Header material &1 is also a component |
| 082 | Operation &1 activity &2: Invalid mode linkage type |
| 083 | Operation &1 activity &2: Cover flag only valid within operation |
| 084 | Operation &1 activity &2: Dynamic setup as preceding activity |
| 085 | Operation &1 activity &2: Only End-Start Relationship valid in operation |
| 086 | Operation &1: Inconsistent primary resources or mode priorities |
| 087 | The name &1 for the source of supply is not valid |
| 088 | Operation &1: Mode coupling via primary resource is inconsistent |
| 089 | Operation &1: Mode coupling via mode number is inconsistent |
| 090 | Product &1 cannot be configured and does not have a configuration |
| 091 | No comparison for product &1 location &2 BOM Usage/Alt. &3 &4 |
| 092 | Only BOM PDS exist, comparison not possible for product &1 in location &2 |
| 093 | Product &1 is marked for deletion at location &2 |
| 094 | Scheduling agreement successfully sent. |
| 095 | Dead Lock occurred. Resend necessary. |
| 096 | Number range issue (/SAPAPO/SC) |
| 097 | No subcontractor found in PPDS. Please create. |
| 098 | Costing/Sch. Agr. details not sent for PDS. Please resend PDS. |
| 099 | Costing details sent successfully for subcontracting PDS |
| 100 | Error when creating model assignment (/SAPAPO/TRPMOD) |
| 101 | Error when writing header data for R/3 production data structure |
| 102 | Error when converting duration &1 &2 into seconds |
| 103 | Mode &1 &2 &3 is not assigned to an activity |
| 104 | No authorization to change &1 |
| 105 | No authorization to create &1 |
| 106 | No authorization to delete &1 |
| 108 | Costing Details Successfully deleted for PDS. |
| 109 | Scheduling Agreement Succfully deleted. |
| 110 | Costing/Sch. Agr. details not deleted for PDS. |
| 111 | Costing/Sch. Agr. deleted in PPDS. |
| 112 | No PDS found, comparison not possible for product &1 in location &2 |
| 200 | Account assignment object not found for sales order item &1 |
| 201 | Account assignment object for WBS element &1 not found |
| 300 | PDS &1: Generation suppressed in planning version &2. |
| 803 | Error during update of PP/DS production data structure to the liveCache |
| 804 | Error in dependency in PP/DS production data structure |
| 807 | Activity &1 for a sequence group does not exist |
| 808 | Activity &1 does not exist for a sequence |
| 809 | Product &1 does not exist |
| 810 | Resource &1 does not exist |
| 811 | Campaign-relevant resource &1 used in secondary resource |
| 812 | Bottleneck ressource &1 used in multiple superordinate operations |
| 813 | Product &1 Location &2 TRPROD entries are inconsistent |
| 814 | /SAPAPO/COMPALTZ entry missing for &1 &2 &3 &4 |
| 815 | Parallel and alternative sequences are not supported in SNP |
| 816 | Error during SNP registration |
| 817 | No single or multiple resources &1 can be used in SNP PDS |
| 818 | The relationships are inconsistent &1 &2 &3 |
| 819 | The planning file entry could not be set |
| 849 | Output quantity cannot be determined for Source of Supply &1 |
| 850 | Error transferring the PP/DS production data structure |
| 851 | Product &1 does not exist |
| 852 | Resource &1 does not exist |
| 853 | Several modes with the same number &4 at activity &1 &2 &3 |
| 854 | The PP/DS production data structure could not fill PPM &1 properly |
| 855 | Setup matrix &1 with key &2 from R/3 does not exist in SAP APO |
| 856 | Unit &1 not yet defined in SAP APO |
| 857 | Order quantity cannot be changed |
| 858 | No capacity requirement for scheduling-relevant resource (mode) |
| 859 | Inconsistent setup information at the primary resources of activity &1 |
| 860 | No activity matches explosion quantity (&1) or explosion date (&2) |