/SAPAPO/CURTO - CURTO: Production Data Structure Generated From R/3 Data

The following messages are stored in message class /SAPAPO/CURTO: CURTO: Production Data Structure Generated From R/3 Data.
It is part of development package /SAPAPO/CURTO in software component SCM-APO-INT-MD-PDS. This development package consists of objects that can be grouped under "Generate Production Data Structure from ERP Data".
Message Nr
Message Text
001Inconsistent call of modules/methods &1
002No usage found in production data structures (from R/3)
003Planning version &1 does not exist
004&1 is non-variable part
005Activity &1 &2 &3 &4 does not exist
006Location &1 does not exist
007Incorrect assignment of object dependencies for component
008Product &1 does not exist in location &2
009Error when accessing application log
010Start loading PP/DS production data structure for product &1, location &2
011Error creating PP/DS production data structure
012No source found for material &1, location &2 with name &3
013Component assignment &1 &2 &3 &4 does not exist
014Error during component assignment &1 &2 &3 &4
015Error during component assignment for material &1
016A scrap factor larger than 100% is not allowed (operation &1)
017Op. &1 activity &2: The successor of the activity is the activity itself
018Variable bucket consumption: resource &1, operation &2, activity &3 < &4
019Variable cont. consumption: resource &1, operation &2, activity &3 < &4
020No bucket consumption for resource &1, operation &2, activity &3
021Variable duration and capacity reqmts: resource &1, operation &2, act. &3
022Component assignment &1 to dynamic setup activities &2 &3 not allowed
023Operation &1, activity &2: Minimum interval > Maximum interval
024Operation &1, activity &2: Invalid activity type
025Invalid input/output indicator for material &1
026Invalid material consumption indicator for material &1
027Inconsistent validity interval for material &1
028Inconsistent validity interval for operation &1, activity &2
029The minimum lot size is larger than the maximum lot size
030Explosion of master data view components
031Explosion of master data view activities
032Explosion of master data view modes
033Explosion of components without configuration with date &1
034Explosion of components with configuration and date &1
035Explosion of components with date &1
036Explosion of activities without configuration with date &1
037Explosion of activities with configuration and date &1
038Explosion of activities with date &1
039Explosion of modes without configuration with date &1
040Explosion of modes with configuration and date &1
041Explosion of modes with date &1
042VC relevant components are not allowed in CDP BOMs
043Error determining the class assignment for CDP product &1
044Interface implementation for class &1 is missing (component &2)
045ABAP class &1 does not exist (component &2)
046ABAP class &1 is inactive (component &2)
047Error adding selection condition for PDS header
048Warning when adding selection condition for PDS header
049Cost function &1 not found
050PP/DS PDS comparison function is valid of PI 2004_1_46B
051No inconsistent data found
052Background processing: Check the log in the application log
053Log does not exist
054The selected data has already been retransferred to SAP APO
055Retransfer of PP/DS production data structure executed
056Background processing: No inconsistent data found
057Background processing: Executed without "automatic retransfer"
058PP/DS PDS for product &1 location &2 prod. version &3 was retransferred
059PP/DS PDS for product &1 location &2 prod. version &3 is inconsistent
060PP/DS PDS for product &1 location &2 production version &3 &4
061Background processing: Executed with "automatic retransfer"
062No comparison for product &1 location &2 production version &3 &4
063The log contains comparison information
064Enter '&1'
065An internal error occurred in the R/3 system: The transfer was terminated
066No location product was found for the selection criteria
067The PP/DS PDS &1 &2 &3 was not found
068Component &1 is not CDP-relevant but has class for requirements
069Product &1 is used as master output and dummy
070No output components found
071The output component has no variable consumption
072Resource &1 is not SNP-relevant
073Unit &1 of bucket consumption does not fit to dimensions of resource &2
074There are several modes for operation &1, activity &2
075Resource &1 is not assigned to model &2
076Material &1 is not SNP-relevant
077Header material &1 is not SNP-relevant
078Operation &1 activity &2 mode &3: Multiple calendar resources defined
079Operation &1 activity &2: Multiple modes with identical primary resource
080Operation &1 activity &2: No mode found
081Recursion: Header material &1 is also a component
082Operation &1 activity &2: Invalid mode linkage type
083Operation &1 activity &2: Cover flag only valid within operation
084Operation &1 activity &2: Dynamic setup as preceding activity
085Operation &1 activity &2: Only End-Start Relationship valid in operation
086Operation &1: Inconsistent primary resources or mode priorities
087The name &1 for the source of supply is not valid
088Operation &1: Mode coupling via primary resource is inconsistent
089Operation &1: Mode coupling via mode number is inconsistent
090Product &1 cannot be configured and does not have a configuration
091No comparison for product &1 location &2 BOM Usage/Alt. &3 &4
092Only BOM PDS exist, comparison not possible for product &1 in location &2
093Product &1 is marked for deletion at location &2
094Scheduling agreement successfully sent.
095Dead Lock occurred. Resend necessary.
096Number range issue (/SAPAPO/SC)
097No subcontractor found in PPDS. Please create.
098Costing/Sch. Agr. details not sent for PDS. Please resend PDS.
099Costing details sent successfully for subcontracting PDS
100Error when creating model assignment (/SAPAPO/TRPMOD)
101Error when writing header data for R/3 production data structure
102Error when converting duration &1 &2 into seconds
103Mode &1 &2 &3 is not assigned to an activity
104No authorization to change &1
105No authorization to create &1
106No authorization to delete &1
108Costing Details Successfully deleted for PDS.
109Scheduling Agreement Succfully deleted.
110Costing/Sch. Agr. details not deleted for PDS.
111Costing/Sch. Agr. deleted in PPDS.
112No PDS found, comparison not possible for product &1 in location &2
200Account assignment object not found for sales order item &1
201Account assignment object for WBS element &1 not found
300PDS &1: Generation suppressed in planning version &2.
803Error during update of PP/DS production data structure to the liveCache
804Error in dependency in PP/DS production data structure
807Activity &1 for a sequence group does not exist
808Activity &1 does not exist for a sequence
809Product &1 does not exist
810Resource &1 does not exist
811Campaign-relevant resource &1 used in secondary resource
812Bottleneck ressource &1 used in multiple superordinate operations
813Product &1 Location &2 TRPROD entries are inconsistent
814/SAPAPO/COMPALTZ entry missing for &1 &2 &3 &4
815Parallel and alternative sequences are not supported in SNP
816Error during SNP registration
817No single or multiple resources &1 can be used in SNP PDS
818The relationships are inconsistent &1 &2 &3
819The planning file entry could not be set
849Output quantity cannot be determined for Source of Supply &1
850Error transferring the PP/DS production data structure
851Product &1 does not exist
852Resource &1 does not exist
853Several modes with the same number &4 at activity &1 &2 &3
854The PP/DS production data structure could not fill PPM &1 properly
855Setup matrix &1 with key &2 from R/3 does not exist in SAP APO
856Unit &1 not yet defined in SAP APO
857Order quantity cannot be changed
858No capacity requirement for scheduling-relevant resource (mode)
859Inconsistent setup information at the primary resources of activity &1
860No activity matches explosion quantity (&1) or explosion date (&2)
Privacy Policy