/SAPAPO/OO_TR - Messages in Development Class OO_TR

The following messages are stored in message class /SAPAPO/OO_TR: Messages in Development Class OO_TR.
It is part of development package /SAPAPO/OO_TR in software component SCM-BAS-MD-TL. This development package consists of objects that can be grouped under "Transportation Lanes".
Message Nr
Message Text
000&1 &2 &3 &4
040Define a business system group
041Location & is not assigned to the model
042Model &1 does not exist
043More than one model was specified
044More than one version was specified
045Version &1 does not belong to model &2
046Specify a location
047Specify a model
048The quota arrangement direction must have the value 1 or 2
049Define a product or a product-independent entry
050A product and a product-independent entry were defined
051Quota arrangement header to be deleted was not found
052Time-based validities overlap
053A quota arrangement header does not exist for the quota arrangement item
054Time-based validities must not have any gaps
055Specify a start date for product &1
056Specify an end date for product &1
057Specify a product or a means of transport
058Specify a start date for means of transport &1
059Specify an end date for means of transport &1
060For product &1, the start date is later than the end date
061For means of trsp &1, the start date is later than the end date
062Specify a planning level for means of transport &1
063Transport calendar &1 does not exist
064TLB profile &1 does not exist
065For product &1, no unit conversion factor between &2 and &3 is determined
066For product &1, the min. lot size is bigger than the max. lot size
067The transportation lane to be deleted was not found
068There is no transportation lane for the product entry
069There is no transportation lane for the means of transport entry
070There is no product entry for the prod.-specific means of transport
071There is no means of transport entry for the prod.-specific means of trsp
072There is no means of transport entry for the TSP / carrier
073The product entry to be deleted was not found
074The means of transport entry to be deleted was not found
075The product-specific means of trsp entry to be deleted was not found
076The transportation service provider entry to be deleted was not found
077Procurement is prod.-independent, means of transport is prod.-specific
078Validities for product &1 and means of transportation &2 do not overlap
079Product &1 cannot be both product-independent and product-specific
080Orders still exist for the transportation lane
081Orders still exist for the product
082Transportation lane is blocked
083User &1 is editing quota arrangements for location &2 in model &3
084User &1 is editing quota arrangements of model &2
085User &1 is editing quotas of selected locations in model &2
086User &1 is editing quotas of selected products in model &2
087Quota Arrangement is Blocked
088PPM &1 does not exist
089TLB profile &1 is not available
090Transportation lanes and PPMs converted successfully
091Conversion of transportation lanes has errors
092Conversion of quota arrangements has errors
093Conversion of means of transport has erreors
094Conversion of PPMs has errors
095Order guideline &1 is not available
100Product does not exist
101The end date must be after the start date
102Validity period already exists
103Select a means of transport
104Select a line
105There has to be at least one validity period
106User settings saved successfully
107Lot size profile &1 does not exist
108The last product assignment cannot be deleted
109Last means of transport cannot be deleted
110Resource &1 is not a transportation resource
111Resource &1 does not exist
112Enter a product
113Choose one entry from the table
114One or more entries are not created because of interval overlap
115Product in model is not assigned to both locations
116Enter a start date
117Enter an end date
118Enter a minimum lot size
119Enter maximum lot size
120Enter a transportation method
121The entry does not exist anymore and can therefore not be changed
122Deletion terminated
123External procurement relationship is not available
124Enter at least one planning level in means of transportation &1
125Enter a product procurement
126Enter a transportation method
127Procurement relationships can only be assigned product-specifically
128Assignment for external procurement relationship has been deleted
129Time frame outside of validity of external procurement relationship
130No external procurement relationship available
131Deletion not possible. Orders still exist
132Prod.-spec. MTr cannot be maintained during procurement f. all prod.
133No resource selected
134Enter a unit for the transportation costs
135Specify a unit for resource consumption
136Unit does not have the dimension 'distance'
137Location &1 does not exist
138Transportation service provider &1 does not exist
139Resource &1 is not a bucket or transportation resource
140Planning version does not exist
141Specify a transportation service provider
142Means of transport &1 does not exist
143Only one procurement form can be selected for product &1
144Choose a means of transport
145Choose at least one means of transport entry or product entry
146An external procurement relationship cannot be quoted for all products
147A production process model cannot be quoted for all products
148No entries exist. The transportation lane is deleted.
149The maximum lot size must be larger than the minimum lot size
150Start location for the template is not unique
151Target location for template is not unique
152Transportation lane as a template is not unique
153No start location for creation was found
154No target location was found for creation
155&1 transportation lanes were copied
156Start location of template does not exist
157Target location of template does not exist
158Transportation of template does not exist
159Specify a relevant version for the model
160Calculation of transportation duration/distances completed
161Unit conversion &4 not maintained for prod. &3 (&1/means of transport &2)
162Unit conversion for prod. &1 from &2 to &3 has not been maintained
163No inconsistencies were found
164Business shares of the TSP/carrier do not result in 100% or 0%
165Resource &1 is already allocated to mns of trspt &4 on trspttn lane &2-&3
166Res. &1 is assigned to different mns of trspt of the transportation lane
167Res. &1 is already allocated to means of transport &2
168No means of transport is specified
169No product procurement is specified
170Product &1 is not allocated to the model at both locations
171Product &1 is not assigned to the model at source location &2
172Product &1 is not assigned to the model at target location &2
173Transportation lane is not created since no entries exist
174Enter a value between 0 and 100 %
175Specify a unit for the minimum splitting quantity
176Max. no. of shipments must be larger than min. no. of shipments
177The form of extermal procurement relationship can not be changed
178Enter an RFQ process profile
179RFQ profile does not exist for outgoing requests
180Product &1 does not exist in both locations
181Product &1 does not exist in source location &2
182Product &1 does not exist in destination location &2
183Product &1 does not exist in the location &2
184Select at least one entry
185Specify a location
186Product &1 is not assigned to the model in location &2
187No RFQ profile is specified for product &1 in location &2
188RFQ profile &1 does not exist
189No products were found in the selected locations
190Location &1 is not included in the preselected locations
191Product &1 is not included in the preselected products
192Validity period does not overlap with the preselected period
193Product &1 in location &2 overlaps with another validity period
194Rounding value for means of transportation &1 must not be larger than 1
195The distance factor must be larger than or equal to 1
196One or more entries were not created as they already exist
197Transportation lane is not included in the preselected trsp. lane
198Transportation planner &1 does not exist
199Transport cost function &1 does not exist
200Data saved
201An error occurred during saving
202Transportation lane does not exist
203Transportation lane already exists
204Means of transport is not assigned to a transportation lane
205Product cost function &1 does not exist
206Specify a transport duration for means of transport &1
207Specify a transportation distance for means of transport &1
208Specify a unit in the transportation costs of means of transport &1
209Specify a unit for resource consumption
210Specify a unit for the split quantity
211Specify a valid value for requirements grouping of product &1
212Location &1 is not assigned to the model
213Quota arrangement items do not exist for quota arrangement header &1/&2
214Source of supply &1 is not assigned to the model
215The validity of product &1 is incorrect
216Indicator for the requirements split must have the value ' ' or 'X'
217The location of TSP / carrier &1 is not assigned to the model
218Cost function &1 is not assigned to procurement category external procmnt
219Cost function &1 is not from the transport category
220Heuristic &1 does not exist
221A unit is missing in the trspttn costs of TSP / carrier &1, MTr &2
222Validities of source of supply &1 and quota arr. header &2 do not overlap
223The validity of product &1 overlaps with a quota arrangement header
224The validity periods of product &1 overlap
225The validities of means of transportation &1 overlap
226The validities of quota arr. headers for product &1 contain gaps
227Heuristic &1 is not a product heuristic
228Source of supply does not exist
229There are no means of transport entries for means of transport &1
230There are no product entries for product &1
231Choose at least one quota arrangement header
232Location &1 is not a transportation service provider
233Period factor in means of transportation &1 must not be greater than 1
234If necessary, means of transport &1 &2 &3 deleted and recreated
235Means of transport &1 &2 &3 deleted
236If necessary, TSP / carrier &1 &2 &3 &4 deleted and recreated
237Transportation service provider &1 &2 &3 &4 deleted
238If nec., product ass. &3 to transport. lane &1 &2 deleted and recreated
239Product ass. &3 to transportation lane &1 &2 deleted
240Missing unit conversion for transportation costs (&1) and product &2
241Lane with same start and destination loc. only allowed for transp. zones
242Prohibition not possible. Orders still currently exist
243Resource &1 was not assigned to model &2
244Product entry was deleted automatically due to the transportation lane
245Means of transport deleted automatically due to transportation lane
246Prod.-spec. means of transport deleted automatically due to transp. lane
247Transp. service provider deleted automatically due to means of transp.
248Quota arrangement item deleted automatically due to quota arr. header
249A model, start location, or destination location was not specified
250Weight unit was not maintained
251Volume unit was not maintained
252Dimension unit was not maintained
253Maintained unit does not belong to dimension &1
254Relev. indicator (TSP / carrier sel.) must not be set for init. strategy
255Validity intervals for Product &1 in &2 -> &3 overlap
256Validity intervals for MOT &1 in &2 -> &3 overlap
257Validities of Prod.-spec.-MOT &1 / &2 in &3 -> &4 overlap
258Validities of Trp. Serv. Prov. &1 / &2 in &3 -> &4 overlap
259Validities of inbound quota arr. &1 / &2 overlap
260System error in program &1
261You are not authorized to use the selected function
262LiveCache error during check re dependent objects
263Location not found
264Location does not exist in model
265Internal error; incorrect reference to object type
266Validities of outbound quota arr. &1 / &2 overlap
270Planning period differs from existing transportation lane for MTr &
271No start location was found
272No destination location was found
273From value in the arrival window must be smaller than the to value
274From value in the departure window must be smaller than the to value
275Specify a transportation service provider
289The coordinates of location(s) &1, &2 are 0 , 0
290Modifications in MTr hierarchy would cause inconsistency at &1
291&1 does not have a valid superordinate means of transport
292Deletion would cause inconsistency at &1
293This report is obsolete, please use: &1 instead !
300The date you entered is in the past
301Product is not assigned to the location in the model
302End date must not be prior to start date
303The end date must not exceed the end date of the following entry
304Quota arrangement does not exist
305Quota arrangement already exists
306Specify a location
307Specify a source of supply for external procurement
308Specify a source of supply for in-house production
309The specified locations are not assigned to the model
310The specified partner location &1 cannot be quoted
311In-house production &1 does not exist
312In-house production &1 cannot be quoted
313No transportation lane was found
314No entry found for following object in header indicator table
315Transp. lane header not deleted autom. due to dependent quota arrangement
320Consistent data was saved
321Connection setup to the LiveCache has failed
322Mass selection does not contain any valid products
323Version-dep. product assignment &3/&4 created for transp. lane &1 &2
324Version-dep. product assignment &3/&4 for transp. lane &1 &2 deleted
350Specify a name for the means of transport
351You cannot have a passive means of transport (&1) with no capacity
352Specify the transportation mode for means of transport &1
353You cannot have a scheduled means of transport (&1) that is passive
354A multiresource must not be passive (&1)
355Specify a transportation mode for means of transport &1
356Invalid resource class chosen for MTr &1
357No. of Indiv. Resources &1 equates to set flag for Unlimited No. of Res.
358Another means of transport (&1) has already been selected as default
359The mode (&1) of the chosen means of transport does not fit
400No entry found in transportation indicator table for following objects
401Product &1 not found
402External procurement not found
403External procurement not found in database or in the tables
404Object points to superordinate object earmarked for deletion
405Transportation lane not found
406Sales contract not found
407Sales contract not found in the database or in the tables
408RFQ process not found in database or in the tables
409Location not found
410Model not found
411Transportation lane not found in the database or in the tables
412RFQ process not found
413Mapping entry not found for transportation lane &1 &2 - &3 &4
414Internal key: &1&2&3&4
415Product transportation lane not found in database or in the tables
416Means of transport not found
417Means of transport not found in the database or in the tables
418Resource &1 was not found
419Transportation service provider not found in database or in the tables
420Quota arrangement header was not found in the database or table
421Product means of transport not found in the database or in the tables
422Mapping entry not found for quota arrangement header
423Quota arrangement item was not found in the database or table
424Quota arrangement direction (in/outbound) not possible for current object
425iPPE not found in the database or the table
426PPM not found in the database or the table
427Quota arrangement header not found
428Incorrect validity ("validity from" is greater than "validity to")
429Validity is not for an exact day (time 00:00:00 - 23:59:59)
430Associated transportation lane does not exist
431Version-dep. product-spec. transp. lane was not found in the database
432Version-dependent means of transport was not found
450Object deleted because the superordinate object is earmarked for deletion
451Object deleted as the superordinate plan is earmarked for deletion
452Validity does not correspond exactly to intersection of TRPROD and TRM
453The validity chain of the quota arrangements has gaps
454Heuristic ID is not assigned or cannot be set for the product
455Quota arrangements still exist for the selected objects
456Independent quota arrangements still exist for the deleted products
457Process calendar &1 does not exist
458Copying is not possible; dependent orders or quota arrangmnts still exist
459Select a product or means of transport
460Select only one product or means of transport
461Transportation duration set to a maximum value of 399,999:59 hours
462Only a maximum transportation duration of 399,999:59 hours is allowed
463Max. transp. duration (399,999:56 hrs) exceeded for means of transp. &1
464Indep. quota arrangements still exist for the deleted means of transport
465No overlapping found btw. means of transp. &2 and quota argt for prod. &1
466Outgoing quota arrangement for means of transportation &2 not allowed
467Quota arrangement for means of transportation &2 not allowed for PPM (&1)
468All products entry is not marked as not being product-specific
469Max. manufacturing duration (399,999:59 hours) exceeded for product &1
470Transportation service provider was not found (see SAP Note 756871)
471Max. correction fixed period (9999 days) exceeded (transp. lane &1-&2)
472Max. planning horizon (9999 days) exceeded for product &1
473Period was set to maximum value of 9999 days
474Max. partner horizon (9999 days) exceeded for product &1
475Max. lead time push exceeded for means of transport &1 (<400.000 h)
476Max. lead time pull exceeded for means of transport &1 (<400.000 h)
477Max. calcul. proc. lead time (399,999:99 hours) exceeded for product &1
478Horizon was set to max. value of 9999 days
479Procurement lead time set to maximum value of 399,999:59 hours
480Only a maximum horizon of 399,999:59 hours is allowed
481A maximum procurement lead time of 399,999:59 hours is allowed
482Max. horizon for expected receipts (9999 days) exceeded for product &1
483Max. horizon for WH stock receipts (9999 days) exceeded for product &1
484You can only set the direct delivery indicator for product-spec. entries
485Product group entry is not marked as product-group-specific
486Product group type &1 is not relevant to transportation lanes
487Product group &1 is not maintained in product group type &2
488Specify a product group
489Distance/duration could not be calculated
490Stock transfer time pull is greater than procurement lead time pull - &1
491Stock transfer time push is greater than procurement lead time push -&1
492Combination of product group type (&1) and product group (&) not found
493Product group type &1 is not relevant to quota arrangement
494Product group &1 does not exist
500Only IGS precision can be assigned
510Speed profile cannot be switched off if it was switched on
511Speed profile prefix cannot be changed if it was set
512Prefix has to be fully filled if speed profile is used
513The prefix is not valid, because already used for Means of Transports
514The prefix &1 is not allowed, because it is used for Speed profiles
600Background processing could not be started
601Assign a job name
602The job start date was assigned incorrectly
603Data saved - job &1 started for calculation of distance and duration
604No data found for posting
605Distances and durations created successfully for all transportation lanes
606Distance and duration could not be determined for following transp. lanes
607Determination of distance and duration failed for following transp. lanes
608Error again for det. of distance and duration for following transp. lanes
609Transportation lane: Model &1, locations &2, means of transp. &3, user &4
610&1 durations and distances preselected successfully
611Also select using the model
612Also fill the start location
613Also fill the destination location
614Choose a user name for the start locations
615Choose a user name for the destination locations
616Report processing was terminated
617&1 records reorganized successfully
618Assign a job name
619Precision set successfully for &1 means of tranport
620Select a shipment category
621Select a hierarchy for the start location
622Select a hierarchy for the destination location
623Choose a selection using start and destination location
624Select a destination location directy, using hierarchy or using work area
625Select a start location directy, using hierarchy, or using work area
626The setting of precision for the means of transport was terminated
627Period factor set successfully for &1 PPMs
628The setting of the period factor for the PPM is terminated
629Period factor was set successfully for &1 means of transport
630Setting of period factor for means of transport is terminated
631The IGS or GIS tool is not currently available
632Select the start locations
633Select the destination locations
634Choose a selection
635Data saved - GIS tool not available, background job not started
636&1 product-specific sources of supply were converted successfully
637The conversion of product-specific sources of supply has been terminated
638&1 means of transport were converted successfully
639The conversion of means of transport has been terminated
640&1 transportation service providers were converted successfully
641The conversion of transportation service providers has been terminated
642&1 external procurements were converted successfully
643The conversion of external procurements has been terminated
644&1 sales scheduling agreements were converted successfully
645The conversion of sales scheduling agreements has been terminated
646&1 quota arrangement headers were converted successfully
647The conversion of quota arrangement headers has been terminated
648Conversion of product-specific sources of supply was started successfully
649Conversion of means of transport was started successfully
650Conversion of transportation service provider was started successfully
651Conversion of external procurements was started successfully
652Conversion of sales scheduling agreements was started successfully
653Conversion of quota arrangement headers was started successfully
654The UTC conversion of all affected master data was completed successfully
655The UTC conversion of all affected master data ended with errors
656Intra-zone lane/location transportation lane does not exist yet
657Location/zone exists already
658Calculated distance is too large for display
659Value is cleared, because checking is not possible.
660Shutdown profile (&1) does not exist.
661Time Zone of the Destination Location and Sync. Calendar aren't the same.
662Calendar (&1) does not exist.
663Save the changes before the consisteny check
800Error occurred when writing change documents for transportation lane
825Error when writing change documents for quota arrangement &1
826TSP / carrier &1 is still being used in shipment &2
827Location and Product specification is mandatory
828&1 Location Products selected. Continue with this selection?
898Transportation lane is blocked
899&1 transportation lanes were copied, some were excluded due to block
998Test
Privacy Policy